ver the past 12 months, the Primary Care team has been actively involved in the delivery of 12 new primary care schemes on site. Of these, six have been completed, totalling 9,685m 2 of space with a total construction cost of £17.35 million. A further 6 projects totalling 7696m 2 , with a total construction cost of £17.32 million are currently on site and are due to be completed this calendar year. A brief synopsis of each project is included below. Completed projects Manchester Square Health Centre, Milford Haven Project details: Manchester Square Health Centre, Milford Haven Client: Hywel Dda Health Board, Barlow House Surgery & Robert Street Practice Third Party Developer: LSP Developments Ltd & Assura Medical Centre Ltd Floor area: 2067m 2 GIA Cost (TOTAL): £2.8m Architects: West Hart Partnership Ltd Building Contractor: Opco Ltd Project Managers: Carl Dean Associates Ltd M & E Engineers: Chapman Bathurst Ltd Start on Site: 29 September 2011 Completion date: 22 October 2012 Gelligaer Health Centre, Rhymney Valley Project details: New Gelligaer Health Centre Client: Aneurin Bevan Health Board & Gelligaer and Gilfach Surgery Third Party Developer: LSP Developments Ltd & Assura Medical Centre Ltd Floor area: 891m 2 GIA Cost (TOTAL): £1.7m Architects: West Hart Partnership Ltd Building Contractor: Opco Ltd Project Managers: Carl Dean Associates Ltd M & E Engineers: Waterman Building Services Ltd Start on Site: 18 July 2011 Completion date: 11 June 2012 Grangetown Medical Centre, Cardiff Project details: Grange Medical Centre, Grangetown, Cardiff Client: Cardiff and Vale Health Board and Dr Lush & Partners Third Party Developer: MedicX Floor area: 1,248m 2 GIA Cost (TOTAL): £3.5m Architects: Powell Dobson Building Contractor: Vinci Construction Ltd Project Managers: Riley Consulting M & E Engineers: MLM Start on Site: September 2011 Opened to patients: October 2012 Primary Care Estate News O Courtesy of John Evans Photography Courtesy of John Evans Photography Courtesy of Cardiff and Vale UHB, MedicX and Vinci Construction Ltd Internet: www.wales.nhs.uk/whe 12

Upload: others

Post on 14-May-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NHS Issue 14

ver the past 12 months, the Primary Care team hasbeen actively involved in the delivery of 12 new

primary care schemes on site. Of these, six havebeen completed, totalling 9,685m2 of space with a totalconstruction cost of £17.35 million.

A further 6 projects totalling 7696m2, with a totalconstruction cost of £17.32 million are currently on siteand are due to be completed this calendar year.

A brief synopsis of each project is included below.

❖ Completed projects ❖ Manchester Square Health Centre, Milford Haven

Project details: Manchester Square Health Centre,Milford Haven

Client: Hywel Dda Health Board,Barlow House Surgery &Robert Street Practice

Third Party Developer: LSP Developments Ltd &Assura Medical Centre Ltd

Floor area: 2067m2 GIACost (TOTAL): £2.8mArchitects: West Hart Partnership LtdBuilding Contractor: Opco LtdProject Managers: Carl Dean Associates LtdM & E Engineers: Chapman Bathurst LtdStart on Site: 29 September 2011Completion date: 22 October 2012

❖ Gelligaer Health Centre, Rhymney Valley

Project details: New Gelligaer Health CentreClient: Aneurin Bevan Health Board &

Gelligaer and Gilfach SurgeryThird Party Developer: LSP Developments Ltd &

Assura Medical Centre LtdFloor area: 891m2 GIACost (TOTAL): £1.7mArchitects: West Hart Partnership LtdBuilding Contractor: Opco LtdProject Managers: Carl Dean Associates LtdM & E Engineers: Waterman Building Services LtdStart on Site: 18 July 2011Completion date: 11 June 2012

❖ Grangetown Medical Centre, Cardiff

Project details: Grange Medical Centre,Grangetown, Cardiff

Client: Cardiff and Vale Health Boardand Dr Lush & Partners

Third Party Developer: MedicX Floor area: 1,248m2 GIACost (TOTAL): £3.5mArchitects: Powell Dobson Building Contractor: Vinci Construction LtdProject Managers: Riley ConsultingM & E Engineers: MLMStart on Site: September 2011Opened to patients: October 2012

Primary Care Estate News

O

Courtesy of John Evans Photography

Courtesy of John Evans Photography

Courtesy of Cardiff and Vale UHB, MedicX and Vinci Construction Ltd

Internet: www.wales.nhs.uk/whe12

NHS Issue 14 4/16/13 8:32 pm Page 14

Page 2: NHS Issue 14

❖ Hirwaun Medical Centre, Cynon Valley

Project details: Hirwaun Medical Centre Client: Cwm Taf Health Board and

Dr George & PartnersThird Party Developer: MedicX Floor area: 1,324m2 GIACost (TOTAL): £2.8mArchitects: West Hart Partnership Building Contractor: Dawnus Construction LtdProject Managers: Davis LangdonM & E Engineers: MLMStart on Site: September 2011Opened to patients: July 2012

❖ The Wye Valley Surgery, Trellech, Monmouthshire

Project details: The Wye Valley Surgery, Trellech Client: Wye Valley Practice &

Aneurin Bevan Health BoardThird Party Developer: Ashley House Plc Floor area: 473m2 GIACost (TOTAL): £1.1mArchitects: Ashley House Plc, In-house

architects Building Contractor: Cowlin Construction LtdProject Managers: Ashley House PlcCivil and Structural Eng.: Such Salinger Peters

(Design Stage)M & E Engineers: Design & Build sub-contractorStart on Site: 30 August 2011Opened to patients: 30 April 2012

❖ Aberystwth Primary Care Centre

Project details: Aberystwyth Primary Care CentreClient: Padarn Surgery & University

of WalesThird Party Developer: Gaufron Healthcare Limited Floor area: 3,682m2 GIACost (TOTAL): £5.45mArchitects: Austin Smith Lord Building Contractor: Par Homes LimitedProject Managers: Austin Smith LordM & E Engineers: Unitec Webber LenihanStart on Site: December 2010Completion date: March 2012

Courtesy of Cwm Taf HB, MedicX and Dawnus Construction Ltd

Courtesy of David Stewart

Courtesy of Janet Baxter Photography - Aberystwyth

Intranet: howis.wales.nhs.uk/whe 13

NHS Issue 14 4/16/13 8:32 pm Page 15

Page 3: NHS Issue 14

❖ Beacon Development, SA1, Swansea

Project details: Beacon Development, SA1,Swansea

Client: Tawe Medical Centre, Port TennantPractice, ABMU Health Board,Eastside Dental Centre,University of Swansea College ofMedicine and Coop Pharmacy

Third Party Developer: Apollo Capital Projects Floor area: 3,100m2 GIACost (TOTAL): £7.25m total development costArchitects: B3 Architects Building Contractor: Dawnus ConstructionProject Managers: RPA LtdM & E Engineers: McCann & PartnersStart on Site: October 2011Practical Completion date: 26 April 2013Opened to patients: 13 May 2013

❖ Cloughmore Surgery, Cardiff

Project details: Cloughmore Surgery, Cardiff Client: Cloughmore Surgery – Dr Foy &

PartnersThird Party Developer: Apollo Capital Projects Floor area: 1,050m2 GIACost (TOTAL): £2.5mArchitects: Boyes Rees Architects Building Contractor: Dawnus ConstructionProject Managers: RPA LtdM & E Engineers: McCann & PartnersStart on Site: August 2012Practical Completion date: 2 August 2013Opened to public: 19 August 2013

❖ North Caerphilly Integrated Resource Centre

Project details: Integrated Health & Social CareResource Centre, Rhymney,North Caerphilly

Client: Aneurin Bevan Health Board,Caerphilly County BoroughCouncil, Dr Evans and Dr Potts

Third Party Developer: MedicX Floor area: 3,718m2 GIACost (TOTAL): £7.7mArchitects: Powell Dobson Building Contractor: Dawnus Construction LimitedProject Managers: E C HarrisM & E Engineers: Hicks TitleyStart on Site: 30 April 2012Estimated completion

date: 26 July 2013

❖ On site projects

Courtesy of Apollo Capital Projects Developments Ltd

Courtesy of Apollo Capital Projects Developments Ltd

Courtesy of Aneurin Bevan HB, MedicX and Dawnus Construction Ltd

Internet: www.wales.nhs.uk/whe14

NHS Issue 14 4/16/13 8:32 pm Page 16

Page 4: NHS Issue 14

❖ Rumney Primary Care Centre, Cardiff

Project details: Rumney Primary Care Centre Client: Rumney Medical Centre,

Cardiff & Vale University HealthBoard and GS Bhogal Pharmacy

Third Party Developer: Apollo Capital Projects Floor area: 2,386m2 GIACost (TOTAL): £6mArchitects: Boyes Rees ArchitectsBuilding Contractor: Vinci ConstructionProject Managers: RPA LtdM & E Engineers: McCann & PartnersStart on Site: August 2012Practical Completion date: 13 September 2013Opened to public: 30 September 2013

❖ Felinheli Primary Care Centre, Gwynedd

Project details: Felinheli Primary Care Centre Client: Betsi Cadwaladr University

Health Board andFelinheli Surgery

Third Party Developer: Amcen Floor area: 880m2 GIACost (TOTAL): £1.9mArchitects: W M DesignBuilding Contractor: Watkin Jones & SonProject Managers: Adeiladol CyfM & E Engineers: Carpenter Davies PartnershipStart on Site: 10 September 2012Estimated completion

date: 30 July 2013

❖ Crymych Extra Care Housing and Health Scheme,Pembrokeshire

Project details: Crymych Extra Care Housing andHealth Scheme

Client: Hywel Dda LHBThird Party Developer: Family Housing Association

(Wales) Ltd Floor area: 712m2 GIACost (TOTAL): £1.715mArchitects: B3 Architects Building Contractor: Cowlin ConstructionProject Managers: Ivor Russell and PartnersM & E Engineers: SABA Consult Start on Site: 23 July 2012Estimated completion

date: 2 May 2014

Acknowledgements

NWSSP – FS is grateful for the information and imagesprovided by each of the individual developers to enablepublication of this feature.

For further information contact:Nicola Powell on 029 2031 5509 ore-mail: [email protected]

SOLAR SHADING BRISE SOLEIL TO SAME DEPTH AS THE SLATEWALL FEATURE PANELS. TO COMPRISE TIMBER LOUVRES ONSAE 316 MARINE GRADE STAINLESS STEEL FRAME

WG - 01WG - 02WG - 18WG - 19

WF - 27 WF - 26 WF - 25 WF - 24 WF - 23 WF - 22 WF - 21

WG - 13WG - 14WG - 15WG - 16WG - 17

ALUMINIUM/TIMBER COMPOSITEWINDOW SYSTEM, NATURAL TIMBERFINISH INTERNALLY AND LIGHT GREYEXTERNALLY AS L10/35A

LINDAB GALVANISED STEEL GUTTERINGAND DOWNPIPES

MOVEMENT JOINT INMASONRY AND RENDER

MOVEMENT JOINT INMASONRY AND RENDER

ASHLAR SLATE WALLING, RANDOMCOURSED BLOCKS AND SIZES

WESTERN RED CEDER CLADDING

SPECIALIST DESIGN GLASSCANOPY OVER MAIN ENTRANCESUPPORTED OFF MARINE GRADESTAINLESS STEEL.

NATURAL SLATE ROOF OFUNIFORM COLOUR AND TEXTURE22.5 DEGREE PITCH AND 100MMMINIMUM HEADLAP

ASHLAR SLATE WALLING, RANDOMCOURSED BLOCKS AND SIZES

100X25MM SQUARE EDGEWESTERN ReD CEDaR AT 150MMVERTICAL CTS ACTING AS SOLARSHADING.

WG - 04WG - 05WG - 03 WG - 20

ED - 02 ED - 01 S - 02

WF - 28

2,1

00

ALUMINIUM/TIMBER COMPOSITEWINDOW SYSTEM, NATURAL TIMBERFINISH INTERNALLY AND LIGHT GREYEXTERNALLY AS L10/35A

IBSTOCK HOLBROOK SANDFACED DARKFACE BRICKWORK BELOW DPC LEVEL

NDAB GALVANISED STEEL GUTTERINGND DOWNPIPES

LINDAB GALVANISED STEELGUTTERING AND DOWNPIPES

FROSTED GLASS TO EXTERNALFIRE ESCAPE DOORS.

MOVEMENT JOINT IN MASONRYAND RENDER

MOVEMENT JOINTIN MASONRYALONG LINE OFSTONE FACING

EXTERNAL LETTERBOX MODEL 6362V BYMAILBOXES GB. SIZE 362X322X104MMMOUNTED AT 850MM TO LETTER SLOTABOVE EXTERNAL GROUND LEVEL

Felinheli HealthCentre

CanolfanIechyd

Prif FynedfaMain Entrance

NORTH EAST ELEVATION 1:100

SOUTH EAST ELEVATION 1:100

Courtesy of Apollo Capital Projects Developments Ltd

Courtesy of W M Design & Architecture LTD

Courtesy of B3 Architects

Intranet: howis.wales.nhs.uk/whe 15

NHS Issue 14 page 17 5/14/13 3:50 pm Page 4