non-county maintained numbered public roads county commissioners work session november 18, 2015

12
Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015

Upload: gwendolyn-conley

Post on 06-Jan-2018

215 views

Category:

Documents


1 download

DESCRIPTION

Annual Maintenance Costs Paved Roads$15,900/mi Unpaved Roads$17,200/mi

TRANSCRIPT

Page 1: Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015

Non-County Maintained Numbered Public Roads

County Commissioners Work SessionNovember 18, 2015

Page 2: Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015

Follow Up to Work Session on Nov 2nd

• Numbered Non-County Maintained Roads• Additional Information About Use and Function– Traffic counts– Connectivity– Community Uses

Page 3: Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015

Annual Maintenance Costs

• Paved Roads $15,900/mi

• Unpaved Roads $17,200/mi

Page 4: Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015

What if the Road’s Not Currently Maintainable?

Rehabilitate Unpaved Gravel Road• $50k to $400k per mile

Rehabilitate or Reconstruct a Paved Road• $150k to $800k per mile

Page 5: Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015

Non-County Maintained Numbered RoadsNon-County Maintained

RoadFrom To Length

(mi)

6 Begin Public ROW CR 23E 0.99

9RR Tracks on Rawhide Property

J Bar Ranch Rd (private rd) 2.31

18 Golden Valley DrBegin Pavement/ Maintenance

0.36

23E CR 6 CR 8E 1.50

23E CR 20 (W 1st St) Sacajawea Way 0.46

31 Begin at county line

Begin Maintenance 2.91

36 Begin at Poudre River CR 3F 0.29

37E end of Maintenance

End of Public Road 0.50

42 CR 5 (Main St) End of Public Road 0.40

54 End of Maintenance

Blossum House Ln 0.16

60 Savvy PlaceBegin Maintenance on CR 60

0.26

82E CR 67J County maint 3.23

Page 6: Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015

Non-County Maintained Numbered RoadsNon-County Maintained

RoadFrom To Length

(mi) ADT

6 Begin Public ROW CR 23E 0.99 25

9RR Tracks on Rawhide Property

J Bar Ranch Rd (private rd) 2.31 No Count

18 Golden Valley DrBegin Pavement/ Maintenance

0.36 235

23E CR 6 CR 8E 1.50 35

23E CR 20 (W 1st St) Sacajawea Way 0.46 175

31 Begin at county line

Begin Maintenance 2.91 45

36 Begin at Poudre River CR 3F 0.29 5

37E end of Maintenance

End of Public Road 0.50 145

42 CR 5 (Main St) End of Public Road 0.40 25

54 End of Maintenance

Blossum House Ln 0.16 No Count

60 Savvy PlaceBegin Maintenance on CR 60

0.26 45

82E CR 67J County maint 3.23 20*

Page 7: Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015

Functional Differences?• Connector Roads – collect traffic from and

distribute traffic to local streets within neighborhoods or industrial districts

• Community Use Roads - serve area residents and help the general public reach community destinations like places of worship, schools, parks and trailheads

Page 8: Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015

Non-County Maintained Numbered RoadsNon-County Maintained

RoadFrom To Length

(mi) ADT Connectivity Community Use

6 Begin Public ROW CR 23E 0.99 25

9RR Tracks on Rawhide Property

J Bar Ranch Rd (private rd) 2.31 No Count

18 Golden Valley DrBegin Pavement/ Maintenance

0.36 235

23E CR 6 CR 8E 1.50 35

23E CR 20 (W 1st St) Sacajawea Way 0.46 175

31 Begin at county line

Begin Maintenance 2.91 45

36 Begin at Poudre River CR 3F 0.29 5

37E end of Maintenance

End of Public Road 0.50 145

42 CR 5 (Main St) End of Public Road 0.40 25

54 End of Maintenance

Blossum House Ln 0.16 No Count

60 Savvy PlaceBegin Maintenance on CR 60

0.26 45

82E CR 67J County maint 3.23 20*

Page 9: Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015

Non-County Maintained Numbered RoadsNon-County Maintained

RoadFrom To Length

(mi) ADT Connectivity Community Use

6 Begin Public ROW CR 23E 0.99 25

9RR Tracks on Rawhide Property

J Bar Ranch Rd (private rd) 2.31 No Count

18 Golden Valley DrBegin Pavement/ Maintenance

0.36 235

23E CR 6 CR 8E 1.50 35 X

23E CR 20 (W 1st St) Sacajawea Way 0.46 175

31 Begin at county line

Begin Maintenance 2.91 45

36 Begin at Poudre River CR 3F 0.29 5

37E end of Maintenance

End of Public Road 0.50 145

42 CR 5 (Main St) End of Public Road 0.40 25

54 End of Maintenance

Blossum House Ln 0.16 No Count

60 Savvy PlaceBegin Maintenance on CR 60

0.26 45

82E CR 67J County maint 3.23 20* X X

Page 10: Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015

Non-County Maintained Numbered RoadsNon-County Maintained

RoadFrom To Length

(mi) ADT Connectivity Community Use

Estimated Cost to Improve

Estimated Cost to Maintain/yr

6 Begin Public ROW CR 23E 0.99 25

9RR Tracks on Rawhide Property

J Bar Ranch Rd (private rd) 2.31 No Count

18 Golden Valley DrBegin Pavement/ Maintenance

0.36 235

23E CR 6 CR 8E 1.50 35 X $600,000 $25,800

23E CR 20 (W 1st St) Sacajawea Way 0.46 175

31 Begin at county line

Begin Maintenance 2.91 45

36 Begin at Poudre River CR 3F 0.29 5

37E end of Maintenance

End of Public Road 0.50 145

42 CR 5 (Main St) End of Public Road 0.40 25

54 End of Maintenance

Blossum House Ln 0.16 No Count

60 Savvy PlaceBegin Maintenance on CR 60

0.26 45

82E CR 67J County maint 3.23 20* X X $1,292,000 $55,556

Page 11: Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015

Non-County Maintained Numbered RoadsNon-County Maintained

RoadFrom To Length

(mi) ADT Connectivity Community Use

Estimated Cost to Improve

Estimated Cost to Maintain/yr

6 Begin Public ROW CR 23E 0.99 25

9RR Tracks on Rawhide Property

J Bar Ranch Rd (private rd) 2.31 No Count

18 Golden Valley DrBegin Pavement/ Maintenance

0.36 235

23E CR 6 CR 8E 1.50 35 X $600,000 $25,800

23E CR 20 (W 1st St) Sacajawea Way 0.46 175

31 Begin at county line

Begin Maintenance 2.91 45

36 Begin at Poudre River CR 3F 0.29 5

37E end of Maintenance

End of Public Road 0.50 145

42 CR 5 (Main St) End of Public Road 0.40 25

54 End of Maintenance

Blossum House Ln 0.16 No Count

60 Savvy PlaceBegin Maintenance on CR 60

0.26 45

82E CR 67J County maint 3.23 20* X X $1,292,000 $55,556

Page 12: Non-County Maintained Numbered Public Roads County Commissioners Work Session November 18, 2015

Questions/Comments