networked lighting controls efficient products for ... · networked lighting controls program...

11
January 2020 v.3 Networked Lighting Controls Program Application 20 20

Upload: others

Post on 23-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Networked Lighting Controls Efficient Products for ... · Networked Lighting Controls Program Application 20 20 Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1

January 2020 v.3

Networked Lighting ControlsProgram Application 2020

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

November 2017

Efficient Products for Business, Process Efficiency & Self-DirectProgram Application 2018

Page 2: Networked Lighting Controls Efficient Products for ... · Networked Lighting Controls Program Application 20 20 Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1

2Efficient Products for Business | Networked Lighting Controls Application - January 2020 2Efficient Products for Business, Process Efficiency & Self-Direct | Program Application - November 2017

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Table of ContentsAPPLICATION GUIDELINES 1

APPLICATION CHECKLIST 2

APPLICANT INFORMATION 3

CUSTOMER AGREEMENT 5

THIRD PARTY PAYMENT RELEASE 6

LIGHTING 7

HVAC 9

MOTORS & DRIVES 12

COMPRESSED AIR 14

REFRIGERATION/FOOD SERVICE 15

AGRICULTURE 17

MISCELLANEOUS 18

PROCESS EFFICIENCY 19

NEW CONSTRUCTION LIGHTING 20

Table of ContentsAPPLICATION GUIDELINES 1

APPLICANT INFORMATION - NETWORKED LIGHTING 2

CUSTOMER AGREEMENT 4

THIRD PARTY PAYMENT RELEASE 5

NETWORKED LIGHTING CONTROLS 6

INDOOR ADVANCED LIGHTING CONTROLS WORKSHEET 7

OUTDOOR ADVANCED LIGHTING CONTROLS WORKSHEET 7

OUTDOOR NETWORKED LIGHTING CONTROLS LIGHTING – WATTS REDUCED 8

PROJECT DOCUMENTATION REQUIREMENTS 9

SPECIFICATIONS 9

INCENTIVE TIERING 9

Page 3: Networked Lighting Controls Efficient Products for ... · Networked Lighting Controls Program Application 20 20 Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1

1Efficient Products for Business | Networked Lighting Controls Application - January 2020 2Efficient Products for Business, Process Efficiency & Self-Direct | Program Application - November 2017

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Table of ContentsAPPLICATION GUIDELINES 1

APPLICATION CHECKLIST 2

APPLICANT INFORMATION 3

CUSTOMER AGREEMENT 5

THIRD PARTY PAYMENT RELEASE 6

LIGHTING 7

HVAC 9

MOTORS & DRIVES 12

COMPRESSED AIR 14

REFRIGERATION/FOOD SERVICE 15

AGRICULTURE 17

MISCELLANEOUS 18

PROCESS EFFICIENCY 19

NEW CONSTRUCTION LIGHTING 20

Application Guidelines

¹A Pre-Approval Application is not a guarantee of an incentive; the actual incentive will be based on the energy savings and equipment installed as determined in the Final Application. Funds are reserved for 90 days, unless an applicant is granted an extension. The program team reserves the right to contact the customer before the reservation expiration date to ensure that the project is moving forward. If the project is not underway, the reservation may be cancelled. Reserved funds are not transferable to other projects, facilities and/or customers. A waiting list will be established when funds become fully subscribed.

Step 1. Verify Eligibility • Customer must have a valid AEP Ohio account.• Equipment/measure must be installed at facilities

served by the AEP Ohio account.• Project must produce permanent reduction in electrical

energy use (kWh).• All installed equipment must meet or exceed the

specifications in the application.• Please see Efficient Products for Business, Process

Efficiency and New Construction Terms and Conditions or Self-Direct Terms and Conditions for program rules

and regulations.

Step 2. Complete Applicant Information• All fields in customer and project information sections

must be completed.• Contractor information must be completed if project is

not self-performed.

Step 3. Complete the Incentive Worksheet(s)• Find and read specifications related to the project.• Choose the incentive category on the worksheet based

on installed equipment and specifications.• Complete all fields (fixture description, operating hours,

etc.) on the related worksheet.

Step 4. Sign Customer Agreement• Read the Terms and Conditions before signing and

submitting the application.• Sign Pre-Approval Agreement and submit the

application to reserve funds.• Sign Final Application Agreement and submit the

application after the project is completed to receive funds.

• Complete Third Party Payment Release AuthorizationONLY if incentive payment is to be paid to an entityother than AEP Ohio customer listed on the ApplicantInformation page.

Step 5. Submit Pre-Approval Application1

(For Self-Direct applications, skip to Step 6)

• Submitting a Pre-Approval Application to determinequalification and reserve program funds for a project isstrongly recommended.

• Complete all fields in Pre-Approval Agreement.• Pre-Approval Application must be submitted with:

• Proposed scope of work (type and quantity of oldand new equipment must be listed)

• Specification sheets for all proposed equipment• W-9 form

• Submit application via email, fax or mail.• An inspection may be required during application

review; applicants requiring inspection will becontacted for scheduling.

Step 6. Submit Final Application• Complete all fields for Final Application Agreement.• Update the application if measures/equipment differs

from pre-application.• Final Application must be submitted with:

• Dated and itemized material invoice• External labor invoice (if applicable)• If Pre-Approval Application was not submitted,

include the documents listed on Step 5• If the project has a pre-approval, add the project ID

number on the top left field on page 2 as the AEPApplication Number

• Submit application via email, fax or mail.• An inspection may be required during application

review; applicants requiring inspection will becontacted for scheduling.

• Self-Direct applications require additional steps. Pleasesee the Self-Direct Terms and Conditions for details.

AEP Ohio Business Incentives Program 700 Morrison RoadGahanna, OH 43230877-541-3048 | [email protected] our website at AEPohio.com/solutions

Final Applications must be submitted before November 15, 2019 in order to qualify for incentives identified in this application. Pleaseread and follow all the steps below to ensure your application is accepted and processed in a timely manner.

Page 4: Networked Lighting Controls Efficient Products for ... · Networked Lighting Controls Program Application 20 20 Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1

2Efficient Products for Business | Networked Lighting Controls Application - January 2020 2Efficient Products for Business, Process Efficiency & Self-Direct | Program Application - November 2017

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Table of ContentsAPPLICATION GUIDELINES 1

APPLICATION CHECKLIST 2

APPLICANT INFORMATION 3

CUSTOMER AGREEMENT 5

THIRD PARTY PAYMENT RELEASE 6

LIGHTING 7

HVAC 9

MOTORS & DRIVES 12

COMPRESSED AIR 14

REFRIGERATION/FOOD SERVICE 15

AGRICULTURE 17

MISCELLANEOUS 18

PROCESS EFFICIENCY 19

NEW CONSTRUCTION LIGHTING 20

Applicant Information - Networked Lighting

CUSTOMER INFORMATION

AEP Application Number AEP - _ _ - _ _ _ _ _ Application Type ______________________

Project Name (if applicable) ____________________________________________________________________________________________

Name as It Appears on Utility Bill ______________________________________________________________________________________

AEP Ohio Account Numbers for this Project ________________________ _________________________ ______________________

r Check if mailing address and project site address are the same.

Project Site Address _________________________________ City ___________________________ State _________ Zip ____________

Building Type ________________________________________ Shift ________________________________________________________

Annual Operating Hours _______________________________ Building Area (sq. ft.) _____ ___________________________________

Construction Type ____________________________________ Does the facility have a data center? ___________________________

Business Name ______________________________________________________________________________________________________

Taxpayer ID _______ - ________________________________ W-9 Tax Status ______________________________________________

PROJECT INFORMATION

CUSTOMER MAILING ADDRESS

Contact Name _______________________________________ Contact Title _________________________________________________

Mailing Address _____________________________________ CCity ___________________________ State _________ Zip ____________

Phone _______________________________ Ext. ___________ Contact Email ________________________________________________

How Did You Hear About the Program? _______________________________ AEP OH Energy Advisor __________________________

Page 5: Networked Lighting Controls Efficient Products for ... · Networked Lighting Controls Program Application 20 20 Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1

3Efficient Products for Business | Networked Lighting Controls Application - January 2020 2Efficient Products for Business, Process Efficiency & Self-Direct | Program Application - November 2017

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Table of ContentsAPPLICATION GUIDELINES 1

APPLICATION CHECKLIST 2

APPLICANT INFORMATION 3

CUSTOMER AGREEMENT 5

THIRD PARTY PAYMENT RELEASE 6

LIGHTING 7

HVAC 9

MOTORS & DRIVES 12

COMPRESSED AIR 14

REFRIGERATION/FOOD SERVICE 15

AGRICULTURE 17

MISCELLANEOUS 18

PROCESS EFFICIENCY 19

NEW CONSTRUCTION LIGHTING 20

Company Name _______________________________________________________________________________________________________

Contact Name _______________________________________ Title of Contact _____________________________________________

Mailing Address _____________________________________ CCity ___________________________ State _________ Zip ____________

Phone _______________________________ Ext. _____________ Contact Email ________________________________________________

Contact Name_________________________________________ Title of Contact ______________________________________________

Phone _______________________________ Ext. _____________ Contact Email _______________________________________________

CONTRACTOR INFORMATION

PRIMARY CUSTOMER CONTACT INFORMATION

Applicant Information - Networked Lighting

Who should we contact with questions about the application? r Customer r Contractor r Energy Advisor

Incentive Summary TableINCENTIVE CATEGORY TOTAL INCENTIVES

INDOOR LIGHTING CONTROLS

OUTDOOR LIGHTING CONTROLS

OUTDOOR WATTS REDUCED

TOTAL INCENTIVES

Page 6: Networked Lighting Controls Efficient Products for ... · Networked Lighting Controls Program Application 20 20 Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1

4Efficient Products for Business | Networked Lighting Controls Application - January 2020 2Efficient Products for Business, Process Efficiency & Self-Direct | Program Application - November 2017

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Table of ContentsAPPLICATION GUIDELINES 1

APPLICATION CHECKLIST 2

APPLICANT INFORMATION 3

CUSTOMER AGREEMENT 5

THIRD PARTY PAYMENT RELEASE 6

LIGHTING 7

HVAC 9

MOTORS & DRIVES 12

COMPRESSED AIR 14

REFRIGERATION/FOOD SERVICE 15

AGRICULTURE 17

MISCELLANEOUS 18

PROCESS EFFICIENCY 19

NEW CONSTRUCTION LIGHTING 20

1Incentive threshold is 50% of the project cost and subject to tiering.

AEP Application Number AEP - _ _ - _ _ _ _ _

Customer AgreementAPPLICATION AGREEMENT

By signing this document, I agree to program requirements outlined in the measure specifications, Terms and Conditions for the applicable program and Final Application Agreement. As an eligible customer, I verify the information is correct and request consideration for participation under this program. Furthermore, I concur that I meet all eligibility criteria in order to receive payment under this program.

Link to Efficient Products for Business/Process Efficiency Terms and Conditions, and Final Application Agreement

Pre-Application Final-Application Project Completion Date __________________________

Total Project Cost ________________________ Total Requested Incentive1 ________________________

Print Name Date AEP Ohio Customer Signature

_____________________________ ____________ ____________________________________________

PRINT APPLICATION

Page 7: Networked Lighting Controls Efficient Products for ... · Networked Lighting Controls Program Application 20 20 Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1

5Efficient Products for Business | Networked Lighting Controls Application - January 2020 2Efficient Products for Business, Process Efficiency & Self-Direct | Program Application - November 2017

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Table of ContentsAPPLICATION GUIDELINES 1

APPLICATION CHECKLIST 2

APPLICANT INFORMATION 3

CUSTOMER AGREEMENT 5

THIRD PARTY PAYMENT RELEASE 6

LIGHTING 7

HVAC 9

MOTORS & DRIVES 12

COMPRESSED AIR 14

REFRIGERATION/FOOD SERVICE 15

AGRICULTURE 17

MISCELLANEOUS 18

PROCESS EFFICIENCY 19

NEW CONSTRUCTION LIGHTING 20

By signing this document, I authorize the payment of the incentive to the third party named above and understand that I will not receive the incentive payment from AEP Ohio. I also understand that my release of the payment to a third party does not exempt me from the program requirements outlined in the measure specifications, Terms and Conditions, and Final Application Agreement.

Complete this section ONLY if incentives check should be made out in any way other than to the AEP Ohio customer exactlyas their name appears on the AEP Ohio account.

THIRD PARTY PAYMENT RELEASE AUTHORIZATION (NOT APPLICABLE TO SELF-DIRECT)

Make checks payable to: Company/Individual _________________________________________________________________________________

Mailing Address _________________________________________________ City______________________ State________ Zip__________

Phone _____________________ Ext. _______

Taxpayer ID of 3rd Party _____ - _______________________ W-9 Tax Status __________________________________________

Print Name Date AEP Ohio Customer Signature

_____________________________ ____________ ____________________________________________

Third Party Payment Release

Page 8: Networked Lighting Controls Efficient Products for ... · Networked Lighting Controls Program Application 20 20 Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1

6Efficient Products for Business | Networked Lighting Controls Application - January 2020 2Efficient Products for Business, Process Efficiency & Self-Direct | Program Application - November 2017

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Table of ContentsAPPLICATION GUIDELINES 1

APPLICATION CHECKLIST 2

APPLICANT INFORMATION 3

CUSTOMER AGREEMENT 5

THIRD PARTY PAYMENT RELEASE 6

LIGHTING 7

HVAC 9

MOTORS & DRIVES 12

COMPRESSED AIR 14

REFRIGERATION/FOOD SERVICE 15

AGRICULTURE 17

MISCELLANEOUS 18

PROCESS EFFICIENCY 19

NEW CONSTRUCTION LIGHTING 20

Networked Lighting Controls Pre-Approval RequiredPlease contact the AEP Ohio Business Incentives Program team. Review the specifications on page 9 for required information and documentation, non-qualifying projects and analysis information.

PROJECT INFORMATION

Total Project Cost

Total Building Square Feet

System Annual Operating Hours

Manufacturer of the Control System

Scope of Work Summary

Minimum System Requirements (see specifications for full measure requirements)

• Lighting system must use LED technology exclusively• Control system must have energy reporting in 15 minute (or less) intervals• Must be network controlled

*Measures not eligible under a prescriptive incentive may qualify under a custom incentive.

INDOOR INSTALLATION TYPE Incentive Rate ($/ft2)

Lower Lumen fixtures/Higher Fixture Density (e.g. fixture height at or below 12 feet, office, classroom, etc.) $0.75

Higher Lumen fixtures/Lower Fixture Density (e.g. fixture height above 12 feet, warehouse, gymnasium, etc.) $0.30

OUTDOOR INSTALLATION TYPE Incentive Rate ($/watts reduced)

Watts Reduced - DLC/ES LED $0.30

Watt Reduced - Other LED remove “New T8/T5” $0.25

Watts Controlled $0.12

Page 9: Networked Lighting Controls Efficient Products for ... · Networked Lighting Controls Program Application 20 20 Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1

7Efficient Products for Business | Networked Lighting Controls Application - January 2020 2Efficient Products for Business, Process Efficiency & Self-Direct | Program Application - November 2017

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Table of ContentsAPPLICATION GUIDELINES 1

APPLICATION CHECKLIST 2

APPLICANT INFORMATION 3

CUSTOMER AGREEMENT 5

THIRD PARTY PAYMENT RELEASE 6

LIGHTING 7

HVAC 9

MOTORS & DRIVES 12

COMPRESSED AIR 14

REFRIGERATION/FOOD SERVICE 15

AGRICULTURE 17

MISCELLANEOUS 18

PROCESS EFFICIENCY 19

NEW CONSTRUCTION LIGHTING 20

INDOOR LIGHTING CONTROLS

Select At Least One More Applicable Control Strategy for Lighting Control System

SPACE TYPE CEILING HEIGHT SQUARE FEET CONTROLLED INCENTIVE RATE TOTAL INCENTIVE

TOTAL

Indoor Advanced Lighting Controls Worksheet

Outdoor Advanced Lighting Controls WorksheetOUTDOOR WATT CONTROLLED WORKSHEET

Lighting controls incentives are only available for new controls. Existing or replacement controls do not qualify for incentives.

SPACE TYPE CONTROL TYPE FIXTURE TYPECONTROLLED

FIXTURE QUANTITY

FIXTURE WATTS

$/WATTS CONTROLLED INCENTIVES

Exterior Advanced Controls 4’ 4 Lamp T8 50 112 $0.12 $672

Exterior Advanced Controls $0.12

Exterior Advanced Controls $0.12

Exterior Advanced Controls $0.12

Exterior Advanced Controls $0.12

Exterior Advanced Controls $0.12

Exterior Advanced Controls $0.12

Exterior Advanced Controls $0.12

Exterior Advanced Controls $0.12

Exterior Advanced Controls $0.12

Exterior Advanced Controls $0.12

Exterior Advanced Controls $0.12

Exterior Advanced Controls $0.12

Total

EXAMPLE

Page 10: Networked Lighting Controls Efficient Products for ... · Networked Lighting Controls Program Application 20 20 Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1

8Efficient Products for Business | Networked Lighting Controls Application - November 2018

Link to Specifications

7Efficient Products for Business, Process Efficiency & Self-Direct | Program Application - November 2017

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

LightingWATTS REDUCED WORKSHEETSee program specifications to check eligibility for incentives. Use the wattages listed in the program specifications for the existing lighting.Does any area included in this project have lighting controls (Occupancy sensor, timeclock, photocell, etc.)? Yes No Adding Not Viable

SPACE TYPE

INCENTIVE CATEGORY

EXISTING LIGHTING NEW LIGHTING INCENTIVES

LAMP TYPELAMP

WATTAGELAMP/

FIXTUREFIXTURE

QTYFIXTURE WATTS

DESCRIPTIONLAMP

WATTAGELAMP/

FIXTUREFIXTURE

QTYFIXTURE WATTS

$/WATTS REDUCED

TOTAL

Interior DLC/ES LED 4’ T8 32 2 15 59 LED Fixture NA NA 15 25 $0.31 $158.10

Interior Other LED 4’ T12 34 2 20 59 LED Tube 12 2 20 24 $0.27 $178.20

Exterior DLC/ES LED Metal Halide 400 1 10 458 LED Corn Lamp 35 1 10 35 $0.31 $1131.50

TotalLink to Additional Worksheet

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

(Select One) (Select One) (Select One)

OUTDOOR WATTS REDUCEDSee program specifications to check eligibility for incentives. Use the wattages listed in the program specifications for the existing lighting.

SPACE TYPE

INCENTIVE CATEGORY

EXISTING LIGHTING NEW LIGHTING INCENTIVES

LAMP TYPELAMP

WATTAGELAMP/

FIXTUREFIXTURE

QTYFIXTURE WATTS

DESCRIPTIONLAMP

WATTAGELAMP/

FIXTUREFIXTURE

QTYFIXTURE WATTS

$/WATTS REDUCED

TOTAL

Exterior DLC/ES LED 4’ T8 32 0 15 25 $0.30 $153.00

Exterior Other LED 4’ T12 34 2 20 59 LED Tube 12 2 20 24 $0.25 $175.00

Exterior

Exterior

Exterior

Exterior

Exterior

Exterior

Exterior

Exterior

Exterior

Exterior

Exterior

Exterior

Exterior

Exterior

Exterior

Exterior

Exterior

Total

EXAMPLE

Outdoor Networked Lighting Controls Lighting – Watts Reduced

2 15 59 LED Fixture 0

Page 11: Networked Lighting Controls Efficient Products for ... · Networked Lighting Controls Program Application 20 20 Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1

9Efficient Products for Business | Networked Lighting Controls Application - January 2020 2Efficient Products for Business, Process Efficiency & Self-Direct | Program Application - November 2017

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Date: File Name: 0817-AEPOH-RNC-891977-My Solutions-Office Application-R1 Additional Details: Trim: 8.5 x 11 Finish Size: 8.5 x 11 Stock: Live: .5 Gutter: NA Finish: Bleed: N/A Color: 4C AM/PM: Gabe P. / Megan C.

Table of ContentsAPPLICATION GUIDELINES 1

APPLICATION CHECKLIST 2

APPLICANT INFORMATION 3

CUSTOMER AGREEMENT 5

THIRD PARTY PAYMENT RELEASE 6

LIGHTING 7

HVAC 9

MOTORS & DRIVES 12

COMPRESSED AIR 14

REFRIGERATION/FOOD SERVICE 15

AGRICULTURE 17

MISCELLANEOUS 18

PROCESS EFFICIENCY 19

NEW CONSTRUCTION LIGHTING 20

A Pre-Application is required for all NLC projects seeking incentives.

In addition to a complete and signed Pre-Application form and W-9, the package must include: • Baseline/Existing reflected ceiling plan (for indoor)• Baseline/Existing Lighting inventory spreadsheet

- Existing fixture descriptions i.e. 2LT8 32W, 400W MH, etc. - Existing fixture operating schedule & control strategy - Existing fixture technical specifications or “cut sheets” if

available - Proposed LED fixture descriptions (if fixtures will be

retrofitted as a part of this project)• Scope of work indicating the proposed Network Lighting

Control strategies for the new system and fixture operating schedules

• Technical specifications or “cut sheets” for proposed Network Lighting Control system

• Technical specifications or “cut sheets” for new LED fixtures (if the fixtures will be retrofitted during this project)

A Final Application is required once the NLC project installation is complete.

In addition to a complete and signed updated Final version of the Application form and invoices (equipment & external labor), the package must include:• Raw data file with kW (or voltage and amperage) readings

in an Excel spreadsheet. The metered data should have a maximum of 15-minute intervals over a minimum of a two-week period. Please note: The project will be deemed ineligible for the incentive payment if the NLC system does not have the capability to record and report the system power consumption over this period of time.

• If any of the following information deviates from the Pre-Application, please also provide updates to the following: - New reflected ceiling plan (for indoor) - New lighting inventory spreadsheet including any new/

updated LED fixture descriptions - Updated scope of work including final NLC strategies for the

new system and fixture operating schedules - Updated (or additional) specification sheets for control

system and fixtures

SpecificationsThe network lighting control system shall have the following minimum capabilities:• All lighting connected to Networked Lighting Control system

must be LED• A central master programming, control, and reporting interface

that is connected via hardwire or wireless technology to all devices and luminaires throughout the entire system. At a minimum, the networked lighting control system shall be capable of the following:

- Providing complete programming and control from the central location

- Occupancy and Operational reporting capability - Energy usage reporting maximum 15-minute monitoring

interval - Storing and delivering monitored energy usage information

in raw data format for a minimum of one year - Small zone control capability of 16 fixtures per zone or fewer - Remote interface and control such as BACnet, etc.

In addition to Occupancy/Vacancy Sensing and Zone Control, a minimum of one additional control strategy capability must be selected from the following:• Dimming (continuous or step)• Task Tuning• High-end trimming• Daylight Harvesting• User set preference/occupant profiles• Photocell Controls (for exterior lighting)• Demand Response• Load Shedding• Time Scheduling• Variable Light Level Control Incentive TieringThe total incentive paid for any retrofit application cannot exceed50% of the incremental project cost (not including internal labor).In addition to the above incremental project cost limit, incentive payment rates vary when a customer’s calculated incentive exceeds the following tiers:

• Tier 1 $0 - $100,000 = 100% of eligible calculated cash rebate value

• Tier 2 $100,001 - $300,000 = 50% of eligible calculated cash rebate value

• Tier 3 $300,001 - $500,000 = 25% of eligible calculated cash rebate value

• Tier 4 $500,001 - beyond = 10% of eligible calculated cash rebate value

Project Documentation Requirements