NOAA NOAA s Ship and Aircraft Support s Ship and Aircraft Support Office of Marine and Aviation Operations (OMAO) Office of Marine and Aviation Operations (OMAO) University-National Oceanographic Laboratory System (UNOLS) Joint Fleet Improvement Committee (FIC)/Council Meeting University of Southern Mississippi March 30, 2010

Upload: others

Post on 25-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

NOAANOAA’’s Ship and Aircraft Supports Ship and Aircraft SupportOffice of Marine and Aviation Operations (OMAO)Office of Marine and Aviation Operations (OMAO)

University-National Oceanographic Laboratory System (UNOLS)Joint Fleet Improvement Committee (FIC)/Council MeetingUniversity of Southern Mississippi March 30, 2010

Page 2: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

Overview

_ _____ __ _____ ___ _______ _________ NOAA’s Office of Marine and Aviation Operations (OMAO) 22

Fleet OverviewBudget ‐ FY2010 and FY2011 (requested)ARRA Funding StatusShip and Aircraft Acquisition UpdatesNOAA Ship Recapitalization PlanPacific Vessel Homeporting: Newport, Oregon

Page 3: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

PASCAGOULA(3)

MOC-ATLANTIC NORFOLK, VA

(1)

CHARLESTON (2)

DELAWARE II

OREGON II

GORDON GUNTERNANCY FOSTERRONALD H. BROWN

KODIAK , AK (1)

Nautical Charting

Fisheries Research

Oceanographic ResearchCoastal Monitoring Ocean Exploration

MISSIONS

KA’IMIMOANA

OSCAR ELTON SETTE

HI’IALAKAI

RAINIER

McARTHUR II

FAIRWEATHER

OSCAR DYSON

PEARL HARBOR (3)

THOMAS JEFFERSON

PISCES

MILLER FREEMAN

20 Ships11 Homeports

KETCHIKAN , AK (1)

NOAA Ships and Homeports in FY2010

MOC-PACIFICSEATTLE, WA

(4)

3NOAA’s Office of Marine and Aviation Operations (OMAO) 33

DAVID STARR JORDAN OKEANOS EXPLORER

FERDINAND R. HASSLER

HENRY B. BIGELOW

SAN DIEGO(1)

BELL M. SHIMADA

Page 4: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

Minneapolis(2)

AOC Tampa, FL(8)

MISSIONSCharting and Mapping

Fisheries Research

Hurricane Research

Environmental Assessment

MISSIONSCharting and Mapping

Fisheries Research

Hurricane Research

Environmental Assessment

SHRIKE COMMANDER

12 Aircraft

Monterey, CA (1)

TWIN OTTER (1)

NOAA Aircraft and Bases in FY2010

4NOAA’s Office of Marine and Aviation Operations (OMAO)

P-3 (3) SHRIKE COMMANDER

KING AIR 350ER

GULFSTREAM IV TWIN OTTER (3)

JET PROP COMMANDER

Manassas, VA(1)

Page 5: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

NOAA OMAO Budget

_ _____ __ _____ ___ _______ _________ NOAA’s Office of Marine and Aviation Operations (OMAO) 55

($ in Millons) *President’s Budget Request

Page 6: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

Status of ARRA Funding

_ _____ __ _____ ___ _______ _________ NOAA’s Office of Marine and Aviation Operations (OMAO) 66

Stimulus Package – American Recovery and Reinvestment Act (ARRA)

o Vessel Maintenance and Repair ($20M)Major Repair Period (MRP) for Rainier ($5.78M, $6.1M PAC)Major Repair Period (MRP) for Oregon II ($4M)Drydock repair for five other vessels 

o Vessel Construction ($78M)Construction of FSV 6, fifth vessel in the Dyson Class

Page 7: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

Operating Days

_ _____ __ _____ ___ _______ _________ NOAA’s Office of Marine and Aviation Operations (OMAO) 77

*Projected

Page 8: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

Ship Acquisition: 1

_ _____ __ _____ ___ _______ _________ NOAA’s Office of Marine and Aviation Operations (OMAO) 88

Pisces:Acoustic problems addressed, and new acoustic trials will be conducted in April 2010 at USN’s AUTEC Range in the Bahamas.Preliminary delivery in June 2009.Final acceptance scheduled for May 2010.

Pisces

Bell M. Shimada

Bell M. Shimada:Construction issues contributed to lengthy delays in delivery.Acoustic problems addressed, and new acoustic trials will be conducted in April 2010 at USN’s AUTEC Range in the Bahamas.Preliminary delivery in January 2010.Final acceptance scheduled for December 2010.

Page 9: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

Ship Acquisition: 2

_ _____ __ _____ ___ _______ _________ NOAA’s Office of Marine and Aviation Operations (OMAO) 99

Ferdinand R. Hassler:Ongoing construction issues have contributed to lengthy delays  in delivery.NOAA continues to work with primary contractor to expedite delivery. 

Ferdinand R. Hassler being lifted into the water

Page 10: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

Aircraft Acquisition/Upgrades

_ _____ __ _____ ___ _______ _________ NOAA’s Office of Marine and Aviation Operations (OMAO) 1010

WP-3D Aircraft

WP-3D Aircraft:Service Live Assessment Program funded for all three P‐3 aircraft in FY2010.Took delivery of an additional P‐3 in FY2010

Performing upgradesWill be used for air chemistry projects.

King Air

NOAA King Air Aircraft:Final acceptance : May 2009Shakedown flights starting in August 2009Now operationalUtilized for imagery acquisition in Haiti disaster response

Page 11: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

NOAA Ship Recapitalization Plan

_ _____ __ _____ ___ _______ _________ NOAA’s Office of Marine and Aviation Operations (OMAO) 1111

Page 12: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

Fleet Recapitalization 1:Fishery Survey Vessels

Two (i.e., Oscar Dyson and Henry B. Bigelow) of seven planned acoustically‐quiet Fisheries Survey Vessels (FSVs) are currently conducting operations.Two more FSVs (i.e., Pisces and Bell M. Shimada) expected to be fully operational in FY2010.$3M included in FY2011 President’s Budget to continue design work for FSV 5.FSV 6 contract award is scheduled for April 2010.

Ship Homeport Commissioning Date

Oscar Dyson (FSV 1) Kodiak, AK 2005

Henry Bigelow (FSV 2) Newport, RI 2007

Pisces (FSV 3) Pascagoula, MS 2009

Bell M. Shimada(FSV 4)

Seattle, WANewport, OR

2010

FSV 5 (shallow draft) Pascagoula, MS 2015

FSV 6 San Diego, CA 2013

FSV 7 Newport, OR 2018

12

Page 13: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

Fleet Recapitalization 2:NOAA Survey Vessels (NSVs)

Six additional multi‐mission NOAA Survey Vessels (NSVs) are planned to be placed in service between 2018 and 2024:

o NSVs will replace:Two hydrographic survey vessels  Four fisheries/ecosystem research vessels

o NSV mission requirements are currently being analyzed.  They are projected to have a common baseline configuration, with minor variations to support specific missions (e.g. hydrographic survey or fisheries/ecosystem research).

One currently active ship (Ka'imimoana) will undergo a service‐life extension (approx. 2020).  Ship maintains buoy arrays used to understand climate change and El Nino‐Southern Oscillation events. Phase II Recapitalization Plan being drafted to:

look at innovative, cost effective ways to collect in situ dataconsider new concepts of operations which incorporate new technology, i.e., autonomous platforms (airborne, surface, underwater, etc.)

13

Page 14: NOAA’s Ship and Aircraft Support · University of Southern Mississippi March 30, 2010. Overview ... PASCAGOULA (3) MOC-ATLANTIC NORFOLK, VA (1) CHARLESTON (2) DELAWARE II OREGON

NOAA Vessel Homeporting:Newport, Oregon

_ _____ __ _____ ___ _______ _________ NOAA’s Office of Marine and Aviation Operations (OMAO) 1414

Status:The lease for Marine Operations Center‐Pacific (MOC‐P) in Lake Union, WA expires in June, 2011.  NOAA followed a competitive solicitation process in Washington and Oregon to award a new lease. On August 7, 2009 NOAA signed a 20‐year  lease with the Port of Newport, Oregon.NOAA is currently conducting an internal assessment of flood‐plain issues at the request of the Government Accountability Office (GAO), to be completed at the end of May 2010.