navair 00-80t-122 - sailorbob - sailorbob 2.0 • index page july 2016/section 4...2016-12-20 ·...

714

Click here to load reader

Upload: buinhu

Post on 03-Jul-2018

384 views

Category:

Documents


26 download

TRANSCRIPT

  • AIRCRAFT OPERATINGPROCEDURES FOR

    AIR-CAPABLE SHIPSNATOPS MANUAL

    1 NOVEMBER 20121 (Reverse Blank)

    NAVAIR 00-80T-122

    THIS PUBLICATION SUPERSEDES NAVAIR 00-80T-122 DATED 15 MAY 2010.

    DISTRIBUTION STATEMENT C Distribution authorized to U.S. Government agenciesonly and their contractors to protect publications required for official use or foradministrative or operational purposes only (1 November 2012). Other requests for thisdocument shall be referred to Commander, Naval Air Systems Command (PMA-251),RADM William A Moffett Bldg, 47123 Buse Rd, Bldg 2272, Patuxent River, MD20670-1547.

    DESTRUCTION NOTICE For unclassified, limited documents, destroy by any method that willprevent disclosure of contents or reconstruction of the document.

    ISSUED BY AUTHORITY OF THE CHIEF OF NAVAL OPERATIONS ANDUNDER THE DIRECTION OF THE COMMANDER,

    NAVAL AIR SYSTEMS COMMAND.

  • NAVAIR 00-80T-122

    ORIGINAL3/(4 blank)

    DEPARTMENT OF THE NAVY

    NAVAL AIR SYSTEMS COMMAND

    RADM WILLIAM A. MOFFETT BUILDING

    47123 BUSE ROAD, BLDG 2272

    PATUXENT RIVER, MARYLAND 206701547

    1 November 2012

    LETTER OF PROMULGATION

    1.The Naval Air Training and Operating Procedures Standardization (NATOPS)Program is a positive approach toward improving combat readiness and achieving asubstantial reduction in the aircraft mishap rate. Standardization, based on professionalknowledge and experience, provides the basis for development of an efficient and soundoperational procedure. The standardization program is not planned to stifle individualinitiative, but rather to aid the Commanding Officer in increasing the unit's combatpotential without reducing command prestige or responsibility.

    2.This manual standardizes ground and flight procedures but does not include tacticaldoctrine. Compliance with the stipulated manual requirements and procedures ismandatory except as authorized herein. In order to remain effective, NATOPS must bedynamic and stimulate rather than suppress individual thinking. Since aviation is acontinuing, progressive profession, it is both desirable and necessary that new ideas andnew techniques be expeditiously evaluated and incorporated if proven to be sound. Tothis end, Commanding Officers of aviation units are authorized to modify procedurescontained herein, in accordance with the waiver provisions established by OPNAVInstruction 3710.7, for the purpose of assessing new ideas prior to initiatingrecommendations for permanent changes. This manual is prepared and kept current bythe users in order to achieve maximum readiness and safety in the most efficient andeconomical manner. Should conflict exist between the training and operating proceduresfound in this manual and those found in other publications, this manual will govern.

    3.Checklists and other pertinent extracts from this publication necessary to normaloperations and training should be made and carried for use in naval aircraft.

    4.Per NAVAIRINST 13034.1 series, this flight clearance product provides NAVAIRairworthiness certification subsequent to design engineering review. It does not authorizeaircraft system modification, nor does it satisfy NAVAIR requirements for configurationmanagement. Refer to OPNAVINST 4790.2 series for policy guidance on configurationmanagement and modification authority.

    Approved

    R. L. MAHRRear Admiral, United States NavyBy direction ofCommander, Naval Air Systems Command

  • NAVAIR 00-80T-122

    ORIGINAL5/(6 blank)

    INTERIM CHANGE SUMMARY

    The following Interim Changes have been canceled or previously incorporated into this manual.

    INTERIMCHANGE

    NUMBER(S) REMARKS/PURPOSE

    1 thru 6 Previously incorporated

    The following Interim Changes have been incorporated into this Change/Revision.

    INTERIMCHANGE

    NUMBER(S) REMARKS/PURPOSE

    7 Delete Ref to the H- 47F Helicopter

    8 Helicopter Indoctrination Course Clarification

    9 Aircraft Spotting on LPD- 4 and - 17 class ships / V- 22 Deck Heating Mitigation Procedures

    Interim Changes Outstanding To be maintained by the custodian of this manual.

    INTERIMCHANGENUMBER

    ORIGINATOR/DATE(or DATE/TIME GROUP)

    PAGESAFFECTED REMARKS/PURPOSE

    10 122009Z AUG 13 11- 46/48,51/53,Q- 10/11

    Flight Deck Operating Matrix andSA- 330J Wind Envelopes

    11 142000Z FEB 14 7- 4,9- 1/6, 27/28c

    Flight Deck Warnings

    12 102005Z MAR 14 29, 9- 34/35,C- 19/22,R- 13/30

    Multi- Subject

    13 192006Z DEC 14 7- 1/15 Ship Maneuvering

  • NAVAIR 192006Z DEC 14 Page 1 of 2 00-80T-122 IC 13

    PAAUZYUW RULYFOO0098 1921943-UUUU--RULYSUU. ZNR UUUUU P 192006Z DEC 14 ZYB FM COMNAVAIRSYSCOM PATUXENT RIVER MD//4.0P// TO COMNAVSURFLANT NORFOLK VA//N8/N83// COMNAVSURFPAC SAN DIEGO CA//N40// COMNAVSURFOR SAN DIEGO CA//N42// INFO COMNAVAIRFOR SAN DIEGO CA//N455/N3B11A/N3C3/N421L// COMNAVSAFECEN NORFOLK VA//11// COMSC WASHINGTON DC//N3/PM1// MSFSC NORFOLK VA//N3// COMSC PAC SAN DIEGO CA COMLOG WESTPAC//N3/N4// FLTREADCENSOUTHEAST JACKSONVILLE FL//3.3.3// COMNAVAIRFORES SAN DIEGO CA//N42/N52// COMNAVAIRSYSCOM PATUXENT RIVER MD//4.0P/4.1/5.0F/5.1// NAVAIRWARCENACDIV LAKEHURST NJ//13391// PEOTACAIR PATUXENT RIVER MD//PMA251// BT UNCLAS MSGID/GENADMIN/MIL-STD-6040(SERIES)/B.0.01.00 /COMNAVAIRSYSCOM PATUXENT RIVER/-/DEC/-/-/USA/UNCLASSIFIED// SUBJ/AIRCRAFT OPERATING PROCEDURES FOR AIR-CAPABLE SHIPS NATOPS /PUBLICATION INTERIM CHANGE// REF/A/DESC:EML/CNAF/-/18DEC2014//// REF/B/DESC:DOC/NAVAIR/-/08DEC2014// REF/C/DESC:DOC/NAVAIR/-/01NOV2012// NARR/REF A IS COG COMMAND CONCURRENCE. REF B IS AIRS 2014-326. REF C IS AIRCRAFT OPERATING PROCEDURES FOR AIR-CAPABLE SHIPS NATOPS MANUAL GENERAL SERIES NATOPS MANUAL, 00-80T-122 DTD 01 NOV 2012.// POC/SARAH GRAVES/CNTR/UNIT:4.0P FLIGHT CLEARANCE /NAME:PATUXENT RIVER MD/TEL:301-342-5741 /EMAIL:SARAH.GRAVES.CTR(AT)NAVY.MIL// GENTEXT/REMARKS/1. THIS MESSAGE IS ISSUED IN RESPONSE TO REFS A AND B. THIS MESSAGE ISSUES INTERIM CHANGE (IC) NUMBER 13 TO REF C. 2. SUMMARY. A. THIS MESSAGE PROVIDES UPDATES TO SHIP MANEUVERING AND AIRCRAFT HANDLING SECTIONS. B. REPLACEMENT PAGES CONTAINING THESE CHANGES FOR DOWNLOADING AND INSERTION INTO REF C WILL BE ATTACHED TO THIS INTERIM CHANGE MESSAGE WHEN IT IS POSTED ON THE NATEC AND AIRWORTHINESS WEBSITES (SEE LAST PARA BELOW). 3. THESE CHANGES IMPACT THE FOLLOWING EXISTING NATOPS FLIGHT MANUAL. THE REPLACEMENT PAGE PACKAGE INCLUDES THE FOLLOWING PAGES: A. REF C (00-80T-122(NM)): PAGES: 5/(6 BLANK) AND 7-1 THROUGH 7-15/(7-16 BLANK). B. TO ENSURE THE PDF PAGES PRINT TO SCALE: SELECT PRINT AND VIEWING PRINT SETUP WINDOW, ENSURE "NONE" IS SELECTED IN THE PAGE SCALING DROPDOWN. 4. POINTS OF CONTACT: A. AIR-CAPABLE SHIPS NATOPS PROGRAM MANAGER, CDR DANIEL NOWICKI, TEL DSN 545-2829 OR COMM (619) 545-2829, EMAIL: [email protected]. B. NAVAIR POCS:

  • NAVAIR 192006Z DEC 14 Page 2 of 2 00-80T-122 IC 13

    (1) GREG HIRSEKORN, AIR 4.0P NATOPS IC COORDINATOR, TEL: COMM (585) 591-0088, EMAIL: GREGORY.HIRSEKORN(AT)NAVY.MIL. (2) LCDR RYAN MCALLISTER, 4.0P NATOPS OFFICER, TEL: DSN 995-2052 OR COMM (301) 995-2052, EMAIL: [email protected]. (3) AIRWORTHINESS GLOBAL CUSTOMER SUPPORT TEAM, TEL: COMM (301) 757-0187, EMAIL: [email protected]. 5. THIS MESSAGE WILL BE POSTED ON THE AIRWORTHINESS WEBSITE, HTTPS:(SLASH)(SLASH)AIRWORTHINESS.NAVAIR.NAVY.MIL WITHIN 72 HOURS OF RELEASE. INTERIM CHANGES MAY BE FOUND IN TWO PLACES: A. IN THE AIRWORTHINESS NATOPS LIBRARY SORTED BY AIRCRAFT PLATFORM AND TMS. B. ADDITIONALLY, THIS MESSAGE WILL BE POSTED ON THE NATEC WEBSITE, HTTPS:(SLASH)(SLASH)MYNATEC.NAVAIR.NAVY.MIL. IF THE IC MESSAGE INCLUDES REPLACEMENT PAGES, THEY WILL BE PLACED WITHIN THE MANUAL AND REPLACED PAGES DELETED. IF UNABLE TO VIEW THIS MESSAGE ON EITHER THE AIRWORTHINESS OR NATEC WEBSITES, INFORM THE NATOPS GLOBAL CUSTOMER SUPPORT TEAM AT (301) 342-3276, DSN 342-3276, OR BY EMAIL AT [email protected]. C. INFORMATION REGARDING THE AIRWORTHINESS PROCESS, INCLUDING A LISTING OF ALL CURRENT INTERIM FLIGHT CLEARANCES, NATOPS AND NATIP PRODUCTS ISSUED BY NAVAIR 4.0P, CAN BE FOUND AT OUR WEBSITE: HTTPS:(SLASH)(SLASH)AIRWORTHINESS.NAVAIR.NAVY.MIL. D. THE MODEL MANAGER UNIT (SEE PARA 4.A ABOVE) IS TO READDRESS THIS MESSAGE AS REQUIRED TO ENSURE ALL AFFECTED SQUADRONS/UNITS ARE NOTIFIED OF THIS IC RELEASE E. E-POWER FOLDER NUMBER 1127024, AIRWORTHINESS TRACKING NUMBER 63856.// BT #0098 NNNN Payne, James (4.0P, PEO(T) Deputy Chief Engr), 12/19/2014

  • PAAUZYUW RULYF000091 2271621-UUUU--RULYSUU. ZNR UUUUU P 102005Z MAR 14 ZYB FM COMNAVAIRSYSCOM PATUXENT RIVER MD//4.0P// TO COMNAVSURFLANT NORFOLK VA//N8/N83// COMNAVSURFPAC SAN DIEGO CA//N40// COMNAVSURFOR SAN DIEGO CA//N42// INFO COMNAVAIRFOR SAN DIEGO CA//N455/N3B11A/N3C3/N421L// COMNAVSAFECEN NORFOLK VA//11// COMSC ~SHINGTON DC//N3/P.M1// MSFSC NORFOLK VA//N3// COMSC PAC SAN DIEGO CA COMLOG WESTPAC//N3/N4// FLTREADCENSOUTHEAST JACKSONVILLE FL//3.3.3// COMNAVAIRFORES SAN DIEGO CA//N42/NS2// COMNAVAIRSYSCOM PATUXENT RIVER MD//4.0P/4.1/5.0F/5.1// NAVAIR~CENACDIV LAKEHURST NJ//13391// PEOTACAIR PATUXENT RIVER MD/ /PMA251/ / BT UNCLAS MSGID/GENADMIN/MIL-STD-6040(SERIES)/B.0.01.00 /COMNAVAIRSYSCOM PATUXENT RIVER/-/MAR/-/-/-/-// SUBJ/AIRCRAFT OPERATING PROCEDURES FOR AIR-CAPABLE SHIPS NATOPS /PUBLICATION INTERIM CHANGE.// REF/A/DESC:EML/CNAF/-/06MAR2014// REF/B/DESC:DOC/NAVAIR/-/03DEC2013// REF/C/DESC:DOC/NAVAIR/-/01NOV2012// NARR/REF A IS COG CO~ CONCURRENCE. REF B IS AIRS 2013-297. REF C IS AIRCRAFT OPERATING PROCEDURES FOR AIR-CAPABLE SHIPS NATOPS MANUAL GENERAL SERIES NATOPS ~, 00-80T-122 DTD 01 NOV 2012 . // POC/JOHN ERWIN/CNTR/UNIT:4.0P FLIGHT CLEARANCE /NAME:PATUXENT RIVER MD/TEL:301-866-5541 /EMAIL:JOHN.P.ERWIN.CTR(AT)NAVY.MIL// GENTEXT/REMARKS/1. THIS MESSAGE IS ISSUED IN RESPONSE TO REFS A AND B . THIS MESSAGE ISSUES INTERIM CHANGE ( IC) NUMBER 12 TO REF C. 2. S~Y.

    A. THIS MESSAGE PROVIDES FURTHER GUIDANCE CONCERNING HOT LOADING, UPDATES H-1 WIND ENVELOPES AND UPDATES V-22 WIND ENVELOPES.

    B. REPLACEMENT PAGES CONTAINING THESE CHANGES FOR DOWNLOADING AND INSERTION INTO REF C WILL BE ATTACHED TO THIS INTERIM CHANGE MESSAGE WHEN IT IS POSTED ON THE NATEC AND AIRWORTHINESS WEBSITES (SEE LAST PARA BELOW).

    3. THESE CHANGES IMPACT THE FOLLOWING EXISTING NATOPS FLIGHT MANUAL . THE REPLACEMENT PAGE PACKAGE INCLUDES THE FOLLOWING PAGES:

    A. REF C (00-80T-122(NM)): PAGES: 5/(6 BLANK), 29, 30, 9-33 THRU 9-36, C-19 THRU C-22 AND R-13 THRU R-30 .

    B. TO ENSURE THE PDF PAGES PRINT TO SCALE: SELECT PRINT AND VIEWING PRINT SETUP WINDOW, ENSURE " NONE" IS SELECTED IN THE PAGE SCALING DROPDOWN.

    4 . POINTS OF CONTACT: A. AIR-CAPABLE SHIPS NATOPS PROGRAM :M2lliAGER, CDR RICHARD

    WEEDEN, TEL DSN 735-2829 OR COMM (619) 545-2829, EMAIL: [email protected]

    NAVAIR 102005Z MAR 14 Page 1 of 2 00-80T-122 IC 12

  • B. NAVAIR POCS: (1) GREG HIRSEKORN, AIR 4. OP NATOPS IC COORDINATOR, TEL:

    (585) 591-0088 , ~IL: GREGORY.HIRSEKORN(AT)NAVY.MIL . (2) LCDR ANDREW MCCRONE, 4.0P NATOPS OFFICER

    TEL : DSN 995-2052 OR COMM (301) 995-2052, EMAIL : ANDREW. MCCRONE (AT) NAVY. MIL .

    (3) AIRWORTHINESS GLOBAL CUSTOMER SUPPORT TEAM:, TEL : (301) 757-0187, ~IL: [email protected].

    5 . THIS MESSAGE WILL BE POSTED ON THE AIRWORTHINESS WEBSITE , HTTPS: (SLASH) (SLASH)AIRWORTHINESS.NA~IR.NAVY.MIL WITHIN 48 HOURS OF RELEASE. INTERIM CHANGES MAY BE FOUND IN TWO PLACES ON THE WEBSITE:

    A. IN THE NATOPS LIBRARY SORTED BY AIRCRAFT PLATFORM AND TMS. B. IN AIRS, SEARCH BY AIRS NUMBER FOUND IN REF B ABOVE .

    THIS MESSAGE WILL ADDITIONALLY BE POSTED ON THE NATEC WEBSITE , HTTPS: (SLASH) (SLASH)MYNATEC.NA~IR.NAVY.MIL. IF THE IC MESSAGE INCLUDES REPLACEMENT PAGES, THEY WILL BE PLACED WITHIN THE MANUAL AND REPLACED PAGES DELETED . IF UNABLE TO VIEW THIS MESSAGE ON EITHER THE AIRWORTHINESS OR NATEC WEBSITES , INFORM THE NATOPS GLOBAL CUSTOMER SUPPORT TEAM AT (301) 342-3276, DSN 342-3276, OR BY ~IL AT [email protected] .

    C. INFORMATION REGARDING THE AIRWORTHINESS PROCESS, INCLUDING A LISTING OF ALL CURRENT INTERIM FLIGHT CLEARANCES, NATOPS AND NATIP PRODUCTS ISSUED BY NAVAIR 4 . 0P, CAN BE FOUND AT OUR WEBSITE : HTTPS: (SLASH) (SLASH)AIRWORTHINESS.NA~R . NAVY.MIL .

    D. THE MODEL MANAGER UNIT (SEE PARA 4.A ABOVE) IS TO READDRESS THIS MESSAGE AS REQUIRED TO ENSURE ALL AFFECTED SQUADRONS/ UNITS ARE NOTIFIED OF THIS IC RELEASE

    E. E-POWER FOLDER NUMBER 1078278, AIRWORTHINESS TRACKING NUMBER 57772.//

    BT #0091 NNNN

    Herr, John (4.0P, PEO(A) Sr Airworthiness Engr), 03/11/2014

    NAVAIR 102005Z ~ 14 Page 2 of 2 00-80T-122 IC 12

  • NAVAIR 142000Z FEB 14 Page 1 of 2 00-80T-122 (IC 11)

    PAAUZYUW RULYFOO0098 1921943-UUUU--RULYSUU. ZNR UUUUU P 142000Z FEB 14 ZYB FM COMNAVAIRSYSCOM PATUXENT RIVER MD//4.0P// TO COMNAVSURFLANT NORFOLK VA//N8/N83// COMNAVSURFPAC SAN DIEGO CA//N40// COMNAVSURFOR SAN DIEGO CA//N42// COMNAVAIRFOR SAN DIEGO CA//N455/N3B11A/N3C3/N421L// COMNAVSAFECEN NORFOLK VA//11// COMSC WASHINGTON DC//N3/PM1// MSFSC NORFOLK VA//N3// COMSC PAC SAN DIEGO CA COMLOG WESTPAC//N3/N4// FLTREADCENSOUTHEAST JACKSONVILLE FL//3.3.3// COMNAVAIRFORES SAN DIEGO CA//N42/N52// INFO COMNAVAIRSYSCOM PATUXENT RIVER MD//4.0P/4.1/5.0F/5.1// NAVAIRWARCENACDIV LAKEHURST NJ//13391// PEOTACAIR PATUXENT RIVER MD//PMA251// BT UNCLAS MSGID/GENADMIN/MIL-STD-6040(SERIES)/B.0.01.00 /COMNAVAIRSYSCOM PATUXENT RIVER/-/FEB/-/-/USA/UNCLASSIFIED// SUBJ/AIRCRAFT OPERATING PROCEDURES FOR AIR-CAPABLE SHIPS NATOPS /PUBLICATION INTERIM CHANGE// REF/A/DESC:EML/CNAF/-/30JAN2013// REF/B/DESC:DOC/NAVAIR/-/05DEC2013// REF/C/DESC:DOC/NAVAIR/-/01NOV2012// NARR/REF A IS COG COMMAND CONCURRENCE. REF B IS AIRS 2013-376. REF C IS AIRCRAFT OPERATING PROCEDURES FOR AIR-CAPABLE SHIPS NATOPS MANUAL GENERAL SERIES NATOPS MANUAL, DTD 01 NOV 2012. // POC/JOHN ERWIN/CNTR/UNIT:4.0P FLIGHT CLEARANCE /NAME:PATUXENT RIVER MD/TEL:301-866-5541 /EMAIL:JOHN.P.ERWIN.CTR(AT)NAVY.MIL// GENTEXT/REMARKS/REMARKS/1. THIS MESSAGE IS ISSUED IN RESPONSE TO REFS A AND B. THIS MESSAGE ISSUES INTERIM CHANGE (IC) NUMBER 11 TO REF C. 2. SUMMARY. A. THIS MESSAGE PROVIDES FURTHER GUIDANCE CONCERNING FLIGHT DECK SAFETY ON DDG AND FFG SHIPS AND ADDS WARNINGS CONCERNING AIR OPERATIONS ABOARD SHIP. B. REPLACEMENT PAGES CONTAINING THESE CHANGES FOR DOWNLOADING AND INSERTION INTO REF C WILL BE ATTACHED TO THIS INTERIM CHANGE MESSAGE WHEN IT IS POSTED ON THE NATEC AND AIRWORTHINESS WEBSITES (SEE LAST PARA BELOW). 3. THESE CHANGES IMPACT THE FOLLOWING EXISTING NATOPS FLIGHT MANUAL. THE REPLACEMENT PAGE PACKAGE INCLUDES THE FOLLOWING PAGES: A. REF C (00-80T-122(NM)): PAGES: 5/(6 BLANK), 7-3 THRU 7-4A (B BLANK),9-1 THRU 9-6A (B BLANK) AND 9-27 THRU 9-28C (D BLANK). B. TO ENSURE THE PDF PAGES PRINT TO SCALE: SELECT PRINT AND VIEWING PRINT SETUP WINDOW, ENSURE "NONE" IS SELECTED IN THE PAGE SCALING DROPDOWN.

  • NAVAIR 142000Z FEB 14 Page 2 of 2 00-80T-122 (IC 11)

    4. POINTS OF CONTACT: A. AIR-CAPABLE SHIPS NATOPS PROGRAM MANAGER, CDR RICHARD WEEDEN, TEL DSN 735-2829 OR COMM (619) 545-2829, EMAIL: [email protected]. B. NAVAIR POCS: (1) GREG HIRSEKORN, AIR 4.0P NATOPS IC COORDINATOR, TEL: (585) 591-0088, EMAIL: GREGORY.HIRSEKORN(AT)NAVY.MIL. (2) LCDR ANDREW MCCRONE, 4.0P NATOPS OFFICER TEL: DSN 995-2052 OR COMM (301) 995-2052, EMAIL: ANDREW.MCCRONE(AT)NAVY.MIL. (3) AIRWORTHINESS GLOBAL CUSTOMER SUPPORT TEAM, TEL: (301) 757-0187, EMAIL: [email protected]. 5. THIS MESSAGE WILL BE POSTED ON THE AIRWORTHINESS WEBSITE, HTTPS://AIRWORTHINESS.NAVAIR.NAVY.MIL WITHIN 72 HOURS OF RELEASE. INTERIM CHANGES MAY BE FOUND IN TWO PLACES ON THE WEBSITE: A. IN THE NATOPS LIBRARY SORTED BY AIRCRAFT PLATFORM AND TMS. B. IN AIRS, SEARCH BY AIRS NUMBER FOUND IN REF B ABOVE. THIS MESSAGE WILL ADDITIONALLY BE POSTED ON THE NATEC WEBSITE, HTTPS://MYNATEC.NAVAIR.NAVY.MIL. IF THE IC MESSAGE INCLUDES REPLACEMENT PAGES, THEY WILL BE PLACED WITHIN THE MANUAL AND REPLACED PAGES DELETED. IF UNABLE TO VIEW THIS MESSAGE ON EITHER THE AIRWORTHINESS OR NATEC WEBSITES, INFORM THE NATOPS GLOBAL CUSTOMER SUPPORT TEAM AT (301) 342-3276, DSN 342-3276, OR BY EMAIL AT [email protected]. C. INFORMATION REGARDING THE AIRWORTHINESS PROCESS, INCLUDING A LISTING OF ALL CURRENT INTERIM FLIGHT CLEARANCES, NATOPS AND NATIP PRODUCTS ISSUED BY NAVAIR 4.0P, CAN BE FOUND AT OUR WEBSITE: AIRWORTHINESS.NAVAIR.NAVY.MIL. D. THE MODEL MANAGER UNIT (SEE PARA 4.A ABOVE) IS TO READDRESS THIS MESSAGE AS REQUIRED TO ENSURE ALL AFFECTED SQUADRONS/UNITS ARE NOTIFIED OF THIS IC RELEASE. E. E-POWER FOLDER NUMBER 1077375, TRACKING NUMBER 57842. // BT #0098 NNNN Herr, John (4.0P, PEO(A) Sr Airworthiness Engr), 02/14/2014

  • NAVAIR 122009Z AUG 13 Page 1 of 2 00-80T-122 IC 10

    PAAUZYUW RULYFOO0091 2271621-UUUU--RULYSUU. ZNR UUUUU P 122009Z AUG 13 ZYB FM COMNAVAIRSYSCOM PATUXENT RIVER MD//4.0P// TO COMNAVSURFLANT NORFOLK VA//N8/N83// COMNAVSURFPAC SAN DIEGO CA//N40// COMNAVSURFOR SAN DIEGO CA//N42// COMNAVAIRFOR SAN DIEGO CA//N455/N3B11A/N3C3/N421L// COMNAVSAFECEN NORFOLK VA//11// COMSC WASHINGTON DC//N3/PM1// MSFSC NORFOLK VA//N3// COMSC PAC SAN DIEGO CA COMLOG WESTPAC//N3/N4// FLTREADCENSOUTHEAST JACKSONVILLE FL//3.3.3// COMNAVAIRFORES SAN DIEGO CA//N42/N52// COMNAVAIRLANT NORFOLK VA//N3/N455// INFO COMNAVAIRSYSCOM PATUXENT RIVER MD//4.0P/4.1/5.0F/5.1// NAVAIRWARCENACDIV LAKEHURST NJ//13391// PEOTACAIR PATUXENT RIVER MD//PMA251// BT UNCLAS MSGID/GENADMIN/MIL-STD-6040(SERIES)/B.0.01.00 /COMNAVAIRSYSCOM PATUXENT RIVER/-/AUG/-/-/-/-// SUBJ/AIRCRAFT OPERATING PROCEDURES FOR AIR-CAPABLE SHIPS NATOPS /PUBLICATION INTERIM CHANGE.// REF/A/DESC:EML/CNAF/-/02AUG2013// REF/B/DESC:DOC/NAVAIR/-/07AUG2013// REF/C/DESC:DOC/NAVAIR/-/01NOV2012// NARR/REF A IS COG COMMAND CONCURRENCE. REF B IS AIRS 2013-016. REF C IS AIRCRAFT OPERATING PROCEDURES FOR AIR-CAPABLE SHIPS GENERAL SERIES NATOPS MANUAL.// POC/SARAH GRAVES/CNTR/UNIT:4.0P FLIGHT CLEARANCE /NAME:PATUXENT RIVER MD/TEL:301-342-5741 /EMAIL:SARAH.GRAVES.CTR(AT)NAVY.MIL// GENTEXT/REMARKS/1. THIS MESSAGE IS ISSUED IN RESPONSE TO REFS A AND B. THIS MESSAGE ISSUES INTERIM CHANGE (IC) NUMBER 10 TO REF C. 2. SUMMARY. A. THIS MESSAGE PROVIDES CHANGES TO LPD -4 AND -17 FLIGHT DECK OPERATING MATRICES, AS WELL AS NEW CAPABILITIES FOR SA-330J LAUNCH AND RECOVERY ENVELOPES ON T-AOE 6 CLASS SHIPS. B. REPLACEMENT PAGES CONTAINING THESE CHANGES FOR DOWNLOADING AND INSERTION INTO REF C WILL BE ATTACHED TO THIS INTERIM CHANGE MESSAGE WHEN IT IS POSTED ON THE NATEC AND AIRWORTHINESS WEBSITES (SEE LAST PARA BELOW). 3. THESE CHANGES IMPACT THE FOLLOWING EXISTING NATOPS FLIGHT MANUAL. THE REPLACEMENT PAGE PACKAGE INCLUDES THE FOLLOWING PAGES: A. REF C (00-80T-122(NM)): PAGES: 5/(6 BLANK), 11-45 THRU 11-48, 11-51 THRU 11-54 AND Q-9 THRU Q-11/(Q-12 BLANK). B. TO ENSURE THE PDF PAGES PRINT TO SCALE: SELECT PRINT AND VIEWING PRINT SETUP WINDOW, ENSURE "NONE" IS SELECTED IN THE PAGE SCALING DROPDOWN. 4. POINTS OF CONTACT: A. AIR-CAPABLE SHIPS NATOPS PROGRAM MANAGER, CDR RICHARD WEEDEN, TEL DSN 735-2829 OR COMM (619) 545-2829, EMAIL: [email protected].

  • NAVAIR 122009Z AUG 13 Page 2 of 2 00-80T-122 IC 10

    B. NAVAIR POCS: (1) GREG HIRSEKORN, AIR 4.0P NATOPS IC COORDINATOR, TEL: (585) 591-0088, EMAIL: GREGORY.HIRSEKORN(AT)NAVY.MIL. (2) LCDR ANDREW MCCRONE, 4.0P NATOPS OFFICER TEL: DSN 995-2052 OR COMM (301) 995-2052, EMAIL: ANDREW.MCCRONE(AT)NAVY.MIL. (3) AIRWORTHINESS GLOBAL CUSTOMER SUPPORT TEAM, TEL: (301) 757-0187, EMAIL: [email protected]. 5. THIS MESSAGE WILL BE POSTED ON THE AIRWORTHINESS WEBSITE, HTTPS:AIRWORTHINESS.NAVAIR.NAVY.MIL WITHIN 48 HOURS OF RELEASE. INTERIM CHANGES MAY BE FOUND IN TWO PLACES ON THE WEBSITE: A. IN THE NATOPS LIBRARY SORTED BY AIRCRAFT PLATFORM AND TMS. B. IN AIRS, SEARCH BY AIRS NUMBER FOUND IN REF B ABOVE. THIS MESSAGE WILL ADDITIONALLY BE POSTED ON THE NATEC WEBSITE, HTTPS:MYNATEC.NAVAIR.NAVY.MIL. IF THE IC MESSAGE INCLUDES REPLACEMENT PAGES, THEY WILL BE PLACED WITHIN THE MANUAL AND REPLACED PAGES DELETED. IF UNABLE TO VIEW THIS MESSAGE ON EITHER THE AIRWORTHINESS OR NATEC WEBSITES, INFORM THE NATOPS GLOBAL CUSTOMER SUPPORT TEAM AT (301) 342-0870, DSN 342-0870, OR BY EMAIL AT [email protected]. C. INFORMATION REGARDING THE AIRWORTHINESS PROCESS, INCLUDING A LISTING OF ALL CURRENT INTERIM FLIGHT CLEARANCES, NATOPS AND NATIP PRODUCTS ISSUED BY NAVAIR 4.0P, CAN BE FOUND AT OUR WEBSITE: AIRWORTHINESS.NAVAIR.NAVY.MIL. D. THE MODEL MANAGER UNIT (SEE PARA 4.A ABOVE) IS TO READDRESS THIS MESSAGE AS REQUIRED TO ENSURE ALL AFFECTED SQUADRONS/UNITS ARE NOTIFIED OF THIS IC RELEASE. 6. E-POWER FOLDER ID: 1040001, TRACKING NUMBER: 52914.// BT #0091 NNNN Ball, James (4.0P, PEO(A)&1.0 Deputy Chief AW Engineer), 08/13/2013

  • NAVAIR 00-80T-122

    ORIGINAL7/(8 blank)

    RECORD OF CHANGES

    Change No. andDate of Change

    Date ofEntry

    Page Count Verified by(Signature)

  • NAVAIR 00-80T-122

    ORIGINAL9/(10 blank)

    LIST OF EFFECTIVE PAGESEffective

    Pages Page NumbersOriginal 1 (Reverse Blank)

    Original 3 (Reverse Blank)

    Original 5 (Reverse Blank)

    Original 7 (Reverse Blank)

    Original 9 (Reverse Blank)

    Original 11 thru 25 (Reverse Blank)

    Original 27 thru 45 (Reverse Blank)

    Original 47 thru 51 (Reverse Blank)

    Original 53 thru 57 (Reverse Blank)

    Original 1-1 thru 1-2

    Original 2-1 thru 2-31 (Reverse Blank)

    Original 3-1 thru 3-2

    Original 4-1 thru 4-3 (Reverse Blank)

    Original 5-1 thru 5-7 (Reverse Blank)

    Original 6-1 thru 6-14

    Original 7-1 thru 7-7 (Reverse Blank)

    Original 8-1 thru 8-10

    Original 9-1 thru 9-46

    Original 10-1 thru 10-14

    Original 11-1 thru 11-56

    Original 12-1 thru 12-29 (Reverse Blank)

    Original 13-1 thru 13-2

    Original 14-1 thru 14-6

    EffectivePages Page Numbers

    Original A-1 thru A-8

    Original B-1 thru B-49 (Reverse Blank)

    Original C-1 thru C-18

    Original D-1 thru D-10

    Original E-1 thru E-22

    Original F-1 thru F-6

    Original G-1 thru G-5 (Reverse Blank)

    Original H-1 thru H-29 (Reverse Blank)

    Original I-1 thru I-14

    Original J-1 thru J-44

    Original K-1 thru K-8

    Original L-1 thru L-7 (Reverse Blank)

    Original M-1 thru M-80

    Original N-1 thru N-6

    Original O-1 thru O-6

    Original P-1 thru P-12

    Original Q-1 thru Q-9 (Reverse Blank)

    Original R-1 thru R-30

    Original S-1(Reverse Blank)

    Original T-1 thru T-2

    Original U-1 thru U-3 (Reverse Blank)

    Original Index-1 thru Index-18

  • NAVAIR 00-80T-122

    ORIGINAL11

    NATOPS Flight ManualAircraft Operating Procedures for Air--Capable Ships

    CONTENTSPageNo.

    CHAPTER 1 INTRODUCTION

    1.1 PURPOSE 1-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.2 SCOPE 1-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.3 OTHER RELEVANT PUBLICATIONS 1-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    1.4 NATOPS ADVISORY GROUP 1-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PART I AVIATION FACILITIES, SUPPORT AND AIRCRAFT LIMITATIONS

    CHAPTER 2 AVIATION FACILITIES

    2.1 AIR-CAPABLE SHIP CERTIFICATION 2-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.1.1 Certification Waivers 2-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.2 GENERAL REQUIREMENTS 2-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.3 LEVELS AND CLASSES 2-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.3.1 Levels of Operation 2-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.3.2 Classes of Facilities 2-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.3.3 Maintaining Certification 2-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.4 IMC OPERATIONS 2-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.5 HOTLINE ACTION DESK 2-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.6 FLIGHT DECK MARKINGS 2-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.6.1 Landing Lineup Line and Circle 2-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.6.2 Vertical Replenishment T Line 2-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.6.3 Vertical Replenishment Ball and T Line 2-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.6.4 Vertical Replenishment Dash Line 2-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.6.5 Helicopter In-Flight Refueling Marking 2-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    2.7 VISUAL LANDING AIDS 2-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.7.1 Required Lighting Equipment 2-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.7.2 Categories of VLA Lighting Equipment 2-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.7.3 Vertical Replenishment Lighting Equipment 2-13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.7.4 Landing-Configured Lighting Equipment 2-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.7.5 Landing System Additional Lighting Equipment 2-29. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.7.6 Accessory Visual Aids 2-31. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL 12

    PageNo.

    CHAPTER 3 SUPPORT REQUIREMENTS

    3.1 SUPPORT REQUIREMENTS 3-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3.1.1 Logistics 3-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3.1.2 Aircraft Maintenance 3-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3.1.3 Corrosion Control 3-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 4 ROTORCRAFT LIMITATIONS

    4.1 ROTORCRAFT LIMITATIONS 4-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4.1.1 Inherent Limitations 4-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4.1.2 Operational Limitations 4-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    4.2 AMCM LIMITATIONS AND CONSTRAINTS 4-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    4.3 AIRBORNE MINE COUNTERMEASURES EQUIPMENT 4-2. . . . . . . . . . . . . . . . . . . . . .

    PART II TRAINING AND RESPONSIBILITIES

    CHAPTER 5 TRAINING

    5.1 INITIAL SHIP AVIATION TEAM TRAINING 5-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    5.2 TRAINING SHIPS PERSONNEL 5-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.1 Commanding Officers/Executive Officers 5-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.2 Air Officer/Helicopter Control Officer 5-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.3 Flight Deck Officer and VERTREP Cargo Supervisor 5-2. . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.4 Officer of the Deck 5-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.5 Tactical Air Controller 5-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.6 Chief Engineer 5-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.7 Aviation Fuels Officer 5-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.8 Damage Control Assistant 5-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.9 Crash and Salvage Crew/Crash and Rescue Party and Scene Leader 5-3. . . . . . . . . . . . . . . . .5.2.10 Landing Signalman Enlisted 5-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.11 Air Tactical Controllers/CIC Personnel 5-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.12 Flight Deck Crews and Hookup Men 5-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.13 VERTREP Cargo Handling Crew 5-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.14 Ship Search and Rescue Organization 5-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.15 Ships Company Brief 5-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2.16 Aviation Personnel Brief 5-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL13

    PageNo.

    CHAPTER 6 RESPONSIBILITIES

    6.1 RESPONSIBILITIES 6-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.1 Command Relationship With Navy Squadron/Detachment 6-1. . . . . . . . . . . . . . . . . . . . . . . .6.1.2 Airborne MCM Command Relationships 6-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.3 Command Relationship With Marine Squadron/Detachment 6-2. . . . . . . . . . . . . . . . . . . . . . .6.1.4 Ships Commanding Officer 6-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.5 Officer of the Deck 6-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.6 Ships Operations Officer/Combat Systems Officer 6-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.7 Combat Information Center Officer 6-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.8 Chief Engineer 6-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.9 Damage Control Assistant 6-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.10 Air Officer 6-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.11 Aviation Officer 6-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.12 Aviation Coordinator 6-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.13 Helicopter Control Officer 6-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.14 Landing Safety Officer 6-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.15 Flight Deck Officer 6-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.16 Landing Signalman Enlisted 6-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.17 Vertical Replenishment Organizational Responsibilities 6-11. . . . . . . . . . . . . . . . . . . . . . . . .6.1.18 Aviation Safety Officer 6-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.19 Ships Medical Officer/Independent Duty Corpsman 6-12. . . . . . . . . . . . . . . . . . . . . . . . . . . .6.1.20 Ships Supply Officer 6-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    6.2 PERSONNEL RESPONSIBILITIES (CCO/ATO) 6-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6.2.1 Air Plan 6-13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    6.3 MINE COUNTERMEASURE COMMANDER 6-13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    6.4 AIRBORNE MINE COUNTERMEASURES SQUADRONCOMMANDING OFFICER 6-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    6.5 AVIATION DEPARTMENT 6-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PART III SAFETY AND OPERATING PROCEDURES

    CHAPTER 7 SAFETY

    7.1 RESPONSIBILITY FOR SAFETY 7-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.1.1 General Safety Measures 7-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.1.2 Hazards of Foreign Object Damage 7-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.1.3 Rotor Blade Dangers 7-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    7.2 SHIP MANEUVERING 7-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.2.1 Hovering Rotorcraft 7-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL 14

    PageNo.

    7.3 AIRCRAFT HANDLING 7-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    7.4 SAFETY PRECAUTIONS 7-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    7.5 AVIATION FUEL HANDLING 7-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    7.6 FLIGHT DECK FIRE PARTY 7-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    7.7 MISHAP INVESTIGATION 7-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    7.8 INTEGRITY WATCH 7-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    7.9 HAZARDS 7-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.9.1 Weapons/Chaff Hazards 7-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.9.2 Sonic Boom Concussion 7-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.9.3 Hazardous Operations 7-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.9.4 Static Discharge Hazard 7-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.9.5 Hazards of Electromagnetic Radiation to Personnel 7-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 8 PLANNING AND PREPARATION FOR FLIGHT OPERATIONS

    8.1 INTRODUCTION 8-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    8.2 AVIATION OPERATIONS ON READY RESERVE FORCE, COMMERCIALVESSELS, AND NON-AIR-CAPABLE SHIPS 8-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    8.2.1 Training Evolutions 8-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.2.2 Guidelines 8-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    8.3 U.S. NAVY INTERSERVICE AND INTERNATIONAL HELICOPTEROPERATIONS 8-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    8.4 DETACHMENT CROSS-DECK EVOLUTIONS 8-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.4.1 One-Plane to One-Plane Cross-Deck Transfer 8-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.4.2 One-Plane to Two-Plane Cross-Deck Transfer 8-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.4.3 Maintenance and Training 8-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    8.5 AIRCRAFT/CREW ALERT CONDITIONS 8-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.5.1 Alert Conditions 8-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    8.6 SCHEDULING AND BRIEFING 8-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    8.7 WEATHER SUPPORT 8-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    8.8 PLANNING FACTORS 8-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.8.1 Responsibility for the Air Plan 8-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.8.2 Air Plan Contents 8-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.8.3 Flight Clearance 8-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.8.4 Post-Deployment Fly-Off Policy 8-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.8.5 Multiple Aircraft Operations from a Single--Spot Ship 8-8. . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL15

    PageNo.

    8.9 SEARCH AND RESCUE REQUIREMENTS 8-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    8.10 PREOPERATIONAL PROCEDURES 8-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.10.1 Time Schedule 8-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.10.2 Flight Quarters 8-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 9 NORMAL PROCEDURES

    9.1 RAST--EQUIPPED AIR--CAPABLE SHIPS 9-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.1.1 RAST Main Probe Chock Removal/Installation Procedures 9-1. . . . . . . . . . . . . . . . . . . . . . .

    9.2 STOWAGE OF AIRCRAFT AND EQUIPMENT 9-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.2.1 Tiedown Requirements 9-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.2.2 Hangar Operations 9-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.2.3 Stowage of Auxiliary (Aux) Fuel Tank 9-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    9.3 SAFETY 9-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    9.4 MOVEMENT OF AIRCRAFT 9-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.4.1 Brakerider 9-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.4.2 Movement Safety Rules 9-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.4.3 MQ--8B Handling 9-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    9.5 AVIATION FUELING 9-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.5.1 General 9-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.5.2 Fueling on Deck 9-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.5.3 Helicopter In-Flight Refueling (HIFR) 9-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    9.6 LAUNCH/RECOVERY PROCEDURES 9-22. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.6.1 Launch Procedures 9-22. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.6.2 Troubleshooter Signals 9-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.6.3 Recovery Procedures 9-26. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.6.4 Flight Quarters Clothing 9-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.6.5 Wind and Deck Limitations 9-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.6.6 V--22 Deck Heating Mitigation Procedures 9-28. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    9.7 SHIPBOARD CONTROL STATIONS 9-28b. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.7.1 Communications 9-28c. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.7.2 Emission Control 9-30. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.7.3 Military Air Distress Frequency 9-31. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    9.8 AVIATION ORDNANCE 9-31. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.8.1 Personnel Certification 9-32. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.8.2 Hazards of Electromagnetic Radiation to Ordnance/Radiation Hazards

    Safety Precautions 9-32. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL 16

    PageNo.

    9.8.3 Weapons Handling and Movement 9-32. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.8.4 Assembly and Disassembly 9-33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.8.5 Staging 9-33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.8.6 Loading 9-34. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.8.7 Arming 9-35. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.8.8 Downloading and Dearming 9-35. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.8.9 Aircraft Maintenance and Servicing of Loaded Aircraft 9-36. . . . . . . . . . . . . . . . . . . . . . . . . .9.8.10 Undersea Warfare Ordnance 9-36. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.8.11 Hangaring Aircraft With Ordnance 9-37. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.8.12 Munitions 9-37. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    9.9 ENGINE TURNUPS 9-37. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    9.10 SHIPBOARD UNAIDED NIGHT OPERATIONS 9-37. . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.10.1 Night Lighting 9-37. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.10.2 Night Emission Control Recovery Procedures 9-38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.10.3 Additional Preparations for Night Operations 9-38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    9.11 SHIPBOARD NIGHT VISION DEVICE OPERATIONS 9-39. . . . . . . . . . . . . . . . . . . . . . . .9.11.1 Authority for Night Vision Device Operations 9-40. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.11.2 Requirements and Limitations of Night Vision Devices 9-40. . . . . . . . . . . . . . . . . . . . . . . . . .9.11.3 Training and Qualification for Night Vision Devices 9-41. . . . . . . . . . . . . . . . . . . . . . . . . . . .9.11.4 Night Vision Device Equipment 9-43. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.11.5 Shipboard Lighting Requirements 9-44. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.11.6 Aircraft Procedures 9-45. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 10 AIR TRAFFIC CONTROL DOCTRINE

    10.1 AIR TRAFFIC CONTROL DOCTRINE (AIR-CAPABLE SHIPS) 10-1. . . . . . . . . . . . . . . .

    10.2 RESPONSIBILITIES 10-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.2.1 Pilot 10-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.2.2 Operations Officer 10-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.2.3 Combat Information Center Watch Officer 10-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    10.3 CONTROL 10-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3.1 Controlled Airspace 10-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3.2 Control Criteria 10-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3.3 Visual Meteorological Conditions Minimums 10-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3.4 Separation Criteria 10-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3.5 Electronic Control 10-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3.6 Tactical Direction 10-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3.7 Advisory Control 10-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL17

    PageNo.

    10.3.8 Positive Control 10-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3.9 Electronic Emission Control 10-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3.10 Control of Radio Circuits 10-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3.11 Voice Procedures 10-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3.12 Flight Clearance Requirements 10-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3.13 Departing Aircraft 10-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.3.14 Control of Departing Aircraft 10-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    10.4 DEPARTURE PROCEDURES (AIR-CAPABLE SHIPS) 10-6. . . . . . . . . . . . . . . . . . . . . . . .10.4.1 Day Visual Meteorological Conditions 10-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.4.2 Instrument Meteorological Conditions or Night Operations 10-7. . . . . . . . . . . . . . . . . . . . . .10.4.3 Departure Communications Procedures 10-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    10.5 ARRIVAL PROCEDURES 10-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.5.1 Approach Criteria (Air-Capable Ships) 10-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.5.2 Marshal 10-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.5.3 Air Surveillance Radar or Self-Controlled Radar Approach 10-11. . . . . . . . . . . . . . . . . . . . . .10.5.4 Missed Approach and Waveoff (Air-Capable Ships) 10-11. . . . . . . . . . . . . . . . . . . . . . . . . . .10.5.5 Helicopter Approach Minimums 10-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    10.6 AMPHIBIOUS SHIP AIR OPERATIONS (WHERE DIFFERING) 10-11. . . . . . . . . . . . . . .10.6.1 VFR Departure 10-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.6.2 VFR Descent and Approach 10-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.6.3 DELTA Patterns 10-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    10.7 INSTRUMENT FLIGHT RULE PROCEDURES 10-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    10.8 BINGO 10-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    10.9 HSM/HSL AIR CONTROL 10-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    10.10 HSC/HS AIR CONTROL 10-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    10.11 COMMUNICATIONS CONTROL 10-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.11.1 Voice Communications Procedures 10-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    10.12 EMISSION CONTROL 10-14. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 11 SPECIAL PROCEDURES

    11.1 HELICOPTER PERSONNEL TRANSFER AND UTILITY OPERATIONS 11-1. . . . . . . . .

    11.2 PREPARING FOR TRANSFER OPERATIONS 11-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.2.1 Personnel To Be Transferred 11-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.2.2 Cargo To Be Transferred 11-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL 18

    PageNo.

    11.2.3 Briefing of Handling Crew 11-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.2.4 Recommended Procedures and Equipment to Discharge Static Electricity 11-6. . . . . . . . . . .

    11.3 TRANSFER PROCEDURES 11-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.3.1 Transfer of Personnel by Hoist 11-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.3.2 Transfer of Material by Hoist 11-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.3.3 Transfers Involving Submarines 11-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    11.4 MISCELLANEOUS EVOLUTIONS 11-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.4.1 Radiological Reconnaissance Operations 11-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.4.2 Mine Reconnaissance 11-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.4.3 Photography 11-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.4.4 Radar Calibration 11-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.4.5 Gunfire Spotting 11-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.4.6 Special External Load Operations 11-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.4.7 Special Recovery Operations 11-17. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.4.8 Helicopter Rope Suspension Training 11-17. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    11.5 MEDICAL CASUALTY HANDLING ON THE FLIGHT DECK 11-18. . . . . . . . . . . . . . . .

    11.6 VERTICAL REPLENISHMENT 11-18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.6.1 Vertical Replenishment Deck Markings 11-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    11.7 FACTORS AFFECTING VERTICAL REPLENISHMENT 11-19. . . . . . . . . . . . . . . . . . . . .11.7.1 Number of Helicopters Used 11-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.7.2 Wind 11-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.7.3 Ship Stationing 11-20. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.7.4 Ship-Produced Interference 11-24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.7.5 Temperature and Atmospheric Pressure 11-24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.7.6 Pilot Fatigue 11-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.7.7 Fuel Loading 11-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    11.8 ORGANIZATION 11-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    11.9 VERTICAL REPLENISHMENT OPERATIONS 11-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.9.1 Cargo Staging 11-26. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.9.2 Communications 11-28. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.9.3 Load Transfer Procedures 11-28. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.9.4 Fueling 11-33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.9.5 Night Vertical Replenishment 11-33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.9.6 Other Applications 11-34. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL19

    PageNo.

    11.10 SUBMARINE VERTICAL REPLENISHMENT 11-36. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.10.1 Attack Submarines 11-36. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.10.2 SSBN/SSGN Submarines 11-36. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    11.11 SAFETY 11-37. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    11.12 VERTICAL ON-BOARD DELIVERY PROCEDURES 11-40. . . . . . . . . . . . . . . . . . . . . . . .

    11.13 MH-53E HELICOPTER 11-40. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    11.14 PREPARATIONS FOR VERTICAL ON-BOARD DELIVERY SERVICES 11-40. . . . . . . .

    11.15 SUPPORT REQUIREMENTS 11-40. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.15.1 Shore-Based Missions 11-40. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.15.2 Other Than Home-Field, Shore-Based Detachments 11-41. . . . . . . . . . . . . . . . . . . . . . . . . . .11.15.3 Ship-Based Detachments 11-41. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    11.16 VERTICAL ON-BOARD DELIVERY OPERATIONS 11-41. . . . . . . . . . . . . . . . . . . . . . . . .11.16.1 Internal Cargo Transport 11-41. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.16.2 External Cargo Transport 11-42. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.16.3 Aircraft Recovery 11-43. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    11.17 SAFETY 11-43. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    11.18 LPD 4 EXPANDED FLIGHT DECK OPERATIONS 11-44. . . . . . . . . . . . . . . . . . . . . . . . . .11.18.1 Planning Requirements 11-44. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.18.2 Operating Matrix 11-44. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.18.3 Flight Deck Landing/Parking Restrictions 11-45. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.18.4 Flight Operations 11-49. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.18.5 Night Operations 11-49. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.18.6 Aircraft Emergencies 11-50. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.18.7 Ordnance Operations 11-50. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    11.19 LPD 17 EXPANDED FLIGHT DECK OPERATIONS 11-50. . . . . . . . . . . . . . . . . . . . . . . . .11.19.1 Planning Requirements 11-50. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.19.2 Operating Matrix 11-50. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.19.3 Flight Deck Landing/Parking Restrictions 11-50. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.19.4 Flight Operations 11-54. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    11.20 COLD-WEATHER OPERATIONS 11-54. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.20.1 Environmental Considerations 11-54. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.20.2 Maintenance and Servicing 11-54. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11.20.3 Flight Operations 11-55. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL 20

    PageNo.

    PART IV EMERGENCY PROCEDURES

    CHAPTER 12 EMERGENCY PROCEDURES

    12.1 GENERAL 12-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    12.2 IN--FLIGHT EMERGENCY PROCEDURE 12-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12.2.1 Types of In--flight Emergencies 12-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12.2.2 Hung/Misfired Ordnance 12-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12.2.3 Lost Aircraft/Lost Communications 12-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12.2.4 Emergency Low--Visibility Approach Procedures 12-12. . . . . . . . . . . . . . . . . . . . . . . . . . . . .12.2.5 Smokelight Approach 12-17. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    12.3 ON--DECK EMERGENCY PROCEDURE 12-17. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12.3.1 Types of Aircraft On--Deck Emergencies 12-18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    PART V MISCELLANEOUS

    CHAPTER 13 COAST GUARD OPERATIONS

    13.1 CONCEPT 13-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    13.2 OPERATIONS WITH COAST GUARD HELICOPTERS 13-1. . . . . . . . . . . . . . . . . . . . . . .

    13.3 OPERATIONS WITH COAST GUARD CUTTERS 13-1. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 14 UAS OPERATIONS

    14.1 OPERATIONS 14-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14.1.1 Introduction 14-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14.1.2 Fire Party 14-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14.1.3 Training and Workup 14-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    14.2 MQ-8B VERTICAL TAKE OFF AND LANDING TACTICAL UNMANNEDAIR VEHICLE 14-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    14.2.1 Launch 14-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14.2.2 Mission Ingress 14-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14.2.3 On Station 14-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14.2.4 Mission Egress 14-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14.2.5 Recovery 14-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14.2.6 Dual--AV Operations 14-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14.2.7 VTUAV Initial Ship Aviation Team Training 14-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    14.3 AIR CONTROL 14-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL21

    PageNo.

    14.4 SHIPBOARD OPERATING PROCEDURES 14-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14.4.1 General 14-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14.4.2 Flight/Hangar Deck Procedures 14-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14.4.3 Blade Folding/Spreading 14-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14.4.4 Launch and Recovery Procedures 14-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    14.5 COMMUNICATIONS 14-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    14.6 ALERT CONDITIONS 14-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX A HELICOPTER OPERATIONS CHECKLISTS

    A.1 GENERAL A-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A.1.1 Officer of the Deck Air Operations Checklist A-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A.1.2 Combat Information Center Air Operations Checklist A-2. . . . . . . . . . . . . . . . . . . . . . . . . . .A.1.3 Helicopter Control/Flight Deck Officer Checklist A-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A.1.4 Sample Flight Briefing Sheet A-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX B NON--MARITIME HELICOPTER CAPABILITES/SPECIFICATIONS

    B.1 INTRODUCTION B-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B.1.1 General B-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    B.2 H-60 MODEL HELICOPTERS B-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B.2.1 UH-60A/L Utility Helicopter/UH-60Q/HH-60L MEDEVAC Helicopter Shipboard

    Operations Capability B-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B.2.2 MH-60K Assault Helicopter B-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B.2.3 MH-60L/MH-60L IDAP Assault Helicopter B-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B.2.4 HH-60G Assault Helicopter B-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    B.3 H-47 MODEL HELICOPTERS B-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B.3.1 CH-47D Chinook Helicopter B-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B.3.2 MH-47D Assault Helicopter B-18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B.3.3 MH-47E Assault Helicopter B-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    B.4 AH-64A/D SERIES HELICOPTERS B-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B.4.1 Basic Capabilities and Characteristics B-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    B.5 OH-58D SERIES HELICOPTERS B-33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B.5.1 Basic Capabilities and Characteristics B-33. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    B.6 AH/MH-6J SERIES HELICOPTERS B-38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B.6.1 Basic Capabilities and Characteristics B-38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    B.7 MH-53J/M SERIES HELICOPTERS B-42. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL 22

    PageNo.

    B.7.1 Shipboard Operations Capability B-42. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    B.8 MANUAL (HAND) MOVEMENT OF HELICOPTERS B-45. . . . . . . . . . . . . . . . . . . . . . . .B.8.1 General B-45. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX C AH--1 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    C.1 SPECIFICATIONS C-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    C.2 EGRESS C-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    C.3 LAUNCH AND RECOVERY WIND LIMITATIONS C-1. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    C.4 INTEROPERABILITY MATRICES C-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX D -- AV--8B SPECIFICATIONS/WIND LIMITATIONS

    D.1 LAUNCH AND RECOVERY WIND LIMITATIONS D-1. . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX E UH--1 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    E.1 SPECIFICATIONS E-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    E.2 EGRESS E-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    E.3 LAUNCH AND RECOVERY WIND LIMITATIONS E-1. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    E.4 INTEROPERABILITY MATRICES E-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX F H--3 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    F.1 LAUNCH AND RECOVERY WIND LIMITATIONS F-1. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX G H--6 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    G.1 SPECIFICATIONS G-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    G.2 EGRESS G-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    G.3 LAUNCH AND RECOVERY WIND LIMITATIONS G-1. . . . . . . . . . . . . . . . . . . . . . . . . . .

    G.4 INTEROPERABILITY MATRICES G-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX H H--46 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    H.1 SPECIFICATIONS H-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    H.2 EGRESS H-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    H.3 LAUNCH AND RECOVERY WIND LIMITATIONS H-1. . . . . . . . . . . . . . . . . . . . . . . . . . .

    H.4 INTEROPERABILITY MATRICES H-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL23

    PageNo.

    APPENDIX I H--47 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    I.1 SPECIFICATIONS I-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    I.2 EGRESS I-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    I.3 LAUNCH AND RECOVERY WIND LIMITATIONS I-1. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    I.4 INTEROPERABILITY MATRICES I-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX J H--53 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    J.1 SPECIFICATIONS J-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    J.2 EGRESS J-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .J.2.1 Operational Constraints J-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .J.2.2 CH-53 J-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .J.2.3 MH-53 J-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    J.3 LAUNCH AND RECOVERY WIND LIMITATIONS J-1. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    J.4 INTEROPERABILITY MATRICES J-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX K H--57 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    K.1 SPECIFICATIONS K-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    K.2 EGRESS K-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    K.3 LAUNCH AND RECOVERY WIND LIMITATIONS K-1. . . . . . . . . . . . . . . . . . . . . . . . . . .

    K.4 INTEROPERABILITY MATRICES K-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX L H--58 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    L.1 SPECIFICATIONS L-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    L.2 EGRESS L-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    L.3 LAUNCH AND RECOVERY WIND LIMITATIONS L-1. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    L.4 INTEROPERABILITY MATRICES L-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL 24

    PageNo.

    APPENDIX M H--60 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    M.1 SPECIFICATIONS M-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    M.2 EGRESS M-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .M.2.1 MH-60R/SH-60B Helicopter M-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .M.2.2 SH-60F/HH-60H/MH--60S Helicopter M-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .M.2.3 HELICOPTER CABIN SETUP M-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    M.3 LAUNCH AND RECOVERY WIND LIMITATIONS M-3. . . . . . . . . . . . . . . . . . . . . . . . . . .

    M.4 INTEROPERABILITY MATRICES M-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX N H--64 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    N.1 SPECIFICATIONS N-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    N.2 EGRESS N-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    N.3 LAUNCH AND RECOVERY WIND LIMITATIONS N-1. . . . . . . . . . . . . . . . . . . . . . . . . . .

    N.4 INTEROPERABILITY MATRICES N-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX O H--65 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    O.1 SPECIFICATIONS O-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    O.2 EGRESS O-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    O.3 LAUNCH AND RECOVERY WIND LIMITATIONS O-1. . . . . . . . . . . . . . . . . . . . . . . . . . .

    O.4 INTEROPERABILITY MATRICES O-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX P MQ--8B SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    P.1 SPECIFICATIONS P-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    P.2 LAUNCH AND RECOVERY WIND LIMITATIONS P-1. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    P.3 AV TIEDOWN AND SECURING P-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    P.4 SHIPBOARD RELATIVE WIND ENVELOPE P-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL25/(26 blank)

    PageNo.

    APPENDIX Q SA--330 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    Q.1 SPECIFICATIONS Q-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Q.2 EGRESS Q-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Q.3 LAUNCH AND RECOVERY WIND LIMITATIONS Q-1. . . . . . . . . . . . . . . . . . . . . . . . . . .

    Q.4 INTEROPERABILITY MATRICES Q-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX R V--22 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    R.1 SPECIFICATIONS R-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    R.2 EGRESS R-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    R.3 LAUNCH AND RECOVERY WIND LIMITATIONS R-2. . . . . . . . . . . . . . . . . . . . . . . . . . . .

    R.4 INTEROPERABILITY MATRICES R-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX S FLIGHT DECK CLOTHING

    APPENDIX T WEAPONS LOADING/STRIKEDOWN/DOWNLOADING AND RECOVERYGUIDE

    APPENDIX U SHIPBOARD SAFETY/SITE SUITABILITY CHECKLIST

    INDEX INDEX--1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL27

    LIST OF ILLUSTRATIONS

    PageNo.

    CHAPTER 2 AVIATION FACILITIES

    Figure 2--1. Typical Landing Procedures 2-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--2. Typical Vertical Replenishment and Helicopter In-Flight Refueling Procedures 2-6. . . . . . . .Figure 2--3. Typical Vertical Replenishment Procedures (V-22) 2-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--4. Visual Landing Aids Lighting Control Panel 2-13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--5. Typical Visual Landing Aids Installation for Vertical Replenishment Decks 2-15. . . . . . . . . .Figure 2--6. Homing Beacon Light 2-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--7. Deck Edge Lights 2-16. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--8. VERTREP Approach Lineup Lights (Bidirectional) 2-17. . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--9. Overhead/Forward Structure Floodlights 2-17. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--10. Helicopter In-Flight Refueling Heading/Obstruction Lights 2-18. . . . . . . . . . . . . . . . . . . . . .Figure 2--11. Deck Status Light System 2-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--12. Rotary Beacon System 2-19. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--13. Command and Display Signals 2-21. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--14. Stabilized Glide Slope Indicator 2-22. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--15. Stabilized Glideslope Indicator Tricolor Beam 2-23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--16. Waveoff Light System 2-23. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--17. Typical Flight Deck With Visual Landing Aids 2-24. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--18. Waveoff/Cut System 2-25. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--19. Deck Surface or Hangar/Structure Wash Floodlight 2-26. . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--20. Landing Approach Lineup Lights (Unidirectional) 2-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--21. Forward Extended Lineup Lights 2-28. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--22. Aft Extended Lineup Light Bar 2-28. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--23. Flight Deck Status and Signaling System 2-30. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 2--24. Horizon Reference System 2-30. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 5 TRAINING

    Figure 5--1. Initial Ship Aviation Team Training 5-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 6 RESPONSIBILITIES

    Figure 6--1. Chain of Command 6-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 8 PLANNING AND PREPARATION FOR FLIGHT OPERATIONS

    Figure 8--1. Alert Conditions 8-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 8--2. Search and Rescue Requirements 8-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL 28

    PageNo.

    CHAPTER 9 NORMAL PROCEDURES

    Figure 9--1. Maneuvering Restrictions During Flight Operations and RAST--EquippedShipboard Communications System Indications 9-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    Figure 9--2. Typical Sequence of Events for Flight Operations 9-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 9--3. Recovery Assist, Securing, and Traversing Flight Deck Status Light Signals 9-5. . . . . . . . . .Figure 9--4. Stowed Aux Tanks 9-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 9--5. Ground Handling Wheels 9-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 9--6. HT--400--FS Tow Bar 9-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 9--7. Sample Fueling Station Bill 9-17. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 9--8. NATO High-Capacity (NHC) Compatible HIFR Assembly in Standard NATO

    and USN Configuration 9-18. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 9--9. Standard Flight Deck Layout Prior to and During HIFR Operations 9-19. . . . . . . . . . . . . . . .Figure 9--10. Flag Hoist Signals 9-30. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 9--11. Visual Signals Between Ship and Rotorcraft Under Emission Control or Lost

    Communications Procedures 9-31. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 9--12. Aircraft Night Lighting Procedures 9-38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 10 AIR TRAFFIC CONTROL DOCTRINE

    Figure 10--1. Control Area and Control Zone Dimensions 10-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 10--2. Approach Chart Air-Capable Ships TACAN (Helicopter) 10-9. . . . . . . . . . . . . . . . . . . . . . . .Figure 10--3. Approach Chart Air-Capable Ships Nondirectional Beacon (Helicopter) 10-10. . . . . . . . . . . .Figure 10--4. Port/Starboard DELTA Pattern 10-13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 11 SPECIAL PROCEDURES

    Figure 11--1. Rescue Gear and Flotation Gear/Headgear 11-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 11--2. U.S. Coast Guard Rescue Basket 11-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 11--3. Stowage Method for the Grounding Cable and Wand 11-7. . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 11--4. Submarine Transfer Locations 11-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 11--5. Submarine Transfer Signals 11-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 11--6. Typical Ship Stations and Vertical Replenishment Patterns 11-21. . . . . . . . . . . . . . . . . . . . . .Figure 11--7. Typical Night Vertical Replenishment Cargo Prestaging Diagram (Single Landing

    Area Available) 11-27. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 11--8. Mk 105 Hoisting Slings for Return 11-32. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 11--9. SSBN Vertical Replenishment 11-38. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 11--10. SSGN Vertical Replenishment 11-39. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 11--11. LPD-4 Class Expanded Flight Deck Operating Matrix 11-46. . . . . . . . . . . . . . . . . . . . . . . . . .Figure 11--12. LPD-17 Class Expanded Flight Deck Operating Matrix 11-51. . . . . . . . . . . . . . . . . . . . . . . . .Figure 11--13. Predicted Cold-Water Survival Times 11-56. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  • NAVAIR 00-80T-122

    ORIGINAL IC 1229

    PageNo.

    CHAPTER 12 EMERGENCY PROCEDURES

    Figure 12- 1. Holding Pattern for Hung Forward-Firing Ordnance 12-7. . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 12- 2. Offset Approach 12-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 12- 3. Helicopter/Tiltrotor Visual Signals During Lost Communications 12-10. . . . . . . . . . . . . . . . .Figure 12- 4. Fixed-Wing Visual Signals During Lost Communications 12-10. . . . . . . . . . . . . . . . . . . . . .Figure 12- 5. Ship- to-Aircraft Visual Signals During Lost Communications 12-11. . . . . . . . . . . . . . . . . . .Figure 12- 6. Emergency Low-Visibility Approach Pattern 12-13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure 12- 7. Lost Communication Emergency IFF Codes 12-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    CHAPTER 14 UAS OPERATIONS

    Figure 14- 1. MQ-8 FIRE SCOUT Initial Ship Aviation Team Training 14-5. . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX B - NON-MARITIME HELICOPTER CAPABILITIES/SPECIFICATIONS

    Figure B-1. Recommended Method of Respot B-49. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

    APPENDIX C AH- 1 SPECIFICATIONS/EGRESS/WIND LIMITATIONS

    Figure C-1. AH-1 Tiedown C-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure C-2. AH-1W Cobra C-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure C-3. General Launch and Recovery Envelope C-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure C-4. AH-1W Launch and Recovery Envelopes for LPD 4 Class Ships Spot 1,

    Port Approach C-6. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure C-5. AH-1W Launch and Recovery Envelopes for LPD 17 Class Ships Spots 1 and 2,

    Port Approach C-11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure C-6. AH-1W Launch and Recovery Envelopes for LSD 41/49 Class Ships Spot 1,

    Port Approach C-15. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Figure C-7. AH-1Z Launch and Recovery Envelopes for LPD 17 Clas