national water development agency · it gives me immense pleasure to present this annual report of...

159

Upload: others

Post on 03-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives
Page 2: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

National Water Development Agency(Ministry of Water Resources, River Developmentand Ganga Rejuvenation, Government of India)

Annual Report2016 – 17

New Delhi

Page 3: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives
Page 4: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

From Director General’s Desk

It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives a comprehensive overview of the role of NWDA in the field of water resources development, particularly inter basin transfer of water, commonly known as Interlinking of Rivers (ILR). I convey my gratitude to Hon’ble Minister (WR, RD & GR), both Hon’ble Ministers of State (WR, RD & RD) and Secretary (WR, RD & GR) for kind support and guidance to NWDA in its efficient discharge of responsibilities.

The National Water Development Agency was set up in 1982 by the Government of India as a Society under Societies Registration Act 1860 under the then Ministry of Irrigation. NWDA is an autonomous organisation under MoWR, RD & GR and is fully funded by the Government of India. As a part of its mandate NWDA is engaged in preparation of Pre-feasibility Reports, Feasibility Reports and Detailed Project Reports of Inter-State links under the National Perspective Plan (NPP) and Intra – State links as proposed by the State Governments. The consensus and cooperation of the concerned State Governments has played an important role in the preparation of the reports on Interlinking of Rivers.

During the year 2016 – 17, NWDA has carried out its assigned functions in an efficient and effective manner despite many constraints. The important achievements during the period are as below:

• In respect of Ken-Betwa Link Phase – I, NWDA obtained techno-economic clearance of (08.07.2016). NWDA obtained wild life clearance (23.08.2016), environment clearance (30.12.2016) and forest land diversion clearance (30.03.2017).

• Secretary (WR, RD & GR) discussed the Par-Tapi-Narmada link proposal with Hon’ble Chief Minister and Chief Secretary of Gujarat on 31.12.2016. Based on the discussions, NWDA modified the Detailed Project Report by including more tribal areas in the command area of the project.

• 4th India Water Week was successfully organised by NWDA during April 2016 comprising of an International Conference and Exhibition. About 1500 delegates from India and abroad participated in the event.

• NWDA provided the required technical assistance to the Ministry on various issues related to Interlinking of Rivers Programme.

• 42nd meeting of Technical Advisory Committee of NWDA was convened during the year. • 5th Special General Meeting and 30th Annual General Meeting under the chairpersonship of

Hon’ble Minister (WR, RD & GR) were convened during the year. • The 63rd & 64th Meetings of the Governing Body of NWDA were convened during the year. • Four meetings of the Special Committee for Interlinking of Rivers - two under chairpersonship

of Hon’ble Minister (WR, RD & GR) and two under the chairmanship of Hon’ble Minister of State (WR, RD & GR) were convened during the year.

Page 5: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

• NWDA has been identified to act as a repository for borrowing resources from Long Term Irrigation Fund (LTIF) and release of Central Assistance to the State Governments towards the prioritized PMKSY-AIBP (Major & Medium Irrigation) Projects and their CADWM works, for their completion in time bound manner.

NWDA has diligently performed the responsibilities entrusted to it by the Government of India. I am sure this report will be found useful in understanding the role, functions and achievements of NWDA during the year.

(Sanjay Kundu) Director General

Page 6: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

Highlights of ActivitiesDuring the year 2016-17

• 42nd meeting of Technical Advisory Committee of NWDA was held on 23.05.2016 under the Chairmanship of Chairman, Central Water Commission.

• 5th Special General Meeting and 30th Annual General Meeting of NWDA Society were held on 22.06.2016 under the Chairpersonship of Hon’ble Minister of Water Resources, River Development and Ganga Rejuvenation.

• 63rd and 64th meetings of the Governing Body of NWDA was held on 13.06.2016 and 27.03.2017 respectively under Chairmanship of Secretary, Ministry of Water Resources, River Development and Ganga Rejuvenation & Chairman of Governing Body.

• The work of preparation of DPRs of two Intra-State links; one each of Tamil Nadu and Maharashtra namely Ponnaiyar – Palar and Wainganga (Gosikhurd) – Nalganaga (Purna Tapi), remained under progress.

• Four meetings of the Special Committee for Interlinking of Rivers, two under the Chairpersonship of Hon’ble Minister (WR, RD & GR) and two under the Chairmanship of Hon’ble Minister of State (WR, RD & GR) and Hon’ble Minister of State (Independent Charge) for Youth Affairs and Sports were held on 29.04.2016, 26.07.2016, 09.11.2016 and 08.03.2017.

• India Water Week – 2016 was successfully organised by NWDA during 4th – 8th April, 2016 comprising of an International conference and Exhibition. About 1500 delegates from India and abroad participated in the conference.

• NWDA participated in India International Trade Fair – 2016 held during November, 2016 at New Delhi.

• During the year, the functions of NWDA were further modified to undertake implementation of ILR projects and completion of water resources projects under Pradhan Mantri Krishi Sinchai Yojana (PMKSY) and to act as a repository of borrowed fund or loan from Banks / other institutions for the execution of projects.

• NABARD has released Loan of Rs. 5751.04 crore to NWDA during the year which has been disbursed by NWDA to 14 States for their identified projects and Polavaram Project Authority.

• NWDA has obtained techno-economic clearance of Ken-Betwa Link Phase – I and Damanganga – Pinjal link (08.07.2016). NWDA after doing hericulas efforts obtained wild life clearance (23.08.2016), environment clearance (30.12.2016) and forest land diversion clearance (30.03.2017) in respect of Ken-Betwa link Phase – I.

• Secretary (WR, RD & GR) has discussed the Par-Tapi-Narmada link proposal with Hon’ble Chief Minister Gujarat and Chief Secretary Government of Gujarat on 31.12.2016. Based on discussions NWDA has modified the Detailed Project Report by including more tribal areas in the project command.

Page 7: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives
Page 8: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

CONTENTS

S. No. Item Page NoChapter – 1 National Water Development Agency 1

1.0 Introduction 11.1 Establishment of NWDA and its Functions 1

Chapter – 2 Head Quarter and Organisational Set Up 32.1 Head Quarter and Organisational Set Up 32.2 Staff Strength 52.3 NWDA Society 52.4 Governing Body 92.5 Technical Advisory Committee 12

Chapter – 3 Special Committee for “Interlinking of Rivers” (SC – ILR) and Task Force for Interlinking of Rivers

15

3.1 Special Committee for Interlinking of Rivers 153.2 Task Force for Interlinking of Rivers 20

Chapter – 4 Technical Activities 214.1 National Perspective Plan 214.2 Inter Basin Water Transfer Links 214.3 Preliminary Studies Completed by NWDA 214.4 Water Transfer Links under Study by NWDA 21

4.4.1 Present Status of Inter Basin Water Transfer Links under Peninsular Component

24

4.4.2 Present Status of Preparation of Feasibility Report of Inter Basin Water Transfer Links under Himalayan Component

25

4.4.3 Manas – Sankosh – Teesta – Ganga Link 264.4.4 Consensus Building Process for Manas – Sankosh – Teesta – Ganga

Link 26

Chapter – 5 Priority Links Identified Under National Perspective Plan (NPP) 28

5.1 Efforts Made For Arriving At Consensus 28Chapter – 6 Intra-State Links Proposed by States 32

6.1 Intra-State Links 326.1.1 Jharkhand 326.1.2 Gujarat 326.1.3 Maharashtra 326.1.4 Odisha 32

ANNUAL REPORT 2016-17

Page 9: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

6.1.5 Bihar 326.1.6 Rajasthan 336.1.7 Tamil Nadu 336.1.8 Karnataka 336.1.9 Chhattisgarh 33

6.1.10 Overall Status of Preparation of PFRs of Intra – State Links 336.1.11 Present status of preparation of DPRs of intra – State links 366.1.12 Providing funding to the proposals of the State Government for the

preparation of Detailed Project Report of Intra – State river link Projects37

Chapter –7 Activities under Pradhan Mantri Krishi Sinchai Yojna 387.1 NABARD Funding under PMKSY-AIBP 38

7.1.1 Processing of Proposal 387.1.2 Release of funds to States (CA) 387.1.3 Third Party Monitoring 38

Chapter – 8 Website of NWDA 40

Chapter – 9 Other Activities of NWDA 419.1 Training and Human Resource Development Activities 419.2 Implementation of Act for Persons with Disabilities 419.3 Citizen’s Charter of NWDA 419.4 Committee for Complaints on Sexual Harassment of Women Employees 419.5 Communal Harmony Week and Quami Ekta Week 429.6 Publication of in House Bulletin ‘Jal Vikas’ 429.7 Participation in India International Trade Fair (IITF) – 2016 429.8 India Water Week – 2016 429.9 Jal Manthan – 3 45

Chapter – 10 Vigilance Activities in NWDA 4610.1 Vigilance and Disciplinary Cases 4610.2 Vigilance Awareness Week 46

Chapter – 11 Promotion of Use of Rajbhasha (Hindi) 47Chapter – 12 Finance and Accounts 49

12.1 Amendment of Rule No.45 of the rules and regulations of National Water Development Agency (NWDA)

49

12.2 The Central Assistance to the states- Long Term Irrigation Fund (LTIF) under PMKSY scheme.

49

12.3 Grants- in-Aid to NWDA during the Financial Year 2016 – 17 and Actual Expenditure

49

12.4 Audited Account of NWDA for the Financial Year 2016 – 17 49

NATiONAL WATER DEvELOPmENT AgENcy

Page 10: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

Chapter – 13 Acknowledgements 51

List of Appendices

Appendix No. Item Page No.Appendix – I Details of Training Courses Attended by Officials of NWDA 52Appendix – II Details of Conferences / Seminars / Workshop Attended by

Officials of NWDA54

Appendix –III Audit Certificate, Audit Report, Replies of NWDA and Accounts of National Water Development Agency for year 2016-17

59

ANNUAL REPORT 2016-17

Page 11: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives
Page 12: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

1

1.0 Introduction

It is impossible to imagine life without a sufficient amount of water. From basic needs to modern industrial development, water has been a key factor. It also plays an important role in socio-cultural and religious activities around the globe. For thousands of years humans have consumed water as if it were an inexhaustible natural resource. Water resources are not evenly distributed. The concept of interlinking of rivers for optimum development and utilization of water resources was mooted to overcome scarcity of water in certain regions of India. It involves inter-basin and intra-basin water transfer diverting water from surplus river basins, which is basically surplus flood water, to water deficit areas. Because of topographical variation and uneven distribution of rainfall, India has what is called the flood drought-flood syndrome with some areas suffering from flood damages while others face acute water shortage or droughts. Inter-basin water transfer scheme (Interlinking of rivers) will be proved a potent weapon to mitigate flood drought-flood syndrome with irrigation benefits and hydropower generation enhancement to public at large in National interest. Optimal sustainable development, maintenance of quality and efficient use of water resources to match with the growing needs of water is essential in present scenario.

Suggestions for a National water grid for transferring water from water rich regions to water-deficit areas have been made from time to time. Two proposals, put forth earlier in the seventies which attract considerable attention, are National Water Grid by Dr. K. L. Rao and Garland Canal by Captain Dastur. These proposals were not pursued further by the Government as they were not found techno-economically feasible. The continued

Chapter – 1

National Water Development Agency

interest shown by many people gave impetus to study inter-basin water transfer proposals. The then Ministry of Irrigation (now Ministry of Water Resources, RD & GR) formulated a National Perspective Plan (NPP) for Water Resources Development in August 1980. The National Perspective Plan comprises of two components, namely i) Peninsular Rivers Development and ii) Himalayan Rivers Development.

1.1 Establishment of NWDA and its Functions

The National Water Development Agency was set up in July, 1982 by the Government of India as a Society under Societies Registration Act 1860 under the then Ministry of Irrigation now Ministry of Water Resources, River Development and Ganga Rejuvenation to study the feasibility of the links under Peninsular Component of National Perspective Plan. NWDA is fully funded by the Government of India. Subsequently in 1990, NWDA Society resolved to take up the studies of the Himalayan Rivers Development Component also. Further, in the year 2006 preparation of Detailed Project Report (DPR) of link projects and pre-feasibility/ feasibility reports of intra-State links as proposed by States were also included in the functions of NWDA. Accordingly, MoWR vide resolution dated 30.11.2006 has modified the functions of NWDA Society. The functions of NWDA were further modified vide MoWR resolution dated 19.05.2011 to undertake the work of preparation of DPRs of intra-State links also by NWDA. Recently vide Gazette notification dated 7th October, 2016 the functions of NWDA have been further modified to undertake implementation of Inter linking of River (ILR) projects and completion of water resources projects under Pradhan Mantri

Page 13: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

2

Krishi Sinchai Yojana (PMKSY) and to act as a repository of borrowed fund or loan from Banks / other institutions for the execution of projects. Now the functions of NWDA as modified from time to time are as under:- 

a.      To carry out detailed surveys and investigations of possible reservoir sites and inter-connecting links in order to establish feasibility of the proposal of Peninsular Rivers Development Component [1981]* and Himalayan Rivers Development Component [1994]* forming part  of the  National Perspective Plan for Water  Resources Development prepared by the then Ministry of Irrigation (now Ministry of Water Resources, RD &GR) and  Central Water Commission.

b. To carry out  detailed surveys about the quantum of water in various Peninsular River systems [1981]* and Himalayan River systems [1994]* which can be transferred to other basins/States  after meeting the reasonable needs of the basin/States in the foreseeable future.

c. To prepare  feasibility report of the various components of the scheme relating to Peninsular Rivers development [1981]* and Himalayan Rivers development [1994]*.

d.  To prepare detailed project report [2006]* of river link proposals under National Perspective Plan for Water Resources Development after concurrence of the concerned States.

e. To prepare pre – feasibility / feasibility [2006]*/ detailed project reports [2011]* of the intra – state links as may be proposed by the States. The concurrence of the concerned co-basin States for such proposals may be obtained before taking up their FRs / DPRs.

f. To undertake/construct/repair/renovate / rehabilitate / implement the projects either of its own or through an appointed agency /organization/PSU or Company and the projects forming part of Interlinking of Rivers, for completion of projects falling under Pradhan Mantri Krishi Sinchai Yojana (PMKSY) of which projects under Accelerated Irrigation Benefits Programme (AIBP) are also included and similar other projects [2016]*.

g. NWDA to act as a repository of borrowed funds or money received on deposit or loan given on interest or otherwise in such manner, as directed by MOWR, RD & GR and to secure the repayment of any such borrowed funds/money deposits/loan etc. by way of mortgage, pledge, change or lien upon all or any other property, assets or revenue of the society both present and future [2016]*.

h.         To do all such other things the Society may consider necessary, incidental, supplementary or conducive to the attainment of above objectives [1981]*.

* Year of Gazette Notification

Page 14: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

3

Chapter – 2

Head Quarter and Organisational Set Up

2.1 Head Quarter and Organisational Set Up

Director General of the rank of Additional Secretary to Government of India is the Principal Executive Officer of the Society, responsible for all day to day affairs including technical, legal, administrative and financial matters of the Society. The Headquarter of the Agency is at New Delhi. Sh. S. Masood Husain, Member (WP&P), CWC hold the charge of DG NWDA up to 28.03.2017. Dr. S. K. Jain Scientist (G), NIH, Roorkee was encrusted additional

charge of DG NWDA thereafter for a period of 3 months. The Director General, NWDA at the headquarter is assisted by Chief Engineer (HQ), Director (Technical), Director (Finance), Director (Administration), Director (Multi Disciplinary Unit) and two Superintending Engineers. NWDA has 2 field organisations (North and South) each headed by a Chief Engineer. As on 31.03.2017, there are  2 Circles, 7 Divisions under the North organisation, 1 Circle, 2 Divisions under the Chief Engineer (HQ) and 2 Circles, 7 Divisions and 2 Sub – divisions under the South organisation.

Organisation chart of NWDA as on 31.03.2017 upto Superintending Engineer level is shown below:

Page 15: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

4

A map showing the locations of NWDA offices is given below:

Page 16: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

5

2.2 Staff Strength

The existing sanctioned staff strength of NWDA as on 31st March, 2017 is 493 (as per SIU). Actually 483 posts are filled. NWDA is following all the instructions issued from time to time by the Govt. of India regarding providing reservation in service and other benefits to Scheduled Castes/Scheduled Tribes, Other Backward Classes, Ex-

Servicemen and Physically Handicapped persons. Seven candidates were appointed through direct recruitment in the various grades and categories in NWDA during the year 2016-17.

The staff strength (Group-wise) of NWDA as on 31st March, 2017 indicating SC/ST/OBC/PH/EX-Servicemen/General is as under:

The Staff strength (Group-wise) of NWDA as on 31st March, 2017

Group Sanctioned(As per SIU)

SCs STs OBCs PH Ex. S. Man

General Total *Vacant(As per SIU)

1 2 3 4 5 6 7 8 9 10Group’A’ 59 06 - - - 45 51 8Group’B’ 142 23 06 16 01 - 98 143 -1Group’C’ 292 62 21 12 07 02 194 289 3

Total 493 91 27 28 08 02 337 483 10

* As per the Staff Inspection Unit (SIU) recommendation.

Note:- Posts declared surplus by the Staff Inspection Unit (SIU) being abolished out in future adjustments/retirements as recommended by it.

2.3 NWDA Society

The   NWDA Society   is   the apex   body   of the NWDA organisation  and  meets at least once in a year to review the progress and performance  of the  Agency towards the attainment of its objectives and to give such  policy directions as it deems fit. The Hon’ble Union Minister of Water Resources, RD & GR is the President of the Society. The President exercises such powers for the conduct of the business of the Society as may be vested in him by the Society. In addition, the President has powers to review periodically the work and progress of the Society and appoint Committees

or Commissions for the efficient operation of the Society or to enquire into and report on the affairs of the Society and pass such orders, as he considers proper.

Since inception of NWDA, five Special General Meetings (SGM) and thirty Annual General Meetings of the Society have been held upto 31.03.2017. Gazette Notification of functions of NWDA amended during the 5th Special General Meeting held on 22.06.2016 was published in the Gazette of India on 7th October, 2016.

The list of members of the NWDA Society is given below:

Members of NWDA Society

(MoWR Resolution No. 2/9/2002-BM/140 dated 07.10.2016)

1. Union Minister for Water Resources, RD & GR, Govt. of India President2. Union Minister of State for Water Resources, RD & GR, Govt. of India Vice – President3. Member (Agri. & WR), NITI Aayog Member

Page 17: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

6

4. Chief Ministers / Ministers and Secretaries or their nominees not below the rank of Chief Engineer so nominated in – charge of Water Resources / Irrigation of the States of Andhra Pradesh, Assam, Bihar, Chhattisgarh, Gujarat, Haryana, Jharkhand, Karnataka, Kerala, Madhya Pradesh, Maharashtra, Odisha, Punjab, Rajasthan, Tamil Nadu, Telangana, Uttar Pradesh, Uttarakhand, West Bengal, and Union Territory of Puducherry 

Members

5. Secretary, Ministry of Water Resources, RD & GR, Govt. of India Member6. Secretary or his nominee not below the rank of Joint Secretary or equivalent,

Ministry of Agriculture & Farmers Welfare (Department of Agriculture, Cooperation & Farmers Welfare) 

Member

7. Secretary or his nominee not below the rank of Joint Secretary or equivalent, Ministry of Finance (Deptt. of Expenditure) 

Member

8. Secretary or his nominee not below the rank of Joint Secretary or equivalent, Ministry of Power

Member

9. Secretary or his nominee not below the rank of Joint Secretary or equivalent, Ministry of Science & Technology 

Member

10. Secretary or his nominee not below the rank of Joint Secretary or equivalent, Ministry of Environment, Forest and climate change.

Member

11. Secretary or his nominee not below the rank of Joint Secretary or equivalent NITI Aayog.

Member

12. Chairman, Central Water Commission  Member13. Chairman, Central Ground Water Board  Member14. Chairman, Central Electricity Authority  Member15. Additional Secretary, Ministry of Water Resources, RD & GR, Govt. of India Member

16. Member (WP&P), Central Water Commission Member17.  Member (D&R), Central Water Commission Member18.  Director General or his nominee not below the rank of Joint Secretary or

equivalent, India Meteorological DepartmentMember

19.  Director General or his nominee not below the rank of Joint Secretary or equivalent, Geological Survey of India

Member

20. Surveyor General of India or his representative, Survey of India Member21.  Director or his representative, National Remote Sensing Centre  Member22. Joint Secretary (PP), Ministry of Water Resources, RD & GR Member23. Commissioner (SP), Ministry of Water Resources, RD & GR, Govt. of India Member

24. Director General, National Water Development Agency Member–Secretary

(Total Members as on 31.03.2017...........63)

Fifth (5th) Special General Meeting (SGM) of National Water Development Agency (NWDA) Society was held under the Chairpersonship of Sushri Uma Bharti, Hon’ble Minister for Water Resources, River Development and Ganga Rejuvenation on 22nd June, 2016 at New Delhi.

Page 18: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

7

Shri Sanwar Lal Jat, Hon’ble Minister of State for WR, RD & GR; Shri Mathew T. Thomas, Hon’ble Minister, Water Resources Department, Govt. of Kerala; Shri Girish Mahajan, Hon’ble Minister of Water Resources, Govt. of Maharashtra; Shri Surender Singh Patel, Hon’ble Minister of State for Irrigation, Govt. of Uttar Pradesh; Shri T. Harish Rao, Hon’ble Minister of Irrigation, Govt.of Telangana; Shri Devineni Uma Maheshwar Rao, Hon’ble Minister of Water Resources, Govt. of Andhra Pradesh; Shri Rajiv Ranjan Singh, Hon’ble Minister, WRD, Bihar and Shri Babubhai Bokhiriya, Hon’ble Minister, Water Resources, Government of Gujarat and Members/representatives from various Central Government and State Government Organisations attended the meeting.

Hon’ble Minister for Water Resources, River Development and Ganga Rejuvenation extended

warm welcome to the members and participants of the Special General Meeting. She mentioned that the 5th Special General Meeting of NWDA Society had been convened to consider and approve the proposal of adding new functions to NWDA viz; (i) to undertake implementation of ILR projects and completion of water resources project under Pradhan Mantri Krishi Sinchai Yojna (PMKSY) and (ii) to act as a repository of borrowed fund or loan from banks / other institutions for the execution of projects. She mentioned that her Ministry is committed to complete 99 water resources projects under PMKSY/ AIBP funding for which above amendments will be of great help. The views of Members of the Society invited and after deliberation the proposed addition in the functions of NWDA approved.

{Sushri Uma Bharti, Hon’ble Minister (WR, RD & GR) chairing the 5th Special General Meeting of NWDA Society. On her left is Prof. Sanwarlal Jat, Hon’ble Minister of State (WR, RD & GR). On her right are Dr. Amarjit Singh,

Special Secretary, MoWR, RD & GR and Shri S. Masood Husain, DG, NWDA.}

Page 19: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

8

The thirtieth (30th) Annual General Meeting (AGM) of National Water Development Agency (NWDA) Society was held under the Chairpersonship of Sushri Uma Bharti, Hon’ble Minister for Water Resources, River Development and Ganga Rejuvenation on 22nd June, 2016 at Vigyan Bhawan, New Delhi. Shri Sanwar Lal Jat, Hon’ble Minister of State for WR, RD & GR; Shri Mathew T. Thomas, Hon’ble Minister, Water Resources Department, Govt. of Kerala; Shri Girish Mahajan, Hon’ble Minister of Water Resources, Govt. of Maharashtra; Shri Surender Singh Patel, Hon’ble Minister of State for Irrigation, Govt. of Uttar Pradesh; Shri T. Harish Rao, Hon’ble Minister of Irrigation, Govt. of Telangana; Shri Devineni Uma Maheshwar Rao, Hon’ble Minister of Water Resources, Govt. of Andhra Pradesh; Shri Rajiv Ranjan Singh, Hon’ble Minister WRD, Bihar and Shri Babubhai Bokhiriya, Hon’ble Minister, Water Resources, Government of Gujarat and Members/ representatives from various Central Government and State Government Organisations attended the meeting.

Hon’ble Minister (WR, RD & GR) mentioned that the Interlinking of Rivers Programme is very important for enhancing water and food security of the country and would be very helpful in providing water to water deficit, drought prone and rainfed farming areas. She stated that the various clearances related to environment, wildlife and forest in respect of Ken-Betwa link project Phase-I were in the advance stage of processing. She further mentioned that in principle approval for wildlife clearance to the project had been accorded in 38th meeting of Standing Committee of the National Board of Wildlife (NBWL) chaired by Hon’ble Minister of State (I/C) Environment, Forest and Climate Change held on 10th May, 2016. The Hon’ble Minister (WR, RD & GR) solicited the cooperation and assistance of all members especially the concerned State Governments for the successful implementation of Interlinking of Rivers Programme. The work of NWDA presented to the Members of the Society and they expressed satisfaction on the progress and achievements made.

{Sushri Uma Bharti, Hon’ble Minister (WR, RD & GR) chairing the 30th Annual General Meeting of NWDA Society. On her left is Prof. Sanwarlal Jat, Hon’ble Minister of State (WR, RD & GR) and on her right are Dr. Amarjit Singh,

Special Secretary, MoWR, RD & GR and Shri S. Masood Husain, DG, NWDA.}

Page 20: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

9

2.4 Governing Body

The Governing Body (GB) of the NWDA Society under the Chairmanship of the Secretary (Water Resources), Govt. of India, manages,   administers,   directs and controls the affairs and funds of the   Society subject   to   the

rules, bye-laws and orders of   the   Society   and generally   pursues and carries out the activities of the   Society as   set forth in its Memorandum of Association and in   doing   so, follows and implements the policy directions and guidelines   laid down by the Society.

The composition of members of the Governing Body of NWDA is given below:

Composition of the Governing Body of NWDA

(MoWR Resolution No. 2/9/2002-BM/140 dated 07.10.2016)

1. Secretary, Ministry of Water Resources, RD & GR, Govt. of India Chairman

2. Secretary or his nominee not below the rank of Joint Secretary, Ministry of Finance (Deptt. of Expenditure)

Member

3. Secretary or his nominee not below the rank of Joint Secretary, Ministry of Power Member

4. Secretary or his nominee not below the rank of Joint Secretary, Ministry of Agriculture & Farmers Welfare (Deptt. of Agriculture, Co-operation & Farmers Welfare)

Member

5. Secretary or his nominee not below the rank of Joint Secretary, Ministry of Science & Technology

Member

6. Secretary or his nominee not below the rank of Joint Secretary, Ministry of Environment, Forests and Climate Change

Member

7. Secretary or his nominee not below the rank of Joint Secretary, NITI Aayog Member

8. Chairman, Central Water Commission Member

9. Chairman, Central Ground Water Board

10. Chairman, Central Electricity Authority Member

11. Additional Secretary, Ministry of Water Resources, RD & GR Member

12. Member (WP&P), Central Water Commission Member

13. Member (D&R), Central Water Commission Member

14. Director General or his nominee not below the rank of Joint Secretary, India Meteorological Department

Member

15. Joint Secretary (PP), Ministry of Water Resources, RD & GR Member

16. Commissioner (SP), Ministry of Water Resources, RD & GR Member

17. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Andhra Pradesh

Member

18. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Assam Member

19. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Bihar Member

Page 21: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

10

20. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Chhattisgarh

Member

21. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Gujarat

Member

22. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Haryana

Member

23. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Jharkhand

Member

24. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Karnataka

Member

25. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Kerala

Member

26 Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Madhya Pradesh

Member

27. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Maharashtra

Member

28. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Odisha

Member

29. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Punjab

Member

30. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Rajasthan

Member

31. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Tamil Nadu

Member

32. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Uttarakhand

Member

33. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Uttar Pradesh

Member

34. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, West Bengal

Member

35. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Puducherry

Member

36. Water Resources Secretary or his nominee not below the Rank of Chief Engineer, Telangana

Member

37. Director General, National Water Development Agency Member– Secretary

(Total Members as on 31.03.2017...........37)

Page 22: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

11

Since inception of NWDA, Sixty four meetings of the Governing Body have been held up to 31.03.2017. Sixty Third (63rd) meeting of the Governing Body (GB) of National Water Development Agency (NWDA) was held under the Chairmanship of Shri Shashi Shekhar, Secretary,

Ministry of Water Resources, River Development and Ganga Rejuvenation on 13th June, 2016 at New Delhi. Governing Body considered and approved the amendments in the Memorandum of Association of NWDA for addition of new functions.

{Shri Shashi Shekhar, Secretary (WR, RD & GR) chairing the 63rd meeting of Governing Body of NWDA on his left are Dr. Amarjit Singh, Special Secretary, MoWR, RD & GR and Shri Ghanshyam Jha, Chairman, CWC and on his

right are Shri S. Masood Husain, DG, NWDA and Dr. B. Rajender, Joint Secretary (PP), MoWR, RD & GR}

The sixty fourth (64th) meeting of the Governing Body (GB) of National Water Development Agency (NWDA) was held under the Chairmanship of Dr. Amarjit Singh, Secretary, Ministry of Water Resources, River Development and Ganga Rejuvenation on 27th March, 2017 at Vigyan Bhawan, New Delhi.

The Secretary (WR, RD & GR) and Chairman, Governing Body of NWDA extended a warm welcome to all the members and participants. Governing Body discussed the various works undertaken by NWDA and expressed satisfaction on the progress and achievements made.

Page 23: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

12

{Dr. Amarjit Singh, Secretary (WR, RD & GR) chairing the 64th meeting of Governing Body of NWDA. On his right are Shri S. Masood Husain, DG, NWDA and Shri Narendra Kumar, Member (D&R), CWC}

2.5 Technical Advisory Committee

The Governing Body of the NWDA Society has constituted a Technical Advisory Committee (TAC) of NWDA under the Chairmanship of the Chairman, Central Water Commission, for examination and scrutiny of the various technical proposals framed by the Agency. So far 42 meetings

of TAC have been held. The last meeting of the Technical Advisory Committee (TAC) of NWDA was held on 23rd May, 2016 at New Delhi.

The composition of members and special invitees of the TAC of NWDA along with Terms of Reference (TOR) is given below:

Composition of the Technical Advisory Committee of NWDA

(NWDA Letter No.NWDA/112/5/Tech-I/2005/Vol. XXXVII/4639-85 dated 4.5.2006)

1. Chairman, Central Water Commission, New Delhi Chairman2. Member (WP&P), Central Water Commission, New Delhi Member3. Member (D&R), Central Water Commission, New Delhi Member4. Member (HE), Central Electricity Authority Member5. Joint Secretary, Deptt. of Agriculture & Co-operation, New Delhi Member6. Advisor (IA), Ministry of Environment, Forests and climate change, New Delhi Member7. Director General, Geological Survey of India, Kolkata Member8. Chairman, Central Ground Water Board, Faridabad Member9. Director General, India Meteorological Department, New Delhi Member

10. Director/Scientist (F), National Institute of Hydrology, Roorkee Member

Page 24: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

13

11. Chairman, Inland Water ways Authority of India, Noida Member12. Director General, National Water Development Agency, New Delhi Member-

Secretary13. Chief Engineer (Water Resources), Irrigation Department, Govt. of Uttar Pradesh Special Invitee14. Chief Engineer & Joint Secretary, Narmada and Water Resources Department, Govt.

of Gujarat Special Invitee

15. Engineer-in-Chief (Interstate & Water Resources), Irrigation Department, Govt. of Andhra Pradesh

Special Invitee

16. Chief Engineer (Bodhi),Water Resources Department, Govt. of Madhya Pradesh Special Invitee17. Chief Engineer (Water Resources) & Joint Secretary, Irrigation Department, Govt. of

Maharashtra Special Invitee

18. Chief Engineer, Interstate Water, Government of Kerala Special Invitee19. Chief Engineer (Irrigation, Design & Research), Irrigation Unit, Govt. of Rajasthan Special Invitee20. Engineer-in-Chief, Water Resources Organisation, Govt. of Tamil Nadu Special Invitee21. Chief Engineer, Central Planning Unit, Department of Irrigation, Govt. of Orissa Special Invitee22. Engineer-in-Chief, Irrigation Department, Water Resources Development

Organisation, Govt. of Karnataka Special Invitee

23. Chief Engineer,(Water Resources), Irrigation Works, Govt. of Punjab Special Invitee24. Chief Engineer (Lift Canals), Irrigation Department, Govt. of Haryana Special Invitee

25. Chief Engineer, P.P.Cell, Water Resources Deptt., Govt. of Bihar Special Invitee26. Chief Engineer (Design & Research), Irrigation & Waterways Directorate, Govt. of

West BengalSpecial Invitee

27. Chief Engineer (P&D), Brahmaputra Board, Guwahati, Assam Special Invitee28. Chief Engineer, Irrigation Department, Govt. of Assam Special Invitee29. Chief Engineer (I&F), Govt. of NCT of Delhi Special Invitee30. Engineer-in-Chief, Water Resources Department, Govt. of Chhattisgarh Special Invitee

31. Chief Engineer, Irrigation Department, Govt. of Uttarakhand Special Invitee32. Engineer-in-Chief, Water Resources Department, Govt. of Jharkhand Special Invitee

(Total Members as on 31.3.2016 ……12) (Total Special Invitees as on 31.3.2016……20)

Terms of Reference:

1. To provide technical guidance for the studies and investigation undertaken by NWDA.

2. Consideration and acceptance of methodologies adopted by NWDA for carrying out hydrological studies.

3. Consideration and acceptance of water

balance and prefeasibility reports prepared by NWDA in the light of comments/observations received from the concerned States.

4. Consideration and concurrence to take up field surveys and detailed investigations for water transfer link proposals.

5. Guidance in detailed investigations and preparation of feasibility reports.

Page 25: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

14

During the 42nd TAC meeting of TAC held on 23rd May, 2016, Guidelines for preparation of Preliminary Water Balance Studies (based on the recommendations of TAC of NWDA) have been reviewed.

Chief Engineer (HQ), NWDA made a presentation on the guidelines provided by the TAC of NWDA in its various meetings. After presentation, the Chairman, CWC and Chairman TAC invited the views from all the Members and State Governments representatives. The representative of Uttarakhand, West Bengal, Bihar, Tamil Nadu, Jharkhand, Chhattisgarh, Haryana, Uttar Pradesh, Karnataka, Kerala, Madhya Pradesh and Maharashtra agreed with the existing guidelines and offered no comments. Representatives of Brahmaputra Board and Geological Survey of India (GSI) also offered no comments. However, representatives of Telangana, Tamil Nadu, Odisha, Gujarat and Punjab reiterated their observations

which they have sent earlier or given during the meeting. These observations were deliberated in the meeting.

Chairman, CWC and Chairman TAC observed from the views/observations of the State Governments viz. Andhra Pradesh, Telangana, Tamil Nadu, Odisha, Gujarat and Punjab that these States are also in agreement with most of the guidelines.

The views/suggestions of all the members and State representatives have been duly taken into consideration by the TAC and the guidelines given earlier by TAC of NWDA in its various meetings were discussed and reviewed. Based on the discussions, the earlier guidelines provided by the TAC have been appropriately modified.

Based on these modified guidelines, the guidelines for preparation of preliminary water balance studies have also been firmed up.

{Shri Ghanshyam Jha, Chairman, CWC chairing the 42nd meeting of TAC of NWDA. On his right are Shri S. Masood Husain, DG, NWDA and Shri R.K. Jain, CE (HQ), NWDA}

Page 26: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

15

3.1 Special Committee for Interlinking of Rivers.

The Hon’ble Supreme Court vide its judgment dated 27th February, 2012 in the matter of Writ Petition (Civil) No.512 of 2002 “In Re: Networking of Rivers” along with Writ Petition (Civil) No.668 of 2002 has directed the Union of India and particularly the Ministry of Water Resources to constitute a Committee under the chairmanship of Hon’ble Minister of Water Resources for the implementation of Interlinking of Rivers Programme.

Union Cabinet in its meeting held on 24.07.2014 has approved the constitution of the “Special Committee for Inter-linking of Rivers” in light of the judgment dated 27.02.2012 of the Hon’ble Supreme Court. The Special Committee has been constituted by the Ministry of WR, RD and GR vide Gazette Notification dated 23.09.2014. The status on progress report and constitution of “Special Committee for Interlinking of Rivers” in compliance of Hon’ble Supreme Court Judgement dated 27.02.2012 in the matter writ petition (Civil)-512 of 2002: Networking of Rivers alongwith writ petition No. 668 of 2002 were reviewed by the Cabinet in the meeting held on 15.11.2016.

During the year 2016-17 four meetings of the Special Committee for Interlinking of Rivers were held.

Chapter – 3

Special Committee for Inter-linking of Rivers (SC-ILR) and Task Force for Interlinking of Rivers

Ninth meeting of the Special Committee for Interlinking of Rivers chaired by Sushri Uma Bharti, Hon’ble Union Minister of Water Resources, River Development and Ganga Rejuvenation was held on 29th April, 2016 at Vigyan Bhawan, New Delhi.

During this meeting, it was decided that Shri B.N. Navalawala, Chief Advisor, Ministry of Water Resources, River Development and Ganga Rejuvenation and Chairman, Task Force for ILR alongwith the Sub-Committee for System Studies would consider the issue of ‘surplus water’ for the purpose of Interlinking of Rivers and would give recommendations to the Special Committee on ILR in two months time. The Chief Advisor stated in the meeting that the existing guidelines being a compendium of the discussions of the TAC taken from time to time in context of the specific situation/problem and were never considered in a holistic matter and it was decided in the third meeting of the Task Force that the existing guidelines would be re-examined by the TAC of NWDA. The Hon’ble Minister (WR, RD & GR) desired that a representative of the MoEF & CC may also be invited in the meetings of the Task Force so that the issues concerning environment and forests are well understood and sorted out so that the environment & forests clearances would be easier and faster.

Page 27: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

16

{Sushri Uma Bharti, Hon’ble Minister (WR, RD & GR), chairing the 9th meeting of Special Committee for Interlinking of Rivers. On her left is Shri B.N. Navalawala, Chief Advisor (WR, RD & GR). On her right are Shri Shashi Shekhar,

Secretary (WR, RD & GR), Dr. Amarjit Singh, Special Secretary, MoWR, RD & GR, Shri S. Masood Husain, DG, NWDA and Shri G.S. Jha, Chairman, CWC.}

The tenth meeting of the Special Committee for Interlinking of Rivers chaired by Sushri Uma Bharti, Hon’ble Minister for Water Resources, River Development and Ganga Rejuvenation was held on 26th July, 2016 at Vigyan Bhawan, New Delhi. Shri Rajiv Ranjan Singh, Hon’ble Minister of Water Resources, Government of Bihar; Shri Surendra Singh Patel, Hon’ble Minister of State for Irrigation, Uttar Pradesh; Shri R. Vidyasagar Rao, Advisor, Govt. of Telangana and members/representatives from various Central Government and State Government organizations attended the meeting.

During the meeting, it was decided that the tenure of Sub-Committees-I & II is to be extended by another six months beyond 12th August, 2016. Hon’ble Minister (WR, RD & GR) directed that restructuring of NWDA may be expedited by the MoWR, RD & GR. The Report on the Restructuring of NWDA was being processed in the Ministry.

Page 28: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

17

{Sushri Uma Bharti, Hon’ble Minister (WR, RD & GR) chairing the 10th meeting of the Special Committee for ILR. On her left is Shri B.N. Navalawala, Chief Advisor, MoWR, RD & GR. On her right are Dr. Amarjit Singh, Special

Secretary, MoWR, RD & GR and Shri S. Masood Husain, DG, NWDA.}

The eleventh meeting of the Special Committee for Interlinking of Rivers chaired by Shri Vijay Goel, Hon’ble Minister of State for Water Resources, River Development and Ganga Rejuvenation and Hon’ble Minister of State (Independent Charge) for Ministry of Youth Affairs and Sports was held on 9th November, 2016 at Vigyan Bhawan, New Delhi. Shri Narottam Mishra, Hon’ble Minister for Water Resources, Government of Madhya Pradesh; Shri Surendra Singh Patel, Hon’ble Minister of State for Irrigation, Uttar Pradesh; Shri S. Venugopal Chary, Special Representative of Telangana Cabinet, and members/representatives from various Central Government and State Government organizations attended the meeting.

In the meeting, Shri M. Gopalakrishnan, Chairman of the Sub - Committee on Restructuring of NWDA mentioned that the task assigned to NWDA was very huge and unless the restructuring of NWDA was done immediately, the Organisation may not carryout its assigned works in the desired manner. While concluding the meeting, Hon’ble Minister of State (WR, RD & GR) and Minister of State (Independent Charge) for Ministry of Youth Affairs and Sports mentioned that ILR programme is of great importance and in the national interest. The programme will be pursued further on the basis of consensus and nothing would be imposed on the States.

Page 29: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

18

{Shri Vijay Goel, Hon’ble Minister of State (WR, RD & GR) chairing the 11th meeting of Special Committee for ILR. On his left is Shri Narottam Mishra, Hon’ble Minister, WRD, Govt. of MP and on his right are Dr. Amarjit Singh,

Special Secretary, MoWR, RD & GR and Shri S. Masood Husain, DG, NWDA.}

The twelfth meeting of the Special Committee for Interlinking of Rivers chaired by Shri Vijay Goel, Hon’ble Minister of State for Water Resources, River Development and Ganga Rejuvenation and Hon’ble Minister of State (Independent Charge) for Ministry of Youth Affairs and Sports was held on 8th March, 2017 at Vigyan Bhawan, New Delhi.

Members/Special Invitees and Representatives from various Central Governments and State Government organizations attended the meeting. During the meeting status of Ken-Betwa link Phase-I & II, Damanganga-Pinjal link, Par-Tapi-Narmada link project and Intra-State link projects were discussed.

Page 30: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

19

{Shri Vijay Goel, Hon’ble Minister of State (WR, RD & GR) chairing the 12th meeting of Special Committee for ILR. On his left is Shri Ramchandru Tejavath, Special Representative, Government of Telangana. On his right are

Dr. Amarjit Singh, Secretary (WR, RD & GR) and Shri S. Masood Husain, DG, NWDA.}

Special Committee for Interlinking of Rivers has constituted four specific sub-committees; (i) Sub-committee for comprehensive evaluation of various studies/reports available on the issue of ILR (ii) Sub- Committee for system studies for identification of most appropriate alternative plan, (iii) Sub – Committee for restructuring of National Water Development Agency and (iv) Sub-Committee for consensus building through negotiations and arriving at agreement between concerned States. The three Sub-Committees at Sl. No. (i) to Sl. No. (iii) have been constituted vide MoWR, RD&GR O.M. dated 13.02.2015. The Sub-Committee at Sl. No. (iv) the group to speed up the process of arriving at consensus amongst the States on the proposal of Inter Basin Water

Transfer of NWDA, constituted by MoWR, RD & GR in June, 2002 has been renamed as Sub-Committee for the consensus building through negotiations and arriving at agreements between the concerned States vide MoWR, RD & GR letter dated 20.01.2016.

The 7th meeting of Sub-Committee for Comprehensive evaluation of various studies/reports on ILR (Sub-Committee-I) was held on 26.07.2016.

The Sub-Committee for System Studies for identification of most appropriate alternative plan (Sub-Committee-II) held its 8th meeting on 13.05.2016, 9th meeting on 30.08.2016 and 10th meeting was held on 03.03.2017. The revised

Page 31: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

20

studies with multi-reservoir simulation study of Mahanadi-Godavari link was considered and during 10th meeting accepted with minor modifications suggested in the meeting.

The Sub-Committee for Restructuring of National Water Development Agency held 7 meetings and submitted its Report to Hon’ble Minister (WR, RD & GR) and Chairperson, Special Committee on 21.09.2015.

A presentation on “Restructuring of NWDA” was made before Hon’ble Minister (WR, RD & GR) on 30th May, 2016. A presentation was also made to the Secretary (Water Resources, RD & GR) on 8th December, 2016. Secretary (WR, RD & GR) desired that the process of revising the requirement of additional staff may be completed so as to reduce it to the extent possible.

Sub-Committee for Consensus Building under Chairman, CWC held two meetings on 17.04.2015 and 30.10.2015. The issues regarding Netravati-Hemavati and Bedti-Varada link under NPP and Sankh-South Koel, South Koel-Subarnarekha and Barakar-Damodar-Subarnarekha Intra-State link projects were discussed during these meetings. As decided in the first meeting, a Group under DG, NWDA was constituted to look into the relevant aspects of Sankh-South Koel and South Koel-Subarnarekha link. The first meeting of this Group was held on 29.09.2015.

3.2 Task Force for Interlinking of Rivers

The Union Cabinet while approving the constitution of Special Committee for ILR in its meeting held on 24th July, 2014 directed that a committee comprising of experts be constituted to look into the issues relating to inter linking of rivers. In compliance to the direction of Union Cabinet, MoWR, RD & GR vide O.M. dated 13th April, 2015 has constituted a Task Force for Interlinking of Rivers (TF-ILR) under the Chairmanship of Shri B.N. Navalawala, Chief Advisor, MoWR, RD & GR. The tenure of Task Force is 2 years or till further order whichever is earlier. The Task Force will assist the Special Committee for ILR and MoWR, RD & GR regarding the implementation of ILR Programme. Four meetings of the Task Force have been held during the year 2016-17.

During the 3rd meeting held on 28.04.2016 issue of defining of surplus water for ILR project was discussed. During 4th, 5th & 6th meeting held on 15.06.2016, 25.10.2016 & 13.02.2017, Task Force discussed the guidelines of preparation of water balance studies.

Page 32: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

21

4.1 National Perspective Plan

Suggestions for a national water grid for transferring water from water rich regions to water-deficit areas have been made from time to time. Two proposals, put forth earlier in the seventies which attracted considerable attention, are National Water Grid by Dr. K. L. Rao and Garland Canal by Captain Dastur. These proposals were not pursued further by the Government as they were not found techno-economically feasible.

The continued interest shown by many individuals / organisations gave impetus to study inter-basin water transfer proposals. The then Ministry of Irrigation (now Water Resources, River Development and Ganga Rejuvenation) formulated a National Perspective Plan (NPP) for Water Resources Development in August 1980. The National Perspective Plan comprises of two components, namely i) Peninsular Rivers Development and ii) Himalayan Rivers Development.

The implementation of National Perspective Plan would give benefits of 25 million ha of irrigation from surface waters, 10 million ha by increased use of ground waters, raising the ultimate irrigation potential from 140 million ha to 175 million ha and generation of 34 million KW of power, apart from the incidental benefits of flood control, navigation, water supply, fisheries, salinity and pollution control etc.

4.2 Inter Basin Water Transfer Links

National   Water Development Agency  was  initially entrusted with the studies related to the Peninsular Rivers Development Component of the National Perspective Plan for Water Resources Development. Subsequently,

the studies related to the Himalayan Rivers Development Component of National Perspective Plan were also assigned during 1990-91. Work for the preparation of Detailed Project Reports of the links after concurrence of the concerned States was also assigned to NWDA during the year 2006-07. Accordingly, NWDA started preparation of DPR of Ken-Betwa link in 2006-07 and the same was completed on 31.12.2008. The DPR of Ken-Betwa link was further splitted in Phase-I and Phase-II. Ken-Betwa Phase-I comprises of Daudhan Dam and its appurtenant works, tunnel, power houses and link canal was completed in 2010. The DPRs of Ken-Betwa Phase-II and Damanganga - Pinjal link projects have been completed by NWDA during the year 2013-14. The work of preparation of DPR of Par – Tapi – Narmada link project was completed in 2015-16.

Preparation of PFR/FR of intra-State links as proposed by States was assigned to NWDA during 2006-07. Subsequently the work of preparation of DPR of intra-State links was also assigned to NWDA during 2011. The work of preparation of 2 DPRs namely Burhi Gandak-Noon-Baya-Ganga link and Kosi-Mechi link of Bihar State have been completed. The work of preparation of DPR of Wainganga (Gosikhurd)-Nalganga (Purna Tapi) link of Maharashtra and that of Ponnaiyar-Palar link of Tamil Nadu remained under progress during the year. NWDA has completed PFRs of 36 intra-State links upto 31st March, 2017 as proposed by State Governments.

4.3 Preliminary Studies Completed by NWDA

Preliminary studies completed by NWDA under Peninsular and Himalayan Components of National Perspective Plan are shown in Table-1.

Chapter – 4

Technical Activities

Page 33: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

22

Table-1

Preliminary studies completed by NWDA under National Perspective Plan (NPP)

Sl. No. Name of Study Peninsular Component

Himalayan Component

Total Preliminary Studies Completed

1 2 3 4 5i) Water Balance Studies of

- Basins/Sub-basins- Diversion Points

13752

-19

13771

Total: 189 19 208ii) Toposheet Studies for

- Reservoir Storage Sites-Link Alignments

5818

1619

7437

Total: 76 35 111iii) Pre-Feasibility Reports of Links including

one additional and one alternate study 18 14 32

4.4 Water Transfer Links under Study by NWDA

Water transfer links identified for preparation of Feasibility Reports by NWDA:

Peninsular Rivers Development Component:

1. Mahanadi (Manibhadra) - Godavari (Dowlaiswaram)

2. Godavari (Polavaram) - Krishna (Vijayawada)

3. Godavari (Inchampalli) - Krishna (Pulichintala)

4. Godavari (Inchampalli) - Krishna (Nagarjunasagar)

5. Krishna (Nagarjunasagar) - Pennar (Somasila)

6. Krishna (Srisailam) - Pennar 7. Krishna (Almatti) - Pennar 8. Pennar (Somasila) - Cauvery (Grand

Anicut) 9. Cauvery (Kattalai) – Vaigai -Gundar 10. Parbati –Kalisindh - Chambal

11. Damanganga – Pinjal 12. Par-Tapi-Narmada 13. Ken-Betwa 14. Pamba - Achankovil - Vaippar 15. Netravati - Hemavati 16. Bedti – Varada

Himalayan Rivers Development Component:

1. Manas-Sankosh-Teesta-Ganga (M-S-T-G)2. Kosi-Ghaghara 3. Gandak-Ganga 4. Ghaghara-Yamuna 5. Sarda-Yamuna 6. Yamuna-Rajasthan 7. Rajasthan-Sabarmati 8. Chunar-Sone Barrage 9. Sone Dam - Southern Tributaries of Ganga 10. Ganga (Farakka)-Damodar-Subernarekha11. Subernarekha-Mahanadi12. Kosi-Mechi

Page 34: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

23

13. Farakka-Sunderban 14. Jogighopa-Teesta-Farakka (Alternative to M-S-T-G)

A map showing various proposed Inter Basin Water Transfer links under study is given below:

16

15

10

19

11

8

26

27

25

6

24

17 18

2120

1929

22

28

2330

13

23

12

14

7

P I B W T L U Sroposed nter asin ater ransfer inks nder tudyHIMALAYAN COMPONENT

NAME OF THE LINKS

CHUNAR-SONE BARRAGE SONE DAM-SOUTHERN TRIBUTARIES OF GANGAGANGA-DAMODAR-SUBERNAREKHA SUBERNAREKHA-MAHANADI KOSI-MECHIFARAKKA-SUNDERBANS JOGIGHOPA-TISTA-FARAKKA(ALTERNATIVE TO SL. NO. 1)

8

9

10

11

12

13

14

MANAS-SANKOSH-TISTA-GANGAKOSI-GHAGRAGANDAK-GANGA GHAGRA-YAMUNASARDA-YAMUNAYAMUNA-RAJASTHAN RAJASTHAN-SABARMATI

1

2

3

4

5

6

7

PENINSULAR COMPONENTNAME OF THE LINKS

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

MAHANADI (MANIBHADRA) -GODAVARI (DOWLAISWARAM)GODAVARI (INCHAMPALLI )-KRISHNA (PULICHINTALA )GODAVARI (INCHAMPALLI)-KRISHNA (NAGARJUNASAGAR)GODAVARI (POLAVARAM)-KRISHNA (VIJAYAWADA) KRISHNA (ALMATTI)-PENNARKRISHNA (SRISAILAM)-PENNARKRISHNA (NAGARJUNASAGAR)-PENNAR (SOMASILA)PENNAR (SOMASILA)- CAUVERY (GRAND ANICUT)CAUVERY (KATTALAI) - VAIGAI-GUNDARKEN-BETWA PARBATI-KALISINDH-CHAMBAL PAR-TAPI-NARMADA DAMANGANGA-PINJAL BEDTI-VARADANETRAVATI-HEMAVATIPAMBA-ACHANKOVIL-VAIPPAR

LEGEND

INTERNATIONAL BOUNDARYRIVERLINKS

Page 35: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

24

4.4.1 Present Status of Inter Basin Wa-ter Transfer Links under Peninsular Component

Out of 16 links identified under Peninsular Component, FRs of all links except 2 minor links viz. Bedti-Varada and Netravati – Hemavati link pertaining to Karnataka have been completed.

(i) Bedti-Varada Link:

Govt. of Karnataka has conveyed their concurrence for preparation of feasibility report but work was stalled due to opposition of local NGO who demanded that Environmental Impact Assessment (EIA) studies for the concerned area should be done first by the Government of Karnataka with terms of reference prepared by them. During 62nd Governing Body (GB) meeting of NWDA held on 27.01.2016, the representative of Government of Karnataka informed that EIA studies of Bedti-Varada link have been entrusted as per ToR prepared by NWDA to the consultant by the Government of Karnataka.

(ii) Netravati-Hemavati Link:

Govt. of Karnataka has not conveyed their concurrence for preparation of Feasibility Report so far. NWDA has been pursuing the matter regularly with Govt. of Karnataka for concurrence for taking up survey and investigation for preparation of Feasibility Report for the link. During 62nd Governing Body meeting of NWDA held on 27.01.2016, the representative of Government of Karnataka informed that the DPR of Yettinhole project envisaging transfer of Netravati water has been submitted to NWDA vide their letter dated 19.12.2015. The report has been examined

by NWDA and the comments of NWDA have been sent on 11.11.2016. It is seen that both the proposals (i) Yettinhole project as proposed by Karnataka State and (ii) Netrawati-Hemavati link as proposed by NWDA as part of National Perspective Plan (NPP) can be planned.

(iii) Status of Revised Proposal of Mahana-di-Godavari link project

As decided in the 8th meeting of the Sub-Committee on System Studies for identification of most appropriate alternative plan (Sub-Committee-II of SC-ILR) held on 13.05.2016, the draft report on the hydrological studies and multi reservoir simulation for the proposed Mahanadi – Godavari link has been revised by NIH and submitted to NWDA in July, 2016. The report was discussed during the 9th meeting of the Sub-Committee-II held on 30.08.2016 along with observations of Govt. of Odisha. The representative of Govt. of Chhattisgarh was also present during the meeting and it was decided that the study would be further modified by NIH, Roorkee duly considering the observations of Govt. of Odisha. The NIH has modified/revised the report and submitted to NWDA. The revised report was considered by Sub-Committee on System Studies in its tenth meeting held on 3rd March, 2017 and the report was accepted by the Sub-Committee with minor modifications suggested in the meeting. Report after finalisation by the Sub-Committee will be submitted to Special Committee.

The status of various studies under Peninsular Component as on 31st March, 2017 is shown below:

Page 36: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

25

4.4.2 Present Status of Preparation of Feasibility Reports of Inter Basin Water Transfer Links under Himalayan Component

Out of 14 identified links, NWDA has completed feasibility studies of Indian Portion of 2 links i.e. Sarda-Yamuna & Ghaghara-Yamuna. However, these Feasibility Reports could not be circulated to concerned States as the work in Nepal area could not be carried out. Besides above, survey & investigation (S & I) works and preparation of draft feasibility report, pertaining to the 7 links namely (i) Yamuna - Rajasthan link (ii) Chunar -Sone barrage link (iii) Subernarekha - Mahanadi link (iv) Ganga - Damodar - Subernarekha link (v) Farakka - Sunderbans link (vi) Rajasthan - Sabarmati link and (vii) Gandak - Ganga link in Indian portion have been completed.

Survey and Investigation works for preparation of Feasibility Report (FR) of Kosi - Ghaghara in Indian Portion also have been completed. As decided in 5th meeting of Special Committee for Inter linking of Rivers held on 28.07.2015 a copy each of draft FR of Sarda-Yamuna and Yamuna - Rajasthan link projects have been

sent to the Principal Secretaries (WR) of Govt. of Rajasthan, Uttar Pradesh and Haryana vide letters dated 01.09.2015. The Feasibility Report of Sarda – Yamuna link will be reviewed after the finalization of the DPR of Pancheswar dam by CWC/Panchewar Development Authority. As the Kosi-Mechi link entirely lies in Nepal territory and Jogighopa –Teesta –Farakka barrage is the alternate of MSTG, the survey & investigation works could not be initiated. The survey and investigation work of MSTG Link has been completed and the draft feasibility report has been prepared during the year. Survey & investigation work of Sone Dam-Southern Tributaries of Ganga (STG) is under progress.

All the Himalayan links are dependent on storages envisaged in upper links in Nepal and Bhutan and thus involved international ramifications. The progress of preparation of Feasibility Reports of these links, thus, depends on the agreements with Nepal and Bhutan regarding the concerned links for taking up the survey and investigations accordingly.

Page 37: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

26

4.4.3 Manas - Sankosh – Teesta - Ganga (MSTG) Link:

The Pre-Feasibility Report (PFR) of Manas-Sankosh-Teesta-Ganga link was completed in 1996.The Manas-Sankosh-Teesta-Ganga link envisages diversion of 43000 MCM surplus water available in Manas and Sankosh rivers with supplementation from intermediate streams viz. Aie, Torsa, Raidak, Jaldhaka for augmenting the flow of Ganga at Farakka and make available about 13965 MCM of water (after enroute utilization) in Mahanadi basin for further diversion to south for utilization in water short Krishna, Pennar, Cauvery, Vaigai and Gundar river basins. Feasibility Report (FR) as per original alignment could not be completed as alignment of Manas-Sankosh-Teesta-Ganga link was passing through Manas Tiger Reserve, Buxa Tiger Reserve and other forests.

Considering practical difficulties for survey and investigation works in these reaches, NWDA has carried out alternate alignment studies avoiding various reserved forests with about 80m

lift. Feasibility Report of the MSTG link with revised alignment is under preparation and after completion, will be submitted to Govt. of West Bengal, Assam and Bihar for their suggestions/views on the report.

4.4.4 Consensus building process for Manas-Sankosh-Teesta-Ganga link project

The Manas-Sankosh-Teesta-Ganga link project was discussed by the Sub-Committee for System Studies for evaluation of most appropriate alternative plan (a sub-committee of Special Committee on ILR) in its 5th meeting held on 28th July, 2015.

A team of senior officers of Ministry of WR, RD & GR led by the Special Secretary, Ministry of WR, RD & GR which included Director General, NWDA and other officers had a meeting with the Chief Secretary, Government of West Bengal at Kolkata on 17th August, 2015 regarding Sankosh-Mahanadi Link System, which comprises four

The status of various studies under Himalayan Component as on 31st March, 2017 is shown below:

Page 38: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

27

links namely; Sankosh-Teesta (first phase of Manas - Sankosh - Teesta - Ganga link); Ganga - Damodar - Subernarekha; Subernarekha - Mahanadi and Farakka - Sunderbans link projects. The team requested Government of West Bengal for agreeing to the proposal of preparation of DPR by NWDA.

Hon’ble Union Minister (WR, RD & GR) has requested Hon’ble Chief Minister, West Bengal vide letter dated 31-12-2015 seeking her support to the Project Proposal. Hon’ble Chief Minister of West Bengal vide letter dated August 12, 2016

has stated that the proposed project is involving substantial issues of the State relating to natural resources and other key economic and social facts which were not formally discussed with the State, in view of which they do not agree to the project proposal.

All issues of West Bengal State related to natural resources and other key economic and social facts will be duly considered in the FR/DPR in consultation with State Government.

Page 39: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

28

5.1 Efforts Made For Arriving At Consensus

Ministry of Water Resources, RD & GR and National Water Development Agency identified following five links as priority links for initiating the steps to arrive at a consensus amongst the concerned States through ‘Consensus Group’ headed by the Chairman, Central Water Commission:

1. Ken – Betwa Link, 2. Par – Tapi – Narmada Link, 3. Damanganga – Pinjal Link, 4. Parbati – Kalisindh – Chambal Link, and 5. Godavari (Polavaram) – Krishna

(Vijayawada) Link.

After getting the mandate in June 2006 and the consensus building efforts by the Consensus Group headed by Chairman, CWC, NWDA with the concurrence of the concerned States took up the preparation of Detailed Project Report (DPR) of the agreed links. The DPRs of Ken – Betwa link project phase – I and Phase – II, Damanganga – Pinjal link (March, 2014) and Par – Tapi – Narmada link (August, 2015) have been completed by NWDA. The DPR of Parbati – Kalisindh – Chambal link could not be taken up as consensus has not been reached on NWDA proposal, however Government of Madhya Pradesh has taken up its own Intra-State project.

Godavari (Polavaram) – Krishna (Vijayawada) link Project is a part of Polavaram project of Andhra Pradesh and the Government of Andhra Pradesh had taken up the above project including the link component as per their own planning. Government

of India has now constituted Polavaram Project Authority for the execution of the Polavaram irrigation project in accordance with Andhra Pradesh Reorganisation Act-2014.

On the basis of discussions held with Govt. of Odisha from time to time, NWDA had prepared alternative proposal of Mahanadi – Godavari link with minimum submergence and comparable benefits.

In view of above, presently four priority links have been identified viz. 1. Ken – Betwa Link, 2. Par – Tapi – Narmada link, 3. Damanganga – Pinjal link and 4. Mahanadi – Godavari link.

Status of Preparation of Detailed Project Re-ports under National Perspective Plan (NPP)

(1) Ken – Betwa link project (Phase – I)

The techno – economic clearance of the Detailed Project Report (DPR) of Ken – Betwa link project (Phase – I) has been accorded by the Advisory Committee of MoWR, RD & GR during July, 2016 subject to environment, Wild life and Forest clearances. The cost estimate has been revised to present level. The various clearances including environment, forest and wildlife from MoEF & CC and clearance for the R&R of tribal population from MoTA are in advance stages of consideration/processing. The Government plans to start implementing this national project as model link project of ILR programme after obtaining the statutory clearances and the approval of the Cabinet. The status of various clearances are as under:

Chapter – 5

Priority Links Identified Under National Perspective Plan (NPP)

Page 40: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

29

S. No. Activity Present status(i) Techno-economic

Clearance by Advisory Committee, MoWR, RD & GR

Techno-economic clearances to the project recommended by the Advisory Committee of MoWR, RD & GR headed by Secretary (WR, RD & GR) in its 129th meeting held on 08.07.2016.

(ii) Statutory Clearances

(a) Wildlife clearance Standing Committee of NBWL of MoEF & CC chaired by Hon’ble Minister (EF & CC) recommended the project for accord of Wildlife Clearance in its 39th meeting held on 23.08.2016.

(b) Environment Clearance Expert Appraisal Committee of MoEF & CC considered and recommended for accord of Environment Clearance (EC) in its meeting held on 30.12.2016 with certain conditions.

(c) Forest Land Diversion Clearance

The FAC considered the project in the meeting held on 30.03.2017 and recommended the project for Forest Land Diversion clearance.

(d) Clearance from Ministry of Tribal Affairs (MoTA)

MoTA has accorded the clearance vide letter dated 04.01.2017.

(e) Investment Clearance Recommended by the Investment Clearance Committee of the MoWR, RD & GR on 10.02.2017.

(f) Funding Pattern Cabinet Note for 90% : 10% Central : State funding prepared with the approval of Hon’ble Minister WR, RD & GR and circulated to concerned Ministries for comments on 21.02.2017. NITI Aayog vide their letter dated 10.03.02017 supported the proposal.

(2) Ken – Betwa Link Project (Phase – II)

The DPR of Ken-Betwa Link Project Phase-II has been completed and submitted to Government of Madhya Pradesh and Uttar Pradesh vide NWDA letter dated January 17, 2014. Ken-Betwa Link Project Phase-II benefits entirely in the State of Madhya Pradesh. Later as suggested by Government of Madhya Pradesh, the detailed project reports of Phase II including Lower Orr, Kotha Barrage and Bina complex is under revision.

The DPR is being modified/revised by NWDA in consultation with Govt. of Madhya Pradesh. Further in order to speed up the process of implementation separate DPRs of these three projects viz. Lower Orr, Kotha Barrage and Bina complex has submitted to central water commission for technical appraisal.

The status of environment and forest clearance of the Lower Orr Dam under Phase – II Project is given below:

S. No. Activity Present status(a) Environmental

Clearance of Lower Orr Dam

The Environmental Clearance for Lower Orr dam has been considered by EAC of MoEF & CC in its 93rd meeting held on 2nd May, 2016 and recommended the project proposal for grant of Environmental Clearance (EC).

Page 41: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

30

(b) Forest Clearance of Lower Orr Dam

Forest Advisory Committee considered the project for forest clearance in the meeting held on 30.03.2017 and recommended the project for accord of forest land diversion clearance.

(c) Environmental and forest clearance of Bina complex multi purpose project.

Water Resource Department of Government of Madhya Pradesh has obtained environmental and forest clearance of Bina multipurpose project.

(3) Damanganga – Pinjal Link Project

The Detailed Project Report (DPR) of Damanganga – Pinjal link project was completed by NWDA during March, 2014. CWC has completed the

techno-economic appraisal of the project. The status of various statutory clearances is as under:

S. No. Activity Present status(a) Forest Land

Diversion Clearance

Municipal Corporation of Greater Mumbai (MCGM) has submitted the application for forest land diversion clearance to MoEF & CC on 30th June, 2016.

(b) Clearance from Ministry of Tribal Affairs (MoTA)

The proposal seeking clearance from Ministry of Tribal Affairs (MoTA), Government of India for Resettlement and Rehabilitation (R&R) Plan for Scheduled Tribe Project Affected Families in respect of Damanganga - Pinjal Link Project has been submitted by Municipal Corporation of Greater Mumbai (MCGM) to the Ministry of Tribal Affairs, New Delhi in prescribed format along with other documents on 30th June, 2016.

(c) Techno-economic Clearance

Damanganga-Pinjal Link Project was considered by the Advisory Committee on Irrigation, Flood Control & Multipurpose Projects of Ministry of Water Resources, RD & GR chaired by the Secretary (WR, RD & GR) in its 129th meeting held on 8th July, 2016 and was accorded the techno-economic clearance subject to statutory clearances.

(4) Par – Tapi – Narmada Link Project

The DPR of Par – Tapi – Narmada link project has been completed by NWDA and submitted to Water Resources Departments of Government of Gujarat and Maharashtra in August, 2015.

Government of Gujarat suggested to include: the tribal areas enroute of link canal on its rightt side by lift; in the vicinity of reservoirs proposal in the link project; command areas of five projects proposal by Government of Gujarat in the vicinity

of the link project; and in the Panchmahal and Chotaudepur areas by lift from Narmada main canal on its right side by lift on substitution basis in the project benefits and modify the DPR accordingly. The modification of DPR duly considering these issues remained under progress during the year.

Efforts were made to resolve the issue of water sharing between the two States during the year. MoWR, RD & GR team led by Secretary (WR, RD

Page 42: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

31

& GR) met Hon’ble Chief Minister of Gujarat on 31.12.2016 at Gandhinagar and made presentation on this link. Response from Govt. of Gujarat was positive.

(5) Status of Revised Proposal of Maha-nadi-Godavari link project

As decided in the 8th meeting of the Sub-Committee on System Studies for identification of most appropriate alternative plan (Sub-Committee-II of SC-ILR) held on 13.05.2016, the draft report on the hydrological studies and multi reservoir simulation for the proposed Mahanadi – Godavari link has been revised by NIH and submitted to NWDA in July, 2016. The report was discussed by the sub-committee in its various meetings and the report was accepted by the subcommittee in its 10th meeting held on 3rd March, 2017. The representatives of Odisha and Chhattisgarh states were also present during the meeting of the sub-committee and their views were also considered while finalizing the report.

(6) Status of Godavari-Krishna link projects

NWDA has revised the water balance study of Godavari basin at Inchampalli dam site by considering the views of Telangana State and also the latest available data. The study was presented to Sub-Committee for System Studies in its 8th meeting held on 13.05.2016 wherein it was reported that there is a reduction in water yield and water balance. Sub – Committee desired that the reason of reduction in yield, water balance should be indicated in the report. NWDA should reassess the ultimate water utilization data as an independent expert, based on the data as given in published authenticated reports of Telangana State and re- work out water balance and re-submit to Sub – Committee. Accordingly, the project details from the published documents, pertaining to Godavari basin from Govt. of Telangana obtained. Considering this utlisation data upto Inchampalli, the water balance of Godavari basin between SRSP and Inchampalli dam site has been revised and are as given below:

Water balance at Inchampalli dam site (2016)

Considering utilizations as per Telangana State Govt.

Details As per RWBS TS 99 (2015)

Present study (2016)(Considering utilisation as per

Govt. of Telangana75% 50% 75% 50%

Surface water balance (in MCM)

7691 22170 5002 19481

Page 43: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

32

6.1 Intra-State Links

Ministry of Water Resources in June 2005 conveyed the approval to identify intra-State links in the States like Bihar and to prepare pre – feasibility / feasibility reports of these links by NWDA. This work was added in the functions of NWDA after the approval in the Special General Meeting of NWDA Society held on 28.06.2006. Later on during the year 2011, preparation of Detailed Project Report of intra-State links has also been added in the functions of NWDA.

NWDA requested all the States / UTs to inform the details of intra-State links for carrying out further studies by NWDA. Response from the States of Bihar, Maharashtra, Gujarat, Odisha, Jharkhand, Meghalaya, Nagaland, Karnataka, Chhattisgarh, Kerala, Punjab, Delhi, Rajasthan and Union Territories of Puducherry, Andaman & Nicobar Islands and Daman & Diu was received. Govts. of Nagaland, Meghalaya, Kerala, Punjab, Delhi and Union Territories of Puducherry, Andaman & Nicobar Islands and Daman & Diu indicated that there was no Intra-State link proposal concerning to their States / UTs.

6.1.1 Jharkhand

Govt. of Jharkhand suggested three intra-State link proposals viz. (i) Barakar – Damodar – Subarnarekha, (ii) Sankh – South Koel and (iii) South Koel – Subarnarekha links. PFRs of all the three links have been completed.

6.1.2 Gujarat

Govt. of Gujarat suggested for taking up the PFR of Damanganga – Sabarmati – Chorwad intra-State link. The PFR of the link has been completed.

6.1.3 Maharashtra

Out of 20 links proposed by Maharashtra, the PFR of 17 links have been completed upto March 2014. The work of DPR of Wainganga (Gosikhurd) – Nalganga (Purna Tapi) link remained in progress during the year. The Wainganga (Gosikhurd) - Godavari (SRSP) link withdrawn by Govt. of Maharashtra and two links namely Khariagutta-Navatha Satpura foothills and Kharighuti Ghat-Tapi link are ground water recharge schemes to be studied by CGWB, consequently not accepted by TAC of NWDA for PFR studies.

6.1.4 Odisha

Govt. of Odisha submitted proposal for taking up three intra-State links. The PFR of Mahanadi-Brahmani intra-State link was completed by NWDA and not found techno-economically viable. The PFRs of two more links viz; (i) Mahanadi-Rushikulya Link Project (Barmul Project) and (ii) Vamsadhara-Rushikulya (Nandininalla) Project have been completed.

6.1.5 Bihar

In May 2008, Govt. of Bihar requested NWDA to prepare DPRs of six intra-State link proposals, namely transfer of Kosi basin water to Mahananda basin through Kosi – Mechi link canal, transfer of Sone basin water through Sone – Kiul link canal & transfer of Ganga water through Barh – Nawada Pump canal scheme to Punpun – Harohar – Kiul basin with multipurpose development of these basins, Kohra – Chandravat link, Burhi Gandak – Noon – Baya – Ganga link, Burhi Gandak - Bagmati through Belwadhar and Kosi – Ganga link. PFRs of Kosi-Mechi link, Burhi Gandak-Noon-Baya-Ganga, Kohra-Chandravat link, Bagmati-

Chapter – 6

Intra-State Links Proposed by States

Page 44: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

33

Burhi Gandak (through Belwadhar), Barh-Nawada pump canal scheme and Kosi (Bagmati) - Ganga Link were already completed by NWDA.

NWDA has completed Detailed Project Reports of Burhi Gandak-Noon-Baya-Ganga and Kosi-Mechi intra-State links in December, 2013 and March, 2014 respectively and submitted to Government of Bihar. The DPR of Burhi-Gandak-Noon-Baya-Ganga link project is under techno-economic appraisal in CWC. All necessary statutory clearances of Burhi-Gandak-Noon-Baya-Ganga link will be obtained by Government of Bihar. Technical Appraisal of Kosi-Mechi link has been completed by CWC. Advisory Committee on Irrigation, Flood control & Multipurpose projects of MoWR, RD & GR chaired by Secretary (WR, RD & GR) considered the proposal in its meeting held on 08.07.2016 and accorded techno-economic clearance subject to the submission of all statutory clearances.

The Govt. of Bihar vide their letter dated 27.05.2011 has proposed to entrust the work of preparation of DPRs of three more intra-state link schemes to NWDA viz. (i) Development of Bagmati Irrigation & Drainage Project Phase-II (Barrage near Kataunjha in Muzaffarpur District) and Adhwara Multipurpose Project with Kosi-Adhwara-Bagmati links (ii) Transfer of Ganga water to south Bihar through pump canal scheme at Buxer and (iii) Development of Badua-Chandan basin. Initially, NWDA consented to take up the work of two links (a) Transfer of Ganga water to south Bihar through pump canal scheme at Buxer (b) Development of Badua –Chandan Basin but after receiving the details from Govt. of Bihar, it was found that these are not intra-state links therefore not taken up. In the meantime, NWDA has taken up PFR of Kosi-Adhawara-Bagmati links on basis of available data in April, 2014 and the same was completed in March, 2015. Thus, 7 PFRs pertaining to Bihar have been completed by NWDA.

6.1.6 Rajasthan

Govt. of Rajasthan submitted two proposals of intra-State links viz. (i) Mahi-Luni link and (ii) Wakal-Sabarmati-Sei-West Banas-Kameri link. PFR of both these links completed.

6.1.7 Tamil Nadu

Govt. of Tamil Nadu submitted a proposal for diversion of flood flows of Ponnaiyar River below Krishnagiri reservoir to the water short Palar basin through Ponnaiyar-Palar link for which PFR was completed during 2011-12. Draft DPR of Ponnaiyar-Palar link has also been completed by NWDA during 2016-17.

6.1.8 Karnataka

Total six proposals were received from Karnataka. These have been technically examined. Out of these, four proposals are found primafacie feasible for preparation of PFR. The PFR of one link namely Bedti-Dharma and Varada link has been completed during the year 2015-16.

6.1.9 Chhattisgarh

Government of Chhattisgarh proposed one link viz. Pairy-Mahanadi link for preparation of Prefeasibility Report. PFR of this link has been completed.

6.1.10 Overall Status of Preparation of PFRs of Intra-State Links

Upto March, 2017 out of total 47 intra-State links, NWDA has completed PFRs of 36 links. During 2016 – 17, PFR of Damanganga – Vaitarana – Godavari (Kadva Dev) intra state link of Maharashtra has been completed. The status of intra-State links suggested by various State Governments is given below:

Page 45: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

34

Status of Intra – State Link Proposals

S. No. Name of intra-state link Rivers Present status of PFR/DPRMaharashtra

1. Wainganga (Goshikurd) – Nalganga (Purna Tapi)

Wainganga & Nalganga PFR completed and DPR is in progress.

2. Wainganga – Manjra Valley Wainganga & Manjra PFR completed (Not found feasible)

3. Upper Krishna – Bhima (system of Six links)

Krishna & Bhima PFR completed

4. Damanganga (Ekdare)- Godavari Valley

Damanganga & Godavari

PFR completed. DPR taken up.

5.(i) Upper Vaitarna-Godavari valley Vaitarna&Godavari PFR completed.5(ii) Damanganga-Vaitarna-Godavari

(Kadva Dev) Valley Damanganga, Vaitarna & odavari

PFR completed. DPR taken up.

6. North Konkan – Godavari Valley

Patalganga & Godavari PFR completed (Not found feasible)

7. Koyna – Mumbai city Koyna PFR completed8. Sriram Sagar Project (Godavari)

– Purna – ManjiraGodavari, Purna & Manjira

PFR completed

9. Wainganga (Goshikurd) – Godavari (SRSP)

Wainganga & Godavari Withdrawn by Govt. of Maharashtra

10. Middle Konkan – Bhima Valley Savitri, Kundalika,Amba & Bhima

PFR completed (Not found feasible)

11. Koyna – Nira Koyna & Nira PFR completed12. Mulsi – Bhima Mulsi & Bhima PFR completed13. Savithri – Bhima Savithri & Bhima PFR completed14. Kolhapur – Sangli – Sangola Krishan & Bhima PFR completed15. Riverlinking projects of Tapi

basin and Jalgaon DistrictTapi PFR completed

16. Nar – Par - Girna valley Nar, Par & Girna PFR completed (Not found feasible)

17. Narmada – Tapi Narmada & Tapi PFR completed18. Khariagutta – Navatha Satpura

foot hillsDropped Ground water recharge schemes to be

studied by CGWB. Consequently not accepted by TAC of NWDA for PFR studies.

19. Kharia Ghuti Ghat – Tapi Dropped

20. Jigaon – Tapi – Godavari Valley Tapi & Godavari PFR completed (Not found feasible)

Gujarat 21. Damanganga – Sabarmati –

ChorwadDamanganga, Sabarmati & Chorwad

PFR completed

Page 46: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

35

Orissa22. Mahanadi – Brahmani Mahanadi & Brahmani PFR completed

(Not found feasible)23. Mahanadi – Rushikulya

(Barmul Project)Mahanadi & Rushikulya

PFR completed

24. Vamsadhara – Rushikulya (Nandini Nalla project)

Vamsadhara & Rushikulya

PFR completed

Jharkhand PFR completed25. South Koel – Subernarekha South Koel &

SubernarekhaPFR completed

26. Sankh – South Koel Sankh & South Koel PFR completed27. Barkar – Damodar –

Subernarekha Barkar, Damodar & Subernarekha

PFR completed

Bihar28. Kosi – Mechi [entirely lie in

India]Kosi & Mechi DPR completed.

Techno-economic clearance given by Advisory Committee of MoWR, RD & GR.

29. Barh – Nawada Ganga & Kiul PFR completed (Not found feasible)30. Kohra – Chandravat (now

Kohra-Lalbegi)Kohra & Chandravat PFR completed (Not found feasible)

31. Burhi Gandak – None – Baya - Ganga

Burhi Gandak, None, Baya & Ganga

DPR completed and is under Techno-economic appraisal in CWC

32. Burhi Gandak – Bagmati [Belwadhar]

Burhi Gandak & Bagmati

PFR completed (Not found feasible)

33. Kosi – Ganga Kosi & Ganga PFR completed34 Development of Bagmati

Irrigation & Drainage Project-Phase-II (Barrage near Kataunjha in Muzaffarpur District) and Adhwara Multipurpose Project with Kosi-Adhwara-Bagmati Link

Kosi, Adhwara & Bagmati

PFR completed (Not found feasible)

35 Transfer of Ganga water to South Bihar through pump Canal Scheme at Buxer

Ganga Initially, NWDA consented to take up the work but after receiving the details from Govt. of Bihar, it was found that these are not intra-state links therefore not taken up.

36 Development of Badua-Chandan Basin

Badua & Chandan

37. Sone-Falgu link Sone & Falgu Preliminary Study has been taken up

Page 47: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

36

Rajasthan38. Mahi – Luni link Mahi & Luni PFR completed

(Not found feasible)39. Wakal – Sabarmati – Sei –

West Banas – Kameri linkWakal, Sabarmati, Sei, West Banas & Kameri

PFR completed (Not found feasible)

Tamil Nadu40. Ponnaiyar – Palar link Ponnaiyar & Palar PFR completed and DPR under

finalisationKarnataka

41 Almatti (Bagalkot)-Malaprabha Sub-basin

Almatti & Malaprabha Prima Facie Not found feasible

42 Malaprabha-Tungabhadra Sub-basin

Malaprabha &Tungabhadra

Prima Facie Not found feasible

43 Bedti - Dharma - Varada link Bedti, Dharma & Varada

PFR completed

44 Bhadra-Vedavathi(Vani Vilasa Sagar) link

Bhadra &Vedavathi Government of Karnataka withdrew the proposal during 11th meeting of Special Committee for ILR.45 Diversion of west flowing rivers

schemes(Barapole-upper cauvery link)

Barapole & upper cauvery

46 Diversion from Bedti & Aghanashini to Varada

Aghanashini &Varada

Found feasible and will be taken up for preparation of PFR.

Chhattisgarh47 Pairy-Mahanadi link Pairy & Mahanadi PFR completed

6.1.11 Present status of preparation of DPRs for intra-State links:

Present status of preparation of DPRs for intra-State links identified by States is given below:

S. No. Name of link Rivers State concerned

Status of DPR

1 Burhi Gan-dak-Noon- Baya –Ganga link

Burhi Gandak & Ganga

Bihar DPR has been completed and submitted to Government of Bihar vide letter dated December 30, 2013. DPR is under Techno economic appraisal in CWC.

2 Kosi-Mechi Link Kosi & Mechi Bihar Techno-economic clearances accorded by Advisory Committee of MoWR, RD & GR in its meeting held on 08.07.2016 subject to submission of all statutory clearances.

3 Ponnnaiyar-Palar link

Ponnniyar & Palar

Tamil Nadu Draft DPR completed

Page 48: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

37

4 Wainganga (Gosikhurd) - Nalganga (Purna Tapi)

Wainganga & Purna Tapi

Maharashtra DPR is under progress

6.1.12 Providing funding to the proposals of the State Government for the prepa-ration of Detailed Project Report of Intra-State river link Projects

The work for preparation of Detailed Project Report (DPR) of Intra-State river link projects was added in the functions/mandate of NWDA vide MoWR, RD & GR resolution dated 19th May, 2011 and Gazette notification dated 11th June, 2011.

Ministry of WR, RD & GR vide their letter No. 2/12/2015-BM/2217 dated 01.12.2015 has conveyed the following decision regarding the funding of DPR of intra-state links that:

“NWDA should generally confine itself to inter-State river linkage project DPR. They can take up intra-State river linkage projects only as consultancy works, if awarded by any State Government. The Government of India fund should not be utilized for DPR preparation of intra-state river linking projects”.

In view of the above decision/direction of the Ministry of WR, RD & GR, the cost of preparation of DPR of Intra-State links for future projects by NWDA will be borne by the concerned State Governments.

Page 49: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

38

7.1 NABARD Funding under PMKSY-AIBP

A Project Monitoring Unit (PMU) will be established under NWDA to work in coordination with CWC for monitoring as well as updation of information under PMKSY. This will help NWDA to process and recommend the process for NABARD funding and release of Central Assistance to the State under PMKSY-AIBP. PMU shall be headed by an officer of the rank of Chief Engineer with supporting units comprising of experts.

7.1.1 Processing of Proposal

PMU shall prepare a comprehensive note based upon monitoring reports of Third Party & CWC regarding eligibility of further release of CA. Further, recommendation to NABARD shall also be given regarding release of State share.

7.1.2 Release of funds to States (CA)

NWDA shall act as pass through window for CA to

be provided to States through NABARD funding. It shall ensure that funds received from NABARD are released for projects within 1 day of its receipt from NABARD so as to avoid any parking of funds.

7.1.3 Third Party Monitoring

Based on joint proposals received in mission, Third party monitoring visits would be planned in such a way that such reports are available before release of next instalment. Further, the visits of third party shall be planned keeping in view of the visits that shall be made by the CWC.

NWDA has been identified to act as an agency for borrowing resources from LTIF and release Central Assistance to the State Governments towards the prioritized PMKSY-AIBP (Major & Medium Irrigation) Projects and their CADWM works, for their completion in time bound manner. Memorandum of Agreement for borrowing from NABARD to fund Central share in these projects was signed by the Ministry of Water Resources, RD & GR, NWDA and NABARD on 6th September, 2016.

Chapter – 7

Activities under Pradhan Mantri Krishi Sinchai Yojna

Details of Fund of PMKSY distributed to different States upto March, 2017

Distribution of Funds to Different

States

Ist Instalment released on 21.10.2016

(Rs. in crore)

2nd Instalment released on 26.12.2016

(Rs. in crore)

3rd Instalment Released on 15.03.2017

(Rs. in crore)

4th Instalment Released on 30 /

31.03.2017(Rs. in crore)

State wise total fund

delivered as on 31.03.2017(Rs. in crore)

Amount released by NABARD to NWDA

1500 2480.91 876.30 460.67433.16

5751.04

1. Govt. of Gujarat 888.69 - 493.4557 94.712 1476.8577 2. Govt. of Madhya

Pradesh208.54 26.36 - 50.514 285.4140

3. Govt. of Odisha 41.12 198.73 92.7170 160.445 493.0120

Page 50: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

39

4. Govt. of Telangana

11.06 227.75 - 06.622 245.4320

5. Govt. of Manipur

89.25 - - 37.744 126.9940

6. Govt. of Maharashtra

155.21 16.78 17.3120 18.550 207.8520

7. Govt. of Punjab 47.17 - - 05.246 52.4160 8. Govt. of

Karnataka53.86 30.29 - 04.147 88.2970

9. Govt. of Rajasthan

5.10 - 40.7900 45.8900

10. Govt. of Bihar - - 12.6433 12.6433 11. Govt. of

Jharkhand- - 145.7500 145.7500

12. Govt. of UP - - 73.6320 62.000 135.6320 13. Govt. of Andhra

Pradesh- - - 07.400 7.4000

14. Govt. of Chhattiisgarh

- - - 13.290 13.2900

15. Polavaram Project, Govt. of Andhra Pradesh

- 1981.00 - 433.160(31.03.2017)

2414.1600

Total 1500 2480.91 876.30 893.83 5751.04

Page 51: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

40

NWDA launched its website http:// www.nwda.gov.in on 30th September, 2005. The website is being maintained in a bilingual manner while making it more interactive and stakeholder friendly.

The website furnishes information through its main links projected namely on Organization, National Perspective Plan, NWDA Studies, Photogallery, Implementation of RTI Act, Online Query, Notices, Tenders and Vacancy Circulars. In addition to India Water Week, other links viz; Contact us, Office forms, Transfer Guidelines of NWDA, Inter Basin Water Transfer, Special Studies, Committee of Experts, Terms of Reference for preparation of Detailed Project Report, Publication, Vigilance, Grievance Redressal, other ILR matters and Citizen’s charter are also available. The website has been made more interactive by providing instant access to a wide range of information especially concentrating and incorporating details on one of the main objectives of NWDA of Inter Linking of Rivers (ILR) namely, the need, earlier proposals, existing experiences on ILR and proposed ILR projects coming under both Peninsular and Himalayan Rivers Development Components of National Perspective Plan of Ministry of Water Resources, RD & GR, Government of India.

Other related links have also been developed and projected on the website ever since NWDA has

Chapter – 8

Website of NWDA

been mandated with the tasks of DPR preparation of Ken-Betwa Link Project, preparation of PFRs/ FRs/DPRs of intra-State Links and convening of India Water Week so as to provide up to date information on these activities undertaken by Ministry of Water Resources, RD & GR.

The main links maintained and updated during 2016-17 are:

Provision of Information on NWDA and its function, NWDA Society, Governing Body, Technical Advisory Committee, status of intra-State links in NWDA Studies, Photo gallery, Implementation of RTI Act, Notices and Tenders, Vacancy Circular, Contact us, Publication, Telephone Directory, Central Public Information Officer, Vigilance, Grievance Redressal, Citizen Charters, e-Samiksha, e-Book, Personal Information System, Court Cases, Special Committee for ILR etc. Further the DPRs of the links completed so far, Location Map, the brief details on PFR of Intra State link projects have been placed on website during 2016-17.

Further the NWDA is in the process of redesign and redevelopment of its present website.

Page 52: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

41

9.1 Training and Human Resource Devel-opment Activities

The training and exchange of knowledge is given special importance in NWDA. During 2016-17 as part of human resources development, officers of NWDA were deputed for various Training Courses / Conferences / Seminars / Workshops organised by various agencies/organizations to enhance their knowledge in latest technology in the field of Water Resources Engineering, Computer operations, Accounting Management etc. Details of Training courses attended by NWDA officials are given in Appendix-I. Details of Conference/Seminars/workshops etc. in which NWDA officials participated are given at Appendix-II.

9.2 Implementation of Act for Persons with Disabilities

The details of implementation of persons with disabilities (Equal opportunities Protection of Right and Participation) Act 1995 in NWDA are as under:

1. The orders issued by the Govt. of India from time to time are implemented.

2. Reservation for such persons is provided for the posts of Junior Engineer, Steno Gr – III, Draftsman Gr – III, Hindi Translator, LDC and MTS posts filled by direct recruitment method. Benefits of reservation are being provided to physically handicapped persons in promotion wherever applicable from MTS to higher scales in Group C within Group C, as per the instructions and guidelines laid down by the Government.

9.3 Citizen’s Charter of NWDA

As per the guidelines issued by the Department of Administrative Reforms & Public Grievances (AR&PG), MOWR, RD & GR, NWDA has prepared its draft Citizen’s charter as formulated by the Task Force set up for this purpose. The Citizen’s charter for NWDA includes NWDA’s preamble, set up, organizational structure, activities, grievances redressal mechanism, stakeholders etc. Chief Engineer (HQ) has been nominated as Public Grievance Officer and Director (Tech) as nodal officer for Citizen’s charter. The final charter has been sent to Performance Management Division, Cabinet Secretariat and Parliament Library and also uploaded on NWDA’s website. The constitution of its Task Force is furnished below:

1. Chief Engineer (HQ), NWDA Chairman

2. Director (MDU), NWDA Member

3. Director (Admn.), NWDA Member

4. Chief Research Officer, CSMRS Member

5. Director (Technical Coordination), CWC Member

6. Director (Tech.), NWDA Member – Secretary / Nodal Officer

9.4 Committee for Complaints on Sexual Harassment of Women Employees

In accordance with the guidelines laid down by the Hon’ble Supreme Court of India to prevent sexual harassment of women employees, a Committee is

Chapter – 9

Other Activities of NWDA

Page 53: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

42

functioning to look in to the complaints of the women working in NWDA. The composition of the Committee is as follows:-

1. Smt. Jancy Vijayan, Director (MDU)

– Chairperson

2. Shri R. K. Gupta, Executive Engineer (HQ) – Member

3. Dr. (Smt.) R. Malitha, Representative of Nari Raksha Samiti,

– Member NGO, 2, Raj Nivas Marg, Civil Lines, Delhi-56

4. Smt. Jasvinder Kaur, Assistant Engineer – Member

The Committee submits its finding to the Director General, NWDA for necessary action. During the year 2016-17, no complaint has been received by the Committee from any of the women employees of NWDA.

9.5 Communal Harmony Week and Qua-mi Ekta Week

National Water Development Agency observed the Communal Harmony Week which coincided with Quami Ekta Week from 19th to 25th November, 2016 to boost the spirit of communal harmony. During this week all staff of NWDA were administered “National Integration Pledge”. Bilingual posters were displayed in the office premises. DG, NWDA addressed the officers and staff during Communal Harmony Week and Quami Ekta Week to generate the desired awareness.

9.6 Publication of in House Bulletin ‘Jal Vikas’

NWDA is publishing a quarterly in-house bulletin ‘Jal Vikas’ since October 1991. The Journal is being distributed amongst water resources engineers

and scientists of various Central/State Govt. Departments and other concerned Organizations in the country. The primary objective of this bulletin is to disseminate information on activities and achievements of NWDA. The technical articles published in the bulletin mainly pertain to the proposed Inter Basin Water Transfer links studied by NWDA and matter relevant to the NWDA objectives. Every year, the October issue is exclusively brought out in Hindi as ‘Rajbhasha Visheshank’.

9.7 Participation in India International Trade Fair (IITF)-2016

National Water Development Agency participated in India International Trade Fair-2016 held during 14-27 November, 2016 at New Delhi with major emphasis on display of issues related to Interlinking or Rivers. The details of various Inter Basin Water Transfer proposals were exhibited in the stall of NWDA, in the pavilion of Ministry of Water Resources during the Fair. The visitors to the NWDA stall were apprised about the Inter Basin Water Transfer links being studied by NWDA.

9.8 India Water Week-2016

The Ministry of Water Resources, River Development and Ganga Rejuvenation, Govt. of India has been organizing India Water Week (IWW) as an international conference cum exhibition event since 2012. NWDA has been entrusted with the task of organizing the India Water Week by the MoWR, RD & GR.

The fourth India Water Week-2016 with the theme “Water for All-Striving Together” was organized during 4 – 8 April, 2016 at New Delhi comprising of an International Conference and Exhibition. Israel was associated as Partner Country in the organization of IWW-2016. The Hon’ble President of India was the Chief Guest for the valedictory

Page 54: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

43

{Shri Arun Jaitley, Hon’ble Minister of Finance,, Sushri Uma Bharti, Hon’ble Minister (WR, RD & GR), Shri Uri Yehuda Ariel, Hon’ble Minister of Agriculture and Rural Development, Israel, Shri Birender Singh, Hon’ble Minister for Rural Development, Panchayati Raj, Drinking Water and Sanitation, Shri Prakash Javadekar, Hon’ble Minister

for Environment, Forest and Climate Change, Shri Radha Mohan Singh, Hon’ble Minister of Agriculture, Prof. Sanwar Lal Jat, Hon’ble Minister of State for WR, RD & GR, Shri Shivraj Singh Chouhan, Hon’ble Chief Minister of

Madhya Pradesh, Shri Shashi Shekhar, Secretary (WR, RD & GR) and Dr. Amarjit Singh, Special Secretary (WR, RD & GR) unveiling the Proceedings of India Water Week – 2016 during Inaugural Function }

function of the Conference held on 8th April, 2016.

The conference encompassed all major topics related to water resources development and management and thus provided the right platform for the Water Resources fraternity for coming out with pragmatic strategies towards achieving the goal of ‘Water for All’ in line with Government

of India’s vision, “Sab Ka Sath, Sab Ka Vikaas”. The issue of water scarcity was also discussed and covered in the relevant session of the conference.

The entire event was organized by NWDA in association with CWC and other organizations of MoWR, RD & GR. About 1500 delegates from India and abroad participated in the conference.

Page 55: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

44

{Shri Uri Yehuda Ariel, Hon’ble Minister of Agriculture and Rural Development, Israel, Prof. Sanwar Lal Jat, Hon’ble Minister of State for WR, RD & GR visiting the Exihibition of India Water Week – 2016. Shri S. Masood Hussain,

Director General, NWDA explaining the Model of Ken – Betwa link project to them}

{Shri Pranav Mukharjee, Hon’ble President of India, Chief Guest in Valedictory Function. On his left sushri Uma Bharti, Hon’ble Minister (WR, RD & GR), Smt. Vasundhara Raje, Hon’ble Chief Minister of Rajasthan and Shri Shashi Shekhar, Secretary (WR, RD & GR). On his right Shri Suresh Prabhu,

Hon’ble Minister of Railways, Shri Birender Singh, Hon’ble Minister for Rural Development, Pancha-yati Raj, Drinking Water and Sanitation and Prof. Sanwar Lal Jat, Hon’ble Minister of State for WR,

RD & GR.}

Page 56: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

45

{Sushri Uma Bharti, Hon’ble Minister (WR, RD & GR), presiding the Inaugural function of Jal Manthan – 3rd at Vigyan Bhawan, New Delhi. On her left is Dr. Sanjeev Baliyan, Hon’ble Minister of State for WR, RD & GR;

Dr. Amarjit Singh, Secretary, (WR, RD & GR) and Shri G.S. Jha, Chairman, CWC. On her right are Shri Vijay Goel, Hon’ble Minister of State for WR, RD & GR; Shri Brij Mohan Aggarw al, Hon’ble Water resources Minister, Govt. of

Chhattisgarh and Shri Shashi Shekhar, Retd. Secretary (WR, RD & GR).}

9.9 Jal Manthan – 3

A one day conference ‘Jal Manthan-3’ was organised at Vigyan Bhawan, New Delhi on 13.01.2017. The consultation and discussion was held on Implementation of PMKSY & Improvement of

Water Use Efficiency, Ecology Improvement, Participatory Irrigation Management, River Basin Management, River Rejuvenation and Flood Management.

Page 57: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

46

10.1 VIGILANCE AND DISCIPLINARY CASES.

National Water Development Agency is following all the instructions issued from time to time by the Department of Personnel and Training, Govt. of India and Central Vigilance Commission. Chief Vigilance Officer looks after various aspects of Vigilance and disciplinary matters of the employees of NWDA. Shri R. K. Jain, Chief Engineer (HQ) has worked as part time CVO upto 13.08.2016. Thereafter Shri K. P. Gupta, Director (Technical) has been appointed as part time Chief Vigilance Officer of NWDA on 12.08.2016 for three years and he has taken over the charge of CVO on 17.08.2016.

No disciplinary case was under process in the organization. Till date, no complaints have been received from officers/staff members.

All monthly, quarterly and yearly returns with regard to above matters were sent to Ministry of Water Resources, River Development and Ganga Rejuvenation / Central Vigilance Commission from time to time.

Chapter – 10

Vigilance Activities in NWDA

Vigilance Inspections of Offices of the (i) Investigation Division, Vadodara, (ii) Chief Engineer (South) / Superintending Engineer, Investigation Circle / Executive Engineer, Investigation Division, Hyderabad (iii) Investigation Division, Jaipur and (iv) Investigation Division, Nagpur were conducted during the year 2016-17.

10.2 VIGILANCE AWARENESS WEEK

The Vigilance Awareness Week was celebrated from 31.10.2016 to 05.11.2016 by all the Offices of NWDA. A “Pledge” was administered on 31.10.2016 by the Director General, NWDA to the officers and staff members working at NWDA (HQ). Banners and Posters highlighting the evils of corruption were displayed at prime locations in the Headquarters Office as per the instructions of the CVC. Chief Vigilance Officer, NWDA shared his views with the staff/officers on the topic “Public participation in promoting Integrity and eradicating Corruption”.

Page 58: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

47

National Water Development Agency (NWDA) has been actively involved in the promotion of use of Rajbhasha (Hindi) and is continuously taking steps towards the actual implementation of the provisions of official language Act, 1963 & their rules. The quarterly meetings of the Official Language Implementation Committee were organised regularly in the NWDA Headquarter, New Delhi and in all its field offices. During the discussions and reviews done in the meetings organised under the Chairmanship of the Director General and Head of Offices, it was clearly reflected that official use of Hindi and Hindi correspondence is increasing day by day. Rajbhasha Adhikari and Assistant Director (OL) regularly attended the meetings of Official Language Implementation Committee of Ministry of Water Resources, RD & GR and effective steps were taken for implementation & observance of the decisions taken in these meetings. All documents were issued bilingually during the year 2016-17 as mentioned in the Section 3(3) of Official Language Act.

Chapter – 11

Promotion of Use of Rajbhasha (Hindi)

In accordance with the instruction issued by the Department of Official Language ‘Hindi Pakhawara’ was organised from 14th September to 28th September, 2016 at the HQs, New Delhi. DG, NWDA issued appeal for progressive use of Hindi during the Pakhawara. DG, NWDA requested all the officials to be more inclined towards use of official language and work more originally in Hindi and said that the use of official language should not be made only during the Pakhawara but should be adopted on a continuing basis. Various activities were organised during the Pakhawara in which officers and staff members actively participated.

Chief Engineer (HQ), Director (Tech) and Rajbhasha Adhikari and Assistant Director (OL) inspected nine regional offices for the use of official language during the year 2016 – 17.

Sansadiya Rajbhasha Samiti (Sakshya) successfully inspected Investigation Division, Nagpur on 23.12.2016.

{Shri S. Masood Husain, DG, NWDA;, Shri R.K. Jain, Chief Engineer (HQ); Shri N.C. Jain, Director (Tech), NWDA; Shri Narender Kumar, Director (Admn.), NWDA and Smt. Archana Gupta, Assistant Director (OL), NWDA during

the inauguration of Hindi Pakhwara-2016}

Page 59: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

48

{Shri R.K. Jain, Chief Engineer (HQ); Shri N.C. Jain, Director (Tech), NWDA; Shri R. P. Rawat, Executive Engineer (HQ), Shri M. K. Sinha, Consultant, Shri R. K. Kharbanda, Deputy Director, NWDA, Smt. Archana Gupta,

Assistant Director (OL), NWDA and others during the Samapan of Hindi Pakhwara-2016}

Page 60: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

49

12.1 Amendment of Rule No. 45 of the rules and regulations of National Wa-ter Development Agency (NWDA)

In the 5th Special General Meeting of NWDA Society held on 22.06.2016, the following two amendments were incorporated as additional objectives for NWDA.

(f) To undertake/construct/repair/renovate/rehabilitate/implement the projects either on its own or through an appointed agency/organisation/PSU or company and the projects forming part of interlinking of rivers, for completion of projects falling under Pradhan Mantri Krishi Sinchai Yojana (PMKSY) of which projects under Accelerated Irrigation Benefits Programme (AIBP) are also included and similar other projects.

(g) NWDA to act as a repository of borrowed funds or money received on deposit or loan given on interest or otherwise in such manner, as directed by MoWR, RD & GR and to secure the repayment of any such borrowed funds/money deposits/loan etc. by way of mortgage, pledge, change or lien upon all or any other property, assets or revenue of the society both present and future.

As a result of the addition of the new objective mentioned at (g) above, there was a need for consequential amendment of Rule 45 of the Rules & Regulations of NWDA, which at present is as under:

“Funds of the Society”

45. The funds of the Society consist of the following:

Chapter – 12

Finance and Accounts

(i) Lump sum and recurring grant made by the Government of India;

(ii) Fees and other charges received by the Agency;

(iii) All moneys received by the Society by way of grants, gifts, donations or other contributions approved by the Government of India”.

The Rule 45 presently does not include handling of funds obtained by borrowing of loan on interest, etc. The proposed amendment of Rule 45 “45 (iv) borrowings from National Bank for Agriculture and Rural Development (NABARD) and / or any authority or organisation or institution approved by the Government of India, on such terms and conditions as may be agreed upon” of the Rules & Regulations of NWDA was submitted for approval of Secretary (WR, RD & GR) and Chairman of the Governing Body of NWDA and the Hon’ble Union Minister for Water Resources, RD & GR and President of NWDA Society and was approved. The same has been informed to the members of the Governing Body and NWDA Society vide letter dated 13.10.2016.

The above proposal was ratified by the Governing Body in its 64th meeting held on 27.03.2017.

12.2 The Central Assistance to the states – Long Term Irrigation Fund (LTIF) under PMKSY scheme.

Government of India has identified NWDA to act as an agency for borrowing resources from out of LTIF, as also to release funds as Central Assistance to the State Governments towards the identified Irrigation Projects under PMKSY scheme for their completion in time bound manner. A

Page 61: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

50

Memorandum of Agreement for borrowing from NABARD for funding the Central Share in these projects was signed by Ministry of Water Resources, RD & GR, NWDA and NABARD on 6th September, 2016.

NABARD has released Loan of Rs. 5751.04 crore to NWDA during the Financial Year 2016-17 which has been disbursed by NWDA to 14 States for their identified projects and Polavaram Project Authority.

12.3 Grants- in-Aid to NWDA during the Financial Year 2016 – 17 and Actual Expenditure

The Ministry of Water Resources, RD & GR, Government of India allocated and released Grants-in-Aid amounting to Rs. 69.68 crores under plan schemes to NWDA for the financial year 2016 – 17 against which NWDA has incurred actual expenditure of Rs. 69.69 crore.

In addition to above, an amount of Rs. 44,66,35,556.00 was also released by Ministry of Water Resources, RD & GR to NWDA for payment of interest on loan taken from NABARD under LTIF of PMKSY scheme which was paid to NABARD by NWDA on 01.02.2017.

12.4 Audited Account of NWDA for the Financial Year 2016 – 17

The Comptroller and Auditor General of India has been entrusted the work of auditing the accounts of the Agency for a period of 5 years w.e.f. the year 2014 – 15. The Principal Director of Audit, Scientific Departments has conducted the audit of accounts of NWDA for the year 2016 – 17.

Audit Certificate, Audit Report along with para wise replies of NWDA and the audited statement of accounts of the Agency for the year 2016 – 17 are given at Appendix – III.

Page 62: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

51

The   various   activities of the NWDA have  progressed well   during the year 2016-17 under the able guidance and valuable advice of Sushri Uma Bharati, Hon’ble Union Minister of Water Resources RD & GR and President  of the NWDA Society, Dr. Sanjeev Kumar Balyan, Hon’ble Minister for State, Ministry of Water Resources, River Development and Ganga Rejuvenation and Shri Vijay Goel, Hon’ble Minister of State for Water Resources, RD & GR and Hon’ble Minister of State (Independent Charge) Ministry of Youth Affairs and Sports and Vice President of NWDA Society, Shri Shashi Shekhar and Dr. Amarjit Singh, Secretary (WR, RD & GR) & Chairman, Governing Body of NWDA, Shri Ghanshyam Jha and Shri Narender Kumar Chairman, CWC & Chairman of Technical Advisory Committee of NWDA and Chairman of Consensus Group,

Chapter – 13

Acknowledgements

and all the members of   the NWDA Society, Special Committee for Interlinking of Rivers and its Sub-Committees, Task Force for Interlinking of Rivers, Governing Body, TAC, etc. NWDA acknowledges the excellent co-operation received from the Secretaries, Engineers-in-Chief and Chief Engineers and other officials of the States of Andhra Pradesh, Assam, Bihar, Chhattisgarh, Gujarat, Haryana, Jharkhand, Karnataka, Kerala, Madhya Pradesh, Maharashtra, Odisha, Punjab, Puducherry, Rajasthan, Tamil Nadu, Telangana, Uttar Pradesh, Uttrakhand and West Bengal. The Agency also acknowledges the overwhelming cooperation received from the officers of MoWR, RD & GR, CWC, GSI, CSMRS, NRSC, BISAC etc. in achieving the objectives and targets as planned by NWDA.

Page 63: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

52

Appendix – I

Training attended by NWDA Officials

S. N0. Trainings Period Venue Organised by

Officer/(s) who Participated

1. e-Governance Champions Programme (eGCP)

23-05-2016 to15-06-2016 (3 weeks)

Hyderabad, Bangalore, Estonia andNew Delhi.

National Institute of Smart Governance

Smt. Jancy Vijayan, Dir (MDU)

2. Training programme on “Rainfall – Runoff modeling, Flood Routing and Inundation Mapping with open source GIS

19.09.2016 to30.09.2016

NWA, Pune. NWA, Pune.

Sh. M.P. Krishnamurthy, AE

3. Training course on “Role of Laboratory Investigations of Rock in Hydroelectric Projects”

19.01.2017 to20.01.2017

CSMRS, New Delhi.

CSMRS Smt. Indu Jaiswal, JESh. Aheesh Kumar, JE

4. Training course of Nodal Officers, RTI of the Public Authorities under Ministry for aligning PAs to RTI online portal of DoPT

21.02.17 CSOI, Vinay Marg, New Delhi

DoPT Sh. Narendar Kumar, Director (Admn.)

5. Training programme on “Government e-Market place (GeM) – Procurement made smart”

22.02.17 Mini Hall, CGO Towers, Kavadiguda, Secunderabad

Directorate of Quality Assurance, Directorate General of Supplies and Disposals, Hyderabad

Sh. N.G. Rao, DDSh. P.V. Ramaraju, DDSh. R.Vinod Kumar, AESh. K.K.Ali, JESmt. Ch. Vijaya Lakshmi, JESh. D. Rama Mohan Rao, JE

6. Training course on “Ge-otechnical investigations for River Valley Projects”

16.02.17 to

17.02.17

CSMRS, New Delhi

CSMRS, New Delhi

Sh. A. Rajeswar Rao, AE,

Sh. R.K. Mishra, JE,

Page 64: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

53

S. N0. Trainings Period Venue Organised by

Officer/(s) who Participated

7. Training on modules of Public Financial Management System (PFMS) for Centre Sector schemes

07.03.17 Jaipur Department of Expenditure, Controller General of Accounts, New Delhi

Sh. S.S. Mohapatra, AOSh. Ashok Kumar, Cashier

8. Training programme on “Government e-Market place (GeM) for the buyers”

9.3.17 DGS&D, Parliament street, New Delhi

Directorate General of Supplies and Disposals, New Delhi

Sh. R.K. Gupta, EE(HQ)Sh. K.K. Rao, DD(H)Sh. B.K. Tandel, AESh. S.P. Tomar, JESh. S.C. Mangal, AE

9. Training programme on “Government e-Market place (GeM) for the buyers”

16.3.17 DGS&D, Parliament street, New Delhi

Directorate General of Supplies and Disposals, New Delhi

Ms Deepika, AESh. K.H. Rehman, JESh. Hari Om Varshney, JE

10. Training programme on “Design and Analysis of Concrete Gravity Dams using software applications”,

15.3.2017 to 19.3.2017

Engineering Staff College of India (ESCI), Hyderabad

Engineering Staff College of India (ESCI), Hyderabad

Sh. K.K. Rao, DD(H)

11. The training programme on “Irrigation Project Monitoring and Management using Remote Sensing and GIS”

20.3.2017 to 31.3.2017

NWA, Pune NWA, Pune Sh. D.K. Goyal, AD

Page 65: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

54

Appendix – II

Conferences, Seminars and Workshop attended by NWDA Officials

S. N0. Conferences/Seminars/ Workshop

Period Venue Organised by Officer/(s) who Participated

A Conference1. 7th Annual

Sustainability in Design and Construction India Summit (SICI) 2016

02.08.2016 to 03.08.2016

ITC Gardenia, Bengaluru

NISPANA Innovative Platforms Pvt. Ltd.:

Sh. R.K. Jain, CE (HQ)Sh. K.P. Gupta, SESh. S.A. Naidu, EE

2. National Conference and Exhibition on Land Survey & Mapping – Survey India 2016,

07.09.2016 to 08.09.2016

Holiday Inn, Mayur Vihar District Centre, New Delhi

Survey and Mapping Association,Survey India 2016 Secretariat

Sh. S. Masood Husain, DGSh. R.K. Jain, CE (HQ)Sh. B.L. Sharma, SE

3. “6th Asian Regional Conference on Geosynthetics ”

10.11.2016 Manekshaw Centre, Delhi

Indian Chapter of International Geosynthetics Society in association with CBIP.

Smt. Jancy Vijayan, Director (MDU)

4. 10th World Aqua Congress – an International Conference on “Water : Smart Solutions for growing India”

24.11.2016 to 25.11.2016

Gulmohar Hall, India Habitat Centre, New Delhi.

Aqua Foundation, New Delhi.

Sh. N.C. Jain, Director (Technical)

5. 2nd Annual National Summit on “Sustainable Water & Sanitation”

01.12.2016 to 02.12.2016

Eros Hotel, Nehru Place, New Delhi

Ministry of Drinking Water and Sanitation and Swachh Bharat Mission, India.

Sh. Fahim Ashraf, SE

6. CHEMTECH WaterEX World 2017 Conference on “Water Security & Waste Management through Technological Interventions”

15.02.2017 BC & EC, Goregaon, Mumbai

CHEMTECH & Jasubhai Media Pvt. Ltd.

Sh. P.C. Gupta, EE,

Page 66: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

55

S. N0. Conferences/Seminars/ Workshop

Period Venue Organised by Officer/(s) who Participated

7. Third National Dam Safety Conference

18.02.17 to 19.02.17

IIT, Roorkee Central Water Commission

Sh. Fahim Ashraf, SESh. Muzaffar Ahmad, SESh. S.K. Singhal, AEE

8. “5th Annual Conference on Water in India : Services & Management, Technologies and Best Practices”

27.02.17 to 28.02.17

Hotel Le Meridien, New Delhi

India Infrastructural Publishing Pvt. Ltd., New Delhi

Sh. K.P. Gupta, Director (Technical)Sh. Afroz Alam, DD

B Seminars1. A one day event -

“FME World Tour India”

26.4.2016 Hotel Claridges, New Delhi

M/s Pixel Softek Pvt. Ltd., Bangalore.

Sh. K.K. Rao, DD (H)

2. National Consultation on SDGs: Sustainable Management of Water and Sanitation

09.08.2016 Juniper Hall, India Habitat Centre, New Delhi

RIS –Research and Information System for Developing Countries

Sh. S. Masood Husain, DGSh. R.K. Jain, CE(HQ).

3. International Seminar on Sustainable Agriculture through Safer Agrochemicals

27.08.16 Agritech India, Bangalore

Media Today Pvt. Ltd

Sh. R.K. Jain, CE(HQ)

4. EA Water Conclave 2016 on “ Innovative Solutions to Water and Wastewater Management ”

22.08.2016 to 24.08.2016

Hall no.18, Pragati Maidan, New Delhi

EA Water Pvt. Ltd., New Delhi

Sh. Jabbar Ali, DD

5. Seminar on “Governance Framework for harmonizing Water Energy Usage”

21.09.2016 Hotel Taj Mansingh Palace, New Delhi

ASSOCHAM Sh. R.K. Jain, CE(HQ)

Page 67: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

56

S. N0. Conferences/Seminars/ Workshop

Period Venue Organised by Officer/(s) who Participated

6. Two day management development programme on “Gender, Equity and Water Management ”

07.11.2016 to 08.11.2016

TERI University, New Delhi.

TERI University with support of ICEWaRM, Australia.

Smt. Jancy Vijayan, Director (MDU)Sh. D.K. Sharma, SE

7. Bhujal Manthan-2 on “Aquifer Mapping and Ground Water Management”,

29.11.16 Vigyan Bhawan, New Delhi,

CGWB, Delhi Sh. R.K. Jain, CE(HQ)Sh. N.C. Jain, CE (N)Sh. K.P. Gupta, Director (Tech.)Sh. O.P.S. Kushwah, SE-IISmt. Jancy Vijayan, Director (MDU)Sh. R.K. Sinha, Director (Fin.)Sh. Narendra Kumar, Director (Admn.)Sh. Afroz Alam, DDSh. Jabbar Ali, DDSh. R.K. Kharbanda, DDSh. K.K. Shrivastava, DDSh. R.K. Sharma, DDSh. Rakesh Kumar Gupta, EE (HQ)Sh. Nagesh Mahajan, DD

8. Geospatial World Forum on “Geospatial and Deep Learning – Shaping Smarter World”

23.01.2017 to 25.01.2017

Hyderabad Convention Centre, Hyderabad

Geospatial Media and Communica-tions Pvt. Ltd., Noida.

Sh. M.K. Srinivas, CE (S) Sh. N.G. Rao, DDSh. P.V. Ramaraju, DD.Sh. P.S. Murthy, AE.Sh. K.S. Naidu, AE

9. Seminar on “Leakage Detection Systems in Dams”

16.02.17 Hotel Le Meridien, New Delhi

Council of Power Utilities, New Delhi

Smt. Jancy Vijayan, Director (MDU)

Page 68: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

57

S. N0. Conferences/Seminars/ Workshop

Period Venue Organised by Officer/(s) who Participated

10. Seminar on “Waste Water – Monitoring and Management”

22.03.17 CWC , New Delhi

CWC, New Delhi

Sh. R.K. Jain, CE (HQ)Sh. K.P. Gupta, Director (Technical)Sh. O.P.S. Kushwah, SESmt. Jancy Vijayan, Director (MDU)Sh. Jabbar Ali, DDSh. Afroz Alam, DDSh. R.K. Sharma, DDSh. R.K. Kharbanda, DDSh. Nagesh Mahajan, DDSh. K.K. Rao, DDSh. Anil Kumar, ADSmt. Jaswindwer Kaur, AESh. Ashok Bhatele, JESh. Hari Om Varshney, JESh. Ram Kishen, JESh. Aheesh Kumar, JE

C Workshop1. Workshop on

“Latest Repair and Rehabilitation Technologies for Dams”

28.04.16 to 29.04.16

Hotel Hans Plaza, New Delhi

Aqua Foundation Academy.

Sh. M.K. Srinivas, CE (S)

2. Workshop on International Best Practices and Innovation in Inland Water Transport and Logistics: stakeholders’ conference on the theme – “Unlocking the potential of NW-1”

16.08.2016 Kolkata Inland Waterways Authority of India, Ministry of Shipping.

Sh. R.K. Jain, CE (HQ)

Page 69: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

58

S. N0. Conferences/Seminars/ Workshop

Period Venue Organised by Officer/(s) who Participated

3. Workshop on “Tunnel Design and Construction : Issues and Challenges”

07.02.17 to 08.02.17

Hotel Kohinoor Continental, Mumbai

CBIP, New Delhi

Sh. R.K, Jain, CE (HQ)Sh. M.K. Srinivas, CE (S)Sh. D.K. Sharma, SE

4. The “e-HRMS Road-map cum presentation cum Workshop”

15.02.17 to

16.02.17

At CWC, Delhi

At MoWR, Delhi

MoWR, RD & GR, New

Delhi

Sh. K.K. Rao, DD (H)

Sh. E. Kempanna,

Superintendent Grade – II

5. Workshop on “Arsenic Problems in ground wa-ter & its remediation in Ganga Basin”

07.03.17 Ministry of Water Re-

sources, River Development & Ganga Rejuve-

nation

SCOPE Com-plex Audito-rium, New

Delhi

Smt. Jancy Vijayan,

Director (MDU)

Sh. K.K. Shrivastava, DD

Smt. Anita Lalchandani, AD

Sh. Lalit Siyania, JE6. Workshop on “Data

Entry in e-HRMS” 08.03.2017 to 09.03.2017

CWC, Sewa Bhawan, R.K. Puram, New Delhi

MoWR Sh. Narendra Kumar, Director (Admn.)Sh. K.K. Rao, DD (H)Sh. E. Kempanna,Superintendent Grade – IISh. Ajay Pratap Singh, LDC

7. Workshop on “Water Quality and its Management”

20.03.2017 to 24.03.2017

National Institute of Hydrology (NIH), Roorkee

National Institute of Hydrology (NIH), Roorkee

Sh. S.B. Mishra, AE,

Page 70: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

59

Appendix – III

Page 71: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

60

Page 72: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

61

Page 73: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

62

Page 74: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

63

Page 75: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

64

Page 76: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

65

Page 77: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

66

Page 78: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

67

Page 79: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

68

Separate Audit Report of the Comptroller & Auditor General of India on the Accounts of the National Water Development Agency (NWDA), New Delhi for the year ended 31st March 2017.

Comments RepliesA)

A.1.

Balance SheetFixed Assets(Schedule8) Rs. 3.04 croreTwo Divisions namely Hyderabad and Chennai purchased a software “Global Mapper” (Version 18 stand alone License) at a cost of Rs. 50,735 each. As software are considered “Intangible Assets” the value is required to be capitalized. NWDA however did not capitalize the software leading to understatement of Assets for the extent of Rs.1.01 lakh. The Capital accounts on liability side was understated to the same extent.

As software is used for furtherance of work of NWDA, it is booked under main head “work” and hence purchase of software has been treated as revenue expenditure. Therefore, it is requested that the para may please be dropped.

A.2. NWDA, Delhi had purchased a Photocopier Machine during 2016-17 at a cost of Rs. 162725.00 after selling the old photocopier under buyback scheme for a value of Rs. 5500.00. NWDA, Delhi booked an expenditure of Rs. 162725.00 as addition of Assets (Gross value) but did not deduct the book value of the old photocopier. This had resulted in overstatement of fixed assets and under statement of income from realization of asset by Rs. 5500.00.

Necessary entry will be passed in the current financial year.

A.3. NWDA did not make provision for Rs. 5.95 crore of unutilized grants in current liability as a grant refundable to the Ministry.

This amount is carried forward after obtaining approval from MOWR every year and is used to pay salary of March in April and other expenditure of office as fresh grant for the next financial year is normally received by NWDA by the end of April of the next financial year. Approval of MOWR for carry over of unspent balance is enclosed for ready reference.

B)B.1.

Income & Expenditure Account NWDA Headquarters purchased the consumable items amounting to Rs.8.51 lakh during 2016-17. Though the closing balance of consumable items was Rs.3.52 lakh, the same were not depicted in the Annual Accounts whi ch resulted in understatement of Current Assets and Overstatement of Expenditure of Rs. 3.52 lakh.

Consumable items are purchased on quarterly basis. Some balance of consumable items like stationary, cleaning & sanitary items etc. remains every year which are being utilized during the next financial year and previous year balance is used in current year. If previous year balance is deducted from current year balance, it will be nominal amount and there may not be any substantial impact on the current year’s expenditure. Thus, there may not be overstatement of expenditure and understatement of current Assets. In view of the above, the Para may please be dropped.

Page 80: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

69

B.2. As against the total liability of Rs. 48.74 crore (Rs. 31.67 crore of gratuity and Rs. 17.07 crore for leave encashment) as on 31.03.2017, NWDA and provided Rs. 35.48 crore only as provision for Superannuation and Gratuity Fund. Thus there is short provisioning of liability for retirement benefits amounting to Rs. 13.26 crore (48.74 crore-35.48 crore).

Noted. From 2017-18 onwards, the total liability towards Gratuity and Leave Encashment would be depicted in the Balance Sheet.In view of the above, the para may please be dropped.

B.3. NWDA, Bhopal division and Gwalior division paid an advance Rs. 6.61 lakh and Rs. 6.04 lakh respectively for purchase of motor vehicles. Bhopal Division received the motor vehicle on 18.05.17 and charged depreciation of Rs.0.50 lakh on this vehicle though the same was received after 2016-17. Gwalior division received vehicle on 17.11.2016. and charged depreciation Rs. 99688/-(full depreciation) instead of Rs 49844/- (half depreciation). Thus on account of the above transaction Income & Expenditure account had been overstated by Rs. 1.00 lakh and Corpus/Capital Fund in the Balance Sheet (Schedule 1) had been understated to the same extent.

Bhopal Division paid Rs. 6.61 lakhs (vehicle purchased by Government e-market and payment through online) towards purchase of a motor vehicle. However, Bhopal Division received a motor vehicle on 17-05-2017. Division office charged the depreciation on motor vehicle i.e. Rs. 49565/- only ( i.e. half depreciation considering that the asset will be received by Bhopal Division by March, 2017).Necessary rectification will be made in the current financial year.

Further, Gwalior Division paid Rs. 6.65 lakhs (Rs. 604172/- vide cheque no. 371059 dt.29-9-2016 and Rs. 60417 vide cheque no. 371516 dt. 25-11-2016) towards purchase of a motor vehicle. However, Gwalior Division received the Motor vehicle on 17-11-2016. Therefore, excess depreciation of Rs. 49844/-charged by Gwalior Division will be adjusted in the next financial year 2017-2018 by that Division.

Hence, the para may kindly be dropped.B.4. NWDA, Gwalior division and Investigation Circle,

Hyderabad paid insurance charges of Rs. 0.27 lakh (for two vehicles) and Rs. 0.69 lakh (for nine vehicles) respectively. Out of Rs.0.96 lakh, Rs.0.62 lakh (Rs.0.16 lakh for Gwalior circle and Rs.0.46 lakh for Hyderabad circle) pertained to for the year 2017-2018 which was not shown as prepaid expenses under the head Current Assets, Loan, and Advance (Schedule 11). Thus the expenditure under “Administrative Expenses” in Schdule-21 of Income and Expenditure Account had been overstated by Rs. 0.62 lakh and Current Assets, Loan, Advance in Shedure-11 had been understated to the same extent.

Since NWDA is not a commercial organization and only cash system of accounting is followed, therefore, as per the prescribed accounting practice of NWDA, provisions for Rent and Salaries only are to be made in accounts. Hence, the para may please be dropped.

Page 81: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

70

B.5. An amount of Rs. 3,08,360/- (Valsad Division Rs.1,38,650, Vadodara Divn. Rs. 48,165/- & Nasik Division Rs. 1,21,554/-) was depicted as “Interest earned on Saving Bank Account” under “Interest earned” in Shedule-17 of Income in “Income & Expenditure Account”. However, Bank had credited Rs.1,60,334/- on four occasions in respect of Valsad Division as interest earned on saving account. In respect of Vadodara Division Bank had credited Rs.61,716/- on four occasions as interest earned on saving account. Also Nasik Division earned interest Rs.121554/- in 2016-17. Thus actual interest earned by Valsad Circle was Rs. 343604/-. This resulted in understatement of Income by Rs.35,244/- in Income & Expenditure Account and understatement of “Capital Fund” in Liabilities Side of Balance Sheet to the same extent.

The bank interest amounting to Rs.35, 244/- (Rs.21,684/- for Valsad Division & Rs.13560/- for Vadodara Division) has been taken into current Financial year i.e. 2017-18. Hence, the para may kindly be dropped.

C)C.1.

Receipt & Payment AccountsNWDA, Gwalior had shown an amount of Rs. 6.57 crore, Hyderabad Circle office an amount of Rs.12.20 crore and Valsad Circle office as Rs.4.79 crore as total grants received from Government of India which included Rs. 5.49 crore, Rs. 9.75 crore and 4.06 crore respectively only as Grants received from Headquarters which needed reconciliation.

The difference between grant released by NWDA HQs and IC Hyderabad, IC Gwalior and IC Valsad is due to Recovery of CPF/GSLIS/NPS from employees and kept with them. The Yearly Final Grant released is after accounting these realizations. The detailed justification is furnished below:Circle HQ Difference.6.57 5.49 Recovery

CPF/GSLIS/ NPS kept by Divisions

12.20 9.75

4.79 4.06

As per instruction of the Headquarters office letter No. NWDA/ND/AB/42(1)/47/1549-70 date 10.2.1988, CPF/GSLIS, recoveries are added to grants in aid Accounts. For New Pension Scheme also, similar procedure is adopted.CPF, GSLIS and New Pension Scheme of accounts are being maintained at HQ New Delhi in respect of all the NWDA employees irrespective of posting. Amount deducted from the salaries of employees of NWDA towards CPF, GSLIS and NPS is to be remitted by each Division/DDO to NWDA HQ New Delhi for crediting it into respective Accounts.

Page 82: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

71

On the other hand, Grants-in-Aid is being released by HQ New Delhi to Divisions. Therefore, to avoid the physical transfer of fund by the Division to HQ towards recoveries of CPF, GSLIS and NPS, and then transfer the Grant-in-Aid from HQ to Division, it has been decided in NWDA that amount of recoveries/deductions made will be kept by the Division and only schedule for the same will be sent to HQ. Necessary Journal Entry for same by crediting the amount to the Grants-in-Aid will be passed by the Division Office and Grants-in-Aid A/c will be increased by that amount. Similarly, HQ will also pass the entry by debiting the Grants-in-Aid to Divisions and crediting to CPF/GSLIS/NPS accounts. At the end of the financial year, total Grants-in-Aid released to Divisions is got tallied taking the CPF/GSLIS/NPS deductions. This system is being done to avoid the cash transaction and it makes no effect on any accounting system.

Hence, the para may kindly be dropped.

D) Grants-in-aidOut of the total grant-in-aid of Rs. 75.63 crore (Which include Rs 70.01 crore received during 2016-17, unspent grant of previous year Rs 4.82 crore and Rs. 0.8 crore other receipts*) during the year 2016-17, NWDA utilized Rs. 69.68 crore and leaving un-utilized grant of Rs. 5.95 crore. *Rs.0.04 crore (refundable EMD & Security deposit during 2017-18.

This is a statement of fact.

E) Management Letter

Annexure1.(i) (ii)

Adequacy of Internal Audit System:The Internal Audit by the Ministry of Water Resources (MOWR) was conducted up to 2013-17 during April 2017. Out of 17 Divisions and 5 Circle offices, NWDA Head Quarter had conducted Internal audit of two circle office1 and five division2 during the year 2016-17

This is a statement of fact.

Due to heavy work load including PMKSY work and acute shortage of Finance staff at Head Quarters, it becomes difficult to do internal audit of all offices. However, efforts are being made to cover more field offices.

Page 83: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

72

2. (i)

(ii)

(iii)

(iv)

Adequacy of the Internal Control System:In Clause 22 of Bye-Laws of the Memorandum of Association (2015), provision of annual audit by a Chartered Accountant has been mentioned but nowhere audit to be carried out by O/o the C&AG has been stipulated though audit of NWDA is conducted annually by C&AG office and not by any Chartered Accountant.

Accounting Manual had not been prepared by NWDA.

Works Control Register and Register of Contracts were not maintained.

Register of Valuables, Accession Register, and Grants in Aid Register, Stock Register of Consumables, Investment Register and Register of Fixed Assets were not maintained in prescribed format.

The auditing of the accounts of NWDA from the year 1994-95 onwards have been entrusted to Principal Director of Audit Economic and Service Ministries and the same has been informed to Governing Body of NWDA in its 30th meeting held on 13-11-1995.

Significant accounting policies are mentioned in schedule 24 and 25 of consolidated Accounts of NWDA.Noted for future and relevant register is being maintained.

Stock Register of consumables in GFR-41 will be maintained in future. Other registers will also be maintained as per the format in future.

3. System of Physical Verification of InventoryPhysical verification of stationery and consumable items has been conducted up to 31.03.2017 in respect of its Headquarters office and Gwalior Circle, however, no physical verification of inventory in respect of Valsad, Hyderabad, Patna and Bhubaneswar Circle was carried out.

Items of stationery and consumable items are purchased only on obtaining indent/requisition purely on need basis from sections and issued to the concerned sections. After purchase, the balance in stock of such items is very meagre and, therefore, physical verification of stationery and consumable items were not carried out. These field offices will, however, be informed about this observation of audit for their compliance.Hence, the para may be dropped.

4. (i)

Physical verification of Tools & plants items only has been conduct up to 31.03.2017. Physical verification of Furniture & Fixtures, Technical Books, Office Equipment, Vehicles etc; as mentioned in Schedule 8 Could not be conducted.

Physical verification of Assets already carried out for the year 2016-17 of all the Assets including Tools & Plant, Furniture, Fixture & Fitting, Office Equipment Technical Books, Vehicles, and Computer etc. The list of the same was given to the Audit Party.

5. Regularity in payment of statutory dues:NWDA is regular in payment of statutory dues. This is a statement of fact.

Page 84: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

73

1. Annexure-‘A’In Schedule 17 interest earned on Saving Bank A/C and Long Term Advances were shown as Rs. 55.60 lakh3 and Rs.3.72 lakh4 respectively i.e. interest accounted for on cash basic, in contravention of the provision in Uniform Format of Accounts which stipulated to be on accrual basis.

Normally, interest is being credited by the bank in June, September, December and March every year. It means full year interest is being credited by the bank on saving Bank Account in the same year and there may be no accrued interest at the end of the year on saving Account.

However, Accrued Interest in the case of Superannuation and Gratuity Fund (schedule-3) and Contributory Provident Fund (schedule-6) investment in FDR etc has been taken into the Annual Account. The interest on long term advances is recovered as and when it becomes due. Therefore, accrued interest may not be charged in this case Hence, the Para may please be dropped.

2. a.) In the Consolidated accounts of NWDA-Loan and advances of staff were Rs. 42.20 lakh. Of this Rs.0.65 lakhs was outstanding against three officers at NWDA Head Quarters since 1985-86 to 2005-06.

b.) Loan and Advances to Others were Rs. 214.08 lakhs Of this; Rs. 88.02 lakh was outstanding against 12 parties at NWDA Headquarters for more than two years.

As this advance pertains to ex officials on deputation, the matter is constantly pursued with their parent offices for recovery of the same.

Out of Rs.88.02 lakhs, Rs 75.01 lakhs is the Security Deposit to NDMC for occupying the Flats in Palika Bhawan, New Delhi for official purpose.

Balance Rs. 13.01 lakhs will be adjusted in this financial year and shown to audit.

3. Schedule 11(C): Claims receivableIn the Consolidated Accounts of NWDA-Leave Salary Recoverable were Rs. 33.12 Lakh. The amount is accumulated since 1987-88. Similarly, NPS amounting to Rs.2.60 lakh was also recoverable for more than two years. Vigorous efforts need to be made at higher level to recover the old outstanding balance. The same may be brought to the notice of Ministry concerned.

Vigorous efforts for recovery of leave salary amounting to Rs.33.12 lakhs are being made by sending D.O. letters from time to time to the highest level.Hence, the Para may please be dropped.

Page 85: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

74

4. As per Schedule 11:Current Assets, Loans, Advance etc. attached to Consolidated Accounts, Cash Balance in hand and Bank Balances in Saving Bank Account in respect of Valsad Circle Office were Rs.0.12 lakh and Rs. 21.83 lakh respectively whereas as per Schedule 11 attached to Balance Sheet as at 31 March 2017 of Valsad Circle Office; Cash Balances in hand and Bank Balances in Saving Bank Account were shown as Rs.16.74 lakh and Rs. 5.21 lakh respectively which Resulted in difference of Rs. 16.62 lakh in two sets of Accounts. The same needs rectification.

Already rectified in Balance Sheet for the year 2016-17. Hence, the para may kindly be dropped.

5. In Schedule 9: Investment from Earmarked/Endowment Fund the Balance under Savings A/C, Fixed Deposit and Accrued Interest in respect of Head Quarter was shown as Rs. 19.32 crore, 14.80 crore and Rs. 1.36 crore respectively whereas in the Total Column the figure was depicted as Rs. 9.52 crore, Rs. 12.40 crore and Rs. 0.79 crore. The same needs rectification.

In Shedule-9 in the consolidated Balance Sheet, respective figures relating to “Saving Account” “Fixed Deposit” and “Accrued Interest” under the “Total” column are inadvertently got typed as that of the previous year’s figures. However, the total amount has been shown correctly in that column. In view of the above, the para may pleased be dropped.

6. In Shedule11: Current Assets, Loans, Advance attached to Consolidated Accounts, an amount of Rs. 20.00 lakh was exhibited as Loan Advance recoverable from India Water Week an Rs.0.39 lakh exhibited as claims receivable under GSLIS in respect of NWDA head quarter. However, the said amount had not been shown in ‘Total’ column while consolidating to arrive at the grand total figure.

An amount of Rs. 20.00 lakhs recoverable from IWW and Rs. 0.39 lakhs exhibited as claim receivable under GSLIS have been shown in Schedule -11 in HQ column, but it could not be got depicted under “total” column in advertently. However, these amounts are already taken into account in “Total” column.

Hence, the para may please be dropped.7. In Schedule 11: Current Assets, Loans, Advances

attached to Consolidated Accounts, an amount of Rs. 52.03 lakh was exhibited as claims receivable under CPF whereas in Shedule 7 Current liabilities and Provisions of CPF a/c attachet to Consolidated a/c the amount shown as liability from NWDA account was Rs. 50.53 lakh. The same needs rectification.

Necessary correction, as suggested will be made during the current financial year.

Page 86: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

75

8. The Nagpur Division had outsourced a few works such as Geo-Technical Investigation, Topographical Survey and testing of soil and rock etc., to Government organizations as well as Private parties. For this purpose, the Division entered to Agreements/MoUs with those organizations. Audit noticed that in 7 cases, out of total cost of Rs 165.08 lakh, NWDA paid Rs. 83.45 lakh to concerned organization. The remaining amount of Rs.81.63 lakh was payable as and when works are completed. NWDA however did not disclose this amount of Rs. 81.63 lakh as contingent liability in ‘Notes to Accounts’.

Since NWDA is not a commercial organization and only cash system of accounting is followed, the contingent liability is not being mentioned in the annual accounts. However, as the amount could be due for payment when the work will be completed actually. This may happen in the next financial year and may be paid from the budget of that year.

Hence, the para may be dropped.

9. It was observed that NWDA, Jhansi division procured Air conditioner and stabilizer at a cost of Rs. 0.34 lakh in March 2017 and this item was wrongly depicted in Office Equipment instead of Furniture & Fixtures. Since Depreciation was charged at the higher rate (15% instead of 10%) Assets were understated of Rs. 849.00 and expenditure was overstated to the same extent.

Noted. Before finalizing Annual Accounts 2017-18, necessary rectification will be carried out. Hence, the para may please be dropped.

10. Although PBX systems were to categorized as Equipment, NWDA, HQ Debited the value (0.25 lakh) of items from Maintenance & Repair head thereby understanding the value of assets to that extent in books of accounts.

Necessary entry will be passed during the current year which will be reflected in Annual Account.

11. An amount of Rs. 6.20 lakh was shown as ‘Interest’ in the Income and Expenditure Account. Scrutiny of Divisional records revealed that Nagpur Division had included an amount of Rs. 0.57 lakh as ‘accrued interest’. Audit observed that there was no banker’s certificate to support inclusion of this item in the Annual Accounts. Audit further noticed that an amount of Rs. 0.44 lakh was credited by bank as interest for saving account in March, 2017. This amount, however not accounted for by the Division in its books of accounts. As a result, there was net effect of overstatement of income to the excess of Rs. 0.14 lakh. Current Assets on Assets side of balance sheet also overstated to the same extent.

The amount of Rs.43861/- has been taken into account on 03-04-2017 under the head “interest on savings Bank Account”.Normally, interest is being credited by the bank in June, September, December and March every year. It means full year interest is being credited by the bank on saving Bank Account in the same year and there may be no accrued interest at the end of the year on saving Account.

Page 87: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

76

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES,RIVER DEVELOPMENT & GANGA REJUVENATION ,GOVT. OF INDIA)

SIGNIFICANT ACCOUNTING POLICIES(Schedule No. 24 )

2016-17

1. National Water Development Agency is covered under the PLAN EXPENDITURE.

2. The Depreciation is calculated on the assets purchased/added during the year on half yearly basis. (Full year depreciation charged for assets aquired upto 30th September, 2016 and half year for assets aquired after 30th September, 2016.)

3. Depreciation on the Assets has been charged at the following rates on the basis of written down value method.

a) Building 10%b) Furniture, Fixture & Fitting 10% c) Office Equipments 15% d) Compuer/ peripherials 60% e) Tools & Plant 15% f) Vehicles 15% g) Technical Books 60% h) Camp Equipment 15%

4. Salaries & Rent for the month of March,2017 have been provided in Accounts and shown outstanding expenses under the current liabilities .(Schedule-7).

5. Provision of Audit Fee for the year 2016-17 has been made (Schedule-7 )

6. NWDA is fully funded by Govt. Of India through Grants- in-aid.

7. Financial implication on adoption of MACP scheme would be met within the existing budget of NWDA

8. Separate Accounts of IWW has been prepared and attached with NWDA’s Accounts.

9. Separate Accounts of Jal manthan has been prepared and attached with NWDA Accounts

10. Amount has been rounded off to the nearest Rupee.

11. Annual Accounts are prepared on the basis proforma provided by C.G.A.

12. Inventory valuation - Not applicable.

13. Foreign Currency Transactions Nil

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha) (R.K.Jain) Accounts Officer Director (Fin.) Chief Engineer (H.Q)

Page 88: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

77

NATIONAL WATER DEVELOPMENT AGENCY(MINISTRY OF WATER RESOURCES,RIVER DEVELOPMENT & GANGA REJUVENATION ,GOVT. OF INDIA)

CONTINGENT LIABILITIES AND NOTE ON ACCOUNT

(Schedule No. 25 )2016-17

1 Contingent Liabilitiy No such Liability

2 Capital Commitments Not applicable

3 Lease Obligations Nil

4 Current Assets, Loans and Advances Schedule-11

5 Income Tax - Being grantee institution Not applicable

6 Foreign Currency Transactions Nil

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha) (R.K.Jain) Accounts Officer Director (Fin.) Chief Engineer (H.Q)

Page 89: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

78

N

ATIO

NA

L W

ATER

DEV

ELO

PMEN

T A

GEN

CY

( MIN

ISTR

Y O

F W

ATER

RES

OU

RCES

,RIV

ER D

EVEL

OPM

ENT

& G

AN

GA

REJ

UV

ENAT

ION

, GO

VT.

OF

IND

IA )

CO

NSO

LID

ATED

BA

LAN

CE

SHEE

T A

S AT

31s

t MA

RCH

, 201

7

(Am

ount

in R

upee

s)Pa

rtic

ular

s S

ched

ule

Cur

rent

Yea

r P

revi

ous Y

ear

CA

PITA

L FU

ND

AN

D L

IABI

LITI

ES

  

CO

RPU

S/C

API

TAL

FUN

D1

9498

8141

.00

8396

7779

.00

RESE

RVE

AN

D S

URP

LUS

20.

000.

00EA

RMA

RKED

/EN

DO

WM

ENT

FUN

DS

335

4821

998.

0022

7177

524.

00SE

CU

RED

LO

AN

S A

ND

BO

RRO

WIN

GS

40.

000.

00U

NSE

CU

RED

LO

AN

S A

ND

BO

RRO

WIN

GS

50.

000.

00D

EFER

RED

CRE

DIT

LIA

BILI

TIES

60.

000.

00C

URR

ENT

LIA

BILI

TIES

AN

D P

ROV

ISIO

NS

731

4840

58.0

031

5021

03.0

0TO

TAL

 48

1294

197.

0034

2647

406.

00A

SSET

  

FIX

ED A

SSET

S8

3046

1123

.00

2900

9950

.00

INV

ESTM

ENTS

- FR

OM

EA

RMA

RKED

/ 9

3548

2199

8.00

2271

7752

4.00

END

OW

MEN

  

INV

ESTM

ENTS

- O

THER

S10

0.00

0.00

CU

RREN

T A

SSET

S, L

OA

NS,

AD

VAN

CE

ETC

.11

9601

1076

.00

8645

9932

.00

MIS

CEL

LAN

EOU

S EX

PEN

DIT

URE

 0.

000.

00(T

o th

e ex

tent

not

writ

ten

off o

r adj

uste

d) 

  

TOTA

L  

4812

9419

7.00

3426

4740

6.00

SIG

NIF

ICA

NT

AC

CO

UN

TIN

G P

OLI

CIE

S24

  

CO

NTI

NG

ENT

LIA

BILI

TIES

AN

D N

OTE

S O

N

  

 A

CC

OU

NTS

25

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 90: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

79

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y

( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)

CO

NSO

LID

ATED

INC

OM

E &

EX

PEN

DIT

UR

E A

CC

OU

NT

FOR

TH

E Y

EAR

201

6 - 1

7

(Am

ount

in R

upee

s)EX

PEN

DIT

UR

ESc

hedu

leC

urre

nt Y

ear

Prev

ious

Yea

rSc

hedu

leC

urre

nt Y

ear

Prev

ious

Yea

r

Esta

blish

men

t Exp

ense

s20

5380

3874

3.00

5044

3815

2.00

Inco

me

from

Sal

es/S

ervi

ce12

0.00

0.00

Oth

er A

dmin

istra

tive

Expe

nses

etc

.21

6158

6698

.00

5983

8934

.00

GRA

NTS

/ SU

BSID

IES

1369

0883

138.

0068

1785

316.

00W

orks

2155

4402

47.0

010

6214

947.

00(I

rrev

ocab

le G

rant

s & su

bsid

ies r

ecei

ved)

Task

For

ce/S

peci

al C

ell -

ILR

2132

9076

55.0

012

8300

38.0

0Fe

es/S

ubsc

riptio

ns14

0.00

0.00

Expe

nditu

re o

n G

rant

s, Su

bsid

ies e

tc.

220.

000.

00In

com

e fr

om In

vest

men

t (In

com

e on

In

tere

st

230.

000.

00In

vest

. Fro

m E

arm

arke

d/en

dow.

Fun

dsD

epre

ciat

ion

875

8955

5.00

8114

576.

00tr

ansf

erre

d to

Fun

ds)

150.

000.

00In

com

e fr

om R

oyal

ty, P

ublic

atio

n et

c.16

0.00

0.00

Inte

rest

Ear

ned

1759

3197

6.00

4223

295.

00O

ther

Inco

me

1848

6840

.00

1454

67.0

0In

crea

se (D

ecre

ase)

in S

tock

of F

inish

ed

Goo

ds a

nd W

orks

-in-p

rogr

ess.

190.

000.

00TO

TAL:

(B)

 69

5562

898.

0069

1436

647.

00TO

TAL:

(A)

 69

7301

954.

0068

6154

078.

00

Bala

nce

Bein

g Ex

cess

of I

ncom

e ov

erEx

pend

iture

(A -

B)17

3905

6.00

-528

2569

.00

Tran

sfer

to S

peci

al R

eser

ve (S

peci

fy e

ach)

Tran

sfer

to /

from

Gen

eral

Res

erve

0.00

0.00

BALA

NC

E BE

ING

SU

RPLU

S (D

EFIC

IT)

CA

RRIE

D T

O C

ORP

US/

CA

PITA

L FU

ND

1739

056.

00-5

2825

69.0

0SI

GN

IFIC

AN

T A

CC

OU

NTI

NG

PO

LIC

IES

CO

NTI

GEN

T LI

ABI

LITI

ES A

ND

NO

TES

ON

AC

CO

UN

TS

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 91: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

80

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y

( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)

CO

NSO

LID

ATED

REC

EIPT

& P

AYM

ENT

AC

CO

UN

T FO

R T

HE

YEA

R 2

016

- 17

(Am

ount

in R

upee

s)R

ECEI

PTC

urre

nt Y

ear

Prev

ious

Yea

rPA

YMEN

TC

urre

nt Y

ear

Prev

ious

Yea

r

I.O

peni

ng B

alan

ceEx

pens

esa)

. Cas

h in

Han

d67

705.

0030

173.

00a)

. Est

ablis

hmen

t Exp

ense

s54

2734

373.

0050

2337

867.

00b)

. Ban

k Ba

lanc

e

(C

orre

spon

ding

to S

ched

ule

20A

)

i. In

Sav

ing

Acc

ount

s49

3024

75.0

042

8741

56.0

0b)

. Adm

inist

rativ

e Ex

pens

es

6114

8963

.00

5994

4316

.00

ii

Che

que

/ Dra

ft in

Tra

nsit

0.00

0.00

(

Cor

resp

ondi

ng to

Sch

edul

e 21

A)

c). P

osta

ge in

Han

d39

292.

0018

706.

00Su

pera

nnua

tion

& G

ratu

ity F

und

9520

6708

.00

3477

1795

.00

Paym

ent m

ade

agai

nst F

unds

for

II.

Gra

nt R

ecei

ved

Vari

ous P

roje

cts.

a)

Fro

m G

over

nmen

t of I

ndia

7001

6444

4.00

6900

0000

0.00

Lin

k C

anal

Pro

ject

8852

7902

.00

1170

7508

7.00

(b)

Vib

rant

.Guj

rat G

loba

l Tra

de S

how

0.00

0.00

b).

Fro

m S

tate

Gov

ernm

ent

Inve

stm

ent a

nd D

epos

it M

ade

III.

Inco

me

on In

vest

men

t Fro

ma)

. Out

of E

arm

arke

d/En

dow

men

t fun

ds0.

000.

00a)

Ear

mar

ked/

End

ow F

unds

0.00

0.00

b). O

ut o

f Ow

n Fu

nds (

Inve

stm

ent-

oth

ers)

0.00

0.00

b) O

wn

Fund

(On

Inve

stm

ent)

0.00

0.00

S

uper

annu

atio

n&G

ratu

ity F

und

-FD

R24

0000

00.0

048

5000

00.0

0

IV.

Inte

rest

Rec

eive

dEx

pend

iture

on

Fixe

d &

Cap

ital W

ork-

in-

a) O

n Ba

nk D

epos

its:

NW

DA

5508

727.

0037

1041

3.00

Prog

ress

Supe

rann

uatio

n &

Gra

tuity

Fun

d18

4789

9.00

6512

1.00

a) P

urch

ase

of F

ixed

Ass

ets

9281

306.

0081

8876

0.00

b).

Loa

ns &

Adv

ance

s etc

.37

1830

.00

5071

58.0

0b)

. Exp

endi

ture

on

Cap

ital W

ork-

in-P

rogr

ess

0.00

0.00

V.O

ther

Inco

me

(Spe

cify

)R

efun

d of

Inte

rest

and

Lon

g Te

rm A

dvan

ce0.

000.

00Re

alisa

tion

of N

otic

e Pe

riod

Am

ount

0.00

0.00

(b)

Vib

rant

.Guj

rat G

loba

l Tra

de S

how

0.00

2899

.00

Rece

ipt o

n Sa

le o

f Ass

ets

6260

18.0

017

0526

.00

Fina

nce

Cha

rges

(Int

eres

t)0.

000.

00M

isc. R

ecei

pts

9394

4.00

6909

6.00

Oth

er P

aym

ents

(Spe

cify

)

Supe

rann

uatio

n&G

ratu

ity F

und

3545

4807

.00

2113

0032

.00

VI.

Am

ount

Bor

row

ed0.

000.

00Se

curit

y D

epos

it /

Refu

nd28

9279

.00

5200

0.00

Page 92: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

81

VII

.A

ny O

ther

Rec

eipt

s (gi

ve d

etai

ls)

2776

673.

00A

dvan

ce to

Sta

ff

18

0692

7.00

3585

126.

00LS

PC re

ceiv

ed60

809.

00In

dia

Wat

er W

eek(

IWW

) -20

160.

0030

0000

0.00

Adv

ance

to O

ther

s/ R

efun

d of

Adv

. 18

3741

8.00

7523

310.

00Re

cove

ry o

f Loa

ns &

Adv

ance

sRe

mitt

ance

/Ear

nest

Mon

ey D

epos

it17

1000

.00

1593

05.0

0

- F

rom

Sta

ff55

0145

6.00

4425

442.

00st

ale

Che

que

0.00

7483

1.00

-

Fro

m O

ther

s52

0404

.00

8211

587.

00Pe

rfom

ance

Gua

rant

ee/E

MD

1500

.00

3379

.00

Rem

ittan

ce39

00.0

091

19.0

0C

PF47

9189

.00

Imm

edia

te fi

nanc

ial

relie

f to

empl

oyee

8000

.00

TDS

1149

6.00

Indi

a W

ater

Wee

k10

0000

0.00

GSL

IS72

2054

.00

GSL

IS0.

0050

4849

.00

Clo

sing

Bal

ance

sN

PS27

112.

00C

PF0.

0017

1000

.00

Leav

e Sa

lary

Rec

eive

d90

140.

0093

172.

00Su

pera

nnua

tion

& G

ratu

ity F

und

: S.B

.A/c

1931

9980

0.00

9520

6708

.00

Earn

est M

oney

Dep

osit

29

9850

.00

5255

79.0

0Te

lpho

ne R

ecei

vabl

e0.

000.

00a)

. C

ash

in h

and

10

1903

.00

6770

5.00

Perf

orm

ance

Gau

rant

ee D

epos

it38

734.

000.

00b)

Ban

k ba

lanc

eSu

pera

nnua

tion

& G

ratu

ity F

und

A/C

1556

0000

0.00

1300

0000

0.00

i)

In S

avin

g A

ccou

nts

5937

9604

.00

4930

2475

.00

Sale

of s

crap

/Ten

der P

aper

2143

1.00

2050

0.00

c).

Pos

tage

in H

and

3003

0.00

3929

2.00

TDS

0.00

1470

0.00

Tota

l:10

1917

7551

.00

9161

9309

2.00

Tota

l10

1917

7551

.00

9161

9309

2.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 93: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

82

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y

( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

BALA

NC

E SH

EET

AS

AT 3

1st M

ARC

H, 2

017

(Am

ount

in R

upee

s)(A

mou

nt in

Rup

ees)

Sche

dule

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

Prev

ious

Yea

r

CA

PITA

L FU

ND

AN

D L

IABI

LITI

ES   

CO

RPU

S/C

API

TAL

FUN

D1

6891

3867

.00

8179

615.

0027

6570

6.00

2306

601.

0095

9363

3.00

3228

719.

0094

9881

41.0

083

9677

79.0

RESE

RVE

AN

D S

URP

LUS

20.

000.

000.

000.

000.

000.

000.

000.

00 

EARM

ARK

ED/E

ND

OW

MEN

T FU

ND

S3

3548

2199

8.00

0.00

0.00

0.00

0.00

0.00

3548

2199

8.00

2271

7752

4.00

 SE

CU

RED

LO

AN

S A

ND

BO

RRO

WIN

GS

40.

000.

000.

000.

000.

000.

000.

000.

00 

UN

SEC

URE

D L

OA

NS

AN

D B

ORR

OW

ING

S5

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

 D

EFER

RED

CRE

DIT

LIA

BILI

TIES

60.

000.

000.

000.

000.

000.

000.

000.

00 

CU

RREN

T LI

ABI

LITI

ES A

ND

PRO

VIS

ION

S7

8264

491.

0036

3253

6.00

5709

476.

0033

4202

1.00

8924

272.

0016

1126

2.00

3148

4058

.00

3150

2103

.00

 RE

CEI

PT O

F A

SSET

S FR

OM

OTH

ER C

IRC

LES

 28

5185

7.00

4236

952.

0036

2097

1.00

1864

813.

0012

1293

9.00

6845

03.0

014

4720

35.0

014

4720

35.0

TOTA

4348

5221

3.00

1604

9103

.00

1209

6153

.00

7513

435.

0019

7308

44.0

055

2448

4.00

4957

6623

2.00

3571

1944

1.00

 A

SSET

S   

FIX

ED A

SSET

S8

8818

400.

0055

8593

6.00

5483

642.

0029

1469

6.00

5085

181.

0025

7326

8.00

3046

1123

.00

2900

9950

.00

 IN

VES

TMEN

TS -

FRO

M E

ARM

ARK

ED /

935

4821

998.

000.

000.

000.

000.

000.

0035

4821

998.

0022

7177

524.

00

E

ND

OW

MEN

INV

ESTM

ENTS

- O

THER

S10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

 C

URR

ENT

ASS

ETS,

LO

AN

S, A

DVA

NC

E ET

C.

1167

8108

84.0

057

7511

9.00

4318

109.

0039

2172

2.00

1130

9481

.00

2875

761.

0096

0110

76.0

086

4599

32.0

MIS

CEL

LAN

EOU

S EX

PEN

DIT

URE

 (T

o th

e ex

tent

not

writ

ten

off o

r adj

uste

d)   

TRA

NSF

ER O

F A

SSET

S TO

OTH

ER C

IRC

LES

 34

0093

1.00

4688

048.

0022

9440

2.00

6770

17.0

033

3618

2.00

7545

5.00

1447

2035

.00

1447

2035

.00

 TO

TAL

 43

4852

213.

0016

0491

03.0

012

0961

53.0

075

1343

5.00

1973

0844

.00

5524

484.

0049

5766

232.

0035

7119

441.

00 

  

SIG

NIF

ICA

NT

AC

CO

UN

TIN

G P

OLI

CIE

S24

CO

NTI

NG

ENT

LIA

BILI

TIES

AN

D N

OTE

S O

N

  

AC

CO

UN

TS25

 

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 94: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

83

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y

( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

INC

OM

E &

EX

PEN

DIT

UR

E A

CC

OU

NT

FOR

TH

E Y

EAR

201

6 -

17 [E

XPE

ND

ITU

RE]

(Am

ount

in R

upee

s)Pa

rtic

ular

sSc

hedu

leH

ead

Qua

rter

Gw

alio

rBh

uban

esw

arVa

lsad

Hyd

erab

adPa

tna

Tota

lPr

evio

us Y

ear

Esta

blish

men

t Exp

ense

s20

2677

3474

3.00

4606

4101

.00

6512

6525

.00

3524

6023

.00

1020

2287

1.00

2184

4480

.00

5380

3874

3.00

5044

3815

2.00

Oth

er A

dmin

istra

tive

Expe

nses

etc

.21

1939

8601

.00

8327

688.

0087

8817

4.00

4263

926.

0016

3159

42.0

044

9236

7.00

6158

6698

.00

5983

8934

.00

Wor

ks21

1220

8059

.00

1151

2266

.00

6659

155.

0010

6565

28.0

094

8260

2.00

4921

637.

0055

4402

47.0

010

6214

947.

00Ta

sk F

orce

/Spe

cial

Cel

l -

ILR

2132

9076

55.0

00.

000.

000.

000.

000.

0032

9076

55.0

012

8300

38.0

0

Expe

nditu

re o

n G

rant

s, Su

bsid

ies e

tc.

220.

000.

000.

000.

000.

000.

000.

000.

00In

tere

st

230.

000.

000.

000.

000.

000.

000.

000.

00D

epre

ciat

ion

827

5342

4.00

1211

039.

0011

8604

8.00

7226

38.0

013

5415

9.00

3622

47.0

075

8955

5.00

8114

576.

00 

  

  

  

  

  

3350

0248

2.00

6711

5094

.00

8175

9902

.00

5088

9115

.00

1291

7557

4.00

3162

0731

.00

6955

6289

8.00

6914

3664

7.00

Bala

nce

Bein

g Ex

cess

of I

ncom

e ov

erEx

pend

iture

(A -

B)26

7091

32.0

0-3

0674

05.0

0-8

2415

47.0

0-2

6320

13.0

0-7

9569

19.0

0-3

0721

92.0

017

3905

6.00

-278

8539

8.00

Tran

sfer

to S

peci

al R

eser

ve (S

peci

fy e

ach)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Tran

sfer

to /

from

Gen

eral

Res

erve

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

BALA

NC

E BE

ING

SU

RPLU

S (D

EFIC

IT)

CA

RRIE

D T

O C

ORP

US/

CA

PITA

L FU

ND

2670

9132

.00

-306

7405

.00

-824

1547

.00

-263

2013

.00

-795

6919

.00

-307

2192

.00

1739

056.

00-2

7885

398.

00

SIG

NIF

ICA

NT

AC

CO

UN

TIN

G P

OLI

CIE

S

CO

NTI

NG

ENT

LIA

BILI

TIES

AN

D N

OTE

SO

N A

CC

OU

NTS

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 95: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

84

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y

( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

INC

OM

E &

EX

PEN

DIT

UR

E A

CC

OU

NT

FOR

TH

E Y

EAR

201

6 - 1

7 [I

NC

OM

E]

(Am

ount

in R

upee

s)

Part

icul

ars

Sche

dule

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

Prev

ious

Yea

r

Inco

me

from

Sal

es/S

ervi

ce12

00.

000.

000.

000.

000.

000.

000.

00

Gra

nts /

Sub

sidie

s13

3577

0899

4.00

6323

0438

.00

7313

1291

.00

4793

6554

.00

1205

4014

3.00

2833

5718

.00

6908

8313

8.00

6817

8531

6.00

Fees

/ Su

bscr

iptio

ns14

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Inco

me

from

Inve

stm

ent (

Inco

me

on

Inve

st. F

rom

Ear

mar

ked

/ end

ow. F

unds

tran

sfer

red

to F

unds

)15

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Inco

me

from

Roy

alty

, Pub

licat

ion

etc.

160.

000.

000.

000.

000.

000.

000.

000.

00

Inte

rest

Ear

ned

1738

8324

9.00

5829

61.0

033

8225

.00

3130

33.0

061

9954

.00

1945

54.0

059

3197

6.00

4223

295.

00

Oth

er In

com

e18

1193

71.0

023

4290

.00

4883

9.00

7515

.00

5855

8.00

1826

7.00

4868

40.0

014

5467

.00

Incr

ease

(Dec

reas

e) in

Sto

ck o

f Fin

ished

Goo

ds a

nd W

orks

-in-p

rogr

ess.

190.

000.

000.

000.

000.

000.

000.

000.

00

  

  

  

  

  

Tota

l:(A

)  

3617

1161

4.00

6404

7689

.00

7351

8355

.00

4825

7102

.00

1212

1865

5.00

2854

8539

.00

6973

0195

4.00

6861

5407

8.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 96: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

85

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y

( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

REC

EIPT

S &

PAY

MEN

TS A

CC

OU

NT

FO

R T

HE

YEA

R 2

016-

17

[REC

EIPT

S]

(Am

ount

in R

upee

s)Pa

rtic

ular

sH

ead

Qua

rter

Gw

alio

rBh

uban

esw

arVa

lsad

Hyd

erab

adPa

tna

Tota

lPr

evio

us Y

ear

I.O

peni

ng B

alan

ce

(a) .

Cas

h in

Han

d24

090.

0020

751.

0010

402.

0048

35.0

076

27.0

00.

0067

705.

0030

173.

00

(b).

Bank

Bal

ance

I

. In

Cur

rent

Acc

ount

s0.

000.

000.

000.

000.

000.

000.

000.

00

ii

. I

n Sa

ving

Acc

ount

s21

5754

10.0

059

0305

0.00

6124

701.

0035

7449

3.00

8096

969.

0040

2785

2.00

4930

2475

.00

4287

4156

.00

ii

i. C

hequ

e / D

raft

in T

rans

it0.

000.

000.

000.

000.

000.

000.

000.

00

(c).

Pos

tage

in H

and

1658

7.00

3760

.00

2812

.00

2011

.00

1295

9.00

1163

.00

3929

2.00

1870

6.00

(d)

Sup

eran

nuat

ion&

Gra

tuity

Fun

d95

2067

08.0

00.

000.

000.

000.

000.

0095

2067

08.0

034

7717

95.0

0

II.

Gra

nt R

ecei

ved

(a)

Fro

m G

over

nmen

t of I

ndia

3601

9649

8.00

6565

2726

.00

7456

8099

.00

4852

6845

.00

1219

7003

3.00

2925

0243

.00

7001

6444

4.00

6900

0000

0.00

(b).

V.G

ujra

t Glo

bal T

rade

Sho

w0.

000.

000.

000.

000.

000.

000.

000.

00

(c).

Fro

m S

tate

Gov

ernm

ent

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(d).

Fro

m O

ther

Sou

rces

(Det

ails)

III.

Inco

me

on In

vest

men

ts fr

om

(a).

Ea

rmar

ked/

Endo

w F

unds

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(b).

O

wn

Fund

(Oth

.Inve

stm

ent)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

IV.

Inte

rest

Rec

eive

d0.

000

(a)

On

Bank

Dep

osits

37

2113

5.00

5410

65.0

025

2105

.00

3083

60.0

049

8092

.00

1879

70.0

055

0872

7.00

3710

413.

00

(b)

Sup

eran

nuat

ion&

Gra

tuity

Fun

d18

4789

9.00

0.00

0.00

0.00

0.00

0.00

1847

899.

0065

121.

00

(c)

Loa

ns &

Adv

ance

s etc

.16

2114

.00

4189

6.00

8612

0.00

4673

.00

7044

3.00

6584

.00

3718

30.0

050

7158

.00

V.O

ther

Inco

me

(Spe

cify

)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Rece

ipt o

n Sa

le o

f Ass

ets

1348

13.0

031

6465

.00

1009

20.0

015

000.

0056

870.

0019

50.0

062

6018

.00

1705

26.0

0

Misc

. Rec

eipt

s22

635.

0025

913.

0038

000.

0020

.00

6356

.00

1020

.00

9394

4.00

6909

6.00

VI.

Am

ount

Bor

row

ed0.

000.

000.

000.

000.

000.

000.

000.

00

Page 97: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

86

VII

.A

ny O

ther

Rec

eipt

s (gi

ve d

etai

ls)27

7667

3.00

2776

673.

00

LSPC

rece

ived

6080

9.00

6080

9.00

Reco

very

of L

oans

& A

dvan

ces

-

Fro

m S

taff

4492

71.0

062

4635

.00

1329

704.

0014

5262

3.00

9328

30.0

071

2393

.00

5501

456.

0044

2544

2.00

-

Fro

m O

ther

s38

404.

000.

0048

2000

.00

0.00

0.00

0.00

5204

04.0

082

1158

7.00

Rem

ittan

ce39

00.0

00.

000.

000.

000.

000.

0039

00.0

091

19.0

0

Imm

edia

te fi

nanc

ial r

elie

f to

empl

oyee

e 80

00.0

00.

000.

000.

000.

000.

0080

00.0

050

4849

.00

NPS

2711

2.00

0.00

0.00

0.00

0.00

0.00

2711

2.00

1710

00.0

0

Leav

e Sa

lary

Rec

eive

d0.

0021

584.

000.

000.

0068

556.

000.

0090

140.

0093

172.

00

Earn

est M

oney

/Sec

urity

Dep

osit

7000

0.00

7843

4.00

8500

0.00

0.00

0.00

6641

6.00

2998

50.0

052

5579

.00

Tele

phon

e re

ceiv

able

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Perf

orm

ance

Gua

rant

ee D

epos

it0.

0010

000.

000.

0028

734.

000.

000.

0038

734.

000.

00

TDS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1470

0.00

Supe

rann

uatio

n &

Gra

tuity

Fun

d A

/C15

5600

000.

000.

000.

000.

000.

000.

0015

5600

000.

0013

0000

000.

00

Indi

a W

ater

Wee

k10

0000

0.00

Sale

of s

crap

/Ten

der P

aper

s0.

000.

0044

31.0

00.

000.

0017

000.

0021

431.

0020

500.

00

Tota

l:64

0165

385.

0073

2402

79.0

083

0842

94.0

053

9175

94.0

013

4497

408.

0034

2725

91.0

010

1817

7551

.00

9161

9309

2.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 98: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

87

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y

( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

REC

EIPT

S &

PAY

MEN

TS A

CC

OU

NT

FO

R T

HE

YEA

R 2

016-

17

[PAY

MEN

TS]

(Am

ount

in R

upee

s) P

artic

ular

sH

ead

Qua

rter

Gw

alio

rBh

uban

esw

arVa

lsad

Hyd

erab

adPa

tna

Tota

lPr

evio

us Y

ear

I.Ex

pens

esa)

. Est

ablis

hmen

t Exp

ense

s26

7463

727.

0046

0810

97.0

064

9625

46.0

035

1515

85.0

010

1452

590.

0022

0815

77.0

053

7193

122.

0050

2337

867.

00

(C

orre

spon

ding

to S

ched

ule

20A

)b)

. Adm

inist

rativ

e Ex

pens

es

1939

8601

.00

8306

480.

0083

6120

6.00

4252

926.

0016

3153

78.0

045

1437

1.00

6114

8962

.00

5994

4316

.00

(

Cor

resp

ondi

ng to

Sch

edul

e 21

A)

II.

Paym

ent m

ade

agai

nst F

unds

for

Vari

ous P

roje

cts.

Lin

k C

anal

Pro

ject

(Wor

ks)

4511

5714

.00

1151

2266

.00

6839

155.

0010

6565

28.0

094

8260

2.00

4921

637.

0088

5279

02.0

011

7075

087.

00

III.

Inve

stm

ent a

nd D

epos

it M

ade

a). O

ut o

f Ear

mar

ked/

Endo

wm

ent f

unds

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

b). O

ut o

f Ow

n Fu

nds (

Inve

stm

ent-

oth

ers)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

S

uper

annu

atio

n&G

ratu

ity F

und

- FD

R24

0000

00.0

00.

000.

000.

000.

000.

0024

0000

00.0

048

5000

00.0

0IV

.Ex

pend

iture

on

Fixe

d &

Cap

ital W

ork-

in-

Prog

ress

a) P

urch

ase

of F

ixed

Ass

ets

2487

504.

0024

2228

8.00

1436

808.

0059

0291

.00

1429

890.

0091

4525

.00

9281

306.

0081

8876

0.00

b). E

xpen

ditu

re o

n C

apita

l Wor

k-in

-Pro

gres

s0.

000.

000.

000.

000.

000.

000.

000.

00

V.R

efun

d of

Inte

rest

and

Lon

g Te

rm A

dvan

ce0.

000.

000.

000.

000.

000.

000.

000.

007t

h V

ibra

nt G

ujra

t Tra

de S

how

2015

-MO

WR

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2899

.00

VI.

Fina

nce

Cha

rges

(Int

eres

t)0.

000.

000.

000.

000.

000.

000.

000.

00V

II.

Oth

er P

aym

ents

(Spe

cify

)Su

pera

nnua

tion&

Gra

tuity

Fun

d35

4548

07.0

00.

000.

000.

000.

000.

0035

4548

07.0

021

1300

32.0

0Se

curit

y D

epos

it /E

MD

0.00

2077

69.0

00.

000.

0015

00.0

081

510.

0029

0779

.00

5200

0.00

Adv

ance

to S

taff

1910

61.0

00.

000.

0010

6935

0.00

4141

60.0

013

2356

.00

1806

927.

0035

8512

6.00

Stal

e C

hequ

e0.

000.

000.

000.

000.

000.

000.

0074

831.

00 O

ther

s Adv

ance

s/ E

xces

s Ref

unds

7869

18.0

00.

0055

000.

000.

0095

000.

0090

0500

.00

1837

418.

0075

2331

0.00

Indi

a W

ater

Wee

k -2

016

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3000

000.

00Re

mitt

ance

/ Ea

rnes

t Mon

ey D

epos

it0.

0017

1000

.00

0.00

0.00

0.00

0.00

1710

00.0

015

9305

.00

TDS

1149

6.00

0.00

0.00

0.00

0.00

0.00

1149

6.00

0.00

CPF

6020

441.

0060

2044

1.00

GSL

IS72

2054

.00

7220

54.0

00.

000.

000.

000.

000.

000.

0033

79.0

0

Page 99: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

88

VII

I.C

losi

ng B

alan

ces

Supe

rann

uatio

n&G

ratu

ity F

und

-Sav

ing

Acc

ount

1931

9980

0.00

0.00

0.00

0.00

0.00

0.00

1931

9980

0.00

9520

6708

.00

FD

R0.

000.

000.

000.

000.

000.

000.

000.

00a)

. C

ash

in H

and

3147

4.00

3337

9.00

1436

1.00

1221

9.00

1047

0.00

0.00

1019

03.0

067

705.

00b)

. B

ank

Bala

nce

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

i)

In S

avin

g A

ccou

nts

4527

0598

.00

4501

940.

0014

1310

8.00

2183

107.

0052

8583

0.00

7250

21.0

059

3796

04.0

049

3024

75.0

0c)

. P

osta

ge in

Han

d11

190.

0040

60.0

021

10.0

015

88.0

099

88.0

010

94.0

030

030.

0039

292.

00d)

. D

raft

in T

rans

it0.

000.

000.

000.

000.

000.

000.

000.

00 

Tota

l64

0165

385.

0073

2402

79.0

083

0842

94.0

053

9175

94.0

013

4497

408.

0034

2725

91.0

010

1917

7551

.00

9161

9309

2.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 100: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

89

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y

( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AS

AT 3

1st M

ARC

H,2

017

SCH

EDU

LE 1

- CA

PITA

L FU

ND

(Am

ount

in R

upee

s)Pa

rtic

ular

sH

ead

Qua

rter

Gw

alio

rBh

uban

esw

arVa

lsad

Hyd

erab

adPa

tna

Tota

lPr

evio

us Y

ear

Bala

nce

as at

the

Begi

nnin

g of

the

Year

3971

7231

.00

8824

732.

0095

7044

5.00

4348

323.

0016

1206

62.0

053

8638

6.00

8396

7779

.00

8103

8563

.00

Add

;-’

Ass

ets p

urch

ased

dur

ing

the

year

24

8750

4.00

2422

288.

0014

3680

8.00

5902

91.0

014

2989

0.00

9145

25.0

092

8130

6.00

8211

785.

00Su

b To

tal (

A):

4220

4735

.00

1124

7020

.00

1100

7253

.00

4938

614.

0017

5505

52.0

063

0091

1.00

9324

9085

.00

8925

0348

.00

- A

sset

s tra

nsfe

rred

to M

OW

R (V

ehic

les)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

- C

apita

l Inv

estm

ent W

ritte

n O

ff0.

000.

000.

000

0.00

0.00

0.00

Add

/Ded

uct:

Bala

nce

of n

et in

com

e/(e

xpen

ditu

re)

tran

sfer

red

from

the

Inco

me

and

Exp

endi

ture

A/c

.26

7091

32.0

0-3

0674

05.0

0-8

2415

47.0

0-2

6320

13.0

0-7

9569

19.0

0-3

0721

92.0

017

3905

6.00

-528

2569

.00

Sub

Tota

l (B)

:26

7091

32.0

0-3

0674

05.0

0-8

2415

47.0

0-2

6320

13.0

0-7

9569

19.0

0-3

0721

92.0

017

3905

6.00

-528

2569

.00

Bala

nce

at th

e Ye

ar en

d 68

9138

67.0

081

7961

5.00

2765

706.

0023

0660

1.00

9593

633.

0032

2871

9.00

9498

8141

.00

8396

7779

.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 101: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

90

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AS

AT 3

1st M

ARC

H, 2

017

SCH

EDU

LE 3

- EA

RM

AR

KED

/EN

DO

WM

ENT

FUN

DS(

Supe

rann

uatio

n &

Gra

tuity

Fun

d)(A

mou

nt in

Rup

ees)

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

Prev

ious

Yea

ra)

Ope

ning

Bal

ance

of t

he fu

nds

(Sup

eran

nuat

ion&

Gra

tuity

Fun

ds)

Savi

ng B

ank

A/c

9520

6708

.00

0.00

0.00

0.00

0.00

0.00

9520

6708

.00

3477

1795

.00

FDR’

s12

4000

000.

000.

000.

000.

000.

000.

0012

4000

000.

0075

5000

00.0

0b)

Add

ition

to th

e Fu

nds

Bank

Inte

rest

:-Re

ceiv

ed18

4789

9.00

0.00

0.00

0.00

0.00

0.00

1847

899.

0065

121.

00

Acc

rued

1362

2198

.00

0.00

0.00

0.00

0.00

0.00

1362

2198

.00

7970

816.

00Re

ceiv

ed d

urin

g th

e ye

ar15

5600

000.

000.

000.

000.

000.

000.

0015

5600

000.

0013

0000

000.

00C

) Les

s Util

isat

ion/

Expe

nditu

re

Ded

uct:-

Pay

men

ts R

elea

sed

3545

4272

.00

0.00

0.00

0.00

0.00

0.00

3545

4272

.00

-211

3003

2.00

Ded

uct:-

Bank

char

ges

535.

000.

000.

000.

000.

000.

0053

5.00

-176

.00

Tota

l35

4821

998.

000.

000.

000.

000.

000.

0035

4821

998.

0022

7177

524.

00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 102: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

91

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AS

AT 3

1st M

ARC

H,2

017

SCH

EDU

LE -

7 C

UR

REN

T LI

ABI

LITI

ES A

ND

PRO

VIS

ION

S (A

mou

nt in

Rup

ees)

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

Prev

ious

Yea

rA

.C

UR

REN

T LI

ABI

LITI

ESO

ther

Cur

rent

Lia

bilit

ies

Out

stan

ding

Exp

ense

s :

Sala

ry &

Allo

wan

ces

7633

344.

0034

0544

4.00

4968

782.

0028

0179

4.00

8017

638.

0014

2250

7.00

2824

9509

.00

2740

3888

.00

Rent

,Rat

e &

Tax

es0.

0013

8658

.00

5258

11.0

011

2328

.00

2003

30.0

010

6339

.00

1083

466.

0065

6730

.00

Rem

ittan

ce13

019.

000.

000.

000.

000.

000.

0013

019.

0091

19.0

0St

ale

Che

ques

0.00

0.00

0.00

0.00

4942

09.0

00.

0049

4209

.00

0.00

CPF

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1138

862.

00G

SLIS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6828

37.0

0O

ther

s(LS

PC R

ECEI

VED

)60

809.

000.

000.

000.

000.

000.

0060

809.

0074

615.

00Ea

rnes

t Mon

ey /S

ecur

ity D

epos

it19

1500

.00

7843

4.00

2148

83.0

028

7000

.00

1100

00.0

082

416.

0096

4233

.00

1098

162.

00O

utst

andi

ng A

udit

fee

6261

5.00

Perf

orm

ance

Gua

rant

ee D

epos

it0.

0010

000.

000.

0014

0899

.00

1020

95.0

00.

0025

2994

.00

1231

90.0

0Su

pera

nnua

tion

& G

ratu

ityFu

nd0.

000.

000.

000.

000.

000.

000.

000.

00TD

S32

04.0

00.

000.

000.

000.

000.

0032

04.0

014

700.

00Su

b To

tal (

A) :

7964

491.

0036

3253

6.00

5709

476.

0033

4202

1.00

8924

272.

0016

1126

2.00

3118

4058

.00

3120

2103

.00

B.PR

OV

ISIO

NS

Audi

t Fee

pay

able

3000

00.0

00.

000.

000.

000.

000.

0030

0000

.00

3000

00.0

0Su

pera

nnua

tion

& G

ratu

ityFu

nd0.

000.

000.

000.

000.

000.

000.

000.

00

Sub

Tota

l (B)

:30

0000

.00

0.00

0.00

0.00

0.00

0.00

3000

00.0

030

0000

.00

Gra

nd T

otal

:82

6449

1.00

3632

536.

0057

0947

6.00

3342

021.

0089

2427

2.00

1611

262.

0031

4840

58.0

031

5021

03.0

0

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 103: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

92

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

ON

SOLI

DAT

ED S

CH

EDU

LE F

OR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AS

AT 3

1st M

ARC

H,2

017

SCH

EDU

LE -

8: F

IXED

ASS

ETS

DES

CR

IPTI

ON

(Am

ount

in R

upee

s)

Part

icul

ars

GRO

SS B

LOC

KD

EPR

ECIA

TIO

NN

ET B

LOC

K

  

Cos

t/Val

uatio

nA

dditi

ons

Ded

uctio

nC

ost /

As a

t the

On

On

Upt

oA

s at t

heA

s at t

he

  

as at

du

ring

the

durin

gVa

luat

ion

at

begi

nnin

gA

dditi

ons

Ded

uctio

nth

e ye

arcu

rren

tpr

evio

us

  

begi

nnin

g of

ye

arth

e ye

arth

e ye

ar

of th

e ye

ardu

ring

the

durin

year

end

year

end

  

the

year

  

end

 ye

arth

e ye

ar 

  

12

34

56

78

910

11

A.

FIX

ED A

SSET

S

Build

ing

5825

436

00

5825

436.

0056

1284

021

260

056

3410

019

1336

2125

96

Tool

s & P

lant

s19

2521

7922

0100

2649

5219

2073

2717

3749

1929

6615

2537

2717

4178

0717

8952

018

7726

0

Mot

or V

ehic

les

2447

6181

3777

000

3369

165

2488

4016

.00

1664

1676

1568

766

3208

091

1500

2351

9881

665

8226

567

Furn

iture

& F

ixtu

re19

6235

5917

9790

432

3395

2109

8068

1000

5905

1050

530

2721

4510

7842

9010

3137

7896

2033

1

Off

ice

Equi

pmen

t15

5721

2411

2139

221

0532

714

5881

8910

8100

8964

1700

1059

169

1039

2620

4195

569

4762

035

Com

pute

r/Pe

riph

eral

2916

5034

3875

728

6717

5832

3690

04.0

024

9677

5939

9144

366

3573

2829

5629

4073

375

4276

040

Tech

nica

l Boo

k36

6377

00

3663

7733

5326

1863

10

3539

5712

420

3105

1

Cam

p Eq

uipm

ent

1991

00

439

1947

115

840

610

439

1601

134

6040

70

0

Sub

Tota

l :11

4300

800

1079

2124

6735

036

1183

5788

8576

4354

7589

555

5457

144

8789

6765

3046

1123

2900

9950

B.

CA

PITA

L W

OR

K-

IN-P

ROG

RES

S0

00

00

00

00

0

Sub

Tota

l :0

00

00

00

00

0

 G

rand

Tot

al:

1143

0080

0.00

1079

2124

.00

6735

036.

0011

8357

888.

0085

7643

54.0

075

8955

5.00

5457

144.

0087

8967

65.0

030

4611

23.0

029

0099

50.0

0

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 104: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

93

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AT 3

1st M

ARC

H, 2

017

SCH

EDU

LE -

8: F

IXED

ASS

ETS

DES

CR

IPTI

ON

[Col

2 -

Cos

t / V

alua

tion

as a

t Be

ginn

ing

of th

e Ye

ar]

(Am

ount

in R

upee

s)

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

A.

FIX

ED A

SSET

SBu

ildin

g58

2543

6.00

0.00

0.00

0.00

0.00

0.00

5825

436.

00To

ols &

Pla

nts

4708

778.

0065

5196

4.00

1650

928.

0036

3848

9.00

1992

348.

0070

9672

.00

1925

2179

.00

Mot

or V

ehic

les

5155

162.

0045

3652

1.00

5321

868.

0030

4719

3.00

4832

231.

0015

8320

6.00

2447

6181

.00

Furn

iture

& F

ixtu

re53

6508

6.00

2600

324.

0040

7697

2.00

2115

547.

0032

5995

4.00

2205

676.

0019

6235

59.0

0O

ffice

Equ

ipm

ent

5783

093.

0024

4987

3.00

2297

835.

0016

5286

9.00

3029

071.

0035

9383

.00

1557

2124

.00

Com

pute

r/Pe

riphe

ral

1114

0530

.00

3172

883.

0038

9168

3.00

3874

563.

0059

4783

4.00

1137

541.

0029

1650

34.0

0Te

chni

cal B

ook

3056

50.0

014

923.

0027

083.

0036

19.0

014

732.

0037

0.00

3663

77.0

0C

amp

Equi

pmen

t0.

0010

010.

0099

00.0

00.

000.

000.

0019

910.

00

 Su

b To

tal :

3828

3735

.00

1933

6498

.00

1727

6269

.00

1433

2280

.00

1907

6170

.00

5995

848.

0011

4300

800.

000

B.

CA

PITA

L W

OR

K-I

N-P

ROG

RES

S0.

000.

000.

000.

000.

00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

 G

rand

Tot

al:

3828

3735

.00

1933

6498

.00

1727

6269

.00

1433

2280

.00

1907

6170

.00

5995

848.

0011

4300

800.

00

Sd/

-

Sd/-

S

d/-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 105: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

94

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AT 3

1st M

ARC

H,2

017

SCH

EDU

LE -

8: F

IXED

ASS

ETS

DES

CR

IPTI

ON

[Col

- 3:

Add

ition

dur

ing

the

Year

](A

mou

nt in

Rup

ees)

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

A.

FIX

ED A

SSET

SBu

ildin

g0.

000.

000.

000.

000.

000.

000.

00To

ols &

Pla

nts

0.00

0.00

0.00

1035

00.0

011

6600

.00

0.00

2201

00.0

0M

otor

Veh

icle

s68

8049

.00

1344

493.

0064

6924

.00

4249

12.0

00.

0067

2622

.00

3777

000.

00Fu

rnitu

re &

Fix

ture

5219

06.0

064

8714

.00

2612

29.0

013

5727

.00

2128

38.0

017

490.

0017

9790

4.00

Offi

ce E

quip

men

t18

7125

.00

2005

31.0

047

787.

0082

440.

0047

8842

.00

1246

67.0

011

2139

2.00

Com

pute

r/Pe

riphe

ral

2176

330.

0022

8550

.00

4808

68.0

026

8624

.00

6216

10.0

099

746.

0038

7572

8.00

Tech

nica

l Boo

k0.

000.

000.

000.

000.

000.

000.

00C

amp

Equi

pmen

t0.

000.

000.

000.

000.

000.

000.

00

Sub

Tota

l :35

7341

0.00

2422

288.

0014

3680

8.00

1015

203.

0014

2989

0.00

9145

25.0

010

7921

24.0

0

B.

CA

PITA

L W

OR

K-I

N-P

ROG

RES

S0.

000.

000.

000.

000.

00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

 G

rand

Tot

al:

3573

410.

0024

2228

8.00

1436

808.

0010

1520

3.00

1429

890.

0091

4525

.00

1079

2124

.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 106: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

95

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AT 3

1st M

ARC

H,2

017

SCH

EDU

LE -

8: F

IXED

ASS

ETS

DES

CR

IPTI

ON

[Col

- 4:

Ded

uctio

n du

ring

the

Year

](A

mou

nt in

Rup

ees)

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

A.

FIX

ED A

SSET

SBu

ildin

g0.

000.

000.

000.

000.

000.

00To

ols &

Pla

nts

0.00

2071

27.0

093

9.00

4741

7.00

9469

.00

0.00

2649

52.0

0M

otor

Veh

icle

s10

8214

2.00

1264

722.

0048

3821

.00

4249

12.0

011

3568

.00

0.00

3369

165.

00Fu

rnitu

re &

Fix

ture

0.00

1240

02.0

096

615.

0012

186.

0078

202.

0012

390.

0032

3395

.00

Offi

ce E

quip

men

t10

8590

6.00

6029

6.00

4022

65.0

071

515.

0048

5345

.00

0.00

2105

327.

00C

ompu

ter/

Perip

hera

l0.

0096

068.

0016

7520

.00

0.00

4081

70.0

00.

0067

1758

.00

Tech

nica

l Boo

k0.

000.

000.

000.

000.

000.

000.

00C

amp

Equi

pmen

t0.

0043

9.00

0.00

0.00

0.00

0.00

439.

00

 Su

b To

tal :

2168

048.

0017

5265

4.00

1151

160.

0055

6030

.00

1094

754.

0012

390.

0067

3503

6.00

B.

CA

PITA

L W

OR

K -

PRO

GR

ESS

0.00

0.00

0.00

0.00

0.00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

 G

rand

Tot

al:

2168

048.

0017

5265

4.00

1151

160.

0055

6030

.00

1094

754.

0012

390.

0067

3503

6.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 107: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

96

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AT 3

1st M

ARC

H,2

017

SCH

EDU

LE -

8: F

IXED

ASS

ETS

DES

CR

IPTI

ON

[Col

- 5:

Cos

t / V

alua

tion

as a

t Ye

ar en

d](A

mou

nt in

Rup

ees)

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

A.

FIX

ED A

SSET

SBu

ildin

g58

2543

6.00

0.00

0.00

0.00

0.00

0.00

5825

436.

00To

ols &

Pla

nts

4708

778.

0063

4483

7.00

1649

989.

0036

9457

2.00

2099

479.

0070

9672

.00

1920

7327

.00

Mot

or V

ehic

les

4761

069.

0063

4483

7.00

5484

971.

0030

4719

3.00

4718

663.

0022

5582

8.00

2488

4016

.00

Furn

iture

& F

ixtu

re58

8699

2.00

4616

292.

0042

4158

6.00

2239

088.

0033

9459

0.00

2210

776.

0021

0980

68.0

0O

ffice

Equ

ipm

ent

4884

312.

0031

2503

6.00

1943

357.

0016

6379

4.00

3022

568.

0048

4050

.00

1458

8189

.00

Com

pute

r/Pe

riphe

ral

1331

6860

.00

3305

365.

0042

0580

31.0

041

4318

7.00

6161

274.

0012

3728

7.00

3236

9004

.00

Tech

nica

l Boo

k30

5650

.00

1492

3.00

2708

9.00

3619

.00

1473

2.00

370.

0036

6377

.00

Cam

p Eq

uipm

ent

0.00

9571

.00

9900

.00

0.00

0.00

1947

1.00

0.00

Sub

Tota

l :39

6890

97.0

023

7608

61.0

055

4149

23.0

014

7914

53.0

019

4113

06.0

068

9798

3.00

1183

5788

8.00

B.

CA

PITA

L W

OR

K-I

N-P

ROG

RES

S0.

000.

000.

000.

000.

00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

 G

rand

Tot

al:

3968

9097

.00

2376

0861

.00

5541

4923

.00

1479

1453

.00

1941

1306

.00

6897

983.

0011

8357

888.

00

Sd/

-

Sd/-

S

d/-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 108: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

97

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AS

AT 3

1st M

ARC

H,2

017

SCH

EDU

LE -

8: F

IXED

ASS

ETS

DES

CR

IPTI

ON

[Col

- 6:

As a

t the

Beg

inni

ng o

f the

Yea

r](A

mou

nt in

Rup

ees)

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

A.

FIX

ED A

SSET

SBu

ildin

g56

1284

0.00

0.00

0.00

0.00

0.00

0.00

5612

840.

00To

ols &

Pla

nts

4518

685.

0060

6165

8.00

1324

317.

0031

8175

4.00

1722

393.

0056

6112

.00

1737

4919

.00

Mot

or V

ehic

les

2746

482.

0031

0598

3.00

3190

489.

0026

0307

0.00

3520

326.

0014

7532

6.00

1664

1676

.00

Furn

iture

& F

ixtu

re29

0454

1.00

1259

627.

0022

5403

8.00

1034

116.

0017

4566

2.00

8079

21.0

010

0059

05.0

0O

ffice

Equ

ipm

ent

3290

133.

0020

1202

8.00

1801

066.

0014

6329

1.00

2060

677.

0018

2894

.00

1081

0089

.00

Com

pute

r/Pe

riphe

ral

9891

066.

0023

8997

9.00

3387

024.

0033

8410

6.00

4975

024.

0094

0560

.00

2496

7759

.00

Tech

nica

l Boo

k27

9033

.00

1449

5.00

2405

4.00

3457

.00

1394

5.00

342.

0033

5326

.00

Cam

p Eq

uipm

ent

0.00

9953

.00

5887

.00

0.00

0.00

0.00

1584

0.00

 Su

b To

tal :

2924

2780

.00

1485

3723

.00

1198

6875

.00

1166

9794

.00

1403

8027

.00

3973

155.

0085

7643

54.0

0

B.

CA

PITA

L W

OR

K-I

N-P

ROG

RES

S0.

000.

000.

000.

000.

000.

000.

00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

 G

rand

Tot

al:

2924

2780

.00

1485

3723

.00

1198

6875

.00

1166

9794

.00

1403

8027

.00

3973

155.

0085

7643

54.0

0

Sd/

-

Sd/-

S

d/-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 109: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

98

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AT 3

1st M

ARC

H,2

017

SCH

EDU

LE -

8: F

IXED

ASS

ETS

DES

CR

IPTI

ON

[ C

ol -

7: O

n A

dditi

on d

urin

g th

e Ye

ar]

(Am

ount

in R

upee

s)

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

A.

FIX

ED A

SSET

SBu

ildin

g21

260.

000.

000.

000.

000.

000.

0021

260.

00To

ols &

Pla

nts

2851

4.00

7262

7.00

4899

0.00

7572

4.00

4922

6.00

2153

4.00

2966

15.0

0M

otor

Veh

icle

s45

8797

.00

3553

42.0

041

6254

.00

1254

28.0

019

6763

.00

1618

2.00

1568

766.

00Fu

rnitu

re &

Fix

ture

2739

35.0

016

5193

.00

1945

55.0

011

4566

.00

1617

03.0

014

0578

.00

1050

530.

00O

ffice

Equ

ipm

ent

2373

08.0

080

021.

0077

064.

0033

322.

0017

8161

.00

3582

4.00

6417

00.0

0C

ompu

ter/

Perip

hera

l17

1764

0.00

5375

91.0

044

6766

.00

3735

01.0

076

7833

.00

1481

12.0

039

9144

3.00

Tech

nica

l Boo

k15

970.

0025

7.00

1817

.00

97.0

047

3.00

17.0

018

631.

00C

amp

Equi

pmen

t0.

008.

0060

2.00

0.00

0.00

0.00

610.

00

 Su

b To

tal :

2753

424.

0012

1103

9.00

1186

048.

0072

2638

.00

1354

159.

0036

2247

.00

7589

555.

00

B.

CA

PITA

L W

OR

K-I

N-P

ROG

RES

S0.

000.

000.

000.

000.

00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

 G

rand

Tot

al:

2753

424.

0012

1103

9.00

1186

048.

0072

2638

.00

1354

159.

0036

2247

.00

7589

555.

00N

ote;

- Net

dep

reci

atio

n ch

arge

d du

ring

the

year

201

5-16

is R

s.811

4576

/- (R

s.852

1392

- Rs.4

0681

6/-a

dded

by

inv.

Circ

le P

atna

tow

ards

int-

erch

ange

in H

eads

of A

sset

s. Th

e sa

me

has a

lso b

een

take

n in

the

colu

mn

No.

8 w

hich

has

nul

lify

the

impa

ct o

n to

tal D

epre

ciat

ion

char

ged

upto

the

year

201

5-16

Col

.-9)

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 110: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

99

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AS

AT 3

1st M

ARC

H,2

017

SCH

EDU

LE -

8: F

IXED

ASS

ETS

DES

CR

IPTI

ON

[ C

ol -

8: O

n D

educ

tion

duri

ng th

e Ye

ar]

(Am

ount

in R

upee

s)

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

A.

FIX

ED A

SSET

SBu

ildin

g0.

000.

000.

000.

000.

000.

000.

00To

ols &

Pla

nts

0.00

1996

71.0

091

4.00

4375

9.00

9383

.00

0.00

2537

27.0

0M

otor

Veh

icle

s10

4406

5.00

1189

080.

0046

9465

.00

3920

62.0

011

3419

.00

0.00

3208

091.

00Fu

rnitu

re &

Fix

ture

0.00

1054

94.0

070

995.

0010

449.

0074

520.

0010

687.

0027

2145

.00

Offi

ce E

quip

men

t81

442.

0055

406.

0038

8452

.00

6940

5.00

4644

64.0

00.

0010

5916

9.00

Com

pute

r/Pe

riphe

ral

0.00

9447

6.00

1648

22.0

00.

0040

4275

.00

0.00

6635

73.0

0Te

chni

cal B

ook

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Cam

p Eq

uipm

ent

0.00

439.

000.

000.

000.

000.

0043

9.00

Sub

Tota

l :11

2550

7.00

1644

566.

0010

9464

8.00

5156

75.0

010

6606

1.00

1068

7.00

5457

144.

00

B.

CA

PITA

L W

OR

K-I

N-P

ROG

RES

S0.

000.

000.

000.

000.

000.

000.

00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

 Gra

nd T

otal

:11

2550

7.00

1644

566.

0010

9464

8.00

5156

75.0

010

6606

1.00

1068

7.00

5457

144.

00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 111: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

100

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AS

AT 3

1st M

ARC

H,2

017

SCH

EDU

LE -

8: F

IXED

ASS

ETS

DES

CR

IPTI

ON

[Col

- 9:

Tot

al u

pto

the

Year

end]

(Am

ount

in R

upee

s)

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

A.

FIX

ED A

SSET

SBu

ildin

g56

3410

0.00

0.00

0.00

0.00

0.00

0.00

5634

100.

00To

ols &

Pla

nts

4547

199.

0059

3461

4.00

1372

393.

0032

1371

9.00

1762

236.

0058

7646

.00

1741

7807

.00

Mot

or V

ehic

les

2161

214.

0022

7224

5.00

3137

278.

0023

3643

6.00

3603

670.

0014

9150

8.00

1500

2351

.00

Furn

iture

& F

ixtu

re31

7847

6.00

1319

326.

0023

7759

8.00

1138

233.

0018

3284

5.00

9378

12.0

010

7842

90.0

0O

ffice

Equ

ipm

ent

3445

999.

0020

3664

3.00

1489

678.

0014

2720

8.00

1774

374.

0021

8718

.00

1039

2620

.00

Com

pute

r/Pe

riphe

ral

1160

8706

.00

2833

094.

0036

6896

8.00

3757

607.

0053

3858

2.00

1088

672.

0028

2956

29.0

0Te

chni

cal B

ook

2950

03.0

014

752.

0025

871.

0035

54.0

014

418.

0035

9.00

3539

57.0

0C

amp

Equi

pmen

t0.

0095

22.0

064

89.0

00.

000.

000.

0016

011.

00

Sub

Tota

l :30

8706

97.0

014

4201

96.0

012

0782

75.0

011

8767

57.0

014

3261

25.0

043

2471

5.00

8789

6765

.00

B.

CA

PITA

L W

OR

K-I

N-P

ROG

RES

S0.

000.

000.

000.

000.

000.

000.

000.

00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

000.

00

 G

rand

Tot

al:

3087

0697

.00

1442

0196

.00

1207

8275

.00

1187

6757

.00

1432

6125

.00

4324

715.

0087

8967

65.0

0

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 112: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

101

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AS

AT 3

1st M

ARC

H,2

017

SCH

EDU

LE -

8: F

IXED

ASS

ETS

DES

CR

IPTI

ON

[Col

- 10

: As a

t the

Cur

rent

Yea

r end

](A

mou

nt in

Rup

ees)

Pa

rtic

ular

sH

ead

Qua

rter

Gw

alio

rBh

uban

esw

arVa

lsad

Hyd

erab

adPa

tna

Tota

l

A.

FIX

ED A

SSET

SBu

ildin

g19

1336

.00

0.00

0.00

0.00

0.00

0.00

2362

18.0

0To

ols &

Pla

nts

1615

79.0

041

0223

.00

2775

96.0

048

0853

.00

3372

43.0

012

2026

.00

1789

520.

00M

otor

Veh

icle

s25

9985

5.00

2344

047.

0023

4769

3.00

7107

57.0

011

1499

3.00

7643

20.0

098

8166

5.00

Furn

iture

& F

ixtu

re27

0851

6.00

1805

710.

0018

6398

8.00

1100

855.

0015

6174

5.00

1272

964.

0010

3137

78.0

0O

ffice

Equ

ipm

ent

1438

313.

0055

3465

.00

4536

79.0

023

6586

.00

1248

194.

0026

5332

.00

4195

569.

00C

ompu

ter/

Perip

hera

l17

0815

4.00

4722

71.0

053

6063

.00

3855

80.0

082

2692

.00

1486

15.0

040

7337

5.00

Tech

nica

l Boo

k10

647.

0017

1.00

1212

.00

65.0

031

4.00

11.0

012

420.

00C

amp

Equi

pmen

t0.

0049

.00

3411

.00

0.00

0.00

0.00

3460

.00

Sub

Tota

l :88

1840

0.00

5585

936.

0054

8364

2.00

2914

696.

0050

8518

1.00

2573

268.

0030

4611

23.0

0

B.

CA

PITA

L W

OR

K-I

N-P

ROG

RES

S0.

000.

000.

000.

000.

000.

000.

00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

000.

00

 G

rand

Tot

al:

8818

400.

0055

8593

6.00

5483

642.

0029

1469

6.00

5085

181.

0025

7326

8.00

3046

1123

.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 113: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

102

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AS

AT 3

1st M

ARC

H,2

017

SCH

EDU

LE -

8: F

IXED

ASS

ETS

DES

CR

IPTI

ON

[Col

11

- As a

t th

e pr

evio

us Y

ear e

nd]

(Am

ount

in R

upee

s)

Pa

rtic

ular

sH

ead

Qua

rter

Gw

alio

rBh

uban

esw

arVa

lsad

Hyd

erab

adPa

tna

Tota

l

A.

FIX

ED A

SSET

SBu

ildin

g21

2596

.00

0.00

0.00

0.00

0.00

0.00

2125

96.0

0To

ols &

Pla

nts

1900

93.0

049

0306

.00

3266

11.0

045

6735

.00

2699

55.0

014

3560

.00

1877

260.

00M

otor

Veh

icle

s24

0868

0.00

1430

538.

0021

3137

9.00

8361

85.0

013

1190

5.00

1078

80.0

082

2656

7.00

Furn

iture

& F

ixtu

re24

6322

2.00

1340

697.

0018

2293

4.00

1081

431.

0015

1429

2.00

1397

755.

0096

2033

1.00

Offi

ce E

quip

men

t24

9296

0.00

4378

45.0

049

6769

.00

1895

78.0

096

8394

.00

1764

89.0

047

6203

5.00

Com

pute

r/Pe

riphe

ral

1328

229.

0078

2904

.00

5046

59.0

049

0457

.00

9728

10.0

019

6981

.00

4276

040.

00Te

chni

cal B

ook

2661

7.00

428.

0030

29.0

016

2.00

787.

0028

.00

3105

1.00

Cam

p Eq

uipm

ent

0.00

57.0

040

13.0

036

19.0

00.

000.

0040

70.0

  

Sub

Tota

l :91

2239

7.00

4482

775.

0052

8939

4.00

3058

167.

0050

3814

3.00

2022

693.

0029

0099

50.0

0

B.

CA

PITA

L W

OR

K-I

N-P

ROG

RES

S0.

000.

000.

000.

000.

000.

000.

00

Sub

Tota

l :0.

000.

000.

000.

000.

000.

000.

00

 G

rand

Tot

al:

9122

397.

0044

8277

5.00

5289

394.

0030

5816

7.00

5038

143.

0020

2269

3.00

2900

9950

.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 114: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

103

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AS

AT 3

1st M

ARC

H, 2

017

SCH

EDU

LE -

9: IN

VES

TMEN

T FR

OM

EA

RM

AR

KED

/EN

DO

WM

ENT

FUN

D (S

uper

annu

atio

n& G

ratu

ity F

und)

(A

mou

nt in

Rup

ees)

 

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

Prev

ious

Yea

r

1 IN

VES

TMEN

T FR

OM

EA

RM

AR

KED

FU

ND

In G

over

nmen

t Sec

uriti

es

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Oth

er ap

prov

ed S

ecur

ities

0.

000.

000.

000.

000.

000.

000.

000.

00N

atio

nalis

ed B

ank

; Sav

ing

Acc

ount

1931

9980

0.00

0.00

00.

000.

000.

0095

2067

08.0

095

2067

08.0

0

Fi

xed

Dep

osit

1480

0000

0.00

0.00

0.00

0.00

0.00

0.00

1240

0000

0.00

1240

0000

0.00

Acc

rued

Inte

rest

1362

2198

.00

0.00

0.00

0.00

0.00

0.00

7970

816.

0079

7081

6.00  

Tota

l:35

4821

998.

000.

000.

000.

000.

000.

0035

4821

998.

0022

7177

524.

00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 115: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

104

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

BALA

NC

E SH

EET

AS

AT 3

1st M

ARC

H,2

017

SCH

EDU

LE -1

1: C

UR

REN

T A

SSET

S, L

OA

NS,

AD

VAN

CES

etc

.(A

mou

nt in

Rup

ees)

 Pa

rtic

ular

sH

ead

Qua

rter

Gw

alio

rBh

uban

esw

arVa

lsad

Hyd

erab

adPa

tna

Tota

lPr

evio

us Y

ear

A.

CU

RR

ENT

ASS

ETS

Cas

h Ba

lanc

e in

Han

d31

475.

0033

379.

0014

361.

0012

217.

0010

470.

000.

0010

1902

.00

6770

5.00

Bank

Bal

ance

in S

avin

g Ba

nk A

ccou

nt45

2705

9745

0194

0.00

1413

108.

0021

8310

7.00

5285

830.

0072

5021

5937

9603

.00

4930

2475

.00

Bank

Bal

ance

in C

urre

nt A

ccou

nt0.

000.

000.

000.

000.

000.

000.

000.

00Po

stag

e in

Han

d11

190.

0040

60.0

021

10.0

015

90.0

099

88.0

010

94.0

030

032.

0039

292.

00D

raft

in T

rans

it0.

000.

000.

000.

000.

000.

000.

000.

00N

WD

A R

etire

men

t Ben

efit

Acc

ount

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Sub

Tota

l (A

) :45

3132

62.0

045

3937

9.00

1429

579.

0021

9691

4.00

5306

288.

0072

6115

.00

5951

1537

.00

4940

9472

.00

B.

LOA

NS

AD

VAN

CES

AN

D O

THER

ASS

ETS

Loan

s & A

dvan

ces :

To

Staf

f 88

6312

.00

5883

11.0

076

1460

.00

3191

74.0

011

3766

4.00

5276

13.0

042

2053

4.00

6591

586.

00 T

o O

ther

s 13

5129

06.0

055

4007

.00

1484

122.

0069

3812

.00

4262

874.

0090

0500

.00

2140

8221

.00

2673

6080

.00

Indi

a W

ater

Wee

k20

0000

0.00

Sub

Tota

l (B)

:16

3992

18.0

011

4231

8.00

2245

582.

0010

1298

6.00

5400

538.

0014

2811

3.00

2562

8755

.00

3332

7666

.00

C

LAIM

S RE

CEI

VABL

ELe

ave

Sala

lry

Reco

vera

ble.

7466

87.0

093

422.

0058

7948

.00

7118

22.0

045

0505

.00

7215

33.0

033

1191

7.00

3419

030.

00Se

curit

y D

epos

it0.

000.

000.

000.

000.

000.

000.

0011

000.

00N

ew P

ensio

n Sc

hem

e(N

.P.S

.)25

9921

.00

0.00

0.00

0.00

0.00

0.00

2599

21.0

028

7033

.00

Rem

mita

nce

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CPF

5052

579.

000.

0055

000.

000.

0095

000.

000.

0052

0257

9.00

0.00

GSL

IS39

217.

00A

ccru

ed In

tere

st0.

000.

000.

000.

0057

150.

000.

0057

150.

0057

31.0

0Su

b To

tal (

C) :

6098

404.

0093

422.

0064

2948

.00

7118

22.0

060

2655

.00

7215

33.0

088

3156

7.00

3722

794.

00

Gra

nd T

otal

6781

0884

.00

5775

119.

0043

1810

9.00

3921

722.

0011

3094

81.0

028

7576

1.00

9601

1076

.00

8645

9932

.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 116: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

105

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

INC

OM

E &

EX

PEN

DIT

UR

E FO

R T

HE

PER

IOD

/ YEA

R E

ND

ED 3

1st M

ARC

H,2

017

SCH

EDU

LE -

13:

GR

AN

TS /

SUBS

IDIE

S ( I

rrev

ocab

le G

rant

s & su

bsid

ies r

ecei

ved)

(A

mou

nt in

Rup

ees)

 Pa

rtic

ular

sH

ead

Qua

rter

Gw

alio

rBh

uban

esw

arVa

lsad

Hyd

erab

adPa

tna

Tota

lPr

evio

us Y

ear

1G

rant

s-in

-aid

(Cen

tral

Gov

t.)35

7708

994.

0063

2304

38.0

073

1312

91.0

047

9365

54.0

012

0540

143.

0028

3357

18.0

069

0883

138.

0068

1788

215.

002

Gra

nt fo

r 7th

Vib

rant

Guj

rat

Glo

bal T

rade

show

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-289

9.00

Retu

rned

to M

OW

R,RD

&G

R

Tota

l:35

7708

994.

0063

2304

38.0

073

1312

91.0

047

9365

54.0

012

0540

143.

0028

3357

18.0

069

0883

138.

0068

1785

316.

00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 117: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

106

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

INC

OM

E &

EX

PEN

DIT

UR

E FO

R T

HE

YEA

R E

ND

ED 3

1st M

ARC

H,2

017

SCH

EDU

LE -

17:

INTE

RES

T EA

RN

ED(A

mou

nt in

Rup

ees)

 Pa

rtic

ular

sH

ead

Qua

rter

Gw

alio

rBh

uban

esw

arVa

lsad

Hyd

erab

adPa

tna

Tota

lPr

evio

us Y

ear

(a)

On

Savi

ng B

ank

Acc

ount

37

2113

5.00

5410

65.0

025

2105

.00

3083

60.0

054

9511

.00

1879

70.0

055

6014

6.00

3716

144.

00

(b)

Loan

s and

Adv

ance

s16

2114

.00

4189

6.00

8612

0.00

4673

.00

7044

3.00

6584

.00

3718

30.0

050

7151

.00

(c)

Oth

ers

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

 To

tal:

3883

249.

0058

2961

.00

3382

25.0

031

3033

.00

6199

54.0

019

4554

.00

5931

976.

0042

2329

5.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 118: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

107

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

INC

OM

E &

EX

PEN

DIT

UR

E FO

R T

HE

YEA

R E

ND

ED 3

1st M

ARC

H,2

017

SCH

EDU

LE -

18:

OTH

ER IN

CO

ME

(Am

ount

in R

upee

s)

Pa

rtic

ular

sH

ead

Qua

rter

Gw

alio

rBh

uban

esw

arVa

lsad

Hyd

erab

adPa

tna

Tota

lPr

evio

us Y

ear

Disp

osal

of A

sset

s0.

000.

000.

000.

000.

000.

000.

000.

00Pr

ofit

/Los

s on

Disp

osal

of A

sset

s96

736.

0020

8377

.00

4370

8.00

7495

.00

5120

2.00

247.

0040

7765

.00

5586

4.00

Misc

ella

neou

s Inc

ome

2263

5.00

0.00

0.00

20.0

073

56.0

010

20.0

031

031.

0069

103.

00Re

alisa

tion

of N

otic

e Pe

riod

Am

ount

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Sale

of T

ende

r For

ms e

tc.

0.00

2591

3.00

5131

.00

0.00

0.00

1700

0.00

4804

4.00

2050

0.00

Tota

l:11

9371

.00

2342

90.0

048

839.

0075

15.0

058

558.

0018

267.

0048

6840

.00

1454

67.0

0

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 119: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

108

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

INC

OM

E &

EX

PEN

DIT

UR

E FO

R T

HE

YEA

R E

ND

ED 3

1st M

ARC

H,2

017

SCH

EDU

LE -

20:

ESTA

BLIS

HM

ENT

EXPE

NSE

S(A

mou

nt in

Rup

ees)

 

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

Prev

ious

Yea

r

(a)

Sala

ries a

nd W

ages

(Pay

)32

4923

44.0

013

0077

59.0

022

3953

35.0

013

4328

81.0

034

8111

44.0

079

5878

9.00

1240

9825

2.00

1218

3298

5.00

(b)

Allo

wan

ces &

Bon

us61

2172

95.0

033

0563

42.0

042

7311

90.0

021

8131

42.0

066

8169

69.0

013

8856

91.0

023

9520

629.

0022

8711

163.

00

(c)

Con

trib

utio

n to

Pro

vide

nt F

und(

CPF

) and

0.00

0.00

0.00

0.00

0.00

0.00

2211

4373

.00

(d)

Inte

rest

on

CPF

1689

0980

.00

0.00

0.00

0.00

0.00

0.00

1689

0980

.00

0.00

(e)

CPF

/ G

SLIS

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

(f)

Expe

nses

on

Empl

oyee

s’ Re

tirem

ent &

Ter

min

al0.

000.

000.

000.

000.

000.

000.

00

Bene

fit (S

uper

annu

atio

n &

Gra

tuity

Fun

d)15

5600

000.

000.

000.

000.

000.

000.

0015

5600

000.

0013

0000

000.

00

(g)

Leav

e Sa

lary

& P

ensio

n C

ontr

ibut

ion

2656

85.0

00.

000.

000.

0039

4758

.00

0.00

6604

43.0

066

0371

.00

(h)

NPS

Gov

t.Con

trib

utio

n12

6843

9.00

0.00

0.00

0.00

0.00

0.00

1268

439.

0011

1926

0.00

Tota

l:26

7734

743.

0046

0641

01.0

065

1265

25.0

035

2460

23.0

010

2022

871.

0021

8444

80.0

053

8038

743.

0050

4438

152.

00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 120: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

109

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

INC

OM

E &

EX

PEN

DIT

UR

E FO

R T

HE

YEA

R E

ND

ED 3

1st M

ARC

H,2

017

CIR

CLE

WIS

E SC

HED

ULE

- 21

: O

THER

AD

MIN

ISTR

ATIV

E EX

PEN

SES

(Am

ount

in R

upee

s)

 Pa

rtic

ular

sH

ead

Qua

rter

Gw

alio

rBh

uban

esw

arVa

lsad

Hyd

erab

adPa

tna

Tota

lPr

evio

us Y

ear

(a)

Tra

velli

ng E

xpen

ses

2569

089

3957

662.

0027

1477

8.00

1611

081.

0039

9145

6.00

2770

979.

0017

6150

45.0

018

5283

38.0

0(b

) O

ffic

e Ex

pens

esEl

ectr

icity

Cha

rges

1600

722

3783

35.0

051

9148

.00

1691

12.0

082

7646

.00

7970

0.00

3574

663.

0036

5027

7.00

Tele

phon

e &

Tru

nkca

ll69

3090

1802

66.0

030

2187

.00

9501

1.00

1605

59.0

097

859.

0015

2897

2.00

1524

881.

00Pu

blic

atio

n, P

erio

dica

l & B

ook

1800

5463

350.

0045

569.

0054

509.

0093

009.

0023

241.

0045

9732

.00

3813

46.0

0W

ater

Cha

rges

4630

956

546.

0025

7276

.00

0.00

8154

1.00

0.00

4416

72.0

022

4471

.00

Stat

ione

ry &

Prin

ting

8509

4346

135.

0048

761.

0022

101.

0022

902.

0017

737.

0010

0857

9.00

1133

359.

00C

onve

yanc

e0

2167

6.00

2500

.00

5109

.00

1102

1.00

1003

6.00

5034

2.00

6057

3.00

Live

ries

3376

516

920.

0021

731.

0011

555.

0036

504.

0018

536.

0013

9011

.00

1167

13.0

0Te

legr

am, T

elex

& F

ax0

0.00

0.00

0.00

0.00

2901

.00

2901

.00

6638

.00

Post

ages

1990

8858

998.

0058

692.

0036

173.

0093

198.

0013

324.

0045

9473

.00

4753

73.0

0Ru

bber

Sta

mp

00.

0047

0.00

1390

.00

4210

.00

460.

0065

30.0

013

082.

00Re

pairs

of O

ffice

Cyc

le0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Bank

Cha

rges

1292

6824

.00

6874

.00

2067

.00

1724

.00

2572

.00

2135

3.00

1331

50.0

0M

isc. E

xpen

ses

3009

5415

8577

.00

2279

03.0

015

2434

.00

1920

84.0

026

2731

.00

1294

683.

0013

9081

1.00

Law

yer f

ee0

1662

0.00

9100

.00

0.00

0.00

0.00

2572

0.00

4775

5.00

Hos

pita

lity

9460

716

065.

0024

368.

0065

15.0

011

008.

0011

76.0

015

3739

.00

1140

75.0

0A

dver

tisem

ent

9231

624

754.

000.

0013

69.0

070

15.0

033

26.0

012

8780

.00

2861

11.0

0Au

dit F

ees

00.

000.

000.

000.

000.

000.

000.

00In

tern

et C

harg

es0

00.

000.

000.

000.

000.

000.

00fe

e fo

r fili

ng E

TD

S0.

0011

060.

000.

00O

ther

Adm

inist

ativ

e Ex

pens

es11

0070

0.00

0.00

0.00

0.00

0.00

1100

70.0

011

3072

.00

Oth

er fe

es66

8074

(c)

Ren

t, R

ate

& T

axes

9221

126

1621

896.

0030

4992

6.00

1356

238.

0095

1402

5.00

6474

09.0

025

4106

20.0

023

1569

03.0

0

(d)

Rep

airs

& M

aint

enan

ce27

3710

217

0306

4.00

1498

891.

0073

9262

.00

1256

980.

0054

0380

.00

8475

679.

0084

8200

6.00

Sub-

Tota

lSu

b - T

otal

:19

3986

0183

2768

8.00

8788

174.

0042

6392

6.00

1631

5942

.00

4492

367.

0061

5866

99.0

059

8389

34.0

00.

000.

00

Page 121: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

110

(e)

Wor

ks12

2080

59.0

011

5122

66.0

066

5915

5.00

1065

6528

.00

9482

602.

0049

2163

7.00

5544

0247

.00

1062

1494

7.00

(f)

7th

V.G

.Glo

bal T

rade

show

* 0.

000.

000.

000.

000.

000.

000.

000

Sub

- Tot

al:

1220

8059

.00

1151

2266

.00

6659

155.

0010

6565

28.0

094

8260

2.00

4921

637.

0055

4402

47.0

010

6214

947.

00

(g)

Spec

ial C

omm

ittee

/Cel

l-ILR

3290

7655

.00

0.00

0.00

0.00

3290

7655

.00

1283

0038

.00

Tota

l:64

5143

15.0

019

8399

54.0

015

4473

29.0

014

9204

54.0

025

7985

44.0

094

1400

4.00

1499

3460

1.00

1788

8391

9.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 122: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

111

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

REC

EIPT

S &

PAY

MEN

TS A

CC

OU

NT

FOR

TH

E Y

EAR

EN

DED

31-

3 -

2017

SCH

EDU

LE -

20 A

: ES

TABL

ISH

MEN

T EX

PEN

SES

(Am

ount

in R

upee

s)  

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

Prev

ious

Yea

r

(a)

Sala

ries a

nd W

ages

(Pay

)36

8549

16.0

013

0670

10.0

022

4357

44.0

013

4310

06.0

034

6251

01.0

080

7966

9.00

1284

9344

6.00

1260

2594

4.00

(b)

Allo

wan

ces &

Bon

us56

5837

07.0

033

0140

87.0

042

5268

02.0

021

7205

79.0

066

4327

31.0

014

0019

08.0

023

4279

814.

0022

3318

136.

00

(c)

Gov

t. C

ontr

ibut

ion

to P

rovi

dent

Fun

d(C

PF) a

nd0.

000.

000.

000.

000.

000.

000.

000.

00

Inte

rest

on

CPF

1689

0980

.00

0.00

0.00

0.00

0.00

0.00

1689

0980

.00

2120

9424

.00

(d)

Paym

ents

tow

ards

GSL

IS0.

000.

000.

000.

000.

000.

000.

000.

00

(e)

Expe

nses

on

Empl

oyee

s’ Re

tirem

ent &

Ter

min

al

Bene

fit (S

uper

annu

atio

n &

Gra

tuity

Fun

d)15

5600

000.

000.

000.

000.

000.

000.

0015

5600

000.

0013

0000

000.

00

(f)

NPS

Gov

t.Con

trib

utio

n12

6843

9.00

0.00

0.00

0.00

0.00

0.00

1268

439.

0011

1926

0.00

(g)

Leav

e Sa

lary

& P

ensio

n C

ontr

ibut

ion

2656

85.0

00.

000.

000.

0039

4758

.00

0.00

6604

43.0

066

0371

.00

(h)

NPS

0.

00

0.00

0.00

0.00

0.00

0.00

4732

.00

Tota

l:26

7463

727.

0046

0810

97.0

064

9625

46.0

035

1515

85.0

010

1452

590.

0022

0815

77.0

053

7193

122.

0050

2337

867.

00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 123: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

112

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y( M

INIS

TRY

OF

WAT

ER R

ESO

URC

ES,R

IVER

DEV

ELO

PMEN

T &

GA

NG

A R

EJU

VEN

ATIO

N, G

OV

T. O

F IN

DIA

)C

IRC

LE W

ISE

SCH

EDU

LES

FOR

MIN

G P

ART

OF

REC

EIPT

S &

PAY

MEN

TS A

CC

OU

NT

FOR

TH

E Y

EAR

EN

DED

31-

3 -

2017

SCH

EDU

LE -

21 A

: O

THER

AD

MIN

ISTR

ATIV

E EX

PEN

SES

(Am

ount

in R

upee

s)  

Part

icul

ars

Hea

d Q

uart

erG

wal

ior

Bhub

anes

war

Vals

adH

yder

abad

Patn

aTo

tal

Prev

ious

Yea

r

(a)

Tra

velli

ng E

xpen

ses

2569

089.

0039

5766

2.00

2714

778.

0016

1108

1.00

3991

456.

0027

7097

9.00

1761

5045

.00

1860

8338

.00

(b)

Off

ice

Expe

nses

Elec

tric

ity C

harg

es16

0072

2.00

3783

35.0

051

9148

.00

1691

12.0

082

7646

.00

7970

0.00

3574

663.

0036

5027

7.00

Tele

phon

e &

Tru

nkca

ll69

3090

.00

1802

66.0

030

2187

.00

8401

1.00

1605

59.0

097

859.

0015

1797

2.00

1524

881.

00

Publ

icat

ion,

Per

iodi

cal &

Boo

k18

0054

.00

6335

0.00

4556

9.00

5450

9.00

9300

9.00

2324

1.00

4597

32.0

038

1346

.00

Wat

er C

harg

es46

309.

0056

546.

0025

7276

.00

0.00

8154

1.00

0.00

4416

72.0

022

4471

.00

Stat

ione

ry &

Prin

ting

8509

43.0

046

135.

0048

761.

0022

101.

0022

902.

0017

737.

0010

0857

9.00

1133

359.

00

Con

veya

nce

0.00

2167

6.00

2500

.00

5109

.00

1102

1.00

1003

6.00

5034

2.00

6057

3.00

Live

ries

3376

5.00

1692

0.00

2173

1.00

1155

5.00

3650

4.00

1853

6.00

1390

11.0

011

6713

.00

Tele

gram

, Tel

ex &

Fax

0.00

0.00

0.00

0.00

0.00

2901

.00

2901

.00

6638

.00

Post

ages

1990

88.0

058

998.

0058

692.

0036

173.

0093

198.

0013

324.

0045

9473

.00

4753

73.0

0

Rubb

er S

tam

p0.

000.

0047

0.00

1390

.00

4210

.00

460.

0065

30.0

013

082.

00

Repa

irs o

f Offi

ce C

ycle

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Bank

Cha

rges

1292

.00

6824

.00

6874

.00

2067

.00

1724

.00

2572

.00

2135

3.00

1333

26.0

0

Misc

. Exp

ense

s30

0954

.00

1585

77.0

022

7903

.00

1524

34.0

019

2084

.00

2627

31.0

012

9468

3.00

1390

811.

00

Law

yer f

ee0.

0016

620.

0091

00.0

00.

000.

000.

0025

720.

0047

755.

00

Hos

pita

lity

9460

7.00

1606

5.00

2436

8.00

6515

.00

1100

8.00

1176

.00

1537

39.0

011

4075

.00

Adv

ertis

emen

t92

316.

0024

754.

000.

0013

69.0

070

15.0

033

26.0

012

8780

.00

2861

11.0

0

Audi

t Fee

s0.

000.

000.

000.

000.

000.

000.

000.

00

Inte

rnet

Cha

rges

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Oth

er A

dmin

istat

ive

Expe

nses

1100

70.0

00.

000.

000.

000.

000.

0011

0070

.00

1130

72.0

0

writ

eoff

0.00

0.00

0.00

0.00

0.00

0.00

0.00

343.

00

filin

g fe

e fr

E T

DS

1106

0.00

0.00

Oth

er fe

es66

8074

.00

(c)

Rent

, Rat

e &

Tax

es92

2112

6.00

1600

688.

0026

2295

8.00

1356

238.

0095

1346

1.00

6694

13.0

024

9838

84.0

023

1817

66.0

0

Page 124: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

113

(d)

Repa

irs &

Mai

nten

ance

2737

102.

0017

0306

4.00

1498

891.

0073

9262

.00

1256

980.

0054

0380

.00

8475

679.

0084

8200

6.00

Sub

- Tot

al:

1939

8601

.00

8306

480.

0083

6120

6.00

4252

926.

0016

3153

78.0

045

1437

1.00

6046

9828

.00

5994

4316

.00

(e)

Spec

ial C

omm

ittee

/Cel

l-ILR

3290

7655

.00

0.00

0.00

0.00

0.00

0.00

3290

7655

.00

1283

0038

.00

(f)

Wor

ks12

2080

59.0

011

5122

66.0

068

3915

5.00

1065

6528

.00

9482

602.

0049

2163

7.00

5562

0247

.00

1042

4504

9.00

(g)

7th

V.G

.Glo

bal T

rade

show

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Sub

- Tot

al:

4511

5714

.00

1151

2266

.00

6839

155.

0010

6565

28.0

094

8260

2.00

4921

637.

0088

5279

02.0

011

7075

087.

00

Tota

l:64

5143

15.0

019

8187

46.0

015

2003

61.0

014

9094

54.0

025

7979

80.0

094

3600

8.00

1489

9773

0.00

1770

1940

3.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 125: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

114

NATIONAL WATER DEVELOPMENT AGENCY , NEW DELHI CONTRIBUTORY PROVIDENT FUND

BALANCE SHEET AS ON 31ST MARCH 2017

(Amount in Rupees)

PARTICULARS Schedule Current year Previous Year

CAPITAL FUND AND LIABILITIES      

Corpus/Capital Fund 1   0

Reserve and Surplus 2   0

Earmarked /Endowment Fund 3   0

Secured Loans and Borrowings 4   0

Unsecured Loans and Borrowings 5   0

Deferred Credit Liabilities 6 24714761 25003092

Current Liabilities and Provisions 7 704350240 652591656

Total   729065001 677594748

ASSETS      

Fixed Assets 8    

Investments-From Earmarked/Endowment 9    

Investments-Others 10 661101370 636089701

Current Assets, Loans, Advances etc. 11 67963631 41505047

Miscellaneous Expenditure ( To the extent not written off or adjusted      

Total   729065001 677594748

Significant Accounting Policies

Contingent Liabilities and Notes on Accounts

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 126: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

115

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y ,

NEW

DEL

HI

CO

NTR

IBU

TORY

PRO

VID

ENT

FUN

DIn

com

e &

Exp

endi

ture

Acc

ount

for t

he y

ear e

nded

31-

3-20

17

(Am

ount

in R

upee

s)

EXPE

ND

ITU

RE

C

urre

nt Y

ear

Prev

ious

Yea

rIN

CO

ME

C

urre

nt Y

ear

Prev

ious

Yea

r

Gov

t. C

ontr

ibut

ion

11

6967

5812

0658

23In

tere

st o

n FD

R16

5214

7510

8076

72

Int.

on G

ovt.

Con

trib

utio

n23

0097

0623

5607

02In

tere

st o

n G

ovt.

secu

ritie

s27

6768

1225

1180

78

Int.

on E

mpl

oyee

s Con

trib

utio

n27

9602

8427

4990

55In

tere

st o

n SB

A/c

16

6402

422

8403

7

Bank

Cha

rges

1347

1639

Inte

rest

on

SDS

A/c

33

2432

735

0711

0

  

 N

et d

iscou

nt re

ceiv

ed o

n pu

rcha

se o

f G

ovt.

secu

ritie

s --

-41

0233

Exce

ss A

mt.

paid

on

purc

hase

of G

ovt.

secu

rity

34

0952

212

4335

2D

efic

it16

8909

7922

2434

41

Tota

l 66

0776

1764

3705

71To

tal

6607

7617

6437

0571

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 127: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

116

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y ,

NEW

DEL

HI

CO

NTR

IBU

TORY

PRO

VID

ENT

FUN

DR

ecei

pt &

Pay

men

t Acc

ount

for t

he y

ear e

nded

31-

03-2

017

(Am

ount

in R

upee

s)

REC

EIPT

Cur

rent

Yea

rPr

evio

us Y

ear

PAYM

ENT

C

urre

nt Y

ear

Prev

ious

Yea

r

Bank

ope

ning

bal

ance

 

 C

PF A

dvan

ce

2501

1874

3132

6718

Stat

e Ba

nk o

f Bik

aner

& Ja

ipur

2794

1220

6776

8933

Full

& F

inal

Pay

men

t

56

2939

8223

6013

25

Punj

ab N

atio

nal B

ank

12

4249

6411

1756

08Fi

nal W

ithdr

awal

s

1994

5016

2224

0570

Mat

urity

of G

ovt.

Secu

rity

3080

0000

1520

0000

Inve

stm

ent.

in G

ovt.

Secu

ritie

s 45

7095

2269

9331

19

Mat

urity

of F

DR

5520

0000

5384

4786

Inve

stm

ent i

n FD

R

6900

0000

1050

0000

0

Int.

on S

B A

/c

1664

024

2284

037

Bank

Cha

rges

13

4816

39

Int.

on S

DS

A/c

3324

327

3507

110

NPS

Em

ploy

ees C

ont.

-- 

Int.

on G

ovt.

Secu

ritie

s

27

6768

1225

1180

78N

PS G

ovt.

Con

t. 

 

Int.

on F

DR

1652

1475

1080

7672

Bank

Bal

ance

  

Empl

oyee

’s su

bscr

iptio

n &

Intt

on E

mpl

oyee

s &

Em

ploy

er’s

Con

trib

utio

n an

d G

ovt.C

ont

10

8372

551

1027

6333

1PN

B75

1288

827

9412

20

  

 SB

BJ60

4507

4312

4249

64

Tota

l

28

3925

373

2924

6955

5To

tal

2839

2537

329

2469

555

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 128: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

117

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y ,

NEW

DEL

HI

CO

NTR

IBU

TORY

PRO

VID

ENT

FUN

D (3

1.03

.201

7)

(Am

ount

in R

upee

s)

SCH

EDU

EL –

6 D

EFFE

RED

CR

EDIT

LIA

BILI

TES

C

urre

nt Y

ear

Prev

ious

Yea

r

PART

ICU

LARS

  

Inte

rest

Acc

rued

on

Inve

stm

ent

2471

4761

2500

3092

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 129: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

118

NAT

ION

AL

WAT

ER D

EVEL

OPM

ENT

AG

ENC

Y ,

NEW

DEL

HI

CO

NTR

IBU

TORY

PRO

VID

ENT

FUN

D (3

1-03

-201

7 )

(Am

ount

in R

upee

s)Sc

hedu

le –

7 C

urre

nt L

iabi

litie

s and

Pro

visi

ons

Cur

rent

yea

rPr

evio

us Y

ear

PART

ICU

LARS

EMPL

OY

EES

CO

NTR

IBU

TIO

NO

peni

ng B

alan

ces

3502

6321

2.00

3045

0194

7.00

Add

ition

dur

ing

the

year

Empl

oyee

s Con

trib

utio

n74

9058

92.0

071

3676

00.0

0

Refu

nd o

f Adv

ance

1036

8198

.00

1005

7239

.00

Inte

rest

Cre

dite

d to

Mem

bers

Acc

ount

s27

9649

75.0

011

3239

065.

00--

-27

4990

55.0

0

4635

0227

7.00

4134

2584

1.00

Ded

uctio

n du

ring

the

year

Tran

sfer

to u

ncla

imed

subs

crip

tion

---

---

Fina

l Pay

men

ts34

1630

05.0

097

6634

1.00

Fina

l With

draw

al19

9450

16.0

022

2405

70.0

0

Loan

s/A

dvan

ces t

o M

embe

rs25

0118

74.0

031

1557

18.0

0

Tran

sfer

to N

PS su

bscr

iber

s Fun

d--

-79

1198

95.0

038

4382

382.

0063

1636

29.0

035

0263

212.

00

Empl

oyee

s Unc

laim

ed su

bscr

iptio

n12

2694

.00

1226

94.0

012

2694

.00

EMPL

OY

ER’S

CO

NTR

IBU

TIO

NO

peni

ng B

alan

ce30

2205

750.

0028

0414

209.

00

Addi

tion

durin

g the

yea

r

Empl

oyer

’s C

ontr

ibut

ion

1170

8107

.00

1206

5823

.00

Inte

rest

cred

ited

to M

embe

rs A

ccou

nts

2300

9706

.00

3471

7813

.00

2356

0702

.00

3562

6525

3369

2356

3.00

3160

4073

4.00

Ded

uctio

n du

ring

the

year

Fina

l Pay

men

ts22

1309

77.0

0

Tran

sfer

to N

PS S

ubsc

riber

s fun

d--

2213

0977

.00

1383

4984

.00

3147

9258

6.00

3022

0575

0.00

3022

0575

0.00

NW

DA

Acc

ount

5052

578

  

 To

tal

7043

5024

0.00

6525

9165

6.00

 

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 130: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

119

NATIONAL WATER DEVELOPMENT AGENCY , NEW DELHI CONTRIBUTORY PROVIDENT FUND

(31.03.2017)

SCHEDULE-10 INVESTMENTS-OTHERS(Amount in Rupees)

Particulars   Current Year Previous Year

Fixed Deposit 255000000    

Add Accrued Interest 20467041 275467041 261514337

Promissory Notes (Govt. Securities) 341075000

Add Accrued Interest 3416638 344491638 333386978

Special Deposit Scheme 40311609    

Add Accrued interest 831082 41142691 41188386

Total   661101370 636089701

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 131: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

120

NATIONAL WATER DEVELOPMENT AGENCY , NEW DELHI CONTRIBUTORY PROVIDENT FUND

(31.03.2017)

Schedule-11 Current Assets, Loans, Advances etc.(Amount in Rupees)

PARTICULARS Current Year Previous Year

Receivable from EE,ID, Jhansi, NWDA ---------- 171000

NWDA 0 967863

Bank Balances    

State Bank of Bikaner & Jaipur, Saket, New Delhi 7512888 27941220

Punjab National Bank, Sansad Marg, New Delhi. 60450743 12424964

Total 67963631 41505047

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 132: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

121

Annexure - I

NATIONAL WATER DEVELOPMENT AGENCY , NEW DELHI CONTRIBUTORY PROVIDENT FUND

Statement showing the month wise details of CPF Subscription (Employees Contribution) and Refund of Advance for the Year 2016-17

(Amount in Rupees)

Month Subscription (Employees Contribution)

Refund of Advance Total

       Apr-16 6167504 886984 7054488May-16 6208441 856589 7065030Jun-16 6218804 842873 7061677Jul-16 6318635 869868 7188503

Aug-16 6329381 853318 7182699Sep-16 6180261 869398 7049659Oct-16 6265840 887505 7153345Nov-16 6168445 884920 7053365Dec-16 6191854 863645 7055499Jan-17 6205854 867406 7073260Feb-17 6382770 860646 7243416Mar-17 6228103 825046 7053149TOTAL 74865892 10368198 85234090

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 133: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

122

Annexure - II

NATIONAL WATER DEVELOPMENT AGENCY , NEW DELHI CONTRIBUTORY PROVIDENT FUND

Statement showing details of Full & Final Payment / Transfer during the year 2016-17

(Amount in Rupees)

Sl. No. Name & Designation S./Sh./Smt. CPF A/c No. Employees Contribution

(Subscription)

Employer’s Contribution

Total

1 Sh. Tara Kumar Bral , D/m 4 78434 587857 6662912 Smt. G.V.V. Satyanarayanmma D/M 494 258339 483968 742307

3 Sh. T.M. Bhattacharya , UDC 809 1073422 390211 1463633

4 Sh. M.P. Gupta, Dir (F) 955 2621651 698734 33203855 Sh. D.C. Makwana ,MTS 592 1013909 388155 14020646 Sh..M.R.Patel, UDC 575 1703482 584089 22875717 Sh. Partap Singh, Driver 373 61163 532221 5933848 Sh.K. Venkata Ra, Steno 496 1208858 806394 20152529 Sh. P.V. Narayana, Supt 391 1111641 740205 1851846

10 Sh.K Jayaraman, D/m 728 548212 146627 69483911 Sh. K. Sadasivan, LDC 785 1071225 410283 148150812 Sh. A.Sambasiva Rao, JAO 433 478321 968955 144727613 Smt. T.N. Sangeeta, Steno 438 1976152 788907 276505914 Sh. Chet Ram, D/m 31 3619462 733851 435331315 Sh.J.K.Jhurani, JAO 520 2324529 961944 328647316 Sh.K.Shrihari , JAO 387 2057687 973211 303089817 Sh.Arshad Khan, Driver 908 1642031 594296 223632718 Late P.K Mishra, EE 358 3406545 1307279 471382419 Sh.R.P.Rawat, EE 328 628176 1443494 207167020 Sh.H.N. Dixit, CE 321 1101820 1777262 287908221 Sh.N.K.Singh, AD 39 1146215 1127378 227359322 Sh. M. Gangahanumaih, MTS 112 551367 414892 966259

23 Sh. M.C. Gundappa, MTS 87 466758 450170 91692824 Sh. Brijmohan Shakya, MTS 327 130079 406624 53670325 Sh. L.Preman, Driver 155 225015 569773 79478826 Sh.C. Thulsidharan, MTS 151 248837 448672 69750927 Sh. T.S.R. Murty, Steno 457 255896 763394 101929028 Sh. S. Bhadra, LDC 745 990020 471093 146111329 Sh. Mahatab Singh, D/m 289 1403128 722253 212538130 Sh. S.S.Majumdar, JAO 171 686670 1039794 172646431 Sh. B. Sambaiah, MTS 462 73961 398991 472952    Total 34163005 22130977 56293982

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 134: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

123

Annexure - III

NATIONAL WATER DEVELOPMENT AGENCY , NEW DELHI CONTRIBUTORY PROVIDENT FUND

Statement showing the details of fixed deposits schedule as on 31st March, 2017

(Amount in Rupees)

Sl. No. FDR No. Amount Rate of Interest (%)

Date of Maturity

Maturity Value

FDRS Purchased from

            State Bank of Bikaner & Jaipur, Saket, New Delhi

1 677427dt. 8.6.12 8000000 9.5 06-08-2017 12792879 -do-

2 677437 dt. 11.6.12 8000000 9.5 06-11-2017 12792879 -do-

3 677461 dt. 14.6.12 8000000 9.5 14-6-17 12792879 -do-

4 674425 dt. 19.10.12 8000000 9 19-10-17 12484074 –do-

5 674439 dt. 22.10.12 8000000 9 22-10-17 12484074 -do-

6 674444 dt. 23.10.12 8000000 9 23-10-17 12484074 -do-

7 679975 dt 2.2.15 8250000 8.5 02-02-2018 10617904 -do-

8 679981 dt 3.2.15 8250000 8.5 03-02-2018 10617904 -do-

9 679987 dt4.2.15 8250000 8.5 04-02-2018 10617904 -do-

10 679989 dt 5.2.15 8250000 8.5 05-02-2018 10617904 -do-

11 681272 dt 20.4.15 9000000 8.5 20-04-2018 11583168 -do-

12 681304 dt 24.4.15 9000000 8.5 24-04-2018 11583168 -do-

13 681313 dt 27.4.15 9000000 8.5 27-04-2018 11583168 -do-

14 681316 dt 28.4.15 9000000 8.5 28-04-2018 11583168 -do-

15 681312 dt 29.4.15 9000000 8.5 29-04-2018 11583168 -do-

16 681736 dt27.7.15 9000000 8.15 24-06-2018 11388744 -do-

17 681737 dt27.7.15 9000000 8.15 27-06-2018 11388744 -do-

18 682381 dt18.01.16 8400000 7.75 18-12-2018 10508529 -do-

19. 682386 dt19.01.16 8400000 7.75 19-12-2018 10508529 -do-

20 682394 dt20.01.16 8400000 7.75 20-12-2018 10508529 -do-

21 682398 dt21.01.16 8400000 7.75 21-12-2018 10508529 -do-

22 682424 dt25.01.16 8400000 7.75 25-12-2018 10508529 -do-

23 682676 dt18.04.16 9000000 7.5 18-03-2019 11174286 -do-

24 682684 dt19.04.16 9000000 7.5 19-03-2019 11174286 -do-

25 KF 882213 dt21.07.16 8000000 7.5 21-07-2019 9997731 Canara Bank, Saket New Delhi

26 KF 882217 dt22.07.16 8000000 7.5 22-07-2019 9997731 -do-

27 KF 882219 dt26.07.16 8000000 7.5 26-07-2019 9997731 -do-

28 955671 dt20.2.2017 9000000 7 19-02-2018 9646277 SBBJ, Saket, New Delhi

29 955672 dt 21.2.2017 9000000 7 20-02-2018 9646277 -do-

30 955677 dt 22.2.2017 9000000 7 21-02-2018 9646277 -do-

    255000000        

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 135: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

124

Annexure - IV

NATIONAL WATER DEVELOPMENT AGENCY , NEW DELHI CONTRIBUTORY PROVIDENT FUND

Statement showing the details of Promissory Notes/Govt. Securities as on 31.03.2017

(Amount in Rupees)

Sl. No. Promissory Notes No Date of Purchas Face Value Date of Maturity1 6.05% GS 2019 20.01.2006 2600000 12.01.20192 10.45% GS 2018 26.09.2007 2500000 30.04.20183 6.25 % GS 2018 09.05.2008 5700000 02.01.20184 6.35 % GS 2020 24.09.2009 13625000 02.01.20205 6.90% GS 2019 19.01.2010 15000000 13.07.20196 6.35 % GS 2020 22.04.2010 11800000 02.01.20207 8.20% GS 2024 12.08.2010 6200000 15.09.20248 8.20% GS 2024 23.12.2010 13950000 15.09.20249 8.20% GS 2023 25.05.2011 7200000 10.11.2023

10 8.08% GS 2022 02.08.2011 5500000 02.08.202211 8.79% GS 2021 08.12.2011 6900000 08.11.202112 8.28% GS 2027 02.03.2012 14800000 21.09.202713 8.28% GS 2027 19-06-2012 15800000 21-09-202714 8.33% GS 2026 31-10-2012 15200000 09-07202615 8.35% GS 2024 06-07-2013 25600000 27-03-202416 8.20 % GS 2025 25-11-2013 9100000 25-09-202517 8.28 % GS 2027 13-02-2014 12300000 21-09-202718 7.16 % GS 2023 27-03-2014 7600000 20-05-202319 6.90% GS 2026 17.7.2014 11000000 4.2.202620 8.20% GS 2025 15.9.2014 6700000 24.9.202521 8.35% GS 2024 3.2.2015 20600000 27.3.202422 8.35% GS 2024 16.4.2015 29000000 27.3.202423 7.16% GS 2023 4.8.2015 12400000 25.5.202324 7.68% GS 2023 21.1.2016 27700000 15.12.202325 8.40% GOI 2026 26.4.2016 11000000 24.7.202426 7.95% GOI 2026 3.8.2016 14800000 18.2.202627 7.73% GOI 2034 24.3.2016 9000000 19.12.203428 7.32% GOI 2032 24.3.2016 75000000 2.8.2032  Total   341075000  

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 136: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

125

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

INDIA WATER WEEK-2016 BALANCE SHEET AS AT 31.3.2017

(Amount in Rupees)

Particulars Schedule Current Year

   CAPITAL FUND AND LIABILITIES    CORPUS/CAPITAL FUND 1 (-)1086193RESERVE AND SURPLUS 2 0.00EARMARKED/ENDOWMENT FUNDS 3 0.00SECURED LOANS AND BORROWINGS 4 0.00UNSECURED LOANS AND BORROWINGS 5 0.00DEFERRED CREDIT LIABILITIES 6 0.00CURRENT LIABILITIES AND PROVISIONS 7 2000000.00

      

TOTAL   913807.00   

ASSETS    FIXED ASSETS 8 0.00INVESTMENTS - FROM EARMARKED / 9 0.00 ENDOWMENT    INVESTMENTS - OTHERS 10 0.00CURRENT ASSETS, LOANS, ADVANCE ETC. 11 913807.00MISCELLANEOUS EXPENDITURE   0.00

(To the extent not written off or adjusted)       

TOTAL   913807.00SIGNIFICANT ACCOUNTING POLICIES 24  CONTINGENT LIABILITIES AND NOTES ON    ACCOUNTS 25  

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 137: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

126

N

ATIO

NA

L W

ATER

DEV

ELO

PMEN

T A

GEN

CY

( MIN

ISTR

Y O

F W

ATER

RES

OU

RCES

, GO

VT.

OF

IND

IA )

IND

IA W

ATER

WEE

K 2

016-

INC

OM

E &

EX

PEN

DIT

UR

E A

CC

OU

NT

AS

ON

31.

3.20

17(A

mou

nt in

Rup

ees)

EXPE

ND

ITU

RE

Sche

dule

IWW

-201

6IN

CO

ME

Sche

dule

IWW

-201

6

Esta

blish

men

t Exp

ense

s20

0.00

Inco

me

from

Sal

es/S

ervi

ce12

0.00

Oth

er A

dmin

istra

tive

Expe

nses

etc

.21

4259

9229

.00

GRA

NTS

/ SU

BSID

IES

1310

0000

00.0

0

Expe

nditu

re o

n G

rant

s, Su

bsid

ies e

tc.

220.

00(I

rrev

ocab

le G

rant

s & su

bsid

ies r

ecei

ved)

Inte

rest

23

0.00

Fees

/Sub

scrip

tions

1425

4644

49.0

0

Inco

me

from

Inve

stm

ent (

Inco

me

on

Inve

st. F

rom

Ear

mar

ked/

endo

w. F

unds

tran

sfer

red

to F

unds

)15

0.00

Inco

me

from

Roy

alty

, Pub

licat

ion

etc.

160.

00

Inte

rest

Ear

ned

1733

7812

.00

Oth

er In

com

e18

1106

5.00

Incr

ease

(Dec

reas

e) in

Sto

ck o

f Fin

ished

Goo

ds a

nd W

orks

-in-p

rogr

ess.

190.

00

TOTA

L (

B) 

4259

9229

.00

TOTA

L (

A)

 35

8133

26.0

0

Bala

nce

Bein

g Ex

cess

of E

xpen

sed

ove

rIn

com

e (B

- A

)67

8590

3.00

Tran

sfer

to S

peci

al R

eser

ve (S

peci

fy e

ach)

Tran

sfer

to /

from

Gen

eral

Res

erve

0.00

BALA

NC

E BE

ING

SU

RPLU

S (D

EFIC

IT)

CA

RRIE

D T

O C

ORP

US/

CA

PITA

L FU

ND

6785

903.

00SI

GN

IFIC

AN

T A

CC

OU

NTI

NG

PO

LIC

IES

CO

NTI

GEN

T LI

ABI

LITI

ES A

ND

NO

TES

ON

AC

CO

UN

TS

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 138: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

127

N

ATIO

NA

L W

ATER

DEV

ELO

PMEN

T A

GEN

CY

( MIN

ISTR

Y O

F W

ATER

RES

OU

RCES

, GO

VT.

OF

IND

IA )

IND

IA W

ATER

WEE

K-2

016-

REC

EIPT

& P

AYM

ENT

AC

CO

UN

T A

S O

N 3

1.3.

2017

(Am

ount

in R

upee

s)R

ECEI

PTIW

W -2

016

 PA

YMEN

TIW

W -2

016

I.O

peni

ng B

alan

ceI.

Expe

nses

a). C

ash

in H

and

2000

0.00

a). E

stab

lishm

ent E

xpen

ses

0.00

b). B

ank

Bala

nce

(

Cor

resp

ondi

ng to

Sch

edul

e 20

A)

i.

In S

avin

g A

ccou

nts

5679

710.

00b)

. Adm

inist

rativ

e Ex

pens

es

4285

2829

.00

ii

Che

que

/ Dra

ft in

Tra

nsit

0.00

(

Cor

resp

ondi

ng to

Sch

edul

e 21

A)

c). P

osta

ge in

Han

d0.

00II

.Pa

ymen

t mad

e ag

ains

t Fun

ds fo

rII

.G

rant

Rec

eive

dVa

riou

s Pro

ject

s.a)

F

rom

Gov

ernm

ent o

f Ind

ia10

0000

00.0

0 L

ink

Can

al P

roje

ct0.

00b)

. F

rom

Sta

te G

over

nmen

t0.

00II

I.In

vest

men

t and

Dep

osit

Mad

eII

I.In

com

e on

Inve

stm

ent F

rom

a). O

ut o

f Ear

mar

ked/

Endo

wm

ent f

unds

0.00

a) E

arm

arke

d/ E

ndow

Fun

ds0.

00b)

. Out

of O

wn

Fund

s (In

vest

men

t- o

ther

s)0.

00b)

Ow

n Fu

nd (O

n In

vest

men

t)0.

00IV

.In

tere

st R

ecei

ved

IV.

Expe

nditu

re o

n Fi

xed

& C

apita

l Wor

k- in

- a)

On

Bank

Dep

osits

3378

12.0

0Pr

ogre

ss0.

00b)

. L

oans

& A

dvan

ces e

tc.

0.00

V.O

ther

Inco

me

(Spe

cify

)R

efun

d of

Inte

rest

and

Lon

g Te

rm A

dvan

ce0.

00 S

pons

orsh

ip F

ees

1190

8204

.00

V.Su

blet

ting

of S

talls

9731

894.

00Fi

nanc

e C

harg

es (I

nter

est)

0.00

Misc

. Rec

eipt

s

11

065.

00V

I.O

ther

Pay

men

ts (S

peci

fy)

0.00

Regi

stra

tion/

Del

egat

ion

8993

28.0

0C

losi

ng B

alan

ces

VI.

Am

ount

Bor

row

ed-N

WD

A20

0000

0.00

VII

.a)

. C

ash

in h

and

0.

00V

II.

Any

Oth

er R

ecei

pts (

give

det

ails

)b)

Ban

k ba

lanc

eC

ount

ry P

artn

er Is

rael

2925

023.

00

i)

In

Savi

ng A

ccou

nts

- SBB

J28

169.

00O

ther

Rec

eipt

s

H

DFC

6320

38.0

0c)

. P

osta

ge in

Han

dTo

tal:

4351

3036

.00

  

Tota

l:43

5130

36.0

0

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 139: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

128

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

INDIA WATER WEEK-2016 SCHEDULES FORMING PART OF BALANCE SHEET AS AT 31.3.2017

SCHEDULE 1- CAPITAL FUND

(Amount in Rupees)

Particulars IWW-2016

Balance as at the Beginning of the Year 5699710.00

Sub Total (A): 5699710.00

- Capital Investment Written Off

Add/Deduct: Balance of net income/(expenditure)transferred from the Income and Expenditure A/c. 6785903.00

Sub Total (B): 6785903.00

Balance at the Year end -1086193.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 140: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

129

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

INDIA WATER WEEK-2016 SCHEDULES FORMING PART OF BALANCE SHEET AS AT 31.3.2017

SCHEDULE - 7 CURRENT LIABILITIES AND PROVISIONS

(Amount in Rupees)

Particulars     IWW- 2016A. CURRENT LIABILITIES

Other Current LiabilitiesOutstanding Expenses : Salary & Allowances 0.00Rent,Rate & Taxes 0.00Remittance 0.00Stale Cheques 0.00CPF 0.00Others-NWDA 2000000.00Earnest Money /Security Deposit 0.00

Performance Guarantee Deposit 0.00Superannuation & GratuityFund 0.00TDS 0.00Sub Total (A) : 2000000.00

B. PROVISIONSAudit Fee 0.00Superannuation & GratuityFund 0.00

Sub Total (B): 0.00Grand Total:     2000000.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 141: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

130

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

INDIA WATER WEEK 2016 SCHEDULES FORMING PART OF BALANCE SHEET AS AT 31.3.2017

SCHEDULE-11: CURRENT ASSETS, LOANS, ADVANCES etc.

(Amount in Rupees)

  Particulars IWW-2016

A CURRENT ASSETS  

  Cash Balance in Hand 0.00

  Saving Bank Account-SBBJ 28169.00

     

  HDFC 632038.00

  Postage in Hand 0.00

  Draft in Transit 0.00

     

  Sub Total (A) 660207.00

B. LOANS ADVANCES AND OTHER ASSETS  

  Loans & Advances:  

  To staff 0.00

  To Others ( Security Deposit)  

  Vigyan Bhawan 53600.00

  ITPO 0.00

  IWW-2017 200000.00

  Sub Total (B): 0.00

  CLAIMS RECEIVABLE  

     

  Sub Total (C) 253600.00

     

  Grand total 913807.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 142: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

131

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

INDIA WATER WEEK-2016 SCHEDULES FORMING PART OF INCOME & EXPENDITURE ACCOUNT AS ON 31.3.2017

SCHEDULE - 13: GRANTS / SUBSIDIES ( Irrevocable Grants & subsidies received)

(Amount in Rupees)

Particulars     IWW - 2016

Fund received from MOWR,RD & GR for India Water Week-2016 10000000.00

Total:     10000000.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 143: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

132

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

INDIA WATER WEEK-2016 SCHEDULES FORMING PART OF INCOME & EXPENDITURE ACCOUNT AS ON 31.3.2017

SCHEDULE - 14: FEES / SUBSCRIPTION

(Amount in Rupees)

  Particulars     IWW-2016India Water Week

1 Registration/ Delegation Fee 899328.00

2 Annual Fees/Subscription 0.003 Seminar/Programme Fees 04 Sponsorship Fee 11908204.005 Subletting of Stalls-I.W.W. 9731894.006 Other Receipts (Suspense Account) 2925023.007 0.00

Total:     25464449.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 144: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

133

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

INDIA WATER WEEK 2016 SCHEDULES FORMING PART OF BALANCE SHEET AS AT 31.3.2017

SCHEDULE-17 INTEREST EARNED

(Amount in Rupees)

  Particulars IWW-2016

(a) On Saving Bank Account   337812.00

(b) Loans and Advances   0.00

(c) Others   0.00

  Total 337812.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 145: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

134

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

INDIA WATER WEEK 2016 SCHEDULES FORMING PART OF INCOME &EXPENDITURE ACCOUNT AS AT 31.3.2017

SCHEDULE-18 Other income

(Amount in Rupees)

Particulars IWW-2016Disposal of Assets 0.00Profit/ Loss on disposal of Assets 0.00Miscellaneous Inocme 11065.00Sale of Tender Forms etc. 0.00Total 11065.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 146: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

135

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

INDIA WATER WEEK 2016 SCHEDULES FORMING PART OF INCOME &EXPENDITURE ACCOUNT AS AT 31.3.2017

SCHEDULE-21 Other Administrative Expendses

(Amount in Rupees)

Particulars IWW-2016Travelling Expenses   249283.00Printing   1613068.00Telephone & Trunkcall   4000.00Registration Material Exp   1269980.00Launching of Separate Website   1041389.00Momentous purchases   217238.00Postages Exp   70415.00Supporting Staff   208637.00Event Promotion   7082409.00Bank Charges   3877.00Hospitality Expenses   5705594.00Signage Fabrication Works Exp   5127575.00Audio visual Equipment Expenes    Transport Hiring   242117.00Exhibition Works Expenses   14950.00Rent, Vigyan Bhawan   668000.00Rent ITPO   17435348.00Adv. Exp   918046.00Bouquet &Flower at Vigyan Bhawan   374430.00Minor Works   248483.00Work(IT)   9800.00Temp . Adv. Of Sh . S.C. Mangal, AE   41500.00

Conference Exp   890.00Photography & Videographery   24400.00Cultural Programme Exp   27800.00Total   42599229.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 147: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

136

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

INDIA WATER WEEK 2016 SCHEDULES FORMING PART OF RECEIPTS & PAYMENTS ACCOUNT AS AT 31.3.2017

SCHEDULE-21 -A Other Administrative Expendses

(Amount in Rupees)

Particulars IWW-2016Rant A/C ITPO   17435348.00Rent A/c Vigyan Bhawan   668000.00Registration Material Expenses   1269980.00Printing Exp.   1613068.00Hospitality Exp.   5705594.00Launching of separate web site Exp   1041389.00Signage Exp   5127575.00Bouquet & Glower Exp, at Vigyan Bhawan   374430.00Traveling Exp   249283.00Momentous Exp.   217238.00Postage Exp   70415.00Telephone /Eac Exp   4000.00Transport hire Exp.   242117.00Supporting Staf Exp.   208637.00Exhibition works Exp.   14950.00Event Promotion exp.   7082409.00Bank charges Exp.   3877.00Advertisement Exp.   918046.00Minor Works   248483.00Work (IT)   9800.00Conference Exp.   890.00Photography & Videographery   24400.00Cultural Program Exp.   27800.00     Temp . Adv. Of Sh . S.C. Mangal, AE   41500.00Security Deposit Vigyan Bhawan   53600.00Transfer to IWW-2017   200000.00

Total   42852829.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 148: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

137

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

JAL MANTHAN-2017 BALANCE SHEET AS AT 31st March,2017

(Amount in Rupees)

Particulars Schedule Current Year   

CAPITAL FUND AND LIABILITIES    CORPUS/CAPITAL FUND 1 428071.00RESERVE AND SURPLUS 2 0.00EARMARKED/ENDOWMENT FUNDS 3 0.00SECURED LOANS AND BORROWINGS 4 0.00UNSECURED LOANS AND BORROWINGS 5 0.00DEFERRED CREDIT LIABILITIES 6 0.00CURRENT LIABILITIES AND PROVISIONS 7 0.00

TOTAL   428071.00   

ASSETS    FIXED ASSETS 8 0.00INVESTMENTS - FROM EARMARKED / ENDOWMENT 9 0.00INVESTMENTS - OTHERS 10 0.00CURRENT ASSETS, LOANS, ADVANCE ETC. 11 428071.00MISCELLANEOUS EXPENDITURE   0.00(To the extent not written off or adjusted)    

TOTAL   428071.00   

SIGNIFICANT ACCOUNTING POLICIES 24  

CONTINGENT LIABILITIES AND NOTES ON ACCOUNTS 25   

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 149: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

138

N

ATIO

NA

L W

ATER

DEV

ELO

PMEN

T A

GEN

CY

( MIN

ISTR

Y O

F W

ATER

RES

OU

RCES

, GO

VT.

OF

IND

IA )

JAL

MA

NTH

AN

-201

7 - I

NC

OM

E &

EX

PEN

DIT

UR

E A

CC

OU

NT

AS

ON

31-

03-2

017

(Am

ount

in R

upee

s)

 EX

PEN

DIT

UR

ESc

hedu

leJA

L M

AN

THA

INC

OM

ESc

hedu

leJA

L M

AN

THA

Esta

blish

men

t Exp

ense

s20

0.00

Inco

me

from

Sal

es/S

ervi

ce12

0.00

 O

ther

Adm

inist

rativ

e Ex

pens

es e

tc.

21

2

2,91

,356

.00

GRA

NTS

/ SU

BSID

IES

13

25,0

0,00

0.00

 Ex

pend

iture

on

Gra

nts,

Subs

idie

s etc

.22

0.00

(Irr

evoc

able

Gra

nts &

subs

idie

s rec

eive

d) 

 In

tere

st

230.

00Fe

es/S

ubsc

riptio

ns14

0.00

  

 In

com

e fr

om In

vest

men

t (In

com

e on

 

 In

vest

. Fro

m E

arm

arke

d/en

dow.

Fun

ds 

 tr

ansf

erre

d to

Fun

ds)

150.

00 

Inco

me

from

Roy

alty

, Pub

licat

ion

etc.

160.

00 

Inte

rest

Ear

ned

1714

53.0

Oth

er In

com

e18

0.00

 In

crea

se (D

ecre

ase)

in S

tock

of F

inish

ed 

 G

oods

and

Wor

ks-in

-pro

gres

s.19

0.00

  

TOTA

L (

B) 

22,

91,3

56.0

0  

TOTA

L (

A)

 

25,0

1,45

3.00

Bala

nce

Bein

g Ex

cess

of I

ncom

e ov

erEx

pend

iture

(A-B

)

2,1

0,09

7.00

Tr

ansf

er to

Spe

cial

Res

erve

(Spe

cify

eac

h)Tr

ansf

er to

/ fr

om G

ener

al R

eser

ve0.

00BA

LAN

CE

BEIN

G S

URP

LUS

(DEF

ICIT

)C

ARR

IED

TO

CO

RPU

S/C

API

TAL

FUN

D21

0097

.00

SIG

NIF

ICA

NT

AC

CO

UN

TIN

G P

OLI

CIE

SC

ON

TIG

ENT

LIA

BILI

TIES

AN

D N

OTE

SO

N A

CC

OU

NTS

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 150: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

139

N

ATIO

NA

L W

ATER

DEV

ELO

PMEN

T A

GEN

CY

( MIN

ISTR

Y O

F W

ATER

RES

OU

RCES

, GO

VT.

OF

IND

IA )

JAL

MA

NTH

AN

-201

7 - R

ECEI

PT &

PAY

MEN

T A

CC

OU

NT

AS

ON

31.

03.2

017

(Am

ount

in R

upee

s)

REC

EIPT

JAL

MA

NTH

AN

 PA

YMEN

TJA

L M

AN

THA

NI.

Ope

ning

Bal

ance

Expe

nses

a). C

ash

in H

and

0.00

a). E

stab

lishm

ent E

xpen

ses

0.00

b). B

ank

Bala

nce

2179

74.0

0

(C

orre

spon

ding

to S

ched

ule

20A

)

i. In

Sav

ing

Acc

ount

s0.

00b)

. Adm

inist

rativ

e Ex

pens

es

22

,91,

356.

00

ii

Che

que

/ Dra

ft in

Tra

nsit

0.00

(

Cor

resp

ondi

ng to

Sch

edul

e 21

A)

c). P

osta

ge in

Han

d0.

00Pa

ymen

t mad

e ag

ains

t Fun

ds fo

rII

.G

rant

Rec

eive

dVa

riou

s Pro

ject

s.a)

F

rom

Gov

ernm

ent o

f Ind

ia25

0000

0.00

Lin

k C

anal

Pro

ject

0.00

b).

Fro

m S

tate

Gov

ernm

ent

0.00

Inve

stm

ent a

nd D

epos

it M

ade

III.

Inco

me

on In

vest

men

t Fro

ma)

. Out

of E

arm

arke

d/En

dow

men

t fun

ds0.

00a)

Ear

mar

ked/

End

ow F

unds

0.00

b). O

ut o

f Ow

n Fu

nds (

Inve

stm

ent-

oth

ers)

0.00

b) O

wn

Fund

(On

Inve

stm

ent)

0.00

IV.

Inte

rest

Rec

eive

dEx

pend

iture

on

Fixe

d &

Cap

ital W

ork-

in-

a) O

n Ba

nk D

epos

its14

53.0

0Pr

ogre

ss0.

00b)

. L

oans

& A

dvan

ces e

tc.

0.00

V.O

ther

Inco

me

(Spe

cify

)R

efun

d of

Inte

rest

and

Lon

g Te

rm A

dvan

ce0.

00En

tran

ce /

Spon

sors

hip

Fees

0.00

Subl

ettin

g of

Sta

lls0.

00Fi

nanc

e C

harg

es (I

nter

est)

0.00

Misc

. Rec

eipt

s

0.

00O

ther

Pay

men

ts (S

peci

fy)

Adv

ance

to IT

DC

0.00

Secu

rity

depo

sit V

igya

n Bh

awan

7650

.00

VI.

Am

ount

Bor

row

ed0.

00C

losi

ng B

alan

ces

VII

.A

ny O

ther

Rec

eipt

s (gi

ve d

etai

ls)

a).

Cas

h in

han

d

b) B

ank

bala

nce

4204

21.0

0O

ther

Rec

eipt

s0.

00

i

) In

Sav

ing

Acc

ount

s

c).

Pos

tage

in H

and

Tota

l:27

1942

Tota

l:27

1942

7

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 151: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

140

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

JAL MANTHAN-2017 SCHEDULES FORMING PART OF BALANCE SHEET ACCOUNT AS AT 31.3.2017

SCHEDULE -1: Capital Fund

(Amount in Rupees)

  Particulars     JAL MANTHANBalance as at the Begining of the year 217974.00

Sub Total (A) 217974.00

Capital Investment Written Off

Add/Deduct: Balance of net income/(expenditure)transferred form the inc,e and Expenditure A/c 210097.00

Sub Total (B): 210097.00

Balance at the Year end     428071.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 152: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

141

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

JAL MANTHAN-2017 SCHEDULES FORMING PART OF BALANCE SHEET ACCOUNT AS AT 31.3.2017

SCHEDULE -11: CURRENT ASSETS, LOANS, ADVANCES etc.

(Amount in Rupees)

  Particulars     JAL MANTHANA. CURRENT ASSETS

Cash Balance in Hand 0.00Bank Balance in Saving Bank Account 420421.00Bank Balance in Current Account 0.00Postage in Hand 0.00Draft in Transit 0.00

Sub Total (A) : 420421.00

B. LOANS ADVANCES AND OTHER ASSETSLoans & Advances : To Staff 0 To Others (Security deposit vigyan bhawan) 7650.00

Sub Total (B) : 7650.00C CLAIMS RECEIVABLE 0

Sub Total (C) : 0.00Grand Total     428071.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 153: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

142

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

JAL MANTHAN-2017 SCHEDULES FORMING PART OF INCOME & EXPENDITURE ACCOUNT FOR THE YEAR ENDED 31st March,2017

SCHEDULE - 13: GRANTS / SUBSIDIES ( Irrevocable Grants & subsidies received)

(Amount in Rupees)

  Particulars     JAL MANTHAN

Fund received from MOWR,RD & GR for Jal Manthan-2017 2500000.00

Total:     2500000.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 154: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

143

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

JAL MANTHAN-2017 SCHEDULES FORMING PART OF INCOME & EXPENDITURE ACCOUNT FOR THE YEAR ENDED 31st March,2017

SCHEDULE - 17: INTEREST EARNED

(Amount in Rupees)

  Particulars     JAL MANTHAN

(a) On Saving Bank Account 1453.00

(b) Loans and Advances 0.00(c) Others 0.00

  Total:     1453.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 155: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

144

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

JAL MANTHAN-2017 SCHEDULES FORMING PART OF INCOME & EXPENDITURE ACCOUNT FOR THE YEAR ENDED 31ST MARCH, 2017

SCHEDULE - 21: OTHER ADMINISTRATIVE EXPENSES

(Amount in Rupees)

Particulars     JAL MANTHAN

TA/DA Expenses 27637.00

PRINTING EXPENSES 38220.00

REGISTERATION MATERIAL 198990.00

FLOWER DECORATION EXP. 59430.00

LOGISTIC ARRANGEMENT EXP. 645674.00

HOSPITILITY EXPENSES 596224.00

RENT A/C 153000.00

MOMENTOES EXP. 40500.00

ADVERTISEMENT EXP. 531629.00

BANK CHARGES 52.00

Total     2291356.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 156: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

145

NATIONAL WATER DEVELOPMENT AGENCY ( MINISTRY OF WATER RESOURCES, GOVT. OF INDIA )

JAL MANTHAN-2017 SCHEDULES FORMING PART OF RECEIPT & PAYMENTS ACCOUNT FOR THE YEAR ENDED 31ST MARCH, 2017

SCHEDULE - 21 A: OTHER ADMINISTRATIVE EXPENSES

(Amount in Rupees)

Particulars     JAL MANTHAN

TA/DA Expenses 27637.00

PRINTING EXPENSES 38220.00

REGISTERATION MATERIAL 198990.00

FLOWER DECORATION EXP. 59430.00

LOGISTIC ARRANGEMENT EXP. 645674.00

HOSPITILITY EXPENSES 596224.00

RENT A/C 153000.00

MOMENTOES EXP. 40500.00

ADVERTISEMENT EXP. 531629.00

BANK CHARGES 52.00

Total     2291356.00

Sd/- Sd/- Sd/-

(S.S. Mohapatra) (R.K.Sinha ) (R.K.Jain) Accounts Officer Director (Finance) Chief Engineer (H.Q)

Page 157: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

NatioNal Water DevelopmeNt ageNcy

146

N

ATIO

NA

L W

ATER

DEV

ELO

PMEN

T A

GEN

CY

( MIN

ISTR

Y O

F W

ATER

RES

OU

RCES

, GO

VT.

OF

IND

IA )

L

ON

G T

ERM

IRR

IGAT

ION

FU

ND

UN

DER

PM

KSY

SC

HEM

E - R

ECEI

PTS

& P

AYM

ENTS

AC

CO

UN

T FO

R T

HE

YEA

R 2

016-

17

(Am

ount

in R

upee

s)

REC

EIPT

SA

mou

ntPA

YMEN

TSA

mou

nt

I.O

peni

ng B

alan

ceI.

Expe

nses

a). C

ash

in H

and

-

a). E

stab

lishm

ent E

xpen

ses

- b)

. Ban

k Ba

lanc

e

(C

orre

spon

ding

to S

ched

ule

20A

)

i. In

Cur

rent

Acc

ount

s

-

b)

. Adm

inist

rativ

e Ex

pens

es

-

ii C

hequ

e / D

raft

in T

rans

it

-

(C

orre

spon

ding

to S

ched

ule

21A

)II

.G

rant

Rec

eive

dII

.Pa

ymen

t mad

e ag

ains

t Fun

ds fo

ra)

F

rom

Gov

ernm

ent o

f Ind

ia

44,

66,3

5,55

6.00

Va

riou

s Pro

ject

s.

b).

Fro

m S

tate

Gov

ernm

ent

-

Cen

tral

Ass

istan

ce(C

A) R

elea

sed

unde

r LT

IF o

f PM

KSY

schm

e to

the

Sta

te o

f :-

III.

Inco

me

on In

vest

men

t Fro

mA

ndhr

a Pr

ades

h

7,4

0,00

,000

.00

a) E

arm

arke

d/ E

ndow

Fun

ds

-

Bi

har

1

2,64

,33,

000.

00

b) O

wn

Fund

(On

Inve

stm

ent)

-

Chh

attis

garh

1

3,29

,00,

000.

00

Guj

arat

1

4,76

,85,

77,0

00.0

0 IV

.In

tere

st R

ecei

ved

Jhar

khan

d

1

,45,

75,0

0,00

0.00

a)

On

Bank

Dep

osits

-

Kar

nata

ka

88,

29,7

0,00

0.00

M

adhy

a Pr

ades

h

2

,85,

41,4

0,00

0.00

V.

Oth

er In

com

e (S

peci

fy)

-

Man

ipur

1,2

6,99

,40,

000.

00

Mah

aras

htra

2,0

7,85

,20,

000.

00

VI.

Am

ount

Bor

row

ed

-

O

dish

a

4

,93,

01,2

0,00

0.00

Loan

from

Nat

iona

l Ban

k fo

r Agr

icul

tura

l an

d Ru

ral D

evel

opm

ent (

NA

BARD

) und

er

LTIF

of P

MK

SY sc

hem

e 5

7,51

,04,

00,0

00.0

0

Punj

ab

52,

41,6

0,00

0.00

Raja

stha

n

45,

89,0

0,00

0.00

V

II.

Any

Oth

er R

ecei

pts (

give

det

ails)

-

Tela

ngan

a

2

,45,

43,2

0,00

0.00

U

P

1

,35,

63,2

0,00

0.00

Page 158: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives

ANNUAL REPORT 2016-17

147

Pola

vara

m P

roje

ct A

utho

rity

2

4,14

,16,

00,0

00.0

0

III.

Inve

stm

ent a

nd D

epos

it M

ade

-

IV.

Expe

nditu

re o

n Fi

xed

& C

apita

l

-

Wor

k- in

-Pro

gres

s

-

V.Re

fund

of I

nter

est a

nd L

ong

Term

A

dvan

ce

-

Inte

rest

pai

d to

Nat

iona

l Ban

k fo

r A

gric

ultu

ral a

nd R

ural

Dev

elop

men

t (N

ABA

RD)

for L

oan

take

n u

nder

LTI

F of

PM

KSY

sche

me

4

4,66

,35,

556.

00

VI.

Fina

nce

Cha

rges

(Int

eres

t)

-

VII

.O

ther

Pay

men

ts (S

peci

fy)

VII

I.C

losin

g Ba

lanc

esa)

. C

ash

in h

and

-

b) B

ank

bala

nce

-

i

) in

cur

rent

Acc

ount

s

-

To

tal

57,

95,7

0,35

,556

.00

57

,95,

70,3

5,55

6.00

S

d/-

Sd

/-

Sd/

-

(S

.S. M

ohap

atra

) (R

.K.S

inha

) (R

.K.Ja

in)

A

ccou

nts O

ffice

r D

irect

or (F

inan

ce)

Chi

ef E

ngin

eer (

H.Q

)

Page 159: National Water Development Agency · It gives me immense pleasure to present this Annual Report of National Water Development Agency (NWDA) for the year 2016 – 17. This Report gives