NERC Compliance Process Directive #2011-CAG-001 Directive Regarding Generator Transmission LeadsAttachment 1Typical Generator Transmission Leads One-Line Diagrams
2 RELIABILITY | ACCOUNTABILITY
Glossary of Icons
Breaker
Disconnect
Generator
GSU Transformer
Bus
Generation Lead
Integrated System
Line
3 RELIABILITY | ACCOUNTABILITY
Single Generator Transmission Lead1a
Point of Interconnection
Integrated System Line
To Sub 1 To Sub 2
GO/GOP Entity Registered as a TO/TOP Area of
Responsibility
1. > 3 Towers +Adjacent spans
Interconnection TO/TOP
Responsibility
TransformerLow Side
TransformerHigh Side
2. GO/GOPBlackstart
Conditions of GO/GOP Entity with Single Generator Transmission Leads to be registered as a TO/TOP1. Long lead lines or2. Blackstart or3. Considered ‘major transmission’ by RE
NOTE:This is a generic representation.The internal components may increase or decrease.The TO/TOP Area of Responsibility may expand or contract based on specific facts and circumstances, and ownership. Registered GO/GOP
4 RELIABILITY | ACCOUNTABILITY
Multiple Generator Transmission Leads2a
Point ofInterconnection
Integrated System Line
To Sub 1 To Sub 2
Registered GO/GOP 1
Interconnection TO/TOP
Responsibility
NOTE:This is a generic representation.The internal components may increase or decrease.The TO/TOP Area of Responsibility may expand or contract based on specific facts and circumstances, and ownership.
GO/GOP Entity Registered as a
TO/TOP Area of Responsibility
(Typical)
Conditions of GO/GOP Entity with Single Generator Transmission Leads (feeding a bus) to be registered as a TO/TOP1. Long lead lines or2. Blackstart or3. Considered ‘major
transmission’ by REGO/GOP 2 would be registered
as a TO/TOP responsible for the bus to Point of Interconnection tie line.
Registered GO/GOP 2
Registered GO/GOP 3
1. > 3 Towers +Adjacent spans
2. GO/GOPBlackstart