New test structures: Status report and technical documentation review Case structures : 11WNSDVG1.KS N2 (T18) PETS 11.4 GHz with damping material Extra: BAAN, ERP-package for inventory management. Margarita Saifoulina & Maria Filippova BE/RF Input from: Andrey Olyunin - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/1.jpg)
New test structures:Status report and technical documentation review
Case structures : 11WNSDVG1.KS N2 (T18)PETS 11.4 GHz with damping material
Extra: BAAN, ERP-package for inventory management
Margarita Saifoulina & Maria FilippovaBE/RF
Input from:Andrey OlyuninGermana RiddoneSerge Lebet
![Page 2: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/2.jpg)
CATIA/Smarteam & EDMS/MTF
![Page 3: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/3.jpg)
Design
Manufacturing
Installation
Commissioning
Maintenance
Dismantling
CERNEDMS
PLM = Product Lifecycle Management = EDMS/MTF at CERN
![Page 4: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/4.jpg)
Import process
MTF
AxalantDesign data
Drawings & Documents
InforEAMPLM management
Manufacturing workflow
EDMS Web
![Page 5: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/5.jpg)
Introduction to the EDMS/MTF
• Design side(EDMS)= Items – Structure of project– Drawings– 2D models– Parameters– Documentation (test/report)
• Physical manufacturing side(MTF) = Equipment– Structure of assembly– Made of– Equipment data– Manufacturing
• Workflow steps– Quality control– Documents(links to EDMS)– Component’s traceability of whole product lifecycle
Project data management
Product life cycle management
![Page 6: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/6.jpg)
Manufacturing Workflow in MTF• Describes the manufacturing process
Easy to identify data when it appears along with the equipment being manufactured
![Page 7: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/7.jpg)
How to access MTF?
1. Method
![Page 8: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/8.jpg)
![Page 9: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/9.jpg)
2. Method
![Page 10: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/10.jpg)
![Page 11: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/11.jpg)
11WNSDVG1.KS N2 (T18)
Now it’s ready for shipment
![Page 12: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/12.jpg)
PETS 11.4 GHz with damping material material
Now it’s ready for final bake-out
![Page 13: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/13.jpg)
Notification letter for MTF
Proposal of letter content:
Please find new attached report document in MTF,under the structure '11WNSDVG1.8 VB S- CLAAS110277-CR000002'. https://edms.cern.ch/asbuilt/plsql/mtf_equip.eqp_work_top?cooki=9270257&p_rec_id=CLAAS110277-CR000002&p_rec_typeEDMS id. of document 1065640 (ver.1) RF design and parameters of 11.424 GHz T24_vg1.8_disk.( or 11WNSDvg1.8; or CLIC_G undamped) created by Alexej GRUDIEVhttps://edms.cern.ch/document/1065640/1
![Page 14: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/14.jpg)
Notification letter for MTF
• Notification letter should be sent when document is attached to MTF
• Notification system updates every hour• Who should receive notification letter?
- CLIC RF production: IS, WW, AG, JPD, SL, MF, MS, MT, MM, JShi, AS, G. Arnau, Ph. De Souza
![Page 15: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/15.jpg)
PLM/ERP for BE/RF
CAD tools - CATIA
PDM - EDMS PLM - MTF ERP - BAAN
Enterprise Resource Planning – BAAN (Company name)
![Page 16: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/16.jpg)
BAAN – Inventory Management
• ERP- package used by CERN since 1995
• It’s integrated to other applications such as EDH and Qualiac, which is another ERP package for purchasing and logistics export/import documentation
• Component’s traceability of whole product lifecycle in different levels of intra- and inter- organizational integration in one place
![Page 17: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/17.jpg)
BAAN – Inventory Management
• User-friendly interface Training courses not compulsory
• Not yet web-based
• If needed AIS-support can create new functions of database for our personal needs
• Technical Specification in progress
• BAAN- package presentation availablehttps://espace.cern.ch/gs-dep-ais-fpf/ExternalProject/rf/default.aspx
![Page 18: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/18.jpg)
BAAN – Example of standard layout
![Page 19: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/19.jpg)
BAAN – Functions’ Screens
![Page 20: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/20.jpg)
BAAN – Stock Management
![Page 21: New test structures: Status report and technical documentation review](https://reader036.vdocuments.us/reader036/viewer/2022062310/56815e06550346895dcc5355/html5/thumbnails/21.jpg)
Conclusion
• PLM/ERP eliminates: The lack of information Waste of time
Inefficiency of component’s whole lifecycle, not only in manufacturing
• If used properly PLM/ERP increase productivity
• Future actions: Inventory management is needed Standard information in reports for data management: what was done, who did, when, where