nhai.org.innhai.org.in/spw/iereport/mpr-for the month of august 2014... · web viewthe project...
TRANSCRIPT
INDEX
S.No
DESCRIPTION
P.No.
1
INDEX MAP
2
2
EXECUTIVE SUMMARY
3-5
3
PROJECT BACKGROUND
6
4
CONTRACT DATA
7-8
5
SALIENT FEATURES OF THE PROJECT
9
6
SUBMISSION OF RELEVANT MANUAL & DOCUMENTS BY CONCESSIONAIRE
10
7
STATUS OF PERMITS
11
8
TECHNICAL MAN POWER- INDEPENDENT ENGINEER
12
9
TECHNICAL MAN POWER- CONCESSIONAIRE
13
10
TECHNICAL MAN POWER- SUB CONTRACTOR
14-17
11
PRE CONSTRUCTION ACTIVITIES
18-19
12
DETAILS OF CORRESPONDENCE FROM IE
20-27
13
STATUS OF PLANT & MACHINERY
28
14
STATUS OF DRAWING (Structures/Highways)
29-39
15
CONSTRUCTION PROGRAMME BY THE CONCESSIONAIRE,
S-CURVE
40
16
PROJECT WORK PROGRESS
41-42
17
DETAILS STATUS OF STRUCTURE
43-52
18
BAR CHART
53-55
19
E
EMERGENCY SERVICE
56
20
QUALITY ASSURANCE & QUALITY CONTROL
57-67
21
SAFETY AND ROAD MAINTENANCE
68
22
WEATHER REPORT
69
23
PHOTOGRAPHS
70
EXECUTIVE SUMMARY
BACKGROUND:
Ministry of Road Transport and Highways (MORT&H) has embarked on a staged up gradation programme of various National Highway. The widening is necessary to develop National Highway corridors where traffic intensity has increased significantly and there is requirement of augmentation of capacity for safe and efficient movement of traffic. MORT&H has authorized National Highway Authority of India (NHAI) to implement the development projects for six laning of Barwa Adda to Panagarh section of National Highway No.-2 in the state Jharkhand and West Bengal by way of Public-Private Partnership (PPP) mode.
The project corridor on NH-2, a part of Golden Quadrilateral is passing through plains of Gangetic region of landlocked states of Bihar & Jharkhand and connects the National Capital with Kolkata traversing almost 1465 km, passing through the states of west Bengal, Bihar, Jharkhand, Uttar Pradesh, Haryana & Delhi. Apart from cutting across several other NFs it traverses through major towns of Durgapur-Asansol, Dhanbad, Aurangabad, Varanasi, Allahabad, Kanpur, Agra, Faridabad, thereby catering to traffic with East West spectrum within the country.
The project road of NH-2 starts from Barwa-Adda in Dhanbad district in the State of Jharkhand Km 398.240 and ends at Panagarh in Bardhaman district of West Bengal km 521.120. Total length of stretch is 122.88 km passes through Barwaadda, Ponrki, Bhitiya, Kaladih, Amarpur, Govindpur Bajar, Fakirdih,Phufwadih, Gopalganj, Nirsa, Belchahri in the district of Dhanbad in Jharkhand State and Salanpur, Niyamatpur, Asansol, Bogra Chatti, Palas danga, Raniganj More, Mangalpur, Andal More, Kada Road, Durgapur, Muchipara, Rajbandh Chati, Panagarh in the district of Bardhman in West Bengal.
NHAI have awarded the task of Feasibility and Detailed engineering for improvement of this section of NH-2 to M/s ICT, India.
NHAI has awarded the work of Design, Build, Finance, Operate and Transfer of Km. 398.240 to Km. 521.120 including a bypass of length 8.120 Km. and service road of length 149.09 at selected locations to M/s Barwa Adda Expressway Ltd. (Mumbai).
NHAI has awarded the Independent Consultancy for the project to M/s SA Infrastructure Consultants Pvt. Ltd. in association with Sugam Technocarts Pvt. Ltd.
The Project Road
The concessionaire has divided the entire project road length into the following 3 Sections:
Sections
Chainage
From
Chainage
To
Total Length
(Km)
Sub-Contractor
Section-I
398.240
441.565
43.325
M/s APCO Infratech Ltd.
Section-II
441.565
471.150
29.585
M/s APCO Infratech Ltd.
Section-III
471.150
521.120
49.970
M/s Oriental Structural Engineers Pvt. Ltd
Project Milestones
Mile
stone
Description
Scheduled Time Period
Current Status
1
Construction of Project Highway shall have commenced.
(Expended not less than 10% of the total capital cost set forth in Financial Package)
27th September 2014 ( 180th day from Appointed Date)
Five months completed
2
Construction of all bridges shall have commenced.
(Expended not less than 25% of the total capital cost set forth in Financial Package)
31st March 2015 (365th day from Appointed Date)
-
3
Construction of all Project Facilities shall have commenced.
(Expended not less than 75% of the total capital cost set forth in Financial Package)
30th March 2016 (730th day from Appointed Date)
-
4
The scheduled Six Laning Date
26th September 2016 (910th day from Appointed Date)
-
CONDITION PRECEDENT
S. N.
Compliance
Responsible Authority
Execution date
Current Status
1
ROW Handing Over
NHAI
28/03/2014
16/05/2014
27/05/2014
06/06/2014
10/06/2014
14/06/2014
01/07/2014
10/07/2014
21/08/2014
NHAI has handed over EROW of 534.80 Ha +12.286 Ha + 5.076 Ha +4.456 Ha+10.816Ha+ 4.138 ha = 571.572 Ha + 4.801 +1.612 Ha +1.962 Ha= 579.947Ha
79.28 %
2
Permission of Environment Protection & Conservation of Site
NHAI
-
Received.
3
Escrow Agreement
BDU
Nov 01, 2013
Executed
4
Substitution Agreement
BDU
Nov 01, 2013
Executed
5
Performance Security to Client
BDU
Oct 29, 2013
Submitted
6
Delivery of Financial Model to Client
BDU
Nov 01, 2013
Executed
7
Delivery of Warranties from All Consortium Member to client
BDU
Apr 23, 2013
Executed
8
Delivery to the client a legal opinion from the legal counsel of the Concessionaire
BDU
Apr 30, 2013
Executed
9
Appointment of Independent Engineer
NHAI
19.02.2014
M/s S.A. Infrastructure Consultants Pvt. Ltd. in association with Sugam Technocrats Pvt. Ltd.
10
State Support Agreement
NHAI
Jharkhand-13.04.2010
West Bengal 13.04.2010
Available for both the States.
11
Approval from Railway Authorities in form of GAD for construction of ROB
NHAI
08.06.2012
09.09.2011
GADs for both the ROBs have been approved.
PROJECT DETAILS :-
The Project Road is 122.88 KM Long consisting of 1-Bypass of Length 8.120 Km for Congested Area at Panagarh including structures as under:-
A. HIGHWAYS:-
(a) Total Length of Existing Carriage Way = 121.990 Km.
(b) Total No. of lane = 2*3 lane
(c) Total length of Service Road = 149.09 Km.
(d) Width of Service Road = 7m
(c) Bypass Details:-
. Panagarh Bypass = 8.120km
B. STRUCTURES:-
(a) Major Bridges= 3 Nos.
(b) Minor Bridges = 20 Nos. (11 New & 9 Widening)
(c) Grade Separator = 12 Nos.
(d) ROBs= 2 Nos.
(e) VUPs and PUPs=20/11 Nos.
(f) Box Culverts /Hume Pipe/Slab Culverts=202 Nos.
(g) Over Pass/ Under Pass = 2/2 Nos
CONTRACT DATA
CONCESSIONAIRE:
Name of Project :Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.
Employer:National Highways Authority of India
Concessionaire:Barwa Adda Expressway Limited,
Plot No. C-22, G Block, Bandra Kurla
Complex, Mumbai-400051
Project Developer : IL&FS Transportation Networks Limited
Construction Contractor:M/s Apco Infratech Pvt. Ltd. &
M/s Oriental Structural Engineers Pvt.Ltd.
Date of Agreement:May 08, 2013
Development Period:From 08/05/2013 to 31/03/2014
Financial closure : 01/11/2013
Appointed Date:01/04/2014
Project Cost/ Premium :Rs. 1665 Crore
Premium of Rs. 42 Crore on appointed date and shall be increased by 5% as compared to the immediately preceding year.
Construction Period:910 days.
Scheduled Date of Project Completion:26/09/2016
Concession Period:20 Years Including 30 months of Construction Period.
Performance Security :Rs. 107.19 Crore
INDEPENDENT CONSULTANT/ENGINEER:
Engineer (Consultants):M/s SA Infrastructure Consultants Pvt. Ltd in Association with Sugam Technocrats Pvt.Ltd.
Head Office Address :C/o S.A. Infra Structure Consultants Pvt. Ltd.101-102, CS-1 Gyandkhand-II, Indrapuram, Ghaziadad (UP) 201014. Ph.No.: 0120-2607756,
Office Address :Plot No.16/14, Bengal Ambuja, City Center, Durgapur, Dist:- Burdwan (W B), Pin-713216
Phone No.: 0343-2546115
Date of Agreement :19.01.2014
Commencement date :19.02.2014
Contract Period :36 months
Scope of Consultancy:Independent Engineer
SALIENT FEATURES OF THE PROJECT :-
THE PROJECT ROAD
The Project road comprises off from 398.240 to Km.521.120 Km of existing road of NH-2. The Salient Features of the project are as under:-
S.No.
Description
Quantity
1
Length of Project
122.88 KM
2
(a) By Pass
Total Length 8.120 Km
(b) Existing Carriageway
Length 121.990 Km.
3
Width of carriageway
2*12.25=24.50M
4
Service Road
149.09 Km.
5
Width of service road
7 M
6
ROBs
2 Nos at Km 443+710 & Km 520+373
7
Grade Separator
12 Nos. at km.398+811,407+538,408+326,456+312,464+185,475+670,476+050,496+609,501+996,504+287,506+200,515+983
8
Major Bridges - (3 Nos)
MJB 3 Nos. at Km.464+674,517+095,518+829
9
Minor Bridges (20 Nos)
MNB 11 Nos. at Km. 405+330,409+876,415+120,429+973,437+047,450+140,461+652,464+903,468+620,497+840,509+953, Widening 9 Nos. at Km. 445+596,462+895,463+091,463+710,471+006,485+002,492+871,495+735,507+503
10
Vehicular Under Passes
VUP 20 Nos. at Km. 403+440,411+374,413+886,421+400,428+208,433+563,447+771,451+153,460+036,467+115,469,750,473+340,479+109,486+427,489+702,491+451,494+430,509+559,518+221,519+349
11
Pedestrian Underpasses
PUP 11 Nos. at Km. 398+495,399+230,407+400,409+088,417+953,424+400,476+430,504+555,510+700,512+920,514+900
12
Box /HP/Slab Culverts
202 Nos.
13
BUS Lay Byes
LHS 20 Nos.
RHS 20 Nos.
14
Truck Lay Byes
LHS 10 Nos.
RHS 04 Nos.
15
Toll Plaza
2 Nos. at Km. 438+500,507+000.
16
Truck Parking Places
2 Nos. at Km. 398+250 to Km 398+750 & Km 441+800 to Km 442+300.
Submission of Relevant Manual & Documents by Concessionaire:-
SI. No
Description
Remarks
1
QAP
Received
2
Work Methodology
Received
3
Work Schedule
Received
4
EMP
Not received
5
Material Report of Borrow areas
Received
6
Quarry location
Received
7
Safety Manual
Not received
Status of Permits:-
SI . No
Descriptions
Applied Date
1
Permits for extraction of boulder from quarry from Additional District Magistrate (ADM) Mines
15.06.2012
2
Permit for installation of crusher from village Panchayat and State/Central Pollution Control Board
25.11.2013
3
License for explosives from the office of Explosive controller
09.02.2013
4
NOC consent/Clearance required from village panchayat & State/Central Pollution Control Board/Dept.
Vill Panchayat - 25.11.13West Bengal Pollution Control Board - 20.12.13
5
Clearance required from village panchayat & State/Central Pollution Control Board
Vill Panchayat - 25.11.13West Bengal Pollution Control Board - 20.12.13
6
Permission required from village panchayat and ADM mines for Government & private land
Vill. Panchayat - 25.11.13
7
Permission from Forest Department and other applicable agencies
Dhanbad (Jh) - 08.11.11Burdwan (WB) - 23.09.13, 25.09.13, 30.09.13,30.09.13, 03.10.13
List of Technical Man Power of I.E.:-
Technical Manpower- Independent Engineer
PROFESSIONAL STAFF
Sl.
Name
Designation
Date of
Joining
1
Mr. Vinod Prasad Jaiswal
Team Leader cum Sr. Highway Engineer
2
Mr. A. N. Dhodapakar
Sr. Bridge Design Engineer
06.03.2014
3
Mr. Manoj Kumar Jaiswal
Resident cum Highway Engineer I
19.02.2014
4
Mr. Saroj Kumar Singh
Resident cum Highway Engineer II
20.03.2014
5
Mr. Yogendra Prasad
Highway Design Engineer I
02.06.2014
6
Nityanand Kumar
Highway Design Engineer I
19.02.2014
7
Mr. R.K.Rai
Bridge / Structural Engineer
19.02.2014
8
Mr. Kedar Paswan
Sr. Pavement Specialist
19.05.2014
9
Mr. Vijay Kumar Singh
Sr. Quality cum Material Expert
19.02.2014
10
Mr. Satyendu Sinha
Traffic & Transportation Expert
20.5.2014
11
Mr. R. S. Sharma
Road Safety Expert
12
Mr. Upendra Kumar Singh
Financial Expert
13.05.2014
13
Mr. Rajeshwar Kumar Singh
Legal Expert
22.05.2014
SUB PROFESSIONAL STAFF
1
Mr. Binash Ranjan Das
Survey Engineer I
2
TBN
Survey Engineer II
3
Mr. Nitai Satapathy
Survey Engineer III
26.03.2014
4
Mr. Santosh Sharma
Survey Engineer IV
28.03.2014
5
Mr. Lalmani Pratap Singh
Asst. Highway Engineer I
13.08.2014
6
Mr. Amit Kumar Basu
Asst. Highway Engineer II
03.03.2014
7
Mr. Ajoy Banerjee
Asst. Highway Engineer III
07.04.2014
8
Mr. Sachin Kumar
Asst. Highway Engineer IV
08.04.2014
9
Mr. Aniruddha Chatterjee
CADD Expert I
15.05.2014
10
TBN
CADD Expert II
11
TBN
Environmental Engineer
12
TBN
Asst. Bridge Engineer I
13
Mr. Hasan Faraz
Asst. Bridge Engineer II
09.08.2014
14
Mr. Kumar Kaushal
Asst. Bridge Engineer III
26.03.2014
15
Mr. Inderpal Singh
Asst. Bridge Engineer IV
16
Mr. Rakesh Kumar Chakarborthy
Asst. Quality cum Material Engineer I
13.08.2014
17
Mr. Asim Kumar Mahapatra
Asst. Quality cum Material Engineer II
03.03.2014
18
Mr. Anup Mahadani
Asst. Quality cum Material Engineer III
07.04.2014
19
Mr. Tuna Behera
Asst. Quality cum Material Engineer IV
28.04.2014
20
TBN
Electrical Engineer I
21
TBN
Electrical Engineer II
22
TBN
HTMS / Toll Expert I
23
TBN
HTMS / Toll Expert II
24
TBN
Quantity Surveyor I
25
TBN
Quantity Surveyor II
26
Mr. R.K.Singh
Horticulture cum Landscaping Expert I
27
TBN
Horticulture cum Landscaping Expert II
List of Tech. Man Power of Concessionaire:-
Sl. No.
Name
Designation
Remarks
Concessionaire Durgapur (Km. 398.240 to Km. 521.120)
1.
Mr. V.P.KATTI
PROJECT DIRECTOR
2.
Mr. Anil Kumar Mishra
Sr. Planning Engineer
3.
Mr. Vimlesh Kumar
Sr. Quantity Surveyor
4.
Mr. Piyush Jain
Assistant Planning
5.
Mr. Kaushal Mehta
Finance and Accounts
6.
Mr. Abdesh Jha
Administration
7.
Mr. I. Nagaraju
Q.A./Q.C. Head
8.
Mr. Bipad Bhaanjan Ghosh
Sr. Surveyor/CAD
9.
Mr. Vikram Dutta
L.A. Officer
10.
Mr. Amit Garg
L.A. Officer
11.
Mr. S.P.Singh
Utility Shifting (Electrical)
12.
Mr. U C Srivastav
Sr. Manager O & M Tolling
13.
Mr. Praveen Jindal
Manager - Tolling
14.
Mr. Abhishek Anand
Trainee (Highway)
15.
Mr. Krishnendu
Technician
Concessionaire I Dhanbad (Km. 398.240 to Km. 441.565)
16.
Mr. Sanjiban Dutta
Section In-Charge
17.
Mr. Santosh Kumar
Highway/Bridge Engineer
18.
Mr. Naresh Chandra Sao
Assistant Bridge Engineer
19.
Mr. Umesh Sharma
Assistant Material Engineer
20.
Mr. Uttam Kumar Gayan
Assistant Surveyor
21.
Mr. Raj Kumar Ghosh
Lab Technician
Concessionaire II Asansol (Km. 398.465 to Km. 471.150)
22.
Mr. Malay Dutta
Section In-Charge
23.
Mr. Pramod Kumar Pandey
Assistant Highway Engineer
24.
Mr. Himanshu Bushan Panda
Bridge Engineer
25.
Mr. Suresh R
Assistant Bridge Engineer
26.
Mr. Pravin Kumar Sharma
Assistant Material Engineer
27.
Mr. Manoj Kumar Yadav
Assistant Surveyor
28.
Mr. Somnath Chatterjee
Lab Technician
Concessionaire III Durgapur (Km. 471.150 to Km. 521.120)
29.
Mr. Zulfequar Ahmed
Bridge Engineer
30.
Mr. Rajesh Kumar
Assistant Highway Engineer
31.
Mr. Aman Sachdeva
Assistant Bridge Engineer
32.
Mr. Jyoti Prakash
Lab Technician
List of Tech. Man Power of the Sub-Contractor :-
(APCO Infratech Limited) Section I
Sl. No.
Name
Designation
Remarks
Sr. Project Manager
1.
Mr. Satpal Singh
Sr. General Manager
Highway
2.
Mr. Umesh Chand Singh
AGM Highway
3.
Mr. Sanjiv Kumar
Sr. Manager
4.
Mr. Neeraj Pandey
Jr. Engineer
Structure
5.
Mr. Amitabh Kumar
Sr. Engineer
6.
Mr. Jai Prakesh Tiwari
Sr. Project Engineer
7.
Mr. Abhishek Pratap Singh
DET
8.
Mr. Ajit Kumar Yadav
Engineer
9.
Mr. Raju Kumar Singh
Sr. Foreman
Planning & Billing
10.
Mr. Krishan Murari Varma
Sr. Engineer - Billing
11.
Mr. Krishan Chand
Document Controller
12.
Mr. Vanu Pratap Gupta
GET
13.
Mr. Jatin Sharma
Billing Engineer
Quali1ty Control Engineers
14.
Mr. Sarad Kumar Singh
Asst. Engineer
15.
Mr. Natwar Batra
Jr. Engineer
16.
Mr. Pravin Kumar Singh
GET
17.
Mr. Sashi Bhusan Kumar
Lab Technician
18.
Mr. Shayam Prakash Das
Lab Technician
19.
Mr. Pankaj Kumar
Lab Technician
Surveyor
20.
Mr. Praveen K Srivastav
Sr. Supervisor
21.
Mr. Sarya Pratap Kunwar
Sr. Supervisor
22.
Mr. Uttam Kumar Verma
Sr. Supervisor
23.
Mr. Ashish Kumar Mishra
Asst. Supervisor
Mechanical Engineer
24.
Mr. B. Anjaneyulu
Manager
25.
Mr. Mahamad Rashid
Sr. Engineer-Plant
26.
Mr. Umesh Bisht
Mechanical Engineer
27.
Mr. Rajat Singh
GET
28.
Mr. Brajesh Kumar Sharma
Data Entry Operator
Civil Supervisor
29.
Mr. Bineshwar Singh
Supervisor
30.
Mr. Pradip Kumar Singh
Supervisor
31.
Mr. Dharmendra Singh
Civil Supervisor
32.
Mr. Ranjeet Singh
Supervisor
33.
Mr. Shahrukh Khan
Supervisor
34.
Mr. Babu Kumar Singh
Supervisor (Borrow Area)
35.
Mr. Digvijay Singh
Civil Supervisor
Store
36.
Mr. Pradip Kumar Mishra
Sr. Store Officer
37.
Mr. Munna Kumar Singh
Store Officer
Admin & Accounts
38.
Mr. Partha Majumber
Dy. Manager
39.
Mr. S.R. Srivastav
Sr. Manager ( (P & A)
40.
Mr. Rajneesh Kumar
Accountant
41.
Mr. Raj Kumar Sharma
Officer
42.
Mr. Ram Mahajon
Supervisor (Admin)
43.
Mr. Indra Bhusan Kumar
Manager
IT Dept.
44.
Mr. Bipin Kumar Sharma
IT Executive
(APCO Infratech Limited) Section II
Sl. No.
Name
Designation
Remarks
Project Manager
1.
Mr. Manish Mishra
Project Manager
Highway
2.
Mr. R. P.Chowdhury
Manager
3.
Mr. Mukesh Kumar Singh
Engineer
4.
Mr. Chandra Prakash Singh
Supervisor
Structure
5.
Mr. Jagadish Srivastava
Manager
6.
Mr. Suresah Prasad Singh
Manager
7.
Mr. Yogesh Chandra
Jr. Engineer
8.
Mr. Jitendra Kumar Singh
Jr. Engineer
9.
Mr. Rajindar Kumar
Asst. Engineer
10.
Mr. Amresh Singh
Asst. Engineer
11.
Mr. Satosh Kumar Srivastav
Supervisor
Planning & Billing
12.
Mr. Bijay Kumar Sahoo
Engineer
Quality Control Engineers
13.
Mr. Suman Sanyal
Manager
14.
Mr. Chandan Singh
Jr. Engineer
15.
Mr. Md. Shakil
Sr. Lab Technician
16.
Mr. Raj Kamal Tiwari
Lab Technician
Surveyor
17.
Mr. Ashutosh Kumar Singh
Sr. Surveyor
18.
Mr. Santosh Kumar Tripathi
Sr. Surveyor
19.
Mr. Sunil Kumar Yadav
Surveyor
20
Mr. Atul Kumar
Asst. Surveyor
21.
Mr. Sandip Mishra
Asst. Surveyor
Mechanical & Mining Engineer
22.
Mr. Kishan Mahon Kushwaha
Manager
23.
Mr. Gautam Kumar Paul
Asst. Manager
24.
Mr. P Bhaskar Reddy
Engineer
25.
Mr. Jitendra Kumar
Manager - Mining
Store
26.
Mr. P. P. Rajan
Manager
27.
Mr. Sanu Lal Verma
Sr. Store Keeper
28.
Mr. Atul Kumar Debey
Officer Store
29.
Mr. Shailendra Kumar Singh
Operator
Admin & Accounts
30.
Mr. Anil Kumar Singh
Manager Admin
31.
Mr. Sailendra Pattanayak
Dy. Manager Admin
32.
Mr. M. Srinivasa Rao
Dy. Manager Accounts
33.
Mr. Arun Kumar Singh
Executive Admin
34.
Mr. Gagan Kumar Gandhi
Accountant
35.
Mr. Chinmay Nayak
Officer Admin
36.
Mr. Pravat Kumar Rout
Accounts officer
Safety
37.
Mr. Manoj Kumar Giri
Safety Officer
(Oriental Structural Engineers Pvt. Ltd.) Section III
Sl. No.
Name
Designation
Remarks
Chief Project Manager
1.
Mr. V. K. Chauhan
Chief Project Manager
Highway
2.
Mr. N. K. Singh
Sr. Project Manager
3.
Mr. Praveen Srivastava
Project Manager
4.
Mr. Shio Kr. Singh
Sr. Project Manager
5.
Mr. Krishna Kumar Singh
Sr. Project Manager
6.
Mr. Arindam Das
Project Engineer
7.
Mr. Arijit Mittal
Sr. Manager
8.
Mr. S. S. Negi
Dy. Manager
9.
Mr. Chandra Mani Kishore
Sr. Engineer
10.
Mr. B. Shankar Rao
Sr. Engineer
11.
Mr. Abhinav Singh
Sr. Engineer
12.
Mr. Avimunyu Pal
Dy. Manager
13.
Mr. Suresh Kushwh
Asst. Manager
14.
Mr. Ummed Singh
Asst. Manager
15.
Mr. U.K.Jha
Jr. Officer
16.
Mr. Saurabh Kumar
Sr. Supervisor
17.
Mr. K.K. Jha
Sr. Supervisor
18.
Mr. Manor Gautam
Supervisor
19.
Mr. Vinod Kumar Sharma
Sr. Supervisor
20.
Mr. Sanjay Kumar Bharti
Sr. Supervisor
21.
Mr. Shivaji Suryanvanshi
Sr. Supervisor
22.
Mr. Jitendra Kumar Yadav
Supervisor
23.
Mr. Pravesh Kumar Yadav
Supervisor
Structure
24.
Mr. Rajeev Naryal
Sr. Project Manager
25.
Mr. Surendra Chhabra
Project Manager
26.
Mr. Ramavatar Sharma
Dy. Project Manager
27.
Mr. Ashok Kumar Singh
Dy. Project Manager
28.
Mr. S. N. Mondal
Dy. Project Manager
29.
Mr. Chandan Rikhi
Project Engineer
30.
Mr. Pawan Kumar
Project Engineer
31.
Mr. Manish Kumar Singh
Sr. Engineer
32.
Mr. Shivram Mishra
Sr. Engineer
33.
Mr. Shiv Prakash Mourya
Asst. Engineer
34.
Mr. G. Haribabu
Asst. Engineer
35.
Mr. Arjun Kumar
Jr. Engineer
36.
Mr. Vijay Kr. Rai
Jr. Engineer
37.
Mr. Ambrish Kr. Rai
Jr. Engineer
38.
Mr. Rajeev Kumar
Foreman
39.
Mr. Ugrasen Singh
Asst. Manager
40.
Mr. Durga Prasad Gautam
Officer
41.
Mr. Amit Kumar Singh
Asst. Officer
42.
Mr. Krishna Kumar Tripathi
Supervisor
43.
Mr. Baidhnath Upadhyay
Supervisor
Planning & Billing
44.
Mr. Sumanta Chakraborty
Jt. GM
45.
Mr. Faishal Rizwan Siddqui
Sr. CAD Engineer
46.
Mr. Pawan Kumar
Asst. Engineer (Design)
47.
Mr. Avijit Mahanto
Asst. Manager
48.
Mr. Brijesh Kumar Mishra
Officer
49.
Mr. Abhist Narayan Singh
GET
Quality Control Engineers
50.
Mr. Anil Kumar
Project Manager
51.
Mr. Hari Singh
Dy. Manager
52.
Mr. Mukesh Kumar Singh
Asst. Engineer
53.
Mr. Sanjay Kumar Paul
Asst. Engineer
54.
Mr. Ravish Kumar
GET
55.
Mr. Manik Kumar Jha
Sr. Lab Technician
56.
Mr. Sunil Kumar Jha
Lab Technician
57.
Mr. Jay Prakash
Lab Technician
58.
Mr. Vinod Kumar Ray
Lab Technician
59.
Mr. Rajendra Pratap Singh
Lab Assistant
Surveyor
60.
Mr. Janmejay Rai
Project Engineer
61.
Mr. Vijay Kumar
Sr. Surveyor
62.
Mr. Santosh Kumar Pradhan
Surveyor
63.
Mr. Hardev Singh
Surveyor
64.
Mr. Ravindra Tiwari
Surveyor
65.
Mr. Biswanath Mondal
Surveyor
66.
Mr. Ashok Kumar Singh
Asst. Surveyor
Mechanical & Mining Engineer
67.
Mr. B.B. Singh
Project Manager (P&M)
68.
Mr. J. S. Virdhi
Project Manager (Crusher)
69.
Mr. Man Mohan Sharma
Jt. AGM
70.
Mr. L. K. Sharma
AGM
71.
Mr. D. P. Singh
Sr. Engineer
72.
Mr. Sailesh Kr. Dixit
Asst. Engineer
73.
Mr. Hazari Lal Prasad
Foreman (elect.)
74.
Mr. Ram Raj Yadav
Foreman (Plant)
75.
Mr. Salil Das Gupta
Dy. Manager
76.
Mr. S N. Mishra
Dy. Manager (Production)
77.
Mr. Arun Kumar Singh
DEO
78.
Mr. Kaladharan
Supervisor
Safety/HSE
79.
Mr. Jadav Akhtar
Officer
80.
Mr. Manoj Kumar Singh
Officer
Store
81.
Mr. Shubrata Ghoshal
Manager
82.
Mr. R. Bhattachrarya
Asst. Manager
83.
Mr. B.D.Tiwari
Asst. Manager
84.
Mr. Veer Singh
Asst. Manager
85.
Mr. Sabir Khan
Manager
86.
Mr. Dependra Kulshresta
Officer
87.
Mr. Bipadtaran Singha
Sr. Officer
88.
Mr. Surendra Pratap Sharma
Officer
89.
Mr. Moti Upadhyay
Sr. Supervisor
90.
Mr. Jay Chand Jha
Supervisor
91.
Mr. Vishwajit Singh
Supervisor
92.
Mr. Chandan Singh
Supervisor
HR/Admin
93.
Mr. Sandipan Dev Ray
Jt. GM
94.
Mr. Shailesh Sharma
Manager
95.
Mr. Sachin Kumar
Dy. Manager
96.
Mr. Anubhav Pandey
Dy. Manager
97.
Mr. Ujjaval Kumar
Officer (Liaison)
98.
Mr. Rajesh Tiwari
Asst. Officer
99.
Mr. Ajit Kumar
Asst. Officer
Accounts
100.
Mr. Dipak Kr. Dutta
Jt. AGM
101.
Mr. N. K. Srivastava
Manager
102.
Mr. Devendra Saptsishi
Manager
103.
Mr. Manas Kumar Mohanty
Asst. Manager
PRE CONSTRUCTION ACTIVITIES :-
SUB HEAD
STATUS OF LAND ACQUISITIONS:-
Description
Jharkhand
West Bengal
Total
Remarks
Length
43.16 km
79.72 km
122.880 km
Total land required
259.00 Ha
472.56 Ha
731.56 Ha
Handed over
185.00 Ha
394.947 Ha
579.947Ha
79.28%
To be handed over
74.00 Ha
77.613 Ha
151.613 Ha
20.72%
STATUS OF UTILITIES SHIFTING:-
S. N.
Activity
Unit
Total
Attended till this month
Balance
Remarks
1
Tree Cutting
Nos.
26670
12685
13985
52.44% balance
2
Electric Poles
Nos.
7194
Nil
7194
Work in progress (JSEB , DPL &WBSEDCL)
3
Electric Towers
Nos.
12
Nil
12
4
Water Pipe lines
RM
82379
Nil
82379
5
Gas Pipe Lines (GEECL)
RM
52100
Nil
52100
6
Petroleum Pipe line
RM
837
Nil
837
STATUS OF ENCUMBRANCES:-
SI. N.
Descriptions
Side
Units
(affected length)
Total
Attended till this month
Balance
Remarks
1.
Pucca Buildings
LHS
RHS
M
M
971
944
Nil
Nil
971
944
2.
Semi Pucca Buildings
LHS
RHS
M
M
991
1033
Nil
Nil
991
1033
3.
Kachha Buildings
LHS
RHS
M
M
409
381
Nil
Nil
409
381
4.
Religious Structures
LHS
RHS
M
M
41
43
Nil
Nil
41
43
DETAILS OF CORRESPONDENCE FROM IEs OFFICE-DURGAPUR
(AUGUST, 2014)
Correspondence with PD, NHAI PIU-Durgapur:
1. OUTGOING CORRESPONDENCE
Sl.
Ref. No.
Date
Subject
1
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/233
01.08.2014
Repair & Maintenance of Entrusted Highways Stretches.
2
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/236
01.08.2014
Verification & Certification of estimate for utility shifting received from Drinking water & sanitation Deptt. Jharkhand
3
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/238
02.08.2014
Submission of Monthly Accident Report
4
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/239
04.08.2014
Installation of CCTV Camera At Toll Plazas
5
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/240
04.08.2014
Submission of weekly status report for tree filling
6
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/241
04.08.2014
Submission of Invoice for the month of July 2014
7
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/247
06.08.2014
Proposal for development of way side amenities along National Highways
8
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/249
07.08.2014
Inspection report of Independent Engineer
9
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/251
09.08.2014
Estimate for cutting and transportation of trees from Km. 398.240 (Barwa Adda) to Km. 441.400 (Barakar) for six laning of NH-2.
10
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/252
11.08.2014
Submission of Weekly status reports for tree felling
11
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/256
14.08.2014
Reference received from PMO
12
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/260
14.08.2014
Compliance to the decision of executive committee held on 30.07.2014
13
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/261
16.08.2014
Repair and maintenance of entrusted highway stretches
14
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/263
19.08.2014
Submission of weekly status report for tree felling
15
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/265
19.08.2014
Repair and maintenance of Entrusted highways
16
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/266
19.08.2014
Fixing of 2 Nos. signed board 200 m away both side from Kalla More
17
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/268
19.08.2014
MPR-6 for the month of July 2014
18
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/270
21.08.2014
The Durgapur Projects Ltd. Proposal submitted vide letter no. DPL/ETD/CD/NHAI/579 dated 26.07.2014
19
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/279
23.08.2014
Condition of road between Asansol to Panagarh
20
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/280
25.08.2014
Submission of Weekly status reports for tree felling
21
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/282
25.08.2014
Estimate for cutting and transportation of trees from Km. 398.240 (Barwa Adda) to Km. 441.400 (Barakar) for six laning of NH-2.
22
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/291
26.08.2014
Vehicle Tracking System (VTS) with facility of Global Positioning System (GPS) to track Ambulance / Route Patrol vehicles.
23
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/303
28.08.2014
Joining report
24
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/304
29.08.2014
Verification of utility shifting estimate of DVC
25
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/308
30.08.2014
Construction of Road Under Bridge (RUB) for crossing NH-2 at Km. 430.200 in the state of Jharkhand to establish Railway Siding for Coal Transportation for 2 x 25MV Maithon Right Bank Thermal Power Station located at Maithon
2. INCOMING CORRESPONDECE
Sl.
Ref. No.
Date
Subject
1
15018/1/2013/PIU(DUP)/1988
02.08.2014
Meeting agenda on 30.07.2014 at Dhanbad
2
15018/1/2012/PIU(DUP)/1992
02.08.2014
Installation of CCTV cameras at all Toll Plazas
3
15018/1/2013/PIU(DUP)/2021
07.08.2014
Design and drawings for ROB at Km. 520.385
4
15018/1/2013/PIU(DUP)/2038
08.08.2014
Complaint received regarding tolling operations at Beliyad Toll Plaza
5
15018/1/2012/PIU(DUP)2074
11.08.2014
Reference received from prime minister office
6
13021/1/2001/PIU(DUP)2075
11.08.2014
Verification of proposal of DPL.
7
15018/1/2012/PIU(DUP)2079
11.08.2014
Estimate for cutting and transporting of tree from barwa adda (km.398.240)to barakar (km.441.400)for 6-laning of NH-2
8
15018/1/2013/PIU(DUP)/2081
11.08.2014
Maintenance of NH-2 from Main Gate to Bhiringi More durgapur toward burdwan bounds lane/DVC more,kajora bridge near chitadanga which has became dangerous due to broken/path holes.
9
15018/1/2013/PIU(DUP)/2082
11.08.2014
Construction of ROB's by NHAI- clearance/approval by railway
10
11020/7/2000/PIU(DUP)-TDS/2066
08.08.2014
Issue of TDS Certificate (Form No. 16A) for Qtr. 1 for the FY 2014-15
11
15017/1/2013/PIU(DUP)/2105
12.08.2014
Environment Clearance
12
15018/1/2013/PIU(DUP)/2098
12.08.2014
Tree felling from Barwa Adda to Barakar
13
15018/1/2013/PIU(DUP)/2100
12.08.2014
Fixing of 2 Nos. Signed Board 200mtr. Away both side from Kalla More
14
15016/1/2012/PIU(DUP)/2113
13.08.2014
Discrepancy in Land Acquisition proposal
15
15018/1/2012/PIU(DUP)/2114
12.08.2014
Compliance to the decision of Executive Committee held on 30.07.2014
16
15018/1/2012/PIU(DUP)/2115
13.08.2014
O & M of 4/6 laned corridors
17
15018/1/2013/PIU(DUP)/2119
13.08.2014
Providing protective culverts at IOCL pipeline crossings at malakhola (pipeline Ch.225.415) and Dhadka (pipeline Ch.236.327) & Rajbandh.
18
15018/1/2013/PIU(DUP)/2135
14.08.2014
Repair and maintenance of entrusted highways stretches
19
15018/1/2013/PIU(DUP)/2170
21.08.2014
Discrepancy in Land Acquisition proposal
20
15018/1/2013/PIU(DUP)/2172
21.08.2014
Regarding condition of road between Asansol to Panagarh
21
15018/1/2012/PIU(DUP)/2187
22.08.2014
MPR-6 for the month of July 2014
22
15018/1/2012/PIU(DUP)/2186
22.08.2014
Reg. Manpower for the month of July & August 2014
23
15018/1/2013/PIU(DUP)/2211
26.08.2014
Project specific websites
24
15018//2012/PIU(DUP)/2222
26.08.2014
Representation of the villagers of Shitla
25
15017/1/2012/PIU(DUP)/2238
27.08.2014
Verification of utility shifting estimate of DVC
26
15018/1/2013/PIU(DUP)/2240
27.08.2014
Inspection of materials against estimate no. 51/DESA/2013-14 and W.O. no. 10/ESE/ESC/DHN/D.H./2014-15
27
15018/1/2013/PIU(DUP)/2241
27.08.2014
Condition of road between Asansol to Panagarh
28
15017/1/2008/PIU(DUP)/1880
18.07.2014
Electrical Utility Shifting pertaining to JSEB/JUVNL./ Regarding Return of Measurement Book
29
15018/1/2013/PIU(DUP)/2248
28.08.2014
Verification of IPC-II for shifting of electrical utility of JUVNL.
30
15017/1/2008/PIU(DUP)/2252
28.08.2014
Minutes of meeting held 05 Aug 2014 at Hon,ble Minister of RT&H reg-Issues related to ROBs/RUBs constructed on NHs.
31
15018/1/2013/PIU(DUP)/2255
28.08.2014
Fixing of 2 Nos. Signed Board 200mtr. away both side from Kalla More
32
15018/1/2013/PIU(DUP)/2264
29.08.2014
Prayer for repairing of pot holes and patches on NH-2 at DVC More, DMC More, near Bajaj show room in between Bhiringi more and old court more and kada road more under Durgapur P.S.
33
15018/1/2013/PIU(DUP)/2265
29.08.2014
Guideline of MoEF for diversion of forest land
34
15018/1/2013/PIU(DUP)/2266
29.08.2014
Redressal of grievances of Shri Subrata Roy, Asansol, West Bengal
35
15018/1/2013/PIU(DUP)/2267
29.08.2014
Construction of Box culvert at IOCL pipeline crossing under Asansol jurisdiction at Melakhola (Pipe line Ch. 225.415) and Dhadka (Pipeline Ch. 236.327) during extension of 4 lane to 6 lane of NH-2
36
15018/1/2013/PIU(DUP)/2268
29.08.2014
Minutes of meeting of the monitoring committee to monitor the implementation of the provisions of the notification on Fly Ash Utilization
Correspondence with Concessionaire:
1. OUTGOING CORRESPONDENCE
Sl.
Ref. No.
Date
Subject
1
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/234
01.08.2014
Estimate of Cutting and transportation of tress from km 398.240 (Barwa-adda) to Km 441.400 (Barakar) for six laning of NH-2.
2
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/235
01.08.2014
Review of the GFC Drawings
3
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/237
02.08.2014
Review of Grade Separator at Chainage 501+985 & 515+983
4
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/242
05.08.2014
Borrow area test reports (B.A.-1)
5
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/243
05.08.2014
Approval of Concrete Mix Design of M-15 (PCC), M-20 (PCC), M-25(RCC), M-30 (RCC) & M-35 (Pile)
6
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/244
05.08.2014
Approval of Concrete Mix Design of M-25 (RCC), M-30 (RCC) of M/s India Cements Ltd for of OPC - 43 grade
7
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/245
05.08.2014
Review of Pavement Design
8
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/246
06.08.2014
Review of Pavement Design
9
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/248
06.08.2014
Review of Box Culverts, PUPs & VUPs
10
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/250
07.08.2014
Method statement of initial load test
11
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/253
14.08.2014
O & M of 4/6 laned Corridors
12
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/254
14.08.2014
Review of design and drawing of widening of existing Minor Bridges at Km. 445+595, Km. 471+006 (C.A. Ch. 471+000), Km. 495+735 (C.A. Ch. 495+725), Km. 507+503(C.A. Ch. 507+510), Km. 485+002 (C.A. Ch. 484+990), Km. 492+871(C.A. Ch. 492+860), Km. 462+895, Km. 463+091(C.A. Ch. 462+090) & Km. 463+710
13
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/255
14.08.2014
Maintenance of NH-2 road from Main Gate to Bhiringi More Durgapur toward Burdwan bound lane/DVC More, Kajora Bridge near Chitadanga which has became dangerous due to Broken / Pot holes
14
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/257
14.08.2014
Complaints received regarding tolling operations at Beliyad Toll Plaza
15
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/258
14.08.2014
Construction of Public facility i.e. Medical Aid Post and Washroom at Beliyad Toll Plaza, Maithan
16
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/259
14.08.2014
Trees from Km. 398.240 (Barwa Adda) to Km. 441.400 (Barakar) for six laning of NH-2
17
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/262
16.08.2014
Review of Plan and Profile drawings
18
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/267
19.08.2014
Discrepancy in Land Acquisition proposal
19
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/269
19.08.2014
Submission of progress report of the month July-Discrepancies in the status of drawings approval.
20
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/271
21.08.2014
Route Patrol Vehicle, Ambulance & Crane Reg.
21
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/272
21.08.2014
Review of Typical GADs of Pipe Culverts (Singal, Double and Multi cell)
22
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/273
21.08.2014
Submission of drawing in Auto Cad format
23
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/274
21.08.2014
Review of Plan and Profile drawings for Panagarh Bypass
24
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/275
21.08.2014
Review of detailed drawing for concrete edge drain
25
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/276
21.08.2014
Review of working drawing for various structures
26
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/277
22.08.2014
Review of Design and drawing of Grade Separator at Km. 501+996 & Km. 515+983.
27
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/278
23.08.2014
Review of Over Pass cross section Drawing.
28
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/281
25.08.2014
Vehicle Tracking System (VTS) with facility of Global Positioning System (GPS) to track Ambulance / Route Patrol vehicles.
29
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/283
25.08.2014
Use of steel reinforcement of 10mm dia in vertical walls @506+185
30
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/284
25.08.2014
Bottom steel exposed and soffit of slab badly damaged of existing VUP at Ch. 500+120
31
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/285
25.08.2014
Shifting of rising main along NH-2 under RCFA Pt-II W/S Scheme
32
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/286
25.08.2014
Shoulder repairing works
33
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/287
25.08.2014
Water Pipe line leakage at km 480+500(LHS) on road
34
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/288
25.08.2014
Shifting of 1m dia DW&SD water pipe line on Jharkhand state from km 405+350 to km 456+700
35
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/289
26.08.2014
Procurement of steel
36
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/290
26.08.2014
Review of Minor Bridge (Retaining and Widening) at Km. 445+595, km 471+006, km 495+735, km 507+503, km 485+002, km 492+871, km 462+895, km 463+091, 463+710
37
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/292
26.08.2014
In Liew of the major issues hampering taken off the project
38
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/293
26.08.2014
Site Inspection on 30.08.2014
39
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/294
26.08.2014
Review of plan & profile drawing from km.507+000 to km 512+000
40
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/295
26.08.2014
Safety arrangment at ongoing structures work from km 471.000 to km 521.000
41
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/296
26.08.2014
Approval of Concrete Mix Design of M-20 (RCC), M-35(RCC) & M-35 (R.E.Panel)
42
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/297
26.08.2014
Third party test report of Maheshpur and Jangalpur Quarry proposed to be used for Bituminous and concrete works for the project stretch from Km 398+240 to Km 471+150-source approval
43
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/298
26.08.2014
Borrow Area Test Report (B.A-2)
44
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/299
26.08.2014
Third party test report of Ajay river, Damodar River and Barakar River for source approval-
45
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/300
26.08.2014
Third party test report of fly ash proposed to be used for concrete works for the project stretch-source approval
46
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/301
27.08.2014
Shifting of rising main along NH-2 under RCFA Pt-II W/S Scheme
47
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/302
28.08.2014
Maintenance works
48
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/305
29.08.2014
GSB Mix Design
49
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/306
29.08.2014
Borrow Area Test Reports
50
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/307
30.08.2014
Fixing of 2 Nos. signed board 200 m away both side from Kalla More
51
SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/309
30.08.2014
Redressal of grievances of Shri Subrata Roy, Asansol, West Bengal
2. INCOMING CORRESPONDECE
Sl.
Ref. No.
Date
Subject
1
BAEL/PRJ/TEC/IEO/0219
02.08.2014
Submission of Monthly Fee statement schedule-M for the month of July-2014
2
BAEL/PRJ/TEC/IEO/0220
04.08.2014
Method Statement for Initial Vertical Load Test.
3
BAEL/PRJ/TEC/IEO/0221
04.08.2014
Submission of monthly accident report for the month of July 2014
4
BAEL/PRJ/TEC/IEO/0222
04.08.2014
Submission of weekly traffic census report
5
BAEL/PRJ/TEC/IEO/0223
05.08.2014
Submission of Borrow area test reports (B.A-2)
6
BAEL/PRJ/TEC/IEO/0224
06.08.2014
Submission of weekly accident report
7
BAEL/PRJ/TEC/IEO/0225
07.08.2014
Submission of Revised Plan and Profile Drawings from Km. 506.000 to 511.000
8
BAEL/PRJ/TEC/IEO/0226
07.08.2014
Submission of Pavement Design.
9
BAEL/PRJ/TEC/IEO/0227
07.08.2014
Independent Laboratory Testing Agency Approval.
10
BAEL/PRJ/TEC/IEO/0228
07.08.2014
Submission of Typical drawing for widening of Slab Culvert and Design and Analysis of Box culvert and VUP
11
BAEL/PRJ/TEC/IEO/0229
07.08.2014
Submission of Drawings and Design and Analysis of ROB at Km. 443+710
12
BAEL/PRJ/TEC/IEO/0230
07.08.2014
Third party test reports of Fine Aggregate of Ajay River, Damodar River and Barakar River proposed to based for concrete production from Km. 398+240 to 471+150 - Source approval.
13
BAEL/PRJ/TEC/IEO/0231
08.08.2014
Review of Pavement design.
14
BAEL/PRJ/TEC/IEO/0232
09.08.2014
Submission of GADs structural drawings (Foundation) and Design and Analysis of Grade Separator at Km. 464+185, Km. 504+287 & Km. 506+200 for the project
15
BAEL/PRJ/TEC/IEO/0233
11.08.2014
Submission of progress report for the month of July.
16
BAEL/PRJ/TEC/IEO/0234
12.08.2014
Submission of weekly traffic census report.
17
BAEL/PRJ/TEC/IEO/0235
12.08.2014
Submission of weekly accident report.
18
BAEL/PRJ/TEC/IEO/0236
13.08.2014
Compliance to your observations on Grade Separator at Km. 501+985 to Km. 515+983 submitted by us
19
BAEL/PRJ/TEC/IEO/0237
14.08.2014
Mix design for package III from Km. 471.150 to Km. 521.120.
20
BAEL/PRJ/TEC/IEO/0239
18.08.2014
Submission of Overpass GAD
21
BAEL/PRJ/TEC/IEO/0238
18.08.2014
Source approval for Bitumen Emulsion and modified bitumen
22
BAEL/PRJ/TEC/IEO/0240
19.08.2014
Design and drawing of widening of existing Minor Bridge at Km.. 445+595, Km. 471+006 (C.A. Ch. 471+000), Km. 495+735 (C.A. Ch. 495+725), Km. 507+503(C.A. Ch. 507+510), Km. 485+002 (C.A. Ch. 484+990), Km. 492+871(C.A. Ch. 492+860), Km. 462+895, Km. 463+091(C.A. Ch. 462+090) & Km. 463+710 compliance to the observations on the Minor Bridges.
23
BAEL/PRJ/TEC/IEO/0241
19.08.2014
Submission of working drawing for various structures
24
BAEL/PRJ/TEC/IEO/0242
19.08.2014
Submission of weekly accident report
25
BAEL/PRJ/TEC/IEO/0243
19.08.2014
Submission of weekly traffic census report
26
BAEL/PRJ/TEC/IEO/0244
19.08.2014
Submission of GSB Mix Design
27
BAEL/PRJ/TEC/IEO/0245
19.08.2014
Review of GADs of New Minor Bridge drawing
28
BAEL/PRJ/TEC/IEO/0247
20.08.2014
Compliance to your observations on the TCS drawing submitted by us.
29
BAEL/PRJ/TEC/IEO/0248
22.08.2014
Submission of various structural drawings and design and analysis
30
BAEL/PRJ/TEC/IEO/0249
23.08.2014
Submission of Wet Mix Macadam Mix design
31
BAEL/PRJ/TEC/IEO/0250
23.08.2014
Compliance of plan and profile drawing from Km. 507+000 to 521+000
32
BAEL/PRJ/TEC/IEO/0251
23.08.2014
Submission of various structural drawings and design and analysis of foundation of abutment A1 & A2 (Geotech Capacity) of Minor Bridge at Km. 464+912
33
BAEL/PRJ/TEC/IEO/0252
23.08.2014
Source approval for modified Bitumen
34
BAEL/PRJ/TEC/IEO/0254
25.08.2014
Relocation of existing culvert at Km. 496+749
35
BAEL/PRJ/TEC/IEO/0255
25.08.2014
Source approval for Bitumen Emulsion and modified bitumen
36
BAEL/PRJ/TEC/IEO/0256
25.08.2014
Submission of Borrow area Test Report (B.A.-12)
37
BAEL/PRJ/TEC/IEO/0257
26.08.2014
Submission of revised GAD of VUP at Km. 489+702 and compliance to your observations on Box Structures submitted by us
38
BAEL/PRJ/TEC/IEO/0258
26.08.2014
Vehicle Tracking system (VTS) with facility of Global Positioning system (GPS) to track Ambulance / Route Patrol vehicles
39
BAEL/PRJ/TEC/IEO/0259
26.08.2014
Submission of weekly Accident report
40
BAEL/PRJ/TEC/IEO/0260
26.08.2014
Submission of weekly traffic census report
41
BAEL/PRJ/TEC/IEO/0261
26.08.2014
Rate analysis for change of scope items
42
BAEL/PRJ/TEC/IEO/0263
27.08.2014
Shifting of rising main NH-2 under RCFA Pt-II W/S Scheme
43
BAEL/PRJ/TEC/IEO/0262
27.08.2014
DW&SD water pipe line of Jharkhand state from Km. 405+350 to Km. 456+700
44
BAEL/PRJ/TEC/IEO/0264
27.08.2014
Submission of working drawing for pipe culvert at Km. 439+709
45
BAEL/PRJ/TEC/IEO/0265
28.08.2014
Submission of GFC drawings
46
BAEL/PRJ/TEC/IEO/0266
28.08.2014
Discrepancy in land acquisition proposal from Km. 503+700 to 505+300 (LHS)
47
BAEL/PRJ/TEC/IEO/0267
29.08.2014
Submission of Borrow area test report (B.A. - 4)
48
BAEL/PRJ/TEC/IEO/0268
30.08.2014
Submission of design of approach slab and GFC drawings of Grade Separators at Km. 501+985 & Km. 515+983
STATUS OF PLANTS AND MACHINERY:-
The details of major plants and equipment deployed are mentioned below;
A. PLANTS
SI.No.
Description of Items
Unit
Total
Remarks
1.
Crusher Plant
Nos.
3
Installation in progress (Each 300 TPH)
2.
WMM Plant
Nos.
3
1.Commissioned 1 No. (200 TPH)
2.Ready for Calibration 1 no. (200 TPH),
3. Installation in Progress 1 No. (300 TPH)
3.
Batching plant
Nos.
3
1. Commissioned 1 No. (60 cum/hr)
2. Installation in progress 1 No (30 cum/hr).
2. Installation in progress 1 no. (60 cum/hr.)
4.
Hot mix Plant
Nos.
3
1. Mobilization in progress- 1 No.(200TPH)
2. Installation in progress 2 Nos.
(1 No. 200 TPH & 1 No. 160 TPH)
5.
Weight Bridge
Nos.
5
1. Commissioned = 3 Nos.
2. Installation in Progress 2 No.
(Each 100 MT Capacity)
B. MACHINERY
1.
Dozer
Nos.
3
2.
Excavator(1-1.2 cu.m bucket)
Nos.
7
3.
Motar Grader (135-195HP)
Nos.
7
4.
Vibr. Soil Compactor(8-10 t)
Nos.
12
5.
Tendam Roller
Nos.
3
6.
PTR
No
1
7.
Front Wheel Loader (3.0 cu.m)
Nos.
5
8.
Tipper (10T/25T)
Nos.
40
9.
Water tanker (10kl)
No
4
10.
JCB loader
Nos.
6
11.
Hydra Crane (14 MT)
Nos.
6
12.
Air Compressor
No.
2
13.
Diesel Tanker
No.
2
14.
DG (25-750KVA)
Nos.
24
15.
Transit Mixture
Nos.
10
16.
Broomer
No.
1
17.
Trailor
No.
1
C. SURVEY EQUIPMENTS
1.
Total station
Nos.
6
2.
Auto level
Nos.
16
STATUS OF DESIGN AND DRAWING:-
Sl No.
Chainage No. as per Drawing
Name of Structure
Description
Status
398.240 to 521.120
Plan and Profile
Km. 398.240 to 399.000(R1)
Km. 399.000 to 405.000(R2)
Km 405.000 to 407.000(R1)
Km. 407.000 to 410.000(R0)
Km 410.000 to 422.000(R1)
Km422.000 to 434.000(Ro)
Km 435.000 to 469.000(R2)
Km 471.000 to 507.000(R2)
Km507.000 to 513.000(R1)
Km513.000 to 516.000(R1)
Km 516.000 to 518.000(R2)
Km 518.000 to 519.000(R1)
Km 519.000 to 520.000(R4)
Km 520.000 to 521.000(R3)
Km 521.000 to 521.120(R2)
Commented for km 507+000 to km 521.120.
Under review
398.240 to 521.120
TCS
62 No TCS submitted
26 No. TCS Reviewed
398.240 to 521.120
Pavement Design
Design submitted
Commented
&
Under review
1
464+674
MAJOR BRIDGE
GAD Submitted
Under review
2
517+095
GAD & Design Submitted
Commented
&
Under review
3
518+829
GAD & Design Submitted
Under review
4
398+811
Grade Separator
GAD & Design(only super structure) Submitted
Under review
5
407+538
GAD Submitted
Under review
6
408+326
GAD & Design(only super structure) Submitted
Under review
7
456+312
GAD & Design(only super structure) Submitted
Under review
8
464+185
GAD Submitted
Under review
9
475+670
GAD & Design(only super structure) Submitted
Under review
10
476+050
GAD Submitted
Under review
11
496+609
GAD Submitted
Under review
12
501+996
GAD & Design Submitted
Under review
13
504+287
GAD & Design(only super structure) Submitted
Under review
14
506+200
GAD & Design(only super structure) Submitted
Under review
15
515+983
GAD & Design Submitted
Under review
16
405+330
MINOR BRIDGE (NEW)
GAD Submitted
Under review
17
409+876
GAD Submitted
Under review
18
415+120
GAD Submitted
Under review
19
429+973
GAD Submitted
Under review
20
437+047
GAD Submitted
Under review
21
450+140
GAD Submitted
Under review
22
461+652
GAD Submitted
Under review
23
464+903
GAD Submitted
Under review
24
468+620
25
497+840
GAD Submitted
Under review
26
509+953
GAD Submitted
Under review
27
445+596
MINOR BRIDGE (WIDENING)
GAD & Reinforcement Details
Reviewed
28
462+895
GAD & Reinforcement Details
Reviewed
29
463+091
GAD & Reinforcement Details
Reviewed
30
463+710
GAD & Reinforcement Details
Reviewed
31
471+006
GAD & Reinforcement Details
Reviewed
32
485+002
GAD & Reinforcement Details
Reviewed
33
492+871
GAD & Reinforcement Details
Under Reviewed
34
495+735
GAD & Reinforcement Details
Reviewed
35
507+503
GAD & Reinforcement Details
Reviewed
36
520+373
ROB
Design Submitted
GADs for both the ROBs have been approved
37
443+710
38
403+440
VEHICULAR UNDERPASS
GAD & Reinforcement Details
Reviewed
39
411+374
GAD & Reinforcement Details
Reviewed
40
413+886
GAD & Reinforcement Details
Reviewed
41
421+400
GAD & Reinforcement Details
Reviewed
42
428+208
GAD & Reinforcement Details
Reviewed
43
433+563
GAD & Reinforcement Details
Reviewed
44
447+771
GAD submitted
Under review
45
451+153
GAD submitted
Under review
46
460+036
GAD & Reinforcement Details
Reviewed
47
467+115
GAD & Reinforcement Details
Reviewed
48
469+750
Not submitted
49
473+340
GAD & Reinforcement Details
Reviewed
50
479+109
GAD submitted
Under review
51
486+427
GAD & Reinforcement Details
Reviewed
52
489+702
GAD submitted
Under review
53
491+451
GAD & Reinforcement Details
Reviewed
54
494+430
GAD & Reinforcement Details
Reviewed
55
509+559
GAD & Reinforcement Details
Reviewed
56
518+221
GAD & Reinforcement Details submitted
Under review
57
519+349
GAD & Reinforcement Details submitted
Under review
58
398+495
PEDESTRIAN UNDERPASS
GAD & Reinforcement Details
Reviewed
59
399+230
GAD & Reinforcement Details
Reviewed
60
407+400
GAD & Reinforcement Details submitted
Under review
61
409+088
GAD & Reinforcement Details
Reviewed
62
417+953
GAD & Reinforcement Details
Reviewed
63
424+400
GAD & Reinforcement Details
Reviewed
64
476+430
GAD & Reinforcement Details
Reviewed
65
504+555
GAD & Reinforcement Details
Reviewed
66
510+700
GAD & Reinforcement Details
Reviewed
67
512+920
GAD & Reinforcement Details
Reviewed
68
514+900
GAD & Reinforcement Details
Reviewed
69
398+519
BOX CULVERT
GAD & Design submitted
Under review
70
398+782
GAD & Design submitted
Under review
71
403+335
GAD & Design submitted
Under review
72
407+212
GAD submitted
Under review
73
407+422
GAD & design submitted
Under review
74
407+657
GAD submitted
Under review
75
408+867
GAD & Design submitted
Under review
76
409+060
GAD & Design submitted
Under review
77
409+366
GAD & Design submitted
Under review
78
411+332
GAD & Design submitted
Under review
79
411+391
GAD & Design submitted
Under review
80
413+926
GAD & Design submitted
Under review
81
415+216
82
417+933
GAD & Design submitted
Under review
83
421+327
84
421+497
GAD submitted
Under review
85
424+467
GAD submitted
Under review
86
427+882
GAD & Design submitted
Under review
87
428+025
GAD & Design submitted
Under review
88
443+615
GAD submitted
Under review
89
443+931
GAD submitted
Under review
90
444+047
GAD submitted
Under review
91
448+029
GAD & design submitted
Under review
92
450+883
GAD & Design submitted
Under review
93
451+334
GAD & Design submitted
Under review
94
456+131
GAD & Design submitted
Under review
95
456+175
GAD & Design submitted
Under review
96
456+355
GAD & Design submitted
Under review
97
461+940
GAD & Design submitted
Under review
98
467+300
GAD & Design submitted
Under review
99
470+025
GAD submitted
Under review
100
475+615
GAD submitted
Under review
101
486+816
GAD submitted
Under review
102
489+549
GAD & Design submitted
Under review
103
489+860
GAD submitted
Under review
104
494+593
GAD submitted
Under review
105
496+719
GAD submitted
Under review
106
496+749
GAD submitted
Under review
107
502+182
GAD submitted
Under review
108
502+372
GAD & Design submitted
Under review
109
502+538
GAD & Design submitted
Under review
110
505+934
GAD & Design submitted
Under review
111
506+169
GAD & Design submitted
Under review
112
509+255
GAD submitted
Under review
113
512+635
GAD submitted
Under review
114
512+997
GAD submitted
Under review
115
515+180
GAD & Design submitted
Reviewed
116
516+290
GAD submitted
Under review
117
518+180
GAD & Design submitted
Under review
118
519+690
GAD & Design submitted
Reviewed
119
399+140
PIPE CULVERT
GAD
Reviewed
120
400+070
GAD
Reviewed
121
400+450
GAD
Reviewed
122
401+625
GAD
Reviewed
123
404+115
GAD
Reviewed
124
405+204
GAD
Reviewed
125
405+777
GAD
Reviewed
126
408+207
GAD
Reviewed
127
409+125
GAD
Reviewed
128
409+707
GAD
Reviewed
129
410+140
GAD
Reviewed
130
410+760
GAD
Reviewed
131
414+040
GAD
Reviewed
132
414+240
GAD
Reviewed
133
414+750
GAD
Reviewed
134
418+107
GAD
Reviewed
135
418+748
GAD
Reviewed
136
420+178
GAD
Reviewed
137
425+330
GAD
Reviewed
138
425+900
GAD
Reviewed
139
426+935
GAD
Reviewed
140
429+325
GAD
Reviewed
141
429+449
GAD
Reviewed
142
430+200
GAD
Reviewed
143
431+110
GAD
Reviewed
144
433+265
GAD
Reviewed
145
433+600
GAD
Reviewed
146
434+231
GAD
Reviewed
147
435+200
GAD
Reviewed
148
435+750
GAD
Reviewed
149
435+915
GAD
Reviewed
150
436+127
GAD
Reviewed
151
436+655
GAD
Reviewed
152
438+313
GAD
Reviewed
153
438+605
GAD
Reviewed
154
438+860
GAD
Reviewed
155
438+966
GAD
Reviewed
156
439+370
GAD
Reviewed
157
439+710
GAD
Reviewed
158
440+015
GAD
Reviewed
159
440+095
GAD
Reviewed
160
440+660
GAD
Reviewed
161
440+850
GAD
Reviewed
162
441+010
GAD
Reviewed
163
444+420
GAD
Reviewed
164
444+595
GAD
Reviewed
165
444+897
GAD
Reviewed
GAD
Reviewed
166
446+015
GAD
Reviewed
167
447+048
GAD
Reviewed
168
448+397
GAD
Reviewed
169
449+080
GAD
Reviewed
170
450+505
GAD
Reviewed
171
450+690
GAD
Reviewed
172
450+970
GAD
Reviewed
173
451+070
GAD
Reviewed
174
452+452
GAD
Reviewed
175
452+350
GAD
Reviewed
176
453+453
GAD
Reviewed
177
453+940
GAD
Reviewed
178
454+740
GAD
Reviewed
179
456+460
GAD
Reviewed
180
457+530
GAD
Reviewed
181
459+750
GAD
Reviewed
182
460+000
GAD
Reviewed
183
460+120
GAD
Reviewed
184
460+410
GAD
Reviewed
185
460+495
GAD
Reviewed
186
460+652
GAD
Reviewed
187
460+775
GAD
Reviewed
188
461+505
GAD
Reviewed
189
462+175
GAD
Reviewed
190
462+300
GAD
Reviewed
191
462+360
GAD
Reviewed
192
462+735
GAD
Reviewed
193
463+015
GAD
Reviewed
194
463+345
GAD
Reviewed
195
463+530
GAD
Reviewed
196
467+040
GAD
Reviewed
197
473+415
GAD
Reviewed
198
473+980
GAD
Reviewed
199
476+446
GAD
Reviewed
200
477+500
GAD
Reviewed
201
478+570
GAD
Reviewed
202
478+611
GAD
Reviewed
203
478+990
GAD
Reviewed
204
479+325
GAD
Reviewed
205
485+790
GAD
Reviewed
206
486+075
GAD
Reviewed
207
511+920
GAD
Reviewed
208
406+115
SLAB CULVERT
GAD & design submitted
Under review
209
406+475
GAD & design submitted
Under review
210
409+525
GAD & design submitted
Under review
211
411+755
GAD & design submitted
Under review
212
412+325
GAD & design submitted
Under review
213
412.616
GAD & design submitted
Under review
214
412+836
GAD & design submitted
Under review
215
413+356
GAD & design submitted
Under review
216
413+555
GAD & design submitted
Under review
217
415+830
GAD & design submitted
Under review
218
416+283
GAD & design submitted
Under review
219
416+985
GAD & design submitted
Under review
220
420+790
GAD & design submitted
Under review
221
422+485
GAD & design submitted
Under review
222
422+645
GAD & design submitted
Under review
223
423+026
GAD & design submitted
Under review
224
423+592
GAD & design submitted
Under review
225
423+986
GAD & design submitted
Under review
226
432+316
GAD & design submitted
Under review
227
432+749
GAD & design submitted
Under review
228
432+989
GAD & design submitted
Under review
229
439+900
GAD & design submitted
Under review
230
441+850
GAD & design submitted
Under review
231
442+567
GAD & design submitted
Under review
232
442+745
GAD & design submitted
Under review
233
444+675
GAD & design submitted
Under review
234
446+410
GAD & design submitted
Under review
235
446+655
GAD & design submitted
Under review
236
449+421
GAD & design submitted
Under review
237
449+821
GAD & design submitted
Under review
238
452+685
GAD & design submitted
Under review
239
453+580
GAD & design submitted
Under review
240
455+705
GAD & design submitted
Under review
241
457+130
GAD & design submitted
Under review
242
457+260
GAD & design submitted
Under review
243
465+060
GAD & design submitted
Under review
244
465+087
GAD & design submitted
Under review
245
465+525
GAD & design submitted
Under review
246
465+765
GAD & design submitted
Under review
247
468+375
GAD & design submitted
Under review
248
469+220
GAD & design submitted
Under review
249
472+225
GAD & design submitted
Under review
GAD & design submitted
250
474+862
GAD & design submitted
Under review
251
481+930
GAD & design submitted
Under review
252
484+030
GAD & design submitted
Under review
253
487+904
GAD & design submitted
Under review
254
488+660
GAD & design submitted
Under review
255
489+128
GAD & design submitted
Under review
256
491+970
GAD & design submitted
Under review
257
493+834
GAD & design submitted
Under review
258
495+445
GAD & design submitted
Under review
259
497+040
GAD & design submitted
Under review
260
497+367
GAD & design submitted
Under review
261
499+890
GAD & design submitted
Under review
262
500+278
GAD & design submitted
Under review
263
501+260
GAD & design submitted
Under review
264
501+562
GAD & design submitted
Under review
265
502+863
GAD & design submitted
Under review
266
503+456
GAD & design submitted
Under review
267
505+226
GAD & design submitted
Under review
268
505+700
GAD & design submitted
Under review
269
506+723
GAD & design submitted
Under review
270
507+738
GAD & design submitted
Under review
271
512+383
GAD & design submitted
Under review
PROJECT WORK PROGRESS :-
Road Works Progress:-
Linear Progress (Road Works)
Main Carriageway
Activity Description
Unit
Total Length/Qty
Completed
% progress
Main Carriageway Six lane
C & G
Km.
Ha
122.88
306.53
5.645
18.55
4.60%
6.05%
Embankment
Km.
cum
122.88
1897473
-
10981.10
Work in progress
0.58%
Sub-Grade
Km.
cum
122.88
1544213
-
GSB/ CT sub base
GSB
CT sub-base
Km.
cum
cum
122.88
881086
291830
-
WMM /CT Base
WMM
CT Base
Km.
cum
cum
122.88
192599
120889
-
AG Layer
Km.
cum
42.93
187020
-
DBM
Km.
cum
122.88
250351
-
BC
Km.
cum
122.88
152516
-
Service Road
Activity Description
Unit
Total Length/Qty
Completed
% progress
C & G
Km.
Ha
149.09
141.97
4.70
3.29
3.15%
2.32%
Embankment
Km.
cum
149.09
655085
-
4622.40
Work in progress
0.71%
Sub-Grade
Km.
cum
149.09
644416
-
CT Sub base
Km.
cum
149.09
290445
-
CT Base
Km.
cum
149.09
73124
-
AG Layer
Km.
cum
149.09
103876
-
BC
Km.
cum
149.09
40192
-
Structure Work Progress:-
Type of structures
Total
Completed
In progress
Not yet started
ROB
2
1
1
Major bridge
3
3
Minor bridge
20
20
Grade Separator
12
2
10
Over pass
2
2
Under pass
2
2
Vehicular underpass
20
2
18
Pedestrian Underpass
11
11
Box culverts
47
5
42
Slab culverts
67
2
65
Pipe culverts
88
1
7
80
Total
274
1
19
254
DETAIL STATUS OF STRUCTURE :-
Sl No.
Chainage No. as per Drawing
Name of Structure
Status
Remarks
1
464+674
MAJOR BRIDGE
NYS.
2
517+095
NYS.
3
518+829
NYS.
4
398+811
Grade Separator
NYS.
5
407+538
NYS.
6
408+326
NYS.
7
456+312
NYS.
8
464+185
NYS.
9
475+670
NYS.
10
476+050
NYS.
11
496+609
NYS.
12
501+996
NYS.
13
504+287
NYS.
14
506+200
Work in progress
15
515+983
Work in progress
16
405+330
MINOR BRIDGE (NEW)
NYS.
New 3 Lane Bridge on LHS
17
409+876
NYS.
New 3 Lane Bridge on LHS
18
415+120
NYS.
New 3 Lane Bridge on LHS
19
429+973
NYS.
New 3 Lane Bridge on LHS
20
437+047
NYS.
New 3 Lane Bridge on LHS
21
450+140
NYS.
New 3 Lane Bridge on LHS
22
461+652
NYS.
New 3 Lane Bridge on LHS
23
464+903
NYS.
New 3 Lane Bridge on RHS
24
468+620
NYS.
New 3 Lane Bridge on LHS
25
497+840
NYS.
New 3 Lane Bridge on LHS
26
509+953
NYS.
New 3 Lane Bridge on LHS & Existing LHS Replaced by New 2 Lane Bridge
27
445+596
MINOR BRIDGE (WIDENING)
NYS.
GAD & Reinforcement details approved
28
462+895
NYS.
Widening on both Side
29
463+091
NYS.
Widening on both Side
30
463+710
NYS.
Widening on both Side
31
471+006
NYS.
Widening on both Side
32
485+002
NYS.
Widening on both Side
33
492+871
NYS.
Widening on both Side
34
495+735
NYS.
Widening on both Side
35
507+503
NYS.
Widening on both Side
36
520+373
ROB
Work in progress (Test pile).
GADs for both the ROBs have been approved
37
443+710
NYS.
38
403+440
VEHICULAR UNDERPASS
NYS.
39
411+374
NYS.
40
413+886
NYS.
41
421+400
NYS.
42
428+208
NYS.
43
433+563
NYS.
44
447+771
NYS.
45
451+153
NYS.
46
460+036
NYS.
47
467+115
NYS.
48
469+750
NYS.
49
473+340
NYS.
50
479+109
NYS.
51
486+427
NYS.
52
489+702
NYS.
53
491+451
NYS.
54
494+430
NYS.
55
509+559
NYS.
56
518+221
Work in progress
57
519+349
Work in progress
58
398+495
PEDESTRIAN UNDERPASS
NYS.
59
399+230
NYS.
60
407+400
NYS.
61
409+088
NYS.
62
417+953
NYS.
63
424+400
NYS.
64
476+430
NYS.
65
504+555
NYS.
66
510+700
NYS.
67
512+920
NYS.
68
514+900
NYS.
69
398+519
BOX CULVERT
NYS.
Reconstruction
70
398+782
NYS.
Reconstruction
71
403+335
NYS.
Reconstruction
72
407+212
NYS.
Reconstruction
73
407+422
NYS.
Reconstruction
74
407+657
NYS.
Left side widening & Right side Reconstruction
75
408+867
NYS.
Reconstruction
76
409+060
NYS.
Reconstruction
77
409+366
NYS.
Reconstruction
78
411+332
NYS.
Reconstruction
79
411+391
NYS.
Reconstruction
80
413+926
NYS.
Retained with widening but change to Reconstruction
81
415+216
NYS.
Existing Retained (RHS) New slab (LHS)
82
417+933
NYS.
Reconstruction
83
421+327
NYS.
Reconstruction
84
421+497
NYS.
Reconstruction
85
424+467
NYS.
Reconstruction
86
427+882
NYS.
Reconstruction
87
428+025
NYS.
Reconstruction
88
443+615
NYS.
Reconstruction
89
443+931
NYS.
Reconstruction
90
444+047
NYS.
Reconstruction
91
448+029
NYS.
Retained with widening but change to Reconstruction
92
450+883
NYS.
Reconstruction
93
451+334
NYS.
Reconstruction
94
456+131
NYS.
Retained with widening but change to Reconstruction
95
456+175
NYS.
Retained with widening but change to Reconstruction
96
456+355
NYS.
Retained with widening but change to Reconstruction
97
461+940
NYS.
Retained with widening but change to Reconstruction
98
467+300
NYS.
Reconstruction
99
470+025
NYS.
Reconstruction
100
475+615
NYS.
Reconstruction
101
486+816
NYS.
Reconstruction
102
489+549
NYS.
Reconstruction
103
489+860
NYS.
Reconstruction
104
494+593
NYS.
Reconstruction
105
496+719
Work in progress
Reconstruction
106
496+749
NYS.
Reconstruction
107
502+182
NYS.
Reconstruction
108
502+372
NYS.
Reconstruction
109
502+538
NYS.
Reconstruction
110
505+934
NYS.
Left side widening & Right side Reconstruction
111
506+173
Work in progress
Left side widening & Right side Reconstruction
112
509+255
NYS.
Reconstruction
113
512+635
NYS.
Reconstruction
114
512+997
Work in progress
Reconstruction
115
515+180
NYS.
New
116
516+290
NYS.
New
117
518+180
Work in Progress
New
118
519+690
Work in progress
New
119
399+140
PIPE CULVERT
NYS.
Retained with widening
120
400+070
NYS.
Retained with widening
121
400+450
In progress
Retained with widening
122
401+625
NYS.
Retained with widening
123
404+115
NYS.
Retained with widening
124
405+204
NYS.
Retained with widening
125
405+777
NYS.
Retained with widening
126
408+207
NYS.
Retained with widening
127
409+125
NYS.
Retained with widening
128
409+707
NYS.
Existing Retained (RHS) New Pipe (LHS)
129
410+140
NYS.
Retained with widening
130
410+760
NYS.
Retained with widening
131
414+040
NYS.
Retained with widening
132
414+240
NYS.
Retained with widening
133
414+750
NYS.
Retained with widening
134
418+107
NYS.
Retained with widening
135
418+748
NYS.
Retained with widening
136
420+178
NYS.
Retained with widening
137
425+330
NYS.
Retained with widening
138
425+900
NYS.
Retained with widening
139
426+935
NYS.
Retained with widening
140
429+325
NYS.
Retained with widening
141
429+449
NYS.
Retained with widening
142
430+200
NYS.
Retained with widening
143
431+110
NYS.
Retained with widening
144
433+265
NYS.
Retained with widening
145
433+600
NYS.
Retained with widening
146
434+231
NYS.
Retained with widening
147
435+200
NYS.
Retained with widening
148
435+750
NYS.
Retained with widening
149
435+915
NYS.
Retained with widening
150
436+127
NYS.
Retained with widening
151
436+655
NYS.
Retained with widening
152
438+313
NYS.
Retained with widening
153
438+605
NYS.
Retained with widening
154
438+860
NYS.
Retained with widening
155
438+966
NYS.
Retained with widening
156
439+370
NYS.
Retained with widening
157
439+710
NYS.
Retained with widening
158
440+015
NYS.
Retained with widening
159
440+095
NYS.
Retained with widening
160
440+660
NYS.
Retained with widening
161
440+850
NYS.
Retained with widening
162
441+010
NYS.
Retained with widening
163
444+420
NYS.
Retained with widening
164
444+595
NYS.
Retained with widening
165
444+897
In progrss
Retained with widening
166
446+015
In progress
Retained with widening
167
447+048
NYS.
Retained with widening
168
448+397
NYS.
Retained with widening
169
449+080
NYS.
Retained with widening
170
450+505
NYS.
Retained with widening
171
450+690
NYS.
Retained with widening
172
450+970
NYS.
Retained with widening
173
451+070
NYS.
Retained with widening
174
452+452
NYS.
Retained with widening
175
452+350
In progress
Retained with widening
176
453+453
NYS.
Retained with widening
177
453+940
NYS.
Retained with widening
178
454+740
NYS.
Retained with widening
179
456+460
NYS.
Retained with widening
180
457+530
NYS.
Retained with widening
181
459+750
NYS.
Retained with widening
182
460+000
NYS.
Retained with widening
183
460+120
NYS.
Retained with widening
184
460+410
NYS.
Retained with widening
185
460+495
NYS.
Retained with widening
186
460+652
NYS.
Retained with widening
187
460+775
N