Page 1: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

PowerDist Power Control and Protection Course 2012

NEM Grid Connection and Compliance

DIgSILENT Pacific © NEM Grid Connection and Compliance

g2012Presenter: Tony BertesPresenter: Tony Bertes

DIgSILENT Pacific

PowerDist Power Control and Protection Course 2012 1

Page 2: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Presentation Outline

• Introduction to the Australian Electricity Market

• The Need for Compliance with the NER

DIgSILENT Pacific © • Validation of Compliance Process following a Plant Change

C li & R2 T tig

2012• Compliance & R2 Testing

• Q & A

22PowerDist Power Control and Protection Course 2012

Page 3: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Introduction

DIgSILENT Pacific © g2012

PowerDist Power Control and Protection Course 2012 3

Source: AEMO (www.aemo.com.au)

Page 4: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Introduction – Australia’s National Electricity Market

NEM – National Electricity MarketNEM National Electricity Market

• A wholesale market for supply and purchase of electricity

DIgSILENT Pacific © • Output from all generators is combined and scheduled in real-time to meet consumer demandg

2012• Commenced in 1988, the NEM operates one of the world’s largest

interconnected power system that runs for more than 5,000km (Source: AEMO)

• When NEM commenced, a Code provided guidelines for how the market was to operate

• In June 2005, the Code was replaced by the National Electricity Rules (NER)

44PowerDist Power Control and Protection Course 2012

Page 5: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Introduction – National Electricity Market

DIgSILENT Pacific © g2012

55PowerDist Power Control and Protection Course 2012

Source: AEMO (www.aemo.com.au)

Page 6: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Introduction – AEMC and AER

Australian Energy Market Commission – AEMCAustralian Energy Market Commission AEMCwww.aemc.gov.au

• Approves rules for the nation’s energy markets

DIgSILENT Pacific © • National, independent body, they make and amend the detailed rules for the NEM and natural gas marketsg

2012• Responsible for oversight and regulation of the NEM since June 2005

A t li E R l t AERAustralian Energy Regulator – AERwww.aer.gov.au

• Regulates whole electricity market and responsible for economic gu a o y a a d po b o o oregulation of transmission networks of the NEM

• Also responsible for economic regulation of gas networks and

66

p g genforcing national gas law and gas rules

PowerDist Power Control and Protection Course 2012

Page 7: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Introduction – AEMO

Australian Energy Market Operator – AEMOAustralian Energy Market Operator AEMOwww.aemo.com.au

• AEMO’s roles are:

DIgSILENT Pacific ©  Power System Operator Market Operatorg

2012• Some of AEMO’s responsibilities are:

M t f th NEM Management of the NEM Overseeing reliability and security of the NEM Ensuring supply reserve to meet reliability standards Directing generators to increase production during periods of Directing generators to increase production during periods of

shortfall

• Also responsible for gas market

77

• Also responsible for gas market

PowerDist Power Control and Protection Course 2012

Page 8: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Introduction –NER

National Electricity Rules – NERNational Electricity Rules NER

• The NER govern the operation of NEM. The Rules have the force of law, and are made under the National Electricity Law

DIgSILENT Pacific © law, and are made under the National Electricity Law

• Specifies the objectives, functions, and responsibilities of AEMOg2012

• Current version is 47, downloaded from AEMC website, and it covers some of the following:

Registered Participants and Registration Market Rules Power System Security & Network Connection Economic Regulation of Distribution and Transmission Services Administrative Functions Derogations

88PowerDist Power Control and Protection Course 2012

Page 9: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Introduction – Energy Flow

Transmission Network Service Provider TNSPTransmission Network Service Provider – TNSP

Owner and operator of the high-voltage transmission towers and wires that transport

DIgSILENT Pacific © transmission towers and wires that transport electricity

Examples of TNSP:g

2012Examples of TNSP:

TransGrid – NSW ElectraNet – SA PowerLink – Queensland TransEnd - TasmaniaPowerLink Queensland TransEnd Tasmania

Distribution Network Service Provider

Owner and operator of substations and the wires that transport from distribution centres to end-use consumers.

PowerDist Power Control and Protection Course 2012 9

Source: AEMO (www.aemo.com.au)

Page 10: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Introduction – Market Participant

Market Participant: Registered to participate in the NEM as either:

1. Market Generator (sells electricity); 2. Market Customer (purchases electricity); or3 M k t N t k S i P id ( d t t k

DIgSILENT Pacific © 3. Market Network Service Provider (owns and operates a network

linked to the NER)g2012

1010PowerDist Power Control and Protection Course 2012

An example of some Market Participants

Page 11: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

The Need for Compliance

Section 2

DIgSILENT Pacific © Section 2

The Need for Compliance with the NERg2012

PowerDist Power Control and Protection Course 2012 11

Page 12: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

The Need for Compliance with the NER

- The integrations of generation and into the power system must beThe integrations of generation and into the power system must be coordinated so that levels of quality, reliability of supply and power system security can be maintained

DIgSILENT Pacific © - Reliable and secure operation of a power system is tied to the ability of its mix of generation, transmission, and loads to operate under a variety of conditionsg

2012y

- For this reason, the NER includes processes to coordinate the technical interaction between new and existing generation and the power system

1212PowerDist Power Control and Protection Course 2012

Page 13: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

The Need for Compliance with the NER

- Accurate model data for generators excitation systems turbineAccurate model data for generators, excitation systems, turbine governors and PSS is required to maintain accurate planning of the power system

DIgSILENT Pacific © - Assists organisations such as AEMO and TNSP’s in planning and operation of the networkg

2012

Commissioning of PSS on 100 MVA GT with settings designed on incorrect data

1313PowerDist Power Control and Protection Course 2012

Page 14: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

The Need for Compliance with the NER – Performance Standards

- Rules specify each generating unit must meet a number of technicalRules specify each generating unit must meet a number of technical requirements and these form part of the technical terms and conditions of the Connection Agreement

DIgSILENT Pacific © - These are met by ensuring generators meet a range of performance standards g

2012- The Rules allow performance standards to be negotiated between the

Proponent, the NSP, and AEMO

- An access standard is a benchmark for determining the appropriate performance standard for each unit:

- Minimum Access Standard- Automatic Access Standard- Negotiated Access Standard

1414PowerDist Power Control and Protection Course 2012

Page 15: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

The Need for Compliance with the NER – Performance Standards

• Minimum Access Standard – minimum performance standardMinimum Access Standard minimum performance standard specified in Rules. If a generating unit does not meet this standard, plant will be denied access to network

DIgSILENT Pacific © • Automatic Access Standard – The upper bound for an access standard. g

2012• Negotiated Access Standard – Falls somewhere between the

automatic and minimum bounds for the standard of performance

- Note that no generator will have ‘minimum’ as a standard, instead it will be ‘negotiated’ at the minimum level.

1515PowerDist Power Control and Protection Course 2012

Page 16: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change

Section 3

DIgSILENT Pacific © Section 3

Validation of Compliance Process f ll i Pl t Chg

2012following a Plant Change

PowerDist Power Control and Protection Course 2012 16

Page 17: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change

• Compliance process commences once a Generator proposes to installCompliance process commences once a Generator proposes to install a new AVR (or for new generator connections)

• The following actions need to be taken for an AVR upgrade before

DIgSILENT Pacific © The following actions need to be taken for an AVR upgrade before commissioning:

Data sheets for the excitation system (incl. exciter, regulator, g2012

y ( , g ,PSS, limiters, etc)

Design Report

Model – functional block diagram and source code

Releasable User Guide

Commissioning Plan

1717PowerDist Power Control and Protection Course 2012

Page 18: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change – Data sheetssheets

• Prior to the connection generator must submit registered dataPrior to the connection, generator must submit registered data related to the excitation system

• Registered data falls into two categories:

DIgSILENT Pacific © Registered data falls into two categories:

(a) Prior to actual connection and provision of access, data derived from manufacturers’ data, detailed design g

2012, g

calculations, works or site tests etc (R1);

(b) After connection, data derived from on-system testing (R2)( ) , y g ( )

1818PowerDist Power Control and Protection Course 2012

Page 19: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change – Data sheetssheets

Datasheets can be downloadedDatasheets can be downloadedFrom AEMO websitewww.aemo.com.au

DIgSILENT Pacific © g2012

1919PowerDist Power Control and Protection Course 2012

Page 20: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change

DIgSILENT Pacific © g2012

PowerDist Power Control and Protection Course 2012 20

Flow chart of activities and responsibilities associated with preparation and approval of a design report

Page 21: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change – Design ReportReport

• The design report aims to evaluate compliance against the sections f ffof the NER that the proposed alteration will affect. According to

S5.3.9 (d), these are:

S5 2 5 5 “G ti t t di t b f ll i

DIgSILENT Pacific ©  S5.2.5.5 “Generating system response to disturbances following

contingency events”

S5 2 5 7 “Partial load rejection”g

2012 S5.2.5.7 Partial load rejection

S5.2.5.12 “Impact on network capability”

S5.2.5.13 “Voltage and reactive power control”

• Evaluation of “S5 2 5 5 7 12” require full 5 state model of the NEMEvaluation of S5.2.5.5, .7, .12 require full 5 state model of the NEM. Typically assessed by TNSP and/or AEMO;

• S5.2.5.13 is assessed in the design report prepared by the asset

2121PowerDist Power Control and Protection Course 2012

S5.2.5.13 is assessed in the design report prepared by the asset owner’s consultant;

Page 22: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change – Design ReportReport

• Design report will present proposed settings and results of simulationDesign report will present proposed settings and results of simulation studies to demonstrate that with the new excitation system the generating unit will comply with S5.2.5.13 – Voltage and reactive power control

DIgSILENT Pacific © power control

• The document will contain:g2012

AVR design and assessment of performance offline and online PSS design Small signal stability analysis Excitation limiter design and assessment of online performance Co-ordination with generator protection Recommend/propose settings

• AEMO will then consider the proposed settings as those values that will be used during commissioning. Any large deviations will need to b l i d

2222PowerDist Power Control and Protection Course 2012

be explained

Page 23: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change –S5 2 5 13S5.2.5.13

• Unsynchronised Settling Time < 2.5 seconds for 5% change1.060

Upper Band = 1.055 p.u.

0.402 s 1.053 p.u.

Peak Value

DIg

SILE

NT

1.060

Upper Band = 1.055 p.u.

0.402 s 1.053 p.u.

Peak Value

DIg

SILE

NT

DIgSILENT Pacific © 1.045 Lower Band = 1.045 p.u. 0.228 s

3.00 s 1.050 p.u.

Steady State Value

1.045 Lower Band = 1.045 p.u. 0.228 s

3.00 s 1.050 p.u.

Steady State Valueg2012

1.030

1 015

1.030

1 0151.015

1.000

0.000 s 1.000 p.u.

1.015

1.000

0.000 s 1.000 p.u.

4 0003 0002 0001 0000 0001 000 [s]0.985

Initial Value

4 0003 0002 0001 0000 0001 000 [s]0.985

Initial Value

2323PowerDist Power Control and Protection Course 2012

4.0003.0002.0001.0000.000-1.000 [s]Unit 1: Offline Response: Terminal Voltage in p.u.

4.0003.0002.0001.0000.000-1.000 [s]Unit 1: Offline Response: Terminal Voltage in p.u.

Page 24: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change –S5 2 5 13S5.2.5.13

• Step response simulations without limiter operation

DIgSILENT Pacific © g2012

2424PowerDist Power Control and Protection Course 2012

Page 25: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change –S5 2 5 13S5.2.5.13

• Synchronised Settling Time < 5 seconds for 5% change1.010

DIg

SILE

NT

1.010

DIg

SILE

NT

DIgSILENT Pacific © 0.9960.996

g2012

0.9820.982

0.968

Upper Band = 0 955 p u1 217 s0 000 s

0.968

Upper Band = 0 955 p u1 217 s0 000 s0.954

Upper Band = 0.955 p.u.1.217 s 0.000 s

Lower Band = 0.945 p.u.

0.954Upper Band = 0.955 p.u.1.217 s 0.000 s

Lower Band = 0.945 p.u.

2525PowerDist Power Control and Protection Course 2012

12.009.4006.8004.2001.600-1.000 [s]0.940

Unit 1: Offline Response: Terminal Voltage in p.u.12.009.4006.8004.2001.600-1.000 [s]

0.940

Unit 1: Offline Response: Terminal Voltage in p.u.

Page 26: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change –S5 2 5 13S5.2.5.13

• Excitation Limiter Settling Time < 7.5 seconds for 5% disturbance when operating into a limiter from a point where a disturbance of 2 5% would justoperating into a limiter from a point where a disturbance of 2.5% would just cause the limiter to operate

1.030

10.000 s

DIg

SILE

NT

1.030

10.000 s

DIg

SILE

NT

DIgSILENT Pacific © 1.018

1.025

1.018

1.025

g2012

1.006

19.332 s 0.999 p.u.

Upper Band = 1.004 p.u.

Lower Band = 0.996 p.u.

10.742 s 1.004 p.u.

1.006

19.332 s 0.999 p.u.

Upper Band = 1.004 p.u.

Lower Band = 0.996 p.u.

10.742 s 1.004 p.u.

0.994

0.982

0.994

0.982

20.0015.8011.607.4003.200-1.000 [s]0.970

Unit 1: Terminal Voltage in p.u.avrGen1: AVR AUTO Setpoint

20.0015.8011.607.4003.200-1.000 [s]0.970

Unit 1: Terminal Voltage in p.u.avrGen1: AVR AUTO Setpoint

2626PowerDist Power Control and Protection Course 2012

avrGen1: AVR AUTO Setpoint

Under Excitation Limiter for AVR on a 42.5 MVA Hydro Machine Results(1)

Date:

Annex: /4

avrGen1: AVR AUTO Setpoint

Under Excitation Limiter for AVR on a 42.5 MVA Hydro Machine Results(1)

Date:

Annex: /4

Page 27: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change –S5 2 5 13S5.2.5.13

• Step response simulations into excitation limiters

DIgSILENT Pacific © g2012

2727PowerDist Power Control and Protection Course 2012

Page 28: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change –S5 2 5 13S5.2.5.13

• Impact of Connecting a Generating Unit with PSS• Impact of Connecting a Generating Unit with PSS

4.5

5With GenNewNo GenNew

DIgSILENT Pacific ©  3.5

4

Stability Margin

g2012 2.5

3

quen

cy (

Hz)

1.5

2

ampe

d Fr

eq

0.5

1

-20 -15 -10 -5 0

Da

i ffi i ( 1)

PowerDist Power Control and Protection Course 2012 28

Damping Coefficient (Np.s-1)

Page 29: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change –S5 2 5 13S5.2.5.13

• Effectiveness of the PSS in Time Domain• Effectiveness of the PSS in Time Domain

51.50

DIg

SILE

NT

51.50

DIg

SILE

NT

DIgSILENT Pacific © 51.0051.00 g2012

50.50

50 00

50.50

50 0050.00

49.50

50.00

49.50

5.0004.0003.0002.0001.0000.000 [s]49.00

MFC5: MW: PSS OnMFC5 MW PSS Off

5.0004.0003.0002.0001.0000.000 [s]49.00

MFC5: MW: PSS OnMFC5 MW PSS Off

PowerDist Power Control and Protection Course 2012 29

MFC5: MW: PSS Off

Study Case for PSS Effectiveness for Open Cycle Gas Turbine Generator Signals

Date:

Annex: /1

MFC5: MW: PSS Off

Study Case for PSS Effectiveness for Open Cycle Gas Turbine Generator Signals

Date:

Annex: /1

Page 30: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change –Functional Block DiagramFunctional Block Diagram

• The functional block diagram is required by TNSP and AEMO ItThe functional block diagram is required by TNSP and AEMO. It should include as a minimum when studying the excitation system of a synchronous machine:

DIgSILENT Pacific © • Exciter and AVR;• Reactive power/current compensation;• PSS; g

2012;

• Excitation Limiters (UEL/OEL);

• A governor (if not previously provided) may need to be provided and is decided on a case-by-case basis. For example:

• If there is a risk that the new AVR and PSS can interact with the governor

3030PowerDist Power Control and Protection Course 2012

Page 31: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change –Functional Block Diagram (cont )Functional Block Diagram (cont.)

avr_EX2000: EX2000 Excitation System, also represents IEEE Type AC7B Alternator-Rectifier Excitation Systemavr_EX2000: EX2000 Excitation System, also represents IEEE Type AC7B Alternator-Rectifier Excitation System DIg

SILE

NT

Ve Upper Limit Calculation

OELIfdadvlim M2 Ifdref3 Ifd

Ifdlimp

KKp

(Vfemax-KdIfd)/(Ke+Se(efd))M,Vfemax,Ke,E1,SE1,E2,SE2

0

1

0ut

DIgSILENT Pacific © Ifdadvlim,M2,Ifdref3,Ifd..

Ifdlimn

-{Kp+Ki/s}

Kpr,Kir

Vrmax

{Kp+Ki/s}Kpa,Kia

Vamax

MAX_0

1

LVgate0

1

-{1/sT} sig

Te-1/(1+sT)

Tr1uerrs

f

VaVcuVe

Vem

ax

g2012

-Kl.Vfe

KKf1

KKf2

Vrmin Vamin Vemin

Reflimp

Vfe

Vr

Vf

Se(Efd)E1,SE1,E2,SE2,1

KKd

REF SIGNALKrcc,Kvhz,M1

0

1

2

3

4

5

6

2

3

4

5

6

7upssvuelusetp

KeS

e

sgnnQ

speed

Vx

Fex

Fex(In)Kc

0

1

KKe

8curex

3131PowerDist Power Control and Protection Course 2012

Page 32: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change – Model Source CodeSource Code

• As per AEMO Model Guidelines and Clause S5 2 4(b)(6) modelAs per AEMO Model Guidelines and Clause S5.2.4(b)(6), model source code must be provided in an unencrypted form suitable for at least one of the software simulation products nominated by AEMO

DIgSILENT Pacific © • PSS/E• PowerFactory• TSAT g

2012• The model source code is expected to contain the model of the plant being altered/upgraded, and any other plant that might have an i t th it t fimpact on the unit or system performance

Source: AEMO (http://www.aemo.com.au/registration/118-0001.html)

3232PowerDist Power Control and Protection Course 2012

Page 33: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change –Releasable User GuideReleasable User Guide

• As per AEMO Model Guidelines and Clause S5 2 4(b)(6) theAs per AEMO Model Guidelines and Clause S5.2.4(b)(6), the generator must also provide a Releasable User Guide (RUG)

• The RUG is a document associated with the functional block diagram

DIgSILENT Pacific © The RUG is a document associated with the functional block diagram and model source code and explains how to include the plant in the system model g

2012• It must contain sufficient information so that a Registered Participant

can use the encrypted model source code to carry out studies

• It should contain (but not limited to)

Model parameters and values Instructions on how to use the encrypted model source code Connection point details Commissioning dates

3333PowerDist Power Control and Protection Course 2012

Page 34: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Validation of Compliance Process following a Plant Change –Commissioning PlanCommissioning Plan

• The generator must supply detailed commissioning program 3The generator must supply detailed commissioning program 3 months in advance (for transmission connected generator) as per S5.2.4 of the NER

DIgSILENT Pacific © • The TNSP and AEMO must agree with the program and have the right to witness commissioning testsg

2012

3434PowerDist Power Control and Protection Course 2012

Page 35: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Compliance & R2 Testing

Section 4

DIgSILENT Pacific © Section 4

Compliance & R2 Testingg2012

PowerDist Power Control and Protection Course 2012 35

Page 36: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Compliance & R2 Testing

• Compliance Testing is the process of performing on-site tests to evaluate• Compliance Testing is the process of performing on site tests to evaluate compliance with the relevant Performance Standards affected by the upgrade

R2 testing is the process of performing on site tests to validate R1 data

DIgSILENT Pacific © • R2 testing is the process of performing on-site tests to validate R1 data

• “Type-testing” of plant is permissible, but excludes plant that has settings that g2012

can be applied on-site (includes AVR control systems)– Therefore R2 and Compliance testing is required on all AVR’s of each unit

PowerDist Power Control and Protection Course 2012 36

Page 37: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Compliance & R2 Testing – Compliance Program

• The onus is on the generator and their consultants to develop a “Compliance• The onus is on the generator and their consultants to develop a Compliance Program”

A Reliability Panel put together by the AEMC have developed a template that

DIgSILENT Pacific © • A Reliability Panel, put together by the AEMC, have developed a template that

Generators can follow to develop a “Compliance Program”– www.aemc.gov.au/Market-Reviews/Completed/Template-for-Generator-Compliance-

Programs.htmlg2012• A compliance program will consider all clauses within the Generators

Performance Standard and be valid for the life of the plant

• It is the framework to assist generators in evaluating and maintaining compliancep

PowerDist Power Control and Protection Course 2012 37

Page 38: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Compliance & R2 Testing – Compliance Program

lCold Commissioning

ComplianceTesting

DIgSILENT Pacific © First Fire

Back Energisation

CCGT Operation

Commercial Operation

Grid Code Compliance   kick‐off g

2012FireEnergisation

Q1Q2 Q3 Q4 Q1Q2 Q3 Q4 Q1Q2 Q3 Q4 Q2

Year N+2 Year N+3

Operation

Year N+1Year N

Connection  Motor 

Year N+2 Year N+3Year N+1Year N

Connection 

Offer executed Roll First synch

Reliability Run

Works completed

PowerDist Power Control and Protection Course 2012 38

Page 39: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Compliance & R2 Testing – Compliance Program

• Compliance testing of the AVR for the Performance Standards it affects• Compliance testing of the AVR for the Performance Standards it affects, S5.2.5.13, would occur every 4 years as recommended in the template

R2 testing of the excitation system must occur following any plant change i e

DIgSILENT Pacific © • R2 testing of the excitation system must occur following any plant change, i.e.

installation of AVR, change in software or software version, etc.g2012

• Test methodology includes:– Unsynchronised and synchronised AVR step response tests– AVR step response test of excitation limiters– AVR and PSS transfer function measurements over required frequency range

PowerDist Power Control and Protection Course 2012 39

Page 40: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Compliance & R2 Testing – cont.

• As the control system is the system being tested the recording system is• As the control system is the system being tested, the recording system is required to be independent of the control system

Therefore an independent data logger or Data Acquisition (DAQ) is required

DIgSILENT Pacific © • Therefore, an independent data logger, or Data Acquisition (DAQ) is required

to measure the quantities during each testg2012

PowerDist Power Control and Protection Course 2012 40

Page 41: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Compliance & R2 Testing – Data Acquisition

• Typical signals measured during tests and the AEMO required resolution:yp g g q

– Terminal voltage (5 V)– Active power (0 01 MW)

DIgSILENT Pacific © Active power (0.01 MW)

– Reactive power (0.05 MVAr)– Rotor voltage (2 V)– Rotor current (1 A)

g2012

Rotor current (1 A)– Stator frequency (0.01 Hz)

• Overall measurement time constants for each of the quantities must not• Overall measurement time constants for each of the quantities must not exceed 20 msec

• Results to be made available in electronic format (Excel) to allow for assessment by AEMO and/or TNSP

Refer to AEMO’s “Commissioning requirements for generating systems” for full details (www.aemo.com.au)

PowerDist Power Control and Protection Course 2012 41

Page 42: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Compliance & R2 Testing – Process

• When commissioning a new (or retrofit) excitation system:• When commissioning a new (or retrofit) excitation system:

1. Perform R2 testing in the form of frequency response (transfer function) testing;

DIgSILENT Pacific © testing;

2. Carry out time domain measurements and recordings during g2012

commissioning of new excitation system;

3. Prepare comparisons between measured and modelled responses in p p pfrequency and time domain to meet requirements specified by AEMO;

4 Produce a Compliance & R2 Test Report;4. Produce a Compliance & R2 Test Report;

5. Provide data and reports to TNSP and AEMO within 3 months after i i i S5 2 4 f th NERcommissioning as per S5.2.4 of the NER;

PowerDist Power Control and Protection Course 2012 42

Page 43: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Compliance & R2 Testing – Accuracy Requirements

• For control system models overall linear response over 0 1 – 5 Hz must be• For control system models, overall linear response over 0.1 5 Hz must be within:– Magnitude within 10% of actual control system magnitude– Phase must be within 5 degrees of the actual control system phase

DIgSILENT Pacific © Phase must be within 5 degrees of the actual control system phase

• For time domain responseR id l i i l d d l l b

g2012

– Rapid slopes in simulated response compared to actual plant response must be within

• 10%; and• From start to finish of the slope 20 msec• From start to finish of the slope, 20 msec

Refer to AEMO’s “Generating System Model Guidelines” for full details (www.aemo.com.au)

PowerDist Power Control and Protection Course 2012 43

Page 44: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Compliance & R2 Testing – R2 Testing

• Set up for a Transfer Function test of the PSS frequency channel

DIgSILENT Pacific © g2012

PowerDist Power Control and Protection Course 2012 44

Page 45: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Compliance & R2 Testing – R2 Testing

• Transfer function testing of the PSS Frequency Channel

DIgSILENT Pacific © g2012

PowerDist Power Control and Protection Course 2012 45

Page 46: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Compliance & R2 Testing – Example of Accuracy Requirements

• Unsynchronised +5% step response on 29.4MVA open cycle GT

DIgSILENT Pacific © g2012

PowerDist Power Control and Protection Course 2012 46

Page 47: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Compliance & R2 Testing – Example of Accuracy Requirements

• Synchronised +2.5% step response on a 42.5MVA hydro machine

DIgSILENT Pacific © g2012

PowerDist Power Control and Protection Course 2012 47

Page 48: NEM Grid Connection and Compliance DIgSILENT Pacific 2012 Conference... · 2018. 9. 10. · PowerDist Power Control and Protection Course 2012 NEM Grid Connection and Compliance DIgSILENT

Thank You!