nexgen decking 0001 · deck construction. dryjoistez will be fastened directly to the perimeter...

16

Upload: others

Post on 07-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 2: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 3: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 4: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 5: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 6: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 7: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 8: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 9: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 10: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 11: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 12: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 13: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 14: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 15: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum
Page 16: NexGEN Decking 0001 · deck construction. DryJoistEZ will be fastened directly to the perimeter framing on all sides and all mid- span beams. Framing shall be built with a minimum