NN Europe July, 2004 Plant Veenendaal – 5 given Total June 04 YTD B P '04 l Quality (NC C +NPC *+DE R ) 53 36 9 6 NCC 53 36 NPC mfg resp. 0 0 DER 0 0 l On time deliveries (%) 91.8 98.0 l Manufacturing Cost (€ /kg) 5.70 5.57 l S ales (T€) 24,897 23,452 l Income from operations (T €) 1262 1052 (% on sales) 5.1% 4.5% l Net Income (T€) 521 363 (% on sales) 2.09% 1.55%

Upload: daniela-rowden

Post on 31-Mar-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – 5 given Total

June 04 YTD BP '04

l Quality (NCC+NPC*+DER) 53 369 6

NCC 53 36

NPC mfg resp. 0 0

DER 0 0

l On time deliveries (%) 91.8 98.0

l Manufacturing Cost (€ /kg) 5.70 5.57

l Sales (T€) 24,897 23,452

l Income from operations (T €) 1262 1052

(% on sales) 5.1% 4.5%

l Net Income (T€) 521 363

(% on sales) 2.09% 1.55%

Page 2: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – 5 given Rollers

June 04 YTD BP '04

l Quality (NCC+NPC*+DER) 38 296 5

NCC 38 29

NPC mfg resp. 0 0

DER 0 0

l On time deliveries (%) 90.4 98.0

l Manufacturing Cost (€ /kg) 5.12 4.91

l Sales (T€) 17,757 17,086

l Income from operations (T €) 172 199

(% on sales) 1.0% 1.2%

l Net Income (T€) -112 -85

(% on sales) -0.63% -0.50%

Page 3: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – 5 given Cages

June 04 YTD BP '04

l Quality (NCC+NPC*+DER) 15 82 1

NCC 20 10

NPC mfg resp. 0 0

DER 0 0

l On time deliveries (%) 93.6 98.0

l Manufacturing Cost (€ /kg) 9.28 9.75

l Sales (T€) 7,140 6,367

l Income from operations (T €) 1090 853

(% on sales) 15.3% 13.4%

l Net Income (T€) 633 448

(% on sales) 8.87% 7.04%

Page 4: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Sales Total

Sales total year total year

Actual Actual Price BP 2004 Act -/- BP FCST Q3-Q4 BP 2004 June YTD

C u s t o m e r in T€ in tons per kg in T€ in T€ in T€ in T€ + FCST

Germany 14,231 2,526.3 5.633 14,949 -718 13,310 28,260 27,679Spain 3,236 448.2 7.220 2,319 916 2,942 4,772 6,177France 277 67.8 4.089 207 71 223 430 430Argentina 28 6.8 4.164 13 15 13 25 25Malaysia 649 15.1 42.945 539 110 610 1,119 1,148China 191 24.5 7.800 217 -26 217 433 434India 39 6.6 5.961 18 21 18 36 57Ukrain 23 3.1 7.622 12 12 12 23 35Various 4 0.1 41.347 12 -8 12 25 17

USA 677 152.3 4.444 883 -206 881 1,763 1,522Brazil 450 49.9 9.007 339 111 373 679 725Mexico 1,249 196.6 6.350 672 576 768 1,383 1,872Total USD cust. 2,375 398.9 5.955 1,894 481 2,021 3,826 4,119

UK 2,658 74.5 35.687 2,242 416 2,438 4,566 4,691

Poland 995 241.3 4.122 883 112 852 1,735 1,791SNR 27 4.7 5.693 0 27 30 0 57

Currency Compens. 163 0.0 148 15 152 300 314

Total Sales NNN 24,897 3,817.7 6.521 23,452 1,444 22,850 45,550 46,973

YTD J u n e 2 0 0 4

Page 5: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Sales Rollers

Sales total year total year

Actual Actual Price BP 2004 Act -/- BP FCST Q3-Q4 BP 2004 June YTDC u s t o m e r in T€ in tons per kg in T€ in T€ in T€ in T€ + FCST

Germany 11,703 2,239.6 5.226 12,284 -581 10,945 23,229 22,648Spain 3,229 447.6 7.215 2,314 915 2,937 4,761 6,166France 0 0 0Argentina 0 0 0Malaysia 0 0 0China 169 22.2 7.587 168 0 168 337 337India 39 6.6 5.961 18 21 18 36 57Ukrain 23 3.1 7.622 12 12 12 23 35Various 4 0.1 41.347 12 -8 12 25 17

USA 633 151.2 4.186 874 -241 872 1,746 1,504Brazil 24 6.9 3.454 10 13 10 21 34Mexico 920 162.8 5.654 489 432 558 1,006 1,479Total USD cust. 1,577 320.9 4.915 1,373 204 1,440 2,772 3,017

UK 57 12.1 4.768 47 11 48 95 106

Poland 858 216.2 3.970 802 56 774 1,576 1,632SNR 27 4.7 5.693 0 27 30 57Currency Compens. 70 55 14 56 112 126

Total Sales Rollers 17,757 3,272.9 5.425 17,086 671 16,441 32,965 34,197

YTD J u n e 2 0 0 4

Page 6: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Sales Cages

Sales total year total year

Actual Actual Price BP 2004 Act -/- BP FCST Q3-Q4 BP 2004 June YTDC u s t o m e r in T€ in tons per kg in T€ in T€ in T€ in T€ + FCST

Germany 2,528 286.7 8.817 2,665 -137 2,366 5,031 5,031Spain 6 0.6 10.690 5 1 6 11 11France 277 67.8 4.089 207 71 223 430 430Argentina 28 6.8 4.164 13 15 13 25 25Malaysia 649 15.1 42.945 539 110 610 1,119 1,148China 22 2.2 9.936 48 -26 48 96 96India 0 0 0Ukrain 0 0 0Various 0 0 0

USA 44 1.1 38.485 9 35 9 18 18Brazil 426 43.1 9.895 329 97 363 658 691Mexico 328 33.8 9.700 183 145 210 377 393Total USD cust. 798 78.0 10.231 521 277 581 1,054 1,102

UK 2,601 62.4 41.655 2,195 405 2,390 4,471 4,585

Poland 136 25.1 5.434 81 56 78 159 159SNR 0 0 0Currency Compens. 94 93 1 96 188 188

Total Sales Cages 7,140 544.8 13.106 6,367 773 6,409 12,585 12,776

YTD J u n e 2 0 0 4

Page 7: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Situation Organization

• All personnel is informed about the targets of the new organisation and the task to close the office building by the end of 2004.

• Unions and Works council are informed and understand the necessity of the total change to safeguard our activity in the future.

• We have informed all people concerned regarding their new workplace and position in the new organisation.

• In the new situation the number of single offices will be reduced from 22 to 12.Building adaptations are in progress

• Last week we started discussions with the owner concerning the adaptations of building 30, which is foreseen for overall company activities

• Number of workplaces in the main office reduced from 42 (2003) to actual 31.

Plant Veenendaal – Orgaization

Page 8: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Personnel

Number of People TOTAL

340

350

360

370

380

390

400

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

Actual Forecast BP

2003 2004

Page 9: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Personnel

Number of People BLUE COLLARS

320

325

330

335

340

345

350

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

Actual Forecast BP

2003 2004

Page 10: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Personnel

Number of People WHITE COLLARS

40

42

44

46

48

50

52

54

56

1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

Actual Forecast BP

2003 2004

Page 11: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Personnel

Absentiism

0

2

4

6

8

10

12

Jan Febr March April May June July Aug Sept Oct Nov Dec

Blue Collars White Collars Total

Page 12: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – IT Expenses

Overview IT Expenses 2002 - 2005

0

200

400

600

800

1000

1200

1400

1600

2002 2003 2004 2005

€ '000

Page 13: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Material Rollers

Wire rod consumption

0

1000

2000

3000

4000

5000

6000

01 02 03 04 05 06 07 08 09 10 11 12

x 1

00

0 K

g

Month YtD target pred.

Page 14: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

ACTION PLAN

Wire drawing main activitiesLast update: 2004-07-05

Actions: Resp. Q3 Q4 1 2 3 4 5 6 7 8 9 10 11 12 1 2

Installation wiredrawer from Pinerolo on 81RH-3, CvO Dfor first testsInstallation wiredrawers on 61RH-1, 61RH-2, 81RH-1, CvO81RH-2, 101RH-1, 101RH-2 Installation wiredrawers on CH2KR-3 and CH2KR-9 CvO

Installation wiredrawer at CH4KR-4 CvO

Installation wiredrawers at CH2KR-4,5,6,7 CvO

Installation wiredrawer at CH4KR-1,2,3 CvO

Define drawingsystem for DPR16 CvO

PlannedOngoingDelayedDone

2005

Done

DONE

Done

2003 2004

Done

Plant Veenendaal – Wiredrawers

Page 15: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

ACTION PLAN

Channel implementation rollersLast update: 2004-07-05

Actions: Resp. 1 2 3 4 5 6 7 8 9 10 11 12 1 2

First information to works council JvV/HW

Listing of machine consequences (hardware) HW

Start with first channelgroup as pilot (A or B) CvO(personnel, machine, types dedicated)Official plan to works council JvV/HW

Rest of channels implemented (software) HW

Start with movement of machinery HW

PlannedOngoingDelayedDone

2005

DONE

2004

Plant Veenendaal – Channels

Page 16: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Internal transport

Cost reduction internal transport

Target: New lease contract - 20%

Starting point: In "old" situation transport splitted over various departments.

20% less cost less trucksless truckdrivers

NNN Changes: lean manufacturing

1st organisational change roller/smp plant

Result: contract - 28%

2 truckdrivers less

resposibility into plants

Page 17: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – ProcessOverview types with reduced allowance

Roller typeGrinding

allowance old in mm.

Grinding allowance

new in mm.

Decrease in volume

Dw x Ld StatusVolume (pieces)

Volume (kg)

RT-32008 X 0.35 0.16 5.4% 7.000 x 14.029 Ready 45250085 165751

RT-32009 X 0.35 0.17 4.8% 7.500 x 14.631 Ready 50075986 219633

RT-29700 0.35 0.15 6.1% 6.488 x 13.025 Ready 87504900 257369

RT-300800 0.30 0.15 4.6% 6.477 x 12.334 Ready 99663009 278403

RT-501300 0.35 0.18 4.1% 8.255 x 13.548 Ready 43007800 239643

RT-445539 0.34 0.17 5.1% 6.790 x 11.039 Ready for test 49292000 131797

RT-503300 0.34 0.16 5.2% 6.950 x 12.726 Ready for test 54667610 181622

RT-32936 0.43 0.30 1.7% 16.000 x 33.549 Tested 656611 30827

Average: 4.6%

RT-BTF-1125 Ready for order 17500000 67050

RT-BTH-1208 Ready for order 29700000 95191

RT-332629 Ready for order 29146000 134934

RT-1861887 Ready for order 16509000 64239

All new types constructed according to new system

Total 2004 volume 1160507824 6140000

Ready: 325501780 1160799 28.0% 18.9%Ready for test/tested: 104616221 344246 9.0% 5.6%Ready for order: 92855000 361414 8.0% 5.9%

Page 18: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Process

Diameterspread rough-grindingRT-LM501300

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1.80

2.00

old allowance test less allowance introducing lessallowance

sta

nd

ard

de

via

tio

n

Inner spread

Total spread

Page 19: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Process

Diameterjump stop/start rough-grindingline 13 - old allowance RT-LM501300

40

45

50

55

60

65

70

75

80

dia

me

ter

Page 20: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Process

Used volume grindingwheel per kg ground rollersRT-LM501300

0.00

0.20

0.40

0.60

0.80

1.00

1.20

old allowance test less allowance introducing lessallowance

cm

^3

gri

nd

ing

wh

ee

l / kg

gri

nd

ed

ro

lle

rs

Page 21: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Process

Diameterjump stop/start rough-grindingline 13 - less allowance RT-LM501300

40

45

50

55

60

65

70

75

80

dia

me

ter

Page 22: NN Europe July, 2004 Plant Veenendaal – 5 given Total

NN Europe

July, 2004

Plant Veenendaal – Process

Current usage rough-grindingRT-LM501300

0

5

10

15

20

25

30

old allowance test less allowance introducing lessallowance

Am

pe

rag

e