NITIN TYAGI 31 st Dec 1984, ADRESS OPP POWERGRID GATE,NEW COLONY ,VILL- PATHROTA,ITARSI (M.P.)-461111 TELEPHONE 8234882870 MOBILE 9174874480 EMAIL nitin.tyagi214@gma il.com nitin_tyagi32@yaho o.co.in CAREER OBJECTIVE Electrical engineer with 5 year experience in electrical project and maintenance, I am looking career that is both challenging and reward. To do a project work or job in an organization and apply my skills and knowledge for accomplishment of the organizational goals. ACADEMIC BACKGROUND M.tech (control system) Rgpv university 82% LNCT Bhopal Year completed 2015 B.E. (ElectricalEngine ering) Rgpv university 70% G.E.C. Ujjain Year completed 2006 Class 12th M.P. board 78% G.H.S.S. itarsi Year completed 2001 Class 10th M.P. board 78% G.H.S.S.itars i Year completed 1999 EMPLOYMENT SUMMARY (Total 08 years experience) Sr. No. COMPANY NAME FROM TO DURATION DEPARTMENT/DESIGNATION 01 UTTAM GALVA STEEL LTD,KHOPOLI(MAHARASHT RA) 03-08- 2006 03-01- 2008 1.5 Year ELECTRICAL PROJECT(SERVICE CENTRE) As GET, SHIFT ENGINEER 02 TORRENT POWER LTD,GUJRAT(SURAT) 03-01- 2008 04-10- 2008 10 Month EHV O&M (220KV/66KV &66KV/11KV) As EXECUTIVE-I 03 GTL URJA 15-10- 15-06- 2 Year DISTRIBUTION FRANCHISEE

Upload: nitin-tyagi

Post on 10-Feb-2017

82 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Nitin CV sept 2

NITIN TYAGI

31st Dec 1984,

ADRESS OPP POWERGRID GATE,NEW COLONY ,VILL-PATHROTA,ITARSI(M.P.)-461111

TELEPHONE 8234882870MOBILE 9174874480

EMAIL [email protected][email protected]

CAREER OBJECTIVE

Electrical engineer with 5 year experience in electrical project and maintenance, I am looking career that is both challenging and reward. To do a project work or job in an organization and apply my skills and knowledge for accomplishment of the organizational goals.

ACADEMIC BACKGROUND

M.tech (control system) Rgpv university 82% LNCT Bhopal Year completed 2015B.E.(ElectricalEngineering) Rgpv university 70% G.E.C. Ujjain Year completed 2006Class 12th M.P. board 78% G.H.S.S. itarsi Year completed 2001Class 10th M.P. board 78% G.H.S.S.itarsi Year completed 1999

EMPLOYMENT SUMMARY (Total 08 years experience)

Sr. No.

COMPANY NAME FROM TO DURATION DEPARTMENT/DESIGNATION

01 UTTAM GALVA STEEL LTD,KHOPOLI(MAHARASHTRA)

03-08-2006 03-01-2008 1.5 Year ELECTRICAL PROJECT(SERVICE CENTRE)As GET, SHIFT ENGINEER

02 TORRENT POWER LTD,GUJRAT(SURAT)

03-01-2008 04-10-2008 10 Month EHV O&M (220KV/66KV &66KV/11KV)As EXECUTIVE-I

03 GTL URJA LTD,AURANGABAD(MAHARASHTRA)

15-10-2008 15-06-2011 2 Year 08 Month

DISTRIBUTION FRANCHISEE (O&M)As SENIOR ENGINEER

WORK EXPERIENCE IN DETAIL

GTL URJA LTD,AURANGABAD (distribution franchisee)Job title :senior engineer

Dec 2008 To Dec 2011 ( 3 years)

I worked in HT/LT special department .as senior engineer. I worked for HT survey, load sanction, estimate for consumers. Load sanction ,estimate calculation. I also worked CT/PT testing, new connection for HT consumer.

Page 2: Nitin CV sept 2

Operationalized systems for planning, monitoring, reporting and cross learning among for substation work. Electrical maintenance work for team to expert in this field. Experience in Power sector, O&M substation work, Load monitoring, Involving in training for O&M maintenance,

Electrical equipment energy management system developed & implemented for saving in energy. Institutionalized the process of regular interactions between district level govt. functionaries and partner meetings for

progress in project work

TORRENT POWER LTD, SURATJob title :Executive engineer

Jan 2008 To Dec 2008 (1 year)

Handling of electrical load as per requirement. Erection HT & LT transmission line & sub-station (33KV).  To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning. To provide the entire electrical solutions as per requirement. 

To maintain the DPR. To check the entire work as according to approved drawings. Keep track of all jobs in their area of operation. Prioritize the jobs on hand and allocate manpower to it depending on the priority. Ensure optimal loading of manpower. Keep track of network and its loading of loading of transformers for optimal distribution; suggest

modifications to HT Cell if required. Be primarily responsible for all equipment for which they are accountable. This includes safety, operational,

maintenance and up gradation aspects of the hardware and network under their preview. Be primarily responsible for all job responsibilities of their respective stations. Make station visits and ensure that there no discrepancies creep into the system. Ensure that the works are being carried out as defined in the SOPs. Ensure all required preparation inputs are available to workers before they leave for site.

UTTAM GALVA STEEL LTD KHOPOLI,PUNEJob title :shift engineer

Aug 2006 To Jan 2008 ( 1 year and 6 month)

Overall responsibility for the company’s electrical project and maintenance Company comprise of various department like ,SMS (Steel melting shop),Rolling mill, HRM(Hot Rolling Mill),

CRM(Cold Rolling Mill),CPP(Captive Power Plant),Gas Plant for Oxygen, Nitrogen, Argon. I worked for drives used for motor speed control.which was from siemens,Rockwell ,ABB.Totally automation done

from Rockwell automation team. My duty was in project from starting to ending help the team which was coming to commission our project .The

automation done from Rockwell team. I have seen erection.testing, commissioning, of motors,transformer.,control panels etc. Commissioning & maintenance of Transformers,

HT& LT Circuit Breakers, AC Drives, RIO Panels Credited for completion of project .

PROFESSIONAL DEVELOPMENT

MS WORLD, EXCEL, COMPUTER KNOWLEDGE, PLC, SCADA,

MAJOR / MINOR PROJECT :

Page 3: Nitin CV sept 2

I have submitted my Thesis on topic “performance analysis of 5-level h-bridge multilevel inverter” Detailed description given below. This thesis presents with the simulation and testing by using matlab of 5-level H-bridge multilevel inverter. This report presents 5-level inverter with harmonics reduction along with the reduction in number of switches. . In this paper modeling and evaluation of 5-level PWM inverter is carried out & also a evaluation with conventional 2-level inverter is made. The percentage (%) total harmonic distortion is intended for 5-level inverter. The harmonic reduction is achieved by PWM method. The functionality confirmation of the 5-level inverter is done using MATLAB.

WORKSHOPS ATTENDED / PAPER PRESENTATION

I attended 2 workshop and published 3 papers in international journal. I also attended national level conferences.

OTHER INFORMATION

Name-Nitin Tyagi,

Nationality-Indian

Marital status-No

Date of Birth—31 December 1984

Passport Details issued at Bhopal.

Passport Number—G456697Issued At—BHOPALValid Till—2020I hereby declare that above written particulars are best of my knowledge and belief.

Date : SEP 2015

Place : ITARSI(M.P) NITIN TYAGI