next gen wireless broadband o problem: o 90 city center das nodes o cannot connect up distributed...

4

Upload: garry-cook

Post on 17-Dec-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Next Gen Wireless Broadband

o Problem:o 90 City Center DAS Nodeso Cannot connect up distributed antennas cost effectivelyo Last fibre drop very time consuming and expensiveo The fibre route to street furniture is space constrained and

complexo Solution:

o Use of Robust Ultra-low friction micro ducto Use of Robust multi-fibre micro cableo Cable pulled 150m

o Result:o Installation time reduced by 50%

DAS - Chicago

3/4G Radio-headso Problem:

o Radiohead on roof – base-station 10 floors down in basement

o The fibre route is space constrained and complex

o Difficulty of installation results in suboptimum wireless coverage

o Solution:o Use of Robust Ultra-Low Friction LSZH

micro ducto Use of Robust 24-fibre micro cableo Cable pushed from 10th floor

o Result:o “Impossible” install achieved

“Pretty slick material to say the least”AT&T Engineer