neel engineers and contractors
DESCRIPTION
NEEL Engineers and Contractors (NEEL) is a contracting firm started by young professional technocrats having more than 10 years of professional experience in the field of project design, selection, project management, project planning, project execution, qualification and validation. We as a team have successfully delivered many projects for Pharmaceutical, Chemical, FMCG and hospitality sector.TRANSCRIPT
Your STAKE HOLDER in building CLEAN ROOM projects as per NATIONAL and INTERNATIONAL STANDRANDS
History and Start up
We are a contracting firm started by young professional technocrats. We are taking project on the basis of Cost+ and Design & build concept.
More than 11 years of professional experience in the field of project design, selection, project management, project planning, project
execution, qualification and validation
We as a team have successfully delivered many projects for Pharmaceutical, Chemical, FMCG and hospitality sector.
History and Start up
Established in March 2011Within 8 months we are worked with 2 MNC clients. M/s Aptar Pharma
and M/s Sandoz & working with 2 Indian clients M/s Celogen Pharma Pvt. Ltd. and M/s Zeiss Pharmaceuticals Pvt. Ltd.
Orders of more than `. 24 million
First Two projects commissioning & Validation completed and client has officially inaugurated facility and started production. Other Two projects are
under design stage.
We are also providing design services to 1 MNC FMCG client i.e. M/s PepsiCo, Punjab for Electrical and Mechanical discipline.
History and Start up
We understand the requirements of present market of Asian Continent and Worldwide
We believe in timely execution of project with Quality
Started three verticals in the firm: Electrical, HVAC and Mechanical Piping & Erection to take project on
turnkey basis.
We as a team have successfully delivered many projects for Pharmaceutical, Chemical, FMCG and hospitality sector
Planning to start two more disciplines:Instrumentation and Validation
Executive Profile: Amol D Sainwar
An incisive professional with over 11 years of rich experience in Project activities like design, selection, Erection Commissioning and Maintenance
Bachelor’s Degree in Mechanical Engineering from Nagpur University with 2nd Rank in University with excellent academic background
Work Experience:
President of Social Organization HOPE (Help Our People for Education) since June 2008 for Development of Rural India
Executive Profile: Jitendra Arun Jadhav
Engineering Professional with an experience of 10 years in Pharmaceutical and FMCG green field projects
Work experience: Cipla Ltd, Ajanta Pharma, Titan Lab, B. Mehtalia Consultants Pvt. Ltd.
Projects managed:
Executive Profile: Naveen Kaul
Energetic engineer having B. Tech in Mechanical, 9 years of experience in the field of Marketing and Project Management
Experience in marketing industrial projects and machineries
Executed clean room projects for:
Exhibit products and review competitor’s products in trade shows
Strength in terms of Expertise :
Mechanical Engineer – 3 Nos.
Electrical Engineer – 3 Nos.
Mechanical Piping & HVAC Draftsman – 1 No.
Electrical draftsman – 1 No.
Clean room panel expert – 1 No.
Accounts / Planning – 1 No.
Our Services
HVAC Contracting
Electrical Contracting
Mechanical Piping and
Erection Contracting
TURNKEY Solutions to
Project
TURNKEY SolutionsIntegrated provider of engineering services
Procurement Value Engineering
Time Schedule
Commissioning and Validation
As-built drawings
Project Construction management
Utilities Instrumentation
Clean room Validation
Process
Mechanical
Electrical
Civil
Control Engineering
HVAC
Process Architecture
Building Management System
Design Construction
Projects Handled
Solid Dose Manufacturing Liquid Dose Manufacturing
Small and Large Volume Sterile Products
Novel Product Delivery Systems
Vaccines Production Facilities
Potent Products and Cytotoxic
Packaging API FMCG Chemical Industry
Advantages with us
One point solution for all your project needs
Being experienced and professional technocrats, we understand your project requirements in detail
We provides project planning, monitoring and execution with latest project planning tools
We provide cost effective and quality solutions for all your requirements
We provide solutions by understanding guidelines like Schedule M, cGMP, cGLP, USFDA, ISO, ASHRAE, ISME, OSHA and all
regulatory authorities
Executed Projects
Project Value : `. 16 Million, Duration : 4 Months.
Project Value : `. 2 Million, Duration : 2 Months.
Project Value : `. 1.2 Million, Duration : 2 Months.
Projects under Progress / Pipeline
Z
Scope of HVAC work Double Skin Air Handling Unit’s and Ventilations Systems
Room Data Sheet & Heat load calculations for the system
High side HVAC – Chiller, Cooling tower, Pumps and its control system
Filters: 20µ, 10µ, 5µ, 3µ, 0.3µ as per EU or ISO standards
Design of areas as per Grade D, C , B orISO 8, 7 & 5 as per international guidelines
Dehumidifier with heat recovery wheel & Humidifier
Air distribution i.e. ducting, insulation, damper, fire damper, diffusers & grills
Chilled water, hot water, condenser and refrigerant piping
HVAC Power & Control panel, cabling and instrumentation
Duct able and Hi Wall Split air conditioning unit
Execution of Total low side and high side HVAC projects
Qualification and validation work
Scope of Electrical work HT Work with two pole or four pole structure with CTPT, HT Breaker,
Transformer
Power distribution panel i.e. LTPCC, MCC, MPDB, MLDB, PDB, LDB
HT & LT Cable Schedule and Cable Selection
Lighting calculation and light fixture selection
Earthing and lightening arrester grid Street light and external lighting
Power, LAN, Telephone distribution network
Installation and Commissioning of equipment i.e. Transformer, DG set, UPS etc
Liasoning with Electricity board for load sanction and charging of Transformer, DG Set and other equipment
Execution of Total HT and LT Electrical projects
Scope of Mechanical Piping and Erection workP & ID, Piping Distribution plan, Isometric view and MTO
External and internal pipe rack fabrication and erection
Fabrication and erection of IBR and Non IBR Piping
Fabrication and installation of fire hydrant network
Equipment rigging and installation
Painting to Structure and piping as per Code
Positioning & Installation of Instrumentation
Cold and Hot Insulation with or without cladding
Liasoning with IBR authorities, CCOE approval for tank forms and Fire Inspector approvals
Execution of Total Mechanical piping and erection projects
THANK YOU & HOPE TO BE PART OF YOUR FUTURE PROJECTS
Thanks, Hope to associate with you in your Project Need
NEEL TEAM