  • NEW YORK STATE DEPARTMENT OF TRANSPORTATION

    NY Gateway Connection Improvements to the US Peace Bridge Plaza

    City of Buffalo, Erie County

    Design-Build Project

    Request for Qualifications

    Informational Meeting

    September 5, 2013

    1

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build ProjectAgenda

    Introductions and Opening RemarksProject StatusProject Overview Quality Control & Quality AssuranceProcurementQuestions and Answers

    2

  • Peter RussellAttn: NY Gateway Connection Improvements

    Office of Contracts ManagementNew York State Department of Transportation

    50 Wolf Road, 6th FloorAlbany, New York [email protected]

    NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Project Contact

    3

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build ProjectProject Status

    Project is on an Accelerated Procurement ScheduleSimultaneous Tasks

    Design ReportSpecific Scope of WorkEnvironmental Impact Studies (Draft EIS by mid Nov.)Site InvestigationsPLA Due DiligenceUtility and other Third Party AgreementsDesign-Build Procurement

    Final Scope will be in Draft RFP

    4

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Agenda

    Introductions and Opening RemarksProject StatusProject Overview

    General LocationGoalsGeneral Scope of Work

    Quality Control & Quality AssuranceProcurementQuestions and Answers

    5

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project General Location

    6

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Existing Conditions Plan

    7

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Concept Plan

    8

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project General Scope of Work (Continued)

    1) Construction of a new Ramp D from Plaza to I-190 Northbound; Widening of the I-190 Northbound bridge, over the existing combined Riverwalk and the access driveway to the Massachusetts Pumping Station

    2) Removal of Baird Drive from Front Park between the Plaza and Porter Avenue, and restoration of the street area to park land; Minor landscaping and pathway restoration

    9

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project General Scope of Work (Continued)

    2) Relocation of the park entrance for vehicles to the Porter Avenue/Lakeview Avenue Intersection

    3) Construction of a new Ramp PN from Porter Avenue to Ramp N

    4) Minor modifications of portions of existing Ramps A, C, N and P

    5) Construction of new access from Porter Avenue to Ramps P & PN by either:a new signalized intersection on Porter Avenue; ora new roundabout on Porter Avenue.

    10

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project General Scope of Work (Continued)

    6) Possible replacement of the Porter Avenue Bridge over I-190 and CSX Railroad

    7) Possible Relocation of the Riverwalkpedestrian/bicycle bridge crossing over CSX Railroad, the access driveway to Massachusetts Pumping Station, and I-190 to an area between I-190 and the Black Rock Canal. Work would include reconstruction of a portion of the Riverwalk

    11

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project General Scope of Work (Continued)

    8) Reconstruction and widening of the sidewalk along the south side of Porter Avenue from Lakeview Avenue to LaSalle Park and Riverwalk for use as a pathway for both pedestrians and bicycles

    12

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Goals

    Ensure a long-service life for all Project ElementsEnsure the safety of the traveling publicMaximize the impact of the public investment in the Project by:

    Providing cost-effective design and construction solutions;Sequencing construction to minimize effects on vehicular traffic operations;Reducing future maintenance requirements; and Minimizing impacts on the environment.

    13

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Goals (Continued)

    Deliver the Project safely, on schedule and within budgetEnsure coordination with all utility owners, third parties and Project stakeholders and any adjacent construction projectsProvide best value to the Department

    14

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Agenda

    Introductions and Opening RemarksProject StatusProject Overview Quality Control & Quality AssuranceProcurementQuestions and Answers

    15

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Quality Control (QC)

    QC is Design-Builder’s Responsibility

    Design-Builder shall be required to develop a QC Plan covering both Design QC and Construction QC

    Design-Builder shall appoint a QC Manager responsible for Project QC

    Design QC shall be by the Designer in accordance with the QC Plan

    Construction Inspection shall be by an Independent Engineering Firm (Hired by the Design-Builder)

    Materials Testing shall be by an Independent Testing Firm or Laboratory (Hired by the Design-Builder)

    The Independent Testing Firm shall report to the Construction Inspection Firm

    Offsite Plant Quality Control will be performed by the Department

    16

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Quality Assurance (QA)

    QA is Department’s ResponsibilityThe Department may perform QA on any of the Design-Builder’s Design and Construction ActivitiesThe Department may utilize an independent Consultant to perform QA of the Design-Builder’s DesignsDepartment Staff will perform Construction QARFQ Section 1.9 covers QA/QCRFP will describe in detail the Department’s QA Role for the Project

    17

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Agenda

    Introductions and Opening RemarksProject StatusProject Overview Quality Control & Quality AssuranceProcurement

    ScheduleContract InformationSOQ Evaluation and SelectionAdditional Information and Website

    Questions and Answers

    18

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Procurement Schedule

    Activity Due DatePre-RFQ Informational Meeting September 5, 2013Final RFQ Released September 19, 2013Final Date for receipt of Proposer’s questions September 25, 2013Issue Date for Final Addendum to the RFQ and/or answers to Proposer’s questions September 30, 2013SOQ Due Date October 8, 2013Shortlisted DB Teams Announced (3 to 5 Teams) November 7, 2013Draft RFP Issued November 20, 2013Draft RFP Informational Meeting December 4, 2013Final RFP to Shortlisted Firms December 20, 2013Proposals Due February 20, 2014Selection / Award March, 2014Execute Contract April, 2014Notice to Proceed May, 2014

    19

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Contract Information

    Lump Sum Design-Build Contract

    Two Step Design-Build Procurement ProcessProject Schedule

    Total Duration 24 Months +/- (under review)There will be a Payment Schedule provided in the RFPStipend Amount is Under Consideration by NYSDOTLiquidated Damages may be imposed for missed milestones and final completionROW by NYSDOT

    Environmental Permits by the DepartmentConstruction Related Permits by Design-Builder

    20

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project SOQ Evaluation and Selection

    Pass/Fail Evaluation FactorsLegal; Financial; Backlog Capacity; Vendor Responsibility; andProposal Responsiveness.

    Quality Evaluation FactorsOrganization and Key Personnel (20%)Experience of the Firms (25%)Project Understanding (30%)Past Performance (25%)

    21

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Additional Information

    Responses to Proposer Questions will be posted on the Project Web Site

    Final Addendum to the RFQ will be issued by Monday, Sept. 30, 2013 Reference Information has been Posted on the Project Web Site:

    NY Gateway Concept PlanProject Scoping Report

    There will be a Buy America ClauseThere will be a DBE Participation GoalRFQ Section 1.10 covers Insurance & Bonding

    22

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Project Website

    https://www.dot.ny.gov/main/business-center/designbuildproject3

    23

  • Peter RussellAttn: NY Gateway Connection Improvements

    Office of Contracts ManagementNew York State Department of Transportation

    50 Wolf Road, 6th FloorAlbany, New York [email protected]

    NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Project Contact

    24

  • NY Gateway Connection Improvements to the US Peace Bridge Plaza: Design-Build Project Questions and Answers

    Questions??