North Dakota Pipeline Authority Justin J. Kringstad May 17, 2013 - Bismarck, ND March 8, 2013 1

Upload: others

Post on 03-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: North Dakota Pipeline Authority Justin J. Kringstad

North Dakota Pipeline Authority Justin J. Kringstad

May 17, 2013 - Bismarck, ND

March 8, 2013 1

Page 2: North Dakota Pipeline Authority Justin J. Kringstad

May 16, 2013 – 193 Drilling Rigs

2 JJ Kringstad - North Dakota Pipeline Authority

Page 3: North Dakota Pipeline Authority Justin J. Kringstad

ND Drilling Stats

3 3 JJ Kringstad - North Dakota Pipeline Authority

Page 4: North Dakota Pipeline Authority Justin J. Kringstad

North Dakota Pipeline Miles

2,353 miles of new pipe in 2011

Roughly Distance from Seattle to Washington DC

2012 Data Available Q3 2013

4 4 JJ Kringstad - North Dakota Pipeline Authority

Page 5: North Dakota Pipeline Authority Justin J. Kringstad

Understanding production potential

Understanding current transportation dynamics and potential transportation constraints

Understanding current and future market conditions

5

Crude Oil

5 JJ Kringstad - North Dakota Pipeline Authority

Page 6: North Dakota Pipeline Authority Justin J. Kringstad

Understanding production potential

Understanding current transportation dynamics and potential transportation constraints

Understanding current and future market conditions

6

Crude Oil

6 JJ Kringstad - North Dakota Pipeline Authority

Page 7: North Dakota Pipeline Authority Justin J. Kringstad

Forecasting Williston Basin Oil Production, BOPD

Production forecast is for visual demonstration purposes only and should not be considered accurate for any near or long term planning.

Today

7 7 JJ Kringstad - North Dakota Pipeline Authority

Page 8: North Dakota Pipeline Authority Justin J. Kringstad

Crude Oil

Understanding production potential

Understanding current transportation dynamics and potential transportation constraints

Understanding current and future market conditions

8 8 JJ Kringstad - North Dakota Pipeline Authority

Page 9: North Dakota Pipeline Authority Justin J. Kringstad

Challenges* 1) Moving oil out of the

Williston Basin 2) Moving oil within the

Williston Basin

*Modified from Bridger and Belle Fourche Pipelines

2

1

9

North Dakota Crude Oil Pipelines

9 JJ Kringstad - North Dakota Pipeline Authority

Page 10: North Dakota Pipeline Authority Justin J. Kringstad

210,000 BOPD

68,000 BOPD

160,000 BOPD

145,000 BOPD

10

North Dakota Crude Oil Pipelines

10 JJ Kringstad - North Dakota Pipeline Authority

Page 11: North Dakota Pipeline Authority Justin J. Kringstad

Oil Loading Rail Facilities

11 JJ Kringstad - North Dakota Pipeline Authority

Page 12: North Dakota Pipeline Authority Justin J. Kringstad

Estimated ND Rail Export Volumes

12 JJ Kringstad - North Dakota Pipeline Authority 12

Page 13: North Dakota Pipeline Authority Justin J. Kringstad

March 2013

Estimated Williston Basin Oil Transportation

13

13 13 JJ Kringstad - North Dakota Pipeline Authority

Page 14: North Dakota Pipeline Authority Justin J. Kringstad

*Some data based on estimates or assumptions

14 14 14

US Williston Basin Oil Transport*

14 JJ Kringstad - North Dakota Pipeline Authority

Page 15: North Dakota Pipeline Authority Justin J. Kringstad

Williston Basin Oil Production & Export Capacity, BOPD

Production forecast is for visual demonstration purposes only and should not be considered accurate for any near or long term planning.

Today

15 15 JJ Kringstad - North Dakota Pipeline Authority

Page 16: North Dakota Pipeline Authority Justin J. Kringstad

Challenges* 1) Moving oil out of the

Williston Basin 2) Moving oil within the

Williston Basin

*Modified from Bridger and Belle Fourche Pipelines

2

1

16

North Dakota Crude Oil Pipelines

16 JJ Kringstad - North Dakota Pipeline Authority

Page 17: North Dakota Pipeline Authority Justin J. Kringstad

Red – Trucked Blue – Pipeline

Sep 2012 Estimates – Some data incomplete or unavailable

All ND Production

ND Crude Oil Gathering

17 17 JJ Kringstad - North Dakota Pipeline Authority

Page 18: North Dakota Pipeline Authority Justin J. Kringstad

Crude Oil

Understanding production potential

Understanding current transportation dynamics and potential transportation constraints

Understanding current and future market conditions

18 18 JJ Kringstad - North Dakota Pipeline Authority

Page 19: North Dakota Pipeline Authority Justin J. Kringstad

Cushing $93.20

Brent $102.36 WTI + $9.16

Crude Oil Prices – May 15, 2013

19 JJ Kringstad - North Dakota Pipeline Authority

Clearbrook* $89.95

WTI - $3.25 *Bloomberg

Brent $102.36 WTI + $9.16

Brent $102.36 WTI + $9.16

Page 20: North Dakota Pipeline Authority Justin J. Kringstad

20 20

Refiner Acquisition Cost of Crude

JJ Kringstad - North Dakota Pipeline Authority

Page 21: North Dakota Pipeline Authority Justin J. Kringstad

21

Major Pipelines and Refining Centers

21

$113.15

$106.64

$97.03

$86.94

$107.11

EIA Feb 2013 Refiner Acquisition Cost

JJ Kringstad - North Dakota Pipeline Authority

Page 22: North Dakota Pipeline Authority Justin J. Kringstad

22

Major Rail Lines and Refineries

22

$113.15

$106.64

$97.03

$86.94

$107.11

EIA Feb 2013 Refiner Acquisition Cost

JJ Kringstad - North Dakota Pipeline Authority

Page 23: North Dakota Pipeline Authority Justin J. Kringstad

23

US Shale Plays and Refineries

Source: EIA Data

23 JJ Kringstad - North Dakota Pipeline Authority

Page 24: North Dakota Pipeline Authority Justin J. Kringstad

Natural Gas

24

Page 25: North Dakota Pipeline Authority Justin J. Kringstad

1. Economics Must Work

2. Understanding Production Potential

3. New Gas Gathering Pipelines

4. Enhancing Existing Gathering Pipelines

5. Adequate Gas Processing Capacity

6. Adequate Interstate Pipeline Capacity

7. Flaring Alternatives (Short & Long Term)

25

Keys to Reducing Flaring

25 JJ Kringstad - North Dakota Pipeline Authority

Page 26: North Dakota Pipeline Authority Justin J. Kringstad

Raw Natural Gas

(1500+ BTU) Processing Plant

Consumer Quality Dry Natural Gas

Methane

($3.49 MMBTU)

NGL’S (8-12 gpm)

Y-Grade or Fractionated

Ethane

41.64%

Propane

28.33%

Butane

16.53%

Natural Gasoline

13.51%

26

*Using NGL breakdown from the July 2012 BENTEK Natural Gas Study

Rich Natural Gas

26 JJ Kringstad - North Dakota Pipeline Authority

Page 27: North Dakota Pipeline Authority Justin J. Kringstad

Forecasting Williston Basin Gas Production

Production forecast is for visual demonstration purposes only and should not be considered accurate for any near or long term planning.

Today

27 27 JJ Kringstad - North Dakota Pipeline Authority

Page 28: North Dakota Pipeline Authority Justin J. Kringstad

Simple Terms Red – Challenges on existing infrastructure Blue – Lack of pipelines

GREEN – % of gas captured and sold Red – % flared from wells with at least one mcf sold. Blue – % flared from zero sales wells

March 2013 Data – Non-Confidential Wells Statewide

Solving the Flaring Challenge

28 JJ Kringstad - North Dakota Pipeline Authority

Page 29: North Dakota Pipeline Authority Justin J. Kringstad

Capturing the 17% Faster Well Connections

First Time Gas Sales Per Month

29 29 JJ Kringstad - North Dakota Pipeline Authority

Page 30: North Dakota Pipeline Authority Justin J. Kringstad

30

ND Gas Gathering Statistics

30 JJ Kringstad - North Dakota Pipeline Authority

Page 31: North Dakota Pipeline Authority Justin J. Kringstad

Older, lower pressure wells connected to plant

New, high pressure well causes older wells to flare

Capturing the 11% Additional Compression

31 31 JJ Kringstad - North Dakota Pipeline Authority

Page 32: North Dakota Pipeline Authority Justin J. Kringstad

Capturing the 11% Looping Existing Pipelines

32 32 JJ Kringstad - North Dakota Pipeline Authority

Page 33: North Dakota Pipeline Authority Justin J. Kringstad

NGL buildup in gathering pipelines reduces area for gas to flow

Capturing the 11% Frequent Pigging

More of an issue in winter months due to lower ground temperature causing

more liquids to drop out

33 33 JJ Kringstad - North Dakota Pipeline Authority

Page 34: North Dakota Pipeline Authority Justin J. Kringstad

5 New or Expanding Gas Plants 2013-2015

(See Website for Details)

34

Natural Gas Processing & Transmission

34 JJ Kringstad - North Dakota Pipeline Authority

Page 35: North Dakota Pipeline Authority Justin J. Kringstad

35

ND Gas Plant Capacity

35 JJ Kringstad - North Dakota Pipeline Authority

Page 36: North Dakota Pipeline Authority Justin J. Kringstad

Assumptions

• No Flaring

• 8 Gal/MCF

• All liquids extracted

36

ND NGL Production Potential

36 JJ Kringstad - North Dakota Pipeline Authority

Page 37: North Dakota Pipeline Authority Justin J. Kringstad

NGL Pipeline Transportation

37 JJ Kringstad - North Dakota Pipeline Authority

Page 38: North Dakota Pipeline Authority Justin J. Kringstad

Justin J. Kringstad, Director North Dakota Pipeline Authority

600 E. Boulevard Ave. Dept. 405 Bismarck, ND 58505-0840

Phone: (701)220-6227

Fax: (701)328-2820 E-mail: [email protected]

Websites:

www.pipeline.nd.gov www.northdakotapipelines.com

38

Contact Information

38 JJ Kringstad - North Dakota Pipeline Authority