new college house west - philadelphia civic design review 20 february 2018 university of...
TRANSCRIPT
New College House WestUniversity of Pennsylvania
Civic Design Review Bohlin Cywinski Jackson | February 20, 2018
(this page left intentionally blank)
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 3
Index
Content
• CDR application form.
• Photographs of the proposed building site and immediate area and aerial photographs in plan and oblique views.
• Existing site survey
• Complete Streets Handbook Checklist
• Proposed ground floor plan
• Landscape plan
• Elevations
• Site sections
• Perspective renderings.
• 3D digital or physical massing model
• CDR Sustainability Questionnaire and Narrative
• Building materials
Page
5
6-9, 14
30
34-40
13
12
32
15, 20, 21, 22, 25, 26, 28
16-19, 23, 27
29, 31
42, 43
33
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 4
(this page left intentionally blank)
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 5
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 6
The Radian Apartments Dubois College House
Rodin College House
Free Library
40th StreetWalnut Street
Site Aerial Looking South - Existing
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 7
REQUEST FOR PROPOSAL
Conceptual Design for a New College House at Hamilton Village
Project Number: TBD
July 18, 2016
University of Pennsylvania Division of Facilities and Real Estate Services
3101 Walnut Street Philadelphia, PA 19104-6289
Site Aerial Looking East - Existing
Site Looking North West to Free Library - Existing
Site Looking South/West to 40th Street - Existing
Site Looking North to Walnut Street - Existing
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 8
Walnut Street Looking West - Existing Walnut Street Looking East - Existing Walnut Street Looking West - Existing
Walnut Street Looking East - Existing Site Looking West to Dubois College House - Existing Site Looking West to Free Library - Existing
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 9
40th Street Looking South - Existing 40th Street Looking North - Existing 40th Street - Existing
40th Street to Free Library Looking South - Existing 40th Street Looking South - Existing
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 10
(this page left intentionally blank)
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 11
College House
Courtyard
New College House West
Campus Plan
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 12
Locust Walk
Rodin College House
Dubois College HouseFree
Library
Walnut Street40
th S
tree
t
Green
House
the Porch
Site Plan
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 13
4
2
1
3
1. Entry2. Welcoming3. Coffee Bar4. Multipurpose Room5. Info Desk 6. Porch7. Main Elevator Lobby8. Common Living Room9. Tinker Space10. House Offices11. Service12. Shared Recycling Court13. Shared Bike Parking
6
8
7
5
9
10
11
12
13
13
Walnut Street
Green
House
Locust Walk
Ground Floor Plan
40th
Str
eet
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 14
Locust Walk - Existing Green - Existing
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 15
Locust Walk Green Courtyard Walnut Street
Longitudinal Site Section
Porch
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 16
40th Street Looking North to Locust Walk
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 17
Locust Walk Looking West
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 18
The Courtyard Looking South
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 19
Green and Entry
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 20
PorchGreen Courtyard
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 21
Living Room Club Roomwith Kitchen
Seminar Room Walnut St.Garden SittingWall
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 22
July 12, 2017CVM • Vanderweil • Meliora • Michael Vergason Landscape Architects • Dharam Consulting
PFRD Schematic Design | Meeting 5Not For Public Release
Streetscape Walnut Street Sidewalk
FFE +87.0Fitted field stone wall /Limestone coping
Walnut Street Sidewalk Section
Walnut Street Sidewalk Plan
Walnut Street
40th
Str
eet
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 23
Walnut Street Looking West
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 24 July 12, 2017CVM • Vanderweil • Meliora • Michael Vergason Landscape Architects • Dharam Consulting
PFRD Schematic Design | Meeting 5Not For Public Release
Library West Access Gateway & Sign
Streetscape 40 th street elevation
40th Street Elevation
July 12, 2017CVM • Vanderweil • Meliora • Michael Vergason Landscape Architects • Dharam Consulting
PFRD Schematic Design | Meeting 5Not For Public Release
Library West Access Gateway & Sign
Streetscape 40 th street elevation
Library NCHW Access from West Locust Walk
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 25July 12, 2017CVM • Vanderweil • Meliora • Michael Vergason Landscape Architects • Dharam Consulting
PFRD Schematic Design | Meeting 5Not For Public Release
40th Street SidewalkStreetscape
LOD
13.1’
16.3’
LOD
40th Street Sidewalk Plan
40th Street Sidewalk
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 26
July 12, 2017CVM • Vanderweil • Meliora • Michael Vergason Landscape Architects • Dharam Consulting
PFRD Schematic Design | Meeting 5Not For Public Release
Streetscape
+86.75
+87.00
+82.50
40th St. West Entry
40th Street Sidewalk Plan
40th Street Sidewalk Section A-A’ 40th Street Sidewalk Section B-B’ 40th Street Sidewalk Section C-C’
40th Street
A
A’
B
B’
C
C’
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 27
40th Street Looking East
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 28
Green40th Street
Cross Site Section
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 29
Physical Model
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 30
DWG. NO.
OF 22THE
CO
PY
ING
OR
RE
US
E O
F TH
IS D
OC
UM
EN
T, O
R P
OR
TIO
NS
TH
ER
EO
F, F
OR
OTH
ER
TH
AN
TH
E O
RIG
INA
L P
RO
JEC
T O
R
THE
PU
RP
OS
E O
RIG
INA
LLY
INTE
ND
ED
, WIT
HO
UT
THE
WR
ITTE
N P
ER
MIS
SIO
N O
F C
ON
TRO
L P
OIN
T A
SS
OC
IATE
S, I
NC
., IS
PR
OH
IBIT
ED
.
CO
NTR
OL
PO
INT
AS
SO
CIA
TES
, IN
C.-
ALL
RIG
HTS
RE
SE
RV
ED
.
0 10 20 40 80
( IN FEET )1 inch = 20 ft.
GRAPHIC SCALE20
APPR
OX.
NO
RTH
PER
REF
. MAP
#5
CLEAN OUT
PAINTED ARROWS
APPROX. LOC. UNDERGROUND ELEC. LINE
APPROX. LOC. UNDERGROUND GAS LINE
GAS VALVE
WATER VALVE
OVERHEAD WIRES
AREA LIGHT
MAIL BOX
U-BOLLARD
BOLLARD
SIGN
GUY WIRE
APPROX. LOC. UNDERGROUND TEL. LINE
APPROX. LOC. UNDERGROUND WATER LINE
UTILITY POLE
TRAFFIC SIGNAL
DECIDUOUS TREE & TRUNK SIZE
DEPRESSED CURB
APPROX. LOC. UNDERGROUND CABLE LINE
DEPRESSED CURB
EDGE OF PAVEMENT
LANDSCAPED AREA
RAILROAD TIE WALL
UNKNOWN VALVE
EDGE OF CONCRETE
CHAIN LINK FENCE
DRAINAGE/STORM MANHOLE
ELECTRIC MANHOLE
SANITARY/SEWER MANHOLE
TELEPHONE MANHOLE
UNKNOWN MANHOLE
METAL COVER
STREET LIGHT
WATER METER
HYDRANT
GAS METER
ELECTRIC METER
TYPICAL
CATCH BASIN OR INLET
GAS BOX
EXIST. GUTTER ELEVATION
EXISTING SPOT ELEVATION
EXIST. TOP OF WALL ELEVATION
EXIST. BOTTOM OF WALL ELEVATION
EXIST. TOP OF CURB ELEVATION
EXISTING CONTOUR
LEGEND
EXIST. FINISHED FLOOR ELEVATION
EXIST. DOOR SILL ELEVATION
DETECTABLE WARNING PAD
SOLID YELLOW LINE
HEIGHT
BUILDING
FILLED w/DEBRIS
SOLID WHITE LINE
DASHED WHITE LINE
DOUBLE YELLOW LINE
NO VISIBLE PIPE
TOP OF SNOUTTOP OF WATERTOP OF DEBRISBORING LOCATION
LIGHT POLE
DEPTH
TEMPORARY BENCHMARK
ROOF DRAIN
POST
APPROX. LOC. UNDERGROUND STEAM LINE
APPROX. LOC. UNDERGROUND SANITARY LATERAL
TREE STUMP & SIZE
CONIFEROUS TREE & TRUNK SIZE
MULTI-TRUNK TREE
C
3900-3950 WALNUT STREETUNIVERSITY OF PENN
COMMONWEALTH OF PENNSYLVANIA
S.C.H.
P.V.
REVIEWED:
FIELD CREW
DRAWN:
J.C./G.N.
3-8-2017
CP16-21FIELD BOOK NO.
FIELD BOOK PG.
FIELD DATE
A
CITY & COUNTY OF PHILADELPHIA (27TH WARD)LOT 46, MAP 19 S 12; OPA #88-1822450
SPL ORTNO
SS CO TAI ETNIO
NI, C .
APPROVED:
4-3-2017DATE
1"=20'SCALE
02-170047FILE NO.
REVISED PER RECEIPT OF TITLE COMMITMENT REPORT1
No. DESCRIPTION OF REVISION
G.N. S.C.H. D.K.H./J.A.C. 5-5-2017
DATEAPPROVED:DRAWN:FIELD CREW
DATE
NOT VALID UNLESS SEALED IN RED INK
PENNSYLVANIA PROFESSIONAL LAND SURVEYOR NO. SU075250
JAMES C. WEED
NEW BRITAIN CORPORATE CENTER1600 MANOR DRIVE, SUITE 210CHALFONT, PA 18914215.712.9800 - 215.712.9802 FAXWWW.CPASURVEY.COM
WARREN, NJ 908.668.0099
THIS SURVEY IS CERTIFIED TO:
FIDELITY NATIONAL TITLE INSURANCE COMPANYUNIVERSITY OF PENN
THIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THE SURVEY ON WHICH IT WAS BASED WEREMADE IN ACCORDANCE WITH THE "2016 MINIMUM STANDARD DETAIL REQUIREMENTS FORALTA/NSPS LAND TITLE SURVEYS", JOINTLY ESTABLISHED AND ADOPTED BY ALTA AND NSPS,AND INCLUDES ITEMS 2, 3, 4, 5, 7(a), 7(b)(1), 7(c), 8, 9, 11 & 13 OF TABLE A THEREOF. THE FIELDWORK WAS COMPLETED ON 4-17-2017
ALTA/NSPS LAND TITLE SURVEY
SOUTHBOROUGH, MA 508.948.3000
MT. LAUREL, NJ 609.857.2099MANHATTAN, NY 646.780.0411
LONG ISLAND, NY 631.580.2645
4-17-2017
CP17-03CP17-04
156-15812, 582
5-5-2017
UNITED STATES STANDARD
PHILADELPHIA DISTRICT STANDARD
TABLE OF POSSIBLE ENCROACHMENTS
A BUILDING LINE ALONG THE DIVIDING LINE BETWEEN PREMISES K AND J.
NOTE: THESE ARE THE POSSIBLE ENCROACHMENTS OBSERVED DURING THEPROCESS OF CONDUCTING THE FIELD WORK. THERE MAY BE OTHERS NOTRECOGNIZED BY THE SURVEYOR.
WALNUT STREET(80' WIDE ROW) (LEGALLY OPEN )
(18'-44'-18') (ON CITY PLAN )
40T
H S
TR
EE
T(6
0' W
IDE
RO
W) (
LEG
ALLY
OPE
N)
(13'
-34'
-13'
) ( O
N C
ITY
PLAN
)
MAP 19 S 12LOT 46
OPA 88-1822450
LOCUST STREET
LOCUST WALK(F.K.A. LOCUST STREET)
(STRICKEN AND VACATED FROM CITY PLAN PER ORDINANCE 11-19-1968)
N11
°01'
00"E
S78°59'00"E 630.328'(P.D.S.)
S11°
01'0
3"W
380.
792'
(P.D
.S.)
FO
RM
ER
39T
H S
TR
EE
T(S
TRIC
KEN
AND
VACA
TED
FRO
M C
ITY
PLAN
PER
ORD
INAN
CE 1
1-15
-197
1.R.
O.W
. RES
ERVE
D FO
R W
ATER
MAI
N AN
D G
AS M
AIN
PURP
OSE
S)
11
12
15 16
380.
792'
(P.D
.S.)
N78°59'00"W 630.328'(P.D.S.)
A
1100 Ludlow StreetSuite 600Philadelphia, PA 19107v: 215.790.5900 f: 215.790.5901
Scale
Date Issued
BCJ Project Number
Seal
Revisions
© 2017 Bohlin Cywinski Jackson
General Notes
September 1, 2017
17301
University of Pennsylvania
PFRD
Schematic Design
CONFIDENTIAL - NOT FOR PUBLIC RELEASE
No. Description Date
1100 Ludlow StreetSuite 600Philadelphia, PA 19107v: 215.790.5900 f: 215.790.5901
Scale
Date Issued
BCJ Project Number
Seal
Revisions
© 2017 Bohlin Cywinski Jackson
General Notes
September 1, 2017
17301
University of Pennsylvania
PFRD
Schematic Design
CONFIDENTIAL - NOT FOR PUBLIC RELEASE
No. Description Date
C1.00
EXISTING CONDITIONSPLAN
20 0 20 40
1 INCH = 20 FEET
CLEAN OUT
PAINTED ARROWS
APPROX. LOC. UNDERGROUND ELEC. LINE
APPROX. LOC. UNDERGROUND GAS LINE
GAS VALVE
WATER VALVE
OVERHEAD WIRES
AREA LIGHT
MAIL BOX
U-BOLLARD
BOLLARD
SIGN
GUY WIRE
APPROX. LOC. UNDERGROUND TEL. LINE
APPROX. LOC. UNDERGROUND WATER LINE
UTILITY POLE
TRAFFIC SIGNAL
DECIDUOUS TREE & TRUNK SIZE
DEPRESSED CURB
APPROX. LOC. UNDERGROUND CABLE LINE
DEPRESSED CURB
EDGE OF PAVEMENT
LANDSCAPED AREA
RAILROAD TIE WALL
UNKNOWN VALVE
EDGE OF CONCRETE
CHAIN LINK FENCE
DRAINAGE/STORM MANHOLE
ELECTRIC MANHOLE
SANITARY/SEWER MANHOLE
TELEPHONE MANHOLE
UNKNOWN MANHOLE
METAL COVER
STREET LIGHT
WATER METER
HYDRANT
GAS METER
ELECTRIC METER
TYPICAL
CATCH BASIN OR INLET
GAS BOX
EXIST. GUTTER ELEVATION
EXISTING SPOT ELEVATION
EXIST. TOP OF WALL ELEVATION
EXIST. BOTTOM OF WALL ELEVATION
EXIST. TOP OF CURB ELEVATION
EXISTING CONTOUR
LEGEND
EXIST. FINISHED FLOOR ELEVATION
EXIST. DOOR SILL ELEVATION
DETECTABLE WARNING PAD
SOLID YELLOW LINE
HEIGHT
BUILDING
FILLED w/DEBRIS
SOLID WHITE LINE
DASHED WHITE LINE
DOUBLE YELLOW LINE
NO VISIBLE PIPE
TOP OF SNOUTTOP OF WATERTOP OF DEBRISBORING LOCATION
LIGHT POLE
DEPTH
TEMPORARY BENCHMARK
ROOF DRAIN
POST
APPROX. LOC. UNDERGROUND STEAM LINE
APPROX. LOC. UNDERGROUND SANITARY LATERAL
TREE STUMP & SIZE
CONIFEROUS TREE & TRUNK SIZE
MULTI-TRUNK TREE
UNITED STATES STANDARD
PHILADELPHIA DISTRICT STANDARD
WALNUT STREET(80' WIDE ROW) (LEGALLY OPEN )
(18'-44'-18') (ON CITY PLAN )
40T
H S
TR
EE
T(6
0' W
IDE
RO
W) (
LEG
ALLY
OPE
N)
(13'
-34'
-13'
) ( O
N C
ITY
PLAN
)
MAP 19 S 12LOT 46
OPA 88-1822450
LOCUST STREET
LOCUST WALK(F.K.A. LOCUST STREET)
(STRICKEN AND VACATED FROM CITY PLAN PER ORDINANCE 11-19-1968)
N11
°01'
00"E
S78°59'00"E 630.328'(P.D.S.)
S11°
01'0
3"W
380.
792'
(P.D
.S.)
FO
RM
ER
39T
H S
TR
EE
T(S
TRIC
KEN
AND
VACA
TED
FRO
M C
ITY
PLAN
PER
ORD
INAN
CE 1
1-15
-197
1.R.
O.W
. RES
ERVE
D FO
R W
ATER
MAI
N AN
D G
AS M
AIN
PURP
OSE
S)
11
12
15 16
380.
792'
(P.D
.S.)
N78°59'00"W 630.328'(P.D.S.)
A
1100 Ludlow StreetSuite 600Philadelphia, PA 19107v: 215.790.5900 f: 215.790.5901
Scale
Date Issued
BCJ Project Number
Seal
Revisions
© 2017 Bohlin Cywinski Jackson
General Notes
September 1, 2017
17301
University of Pennsylvania
PFRD
Schematic Design
CONFIDENTIAL - NOT FOR PUBLIC RELEASE
No. Description Date
1100 Ludlow StreetSuite 600Philadelphia, PA 19107v: 215.790.5900 f: 215.790.5901
Scale
Date Issued
BCJ Project Number
Seal
Revisions
© 2017 Bohlin Cywinski Jackson
General Notes
September 1, 2017
17301
University of Pennsylvania
PFRD
Schematic Design
CONFIDENTIAL - NOT FOR PUBLIC RELEASE
No. Description Date
C1.00
EXISTING CONDITIONSPLAN
20 0 20 40
1 INCH = 20 FEET
CLEAN OUT
PAINTED ARROWS
APPROX. LOC. UNDERGROUND ELEC. LINE
APPROX. LOC. UNDERGROUND GAS LINE
GAS VALVE
WATER VALVE
OVERHEAD WIRES
AREA LIGHT
MAIL BOX
U-BOLLARD
BOLLARD
SIGN
GUY WIRE
APPROX. LOC. UNDERGROUND TEL. LINE
APPROX. LOC. UNDERGROUND WATER LINE
UTILITY POLE
TRAFFIC SIGNAL
DECIDUOUS TREE & TRUNK SIZE
DEPRESSED CURB
APPROX. LOC. UNDERGROUND CABLE LINE
DEPRESSED CURB
EDGE OF PAVEMENT
LANDSCAPED AREA
RAILROAD TIE WALL
UNKNOWN VALVE
EDGE OF CONCRETE
CHAIN LINK FENCE
DRAINAGE/STORM MANHOLE
ELECTRIC MANHOLE
SANITARY/SEWER MANHOLE
TELEPHONE MANHOLE
UNKNOWN MANHOLE
METAL COVER
STREET LIGHT
WATER METER
HYDRANT
GAS METER
ELECTRIC METER
TYPICAL
CATCH BASIN OR INLET
GAS BOX
EXIST. GUTTER ELEVATION
EXISTING SPOT ELEVATION
EXIST. TOP OF WALL ELEVATION
EXIST. BOTTOM OF WALL ELEVATION
EXIST. TOP OF CURB ELEVATION
EXISTING CONTOUR
LEGEND
EXIST. FINISHED FLOOR ELEVATION
EXIST. DOOR SILL ELEVATION
DETECTABLE WARNING PAD
SOLID YELLOW LINE
HEIGHT
BUILDING
FILLED w/DEBRIS
SOLID WHITE LINE
DASHED WHITE LINE
DOUBLE YELLOW LINE
NO VISIBLE PIPE
TOP OF SNOUTTOP OF WATERTOP OF DEBRISBORING LOCATION
LIGHT POLE
DEPTH
TEMPORARY BENCHMARK
ROOF DRAIN
POST
APPROX. LOC. UNDERGROUND STEAM LINE
APPROX. LOC. UNDERGROUND SANITARY LATERAL
TREE STUMP & SIZE
CONIFEROUS TREE & TRUNK SIZE
MULTI-TRUNK TREE
UNITED STATES STANDARD
PHILADELPHIA DISTRICT STANDARD
Existing Site Survey 1” = 60’
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 31
Physical Model
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 32
Aluminum Composite Material Panel
Window Wall
Aluminum Composite Material Panel
Clay Shingle Ribbon Window
Window Wall
ClayShingle
Brick
West Elevation South Elevation
North Elevation East Elevation
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 33
Aluminum Composite Material Panel Brick Clay Shingle Ribbon Window
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 34
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 35
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 36
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 37
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 38
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 39
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 40
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 41
(this page left intentionally blank)
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 42
Philadelphia City Planning Commission
Civic Design Review, Philadelphia Sustainability Questionnaire
Categories Benchmark
Meets or Exceeds the Benchmark (yes or no)?
If yes, please describe how or reference the applicable document in the CDR
submission.
Location and Transportation
Access to Quality Transit
Locate a functional entry of the project within a 1/4-mile (400-meter) walking distance of existing or planned bus, streetcar, or rideshare stops, bus rapid transit stops, light or heavy rail stations.
Yes – Project is 0.2 mile walk to 40th St. Station on MFL (rapid transit rail); 0.1 mile walk to Walnut St. & 40th St. stop on 21 line (bus), 30 line (bus), 40 line (bus), LUCYGO, and LUCYGR; 0.2 mile walk to Spruce St. & 40th St. stop on 42 line (bus).
Reduced Parking Footprint
All new parking areas to be located in the rear yard of the property or under the building, and unenclosed or uncovered parking areas are 40% or less of the site area.
Yes – No new parking areas.
Green Vehicles
Designate 5% of all parking spaces used by the project as preferred parking for green vehicles or car share vehicles. Clearly identify and enforce for sole use by car share or green vehicles, which include plug-in electric vehicles and alternative fuel vehicles.
N/A – no parking areas.
Bike Share Station
Incorporate a bike share station in coordination with and conformance to the standards of Philadelphia Bike Share.
No - The project will incorporate bicycle storage for building users but will not incorporate a Bike Share station because there is an existing Bike Share station adjacent to the site.
Sustainable Sites
Pervious Site Surfaces
Provides vegetated and/or pervious open space that is 30% or greater of the site's Open Area, as defined by the zoning code. Vegetated and/or green roofs can be included in this calculation.
Yes – Well over 30% of the site will be vegetated open space, including a landscaped courtyard and extensive green roofs.
Rainwater Management
Conform to the stormwater requirements of the Philadelphia Water Department(PWD) and either: A)Develop a green street and donate it to PWD, designed and constructed in accordance with the PWD Green Streets Design Manual, OR B) Manage additional runoff from adjacent streets on the development site, designed and constructed in accordance with specifications the PWD Stormwater Management Regulations
No – however, the project will conform to the Stormwater requirements of the PWD.
Heat Island Reduction (excluding roofs)
Reduce the heat island effect through either of the following strategies for 50% or more of all on-site hardscapes: A) Hardscapes that have a high reflectance, an SRI>29. B) Shading by trees, structures, or solar panels.
Yes – sidewalks will have an SRI > 29, and much of the roof will be covered in extensive green roofs. Non-vegetated roofing material will have an SRI > 29.
Philadelphia City Planning Commission
Civic Design Review, Philadelphia Sustainability Questionnaire
Categories Benchmark
Meets or Exceeds the Benchmark (yes or no)?
If yes, please describe how or reference the applicable document in the CDR
submission.
Water Efficiency
Outdoor Water Use
Maintain on-site vegetation without irrigation. OR, reduce the watering requirements to at least 50% from the calculated baseline for the site's peak watering month.
Yes – the outdoor water requirement will have a minimum 50% reduction from
the calculated baseline for the peak watering month.
Energy and Atmosphere
Energy Commissioning
Acquire a separate, independent commissioning service to insure that the energy related systems are installed, calibrated, and perform as intended.
Yes – a commissioning agent is currently being selected for this purpose.
Energy Performance
The project will reduce energy consumption by: Achieving 10% energy saving or more from an established baseline using ASHRAE standard 90.1-2010, OR by conforming to ASHRAE Advanced Energy Design Guide for Commercial Buildings.
Yes – the project is currently achieving a 26% energy savings over the ASHRAE 90.1-2010 baseline.
On-Site Renewable Energy
Produce renewable energy on-site that will provide at least 3% of the project's anticipated energy usage.
No
Innovation
Innovation Any other sustainable measures that could positively impact the public realm.
Yes – the project will divert at least 50% of construction and demolition waste
from landfills. The project will also use all WaterSense labeled indoor fixtures and fittings, and will decrease potable
water use by 30% from a calculated baseline.
Yes — Commissioning Agent has been retained for this purpose.
Yes — the project is currently exceeding 10% energy savings over the ASHRAE 90.1-2010 baseline.
Civ ic Design Review - 20 February 2018 Univers i ty of Pennsy lvania - New Col lege House West 43