MPR – May 2014 NATIONAL HIGHWAY AUTHORITY OF INDIA (MINISTRY OF ROAD TRANSPORT & HIGHWAYS) Rehabilitation, Strengthening and Four Laning of Srinagar to Banihal Section from Km 187.000 to 189.350 (Banihal Bypass) and Km 220.700 to 286.110 of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP–Phase-II/BOT/I/J&K). Monthly Progress Report for the Month of May’2014 Employer : National Highways Authority of India Independent Consultant : Nicholas O’ Dwyer & Company Ltd – SA Infrastructure Pvt .Ltd in association with VKS Infratech Management Pvt. Ltd. (Placed in the month of March 2012). Srinagar Banihal Expressway Limited. Srinagar Banihal Road Project 1

Upload: lythu

Post on 24-Apr-2018

242 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

NATIONAL HIGHWAY AUTHORITY OF INDIA(MINISTRY OF ROAD TRANSPORT & HIGHWAYS)

Rehabilitation, Strengthening and Four Laning of Srinagar to Banihal Section from Km 187.000 to 189.350 (Banihal Bypass) and Km 220.700 to 286.110 of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP–Phase-II/BOT/I/J&K).

Monthly Progress Report for the Month of May’2014

Employer : National Highways Authority of India

Independent Consultant : Nicholas O’ Dwyer & Company Ltd – SA Infrastructure Pvt .Ltd in association with VKS Infratech Management Pvt. Ltd. (Placed in the month of March 2012).

Concessionaire : Srinagar Banihal Expressway Limited.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

1

Page 2: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

TITLE: MPR May’ 2014 (Chainage –187+000 to 189+350, 220+700 to 286+110)

INDEPENDENT ENGINEER:

Nicholas O’ Dwyer & Company Ltd – SA Infrastructure Pvt .Ltd in association with VKS Infratech Management Pvt. Ltd. (Placed in the month of March 2012).

CONCESSIONAIRE:

CONTRACTOR:

RAMKY INFRASTRUCTURE LIMITED

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

2

Srinagar Banihal Expressway Limited. - SPV

Page 3: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.

Srinagar Banihal Road Project NH-1A

Monthly Report IndexMay – 2014

Sr. No DESCRIPTION PAGE01 Cover Sheet 102 Title 303 Index 304 Description of Project 405 Project Alignment 1106 Organization Chart SPV & PMC 1407 Organization Chart EPC 1508 Mobilization Report 1609 Logistics 1711 Material Resource Report 3112 Methodology Statement & Source Approval Letters 3313 Status of Change or Variations 3314 Status of Stretches 3415 Approvals and Permits 3716 Status of Road & Structure Works 3817 Progress of Roads Works & Structures Works (S-Curve) 4018 Major Correspondences from SBEL 4119 Site Progress Photographs 4320 Annexure – I (Strip Plan) + IPC Status -21 Annexure – II (Land Acquisition Strip Chart) -22 Annexure – III (Land Acquisition Status) -23 Annexure – IV (Strip Chart Highway) -24 Annexure –V (Structure Status) -25 Annexure – VI( QA QC Report) + (Weather Report) -26 Annexure – VII(Mobilization of Man Power & Mobilization of

Equipments )-

27 Annexure – VIII(Drawing Status ) -28 Annexure – IX(Targets V/S Achieved ) +Achievements -

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

3

Page 4: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

1. DESCRIPTION OF THE PROJECT:

1.0 INTRODUCTION:

This is the Progress Report for the month of May’ 2014 being submitted by the Concessionaire’s office which reflects the on-site progress and Executive summary of general information about the project is furnished hereunder.

1. 1 Description of the Project

The contract package Srinagar Banihal Road Project involves four laning and strengthening of the Existing National Highway NH- 1A between Srinagar and Banihal – Km 187+000 to 189+350 & 220+700 to 286+110.

1.2. Executive Summary:

In the 67.76 km stretch of the road project SBEL has constructed 5 no’s of Camps namely Camp-I (Banihal) at chainage 188+000 Km, Camp-II (Vessu) at chainage 234+200 km, Camp-III (Samthan) at chainage 249+800Km , Camp-IV (Lethpora) at chainage 270+900 Km and Camp-V (Lasjan) at chainage 282+500 Km. Apart from the camps mentioned above SBEL has also constructed a Steel Yard at chainage 252+980 Km, as shown in the attached Logistic Plan. At these camps SBEL has operated with 2 no’s of Hot mix Plants, 5 no’s of Batching Plants, 4 no’s of Crushers and 3 no’s of Wet mix Plants. All the crushers are functional; also 3 numbers of Batching Plants are functional. Other than plants, Office buildings, Lab, Staff Quarters, Labour Hutments, Security Sheds, Workshops and Cement Stores etc have also been constructed in all the camps. Pre-Cast yard has also been established at the Samthan Camp and functional, where pre-casting of 230 cells of Box Culverts are completed

In Structure Works, SBEL has completed works on 80 no’s culverts on both Sides. Apart from the above mentioned completed culverts, work on 55 no’s culverts are in progress. Work is also being executed on 6 no’s of VUP’s, 4 no’s PUP’s, 5 no’s Major Bridges and 4 no’s Minor Bridges and 1 no Fly-over. The detailed progress is elaborated in tabular form of physical program chart.

In Highway Works SBEL has executed 39.5 lac Cum of earthwork. Other than earthwork SBEL has also executed approximately 1.92 lac Cum of GSB work, 1.43 lac Cum of WMM and 35000 Cum of DBM. The detailed progress is elaborated in tabular form of physical program chart. Apart from the permanent work Concessionaire has done the maintenance of Existing road in the month of April & May 2014 from Panth Chowk, Srinagar up to Qazugund Starting Chainage i.e 220+700. Including the Banihal Bye Pass i.e from Ch. 187+000 to 189+350.

Concessionaire had executed the test of PFVD (Prefabricated Vertical Drain) at external laboratory for ground improvement where the high embankment exists and the test report of the same had submitted vide their office letter number RIL/SBEL/IE/NH-1A/2013/354 dated 22nd Jan 2013 & RIL/SBEL/IE/NH-1A/2013/371 dated 02nd Feb 2013 The agency Tech Feb had already execute the work.

The Concessionaire has requested vide their office letter number RIL/SBEL/IE/NH-1A/11-12/88 dated 17th Aug 2012, RIL/SBEL/IE/NH-1A/11-12/57 dated 12th July 2012 & RIL/SBEL/IE/NH-1A/11-12/76 dated 08th Aug 2012 to approve Shyam Steel for their permanent work against which the approval is still pending. The Concessionaire has requested vide their office letter number RIL/SBEL/IE/NH-1A/12-13/386 dated 21st Feb 2013 to approve TCI Max Cement for their permanent work against which the approval is still pending.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

4

Page 5: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

The Concessionaire has given proposal of via duct for Banihal Section from Km 187+000 to 189+350 vide their office letter number RIL/SBEL/IE/NH-1A/12-13/388 dated 25th Feb 2013 against which the approval is still pending.

The Concessionaire had also submitted 3 (Three) sets of video recording for quarter ending 1st Oct. 2012 to 31st Dec 2012. vide their office letter number RIL/SBEL/NH-1A/12-13/340 dated 20th Feb 2013. The Concessionaire has mobilised additional manpower and resources to expedite the progress of work and the same has been communicated vide their office letter number RIL/SBEL/IE/NH1-A/2013/393 dated 26th Feb 2013.

The concessionaire has been executing the work of PFVD in section – III over the new alignment.

The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH1-A/2013/347 dated 2nd March 2013 regarding the non availability of 100% land as per Article 10 and clause 37.2.1 (a) becomes default of Authority as per Concession Agreement which got Material Adverse effect on the Concessionaires.

The Concessionaire intimated to authority vide their office letter number RIL/SBEL/NH1-A/2013/353 dated 8th March 2013 regarding the month wise stretches made available by the client and the status of land Acquisition as on 28.02.2013.

The Concessionaire once again intimated to authority vide their office letters number RIL/SBEL/NH1-A/2013/356 dated 11th March 2013 and RIL/SBEL/NH-1A/2013/358 dated 16th

March 2013 regarding the achievement of mile stone- I and status of land acquisition.

The Concessionaire intimated to authority vide their office letters number RIL/SBEL/NH1-A/2013/359 & 360 dated 16th March 2013 regarding the Force Majeure (Curfew in Valley of Kashmir) due to militant attack and death of Army Jawans on 13 th March 2013 and subsequent curfew in the valley and strike called by Hurriyat Conference on 13th March 2013.

The Concessionaire intimated to authority vide their office letters number RIL/SBEL/NH1-A/2013/362 dated 19th March 2013 regarding the Force Majeure (Sabotage at Samthan Camp) located at Km 249+700 mentioned that stone pelting on 6 th March 2013 by unknown mob of around 30-35 people and consequences due to which 75 of our staff including 25 Engineers left the place and the progress of the work effected badly.

The Concessionaire intimated to authority vide their office letters number RIL/SBEL/NH1-A/2013/363 dated 19th March 2013 regarding the Force Majeure (Curfew in Kashmir) against the death of boy belongs to Baramullah district. Under the prevailing circumstances even the internet services were barred and SBEL was forced to stop the work.

The Concessionaire intimated to authority vide their office letters number RIL/SBEL/NH1-A/2013/372 dated 31st March 2013 regarding the Force Majeure (Strike called by MMM demanding the body of Afzal Guru) against the Afzal Guru’s body on 28th March 2013. Under the prevailing circumstances even the internet services were barred and SBEL was forced to stop the work.

The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/373 dated 30th March 2013 regarding the additional structures required which are missing from schedule ‘B’ of Concession Agreement.

The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/I.E/NH-1A/2013/429 dated 1st June 2013 regarding the Month wise working stretches available and status of land acquisition as on 31.03.13.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

5

Page 6: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/I.E/NH-1A/2013/432 dated 1st June 2013 regarding the Force Majeure (Sabotage at Samthan Camp & Curfew in Kashmir Valley).

The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/I.E/NH-1A/2013/451 dated 9th June 2013 regarding the Submission of Sub Soil Investigation reports of 58 Location for High Embankment.

The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/378 dated 6th June 2013, RIL/SBEL/NH-1A/2013/386 dated 13th June 2013 & RIL/SBEL/NH-1A/2013/393 dated 30th June 2013 regarding the Entry Tax Exemption for the equipments bringing for this project.

The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/380 dated 8th June 2013 regarding the Land Acquisition status both for Pulwama & Anantnag District. RIL/SBEL/NH-1A/2013/297 dated 29th June 2013 regarding the Land Acquisition status for Banihal District.

The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/381 dated 8th June 2013 regarding the work stopped by the Land Owner at Banihal because the compensation against the land and structures not yet received by the land owners.

The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/385 dated 10th June 2013 regarding the Project Milestones and shifting of appointed date under clause 47.10 of Concession Agreement.

The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/382 dated 09th June 2013 & RIL/SBEL/NH-1A/2013/388 dated 13th June 2013 regarding the Quarry on Strike.

The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/I.E/NH-1A/2013/457 dated 16th June 2013 regarding the 03 (Three) sets of Video Recording for Quarter 01.01.2013 to 31.03.2013.

The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/I.E/NH-1A/2013/459 dated 20th June 2013 regarding the Selection for type of Well/Pile foundation.

The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/I.E/NH-1A/2013/472 dated 25th June 2013 regarding the Submission of method statement for Mackintosh Probe Test.

The Concessionaire intimated to Authority vide their office letter number RIL/SBEL/NH-1A/2013/394 dated 25th June 2013 regarding the stoppage of work by villagers of Bumthan & Jadur villages between Km 236+500 to 237+500 (Force Majeure).

The Concessionaire intimated to I.E vide their office letter number RIL/SBEL/NH-1A/2013/473 dated 27th June 2013 regarding the Snow Fall Accumulation Depth.

The Concessionaire submitted mix design of DBM – Grading II Zewan Quarry vide their office letter number RIL/SBEL/NH-1A/2013/542 dated 29th June 2013.

The Concessionaire submitted the details of machineries & equipments deployed at site against which the entry tax exemption got obtained vide their office letter number RIL/SBEL/NH-1A/13-14/429 dated 01st June 2013.

The Concessionaire submitted month wise land acquisition details to Authority vide their office letter number RIL/SBEL/NH-1A/2013/434 dated 01st June 2013.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

6

Page 7: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/441 dated 09th June 2013 regarding the Force Majeure at Banihal Section.

The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/442 dated 09th June 2013 regarding the Force Majeure at Lasjan Camp.

The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/443 dated 09th June 2013 regarding the Force Majeure (243+900 to 244+100, Qazigund).

The Concessionaire informed Authority regarding the status of land acquisition at Banihal vide their office letter number RIL/SBEL/NH-1A/2013/446 dated 13th June 2013.

The Concessionaire informed Authority regarding the disbursement of compensation and Land Acquisition issues at Banihal Bye Pass (Km 187+000 to 189+350) vide their office letter number RIL/SBEL/NH-1A/2013/449 dated 16th June 2013.

The Concessionaire informed Authority regarding the additional land required for Weigh Bridge for Toll Plaza vide their office letter number RIL/SBEL/NH-1A/2013/454 dated 23rd June 2013.

The Concessionaire informed Authority regarding the dismantling and shifting of Police Lines shed at Km272+820 with in toe vide their office letter number RIL/SBEL/NH-1A/2013/458 dated 26 th June 2013.

The Concessionaire informed Authority regarding the dismal progress on National Highways (Four Lanning) Project in District Pulwama, where in a land made available in bits and pieces to Concessionaire vide their office letter number RIL/SBEL/NH-1A/2013/460 dated 26th June 2013.

The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/462 dated 30th June 2013 regarding the Force Majeure due to stoppage of works on the Highway for Security reason during the visit of Hon’ble Prime Minister to Kashmir Valley on 25th & 26th June 2013.

The Concessionaire intimated Independent Engineer vide their office letter number RIL/SBEL/NH-1A/2013/547 & 570 dated 1st June 2013 & 13th June 2013 regarding the Construction of Project Highway “Banihal Section” Ch. 187+000 to 189+350.

The Concessionaire Submitted Mix designs of DBM- Grade – I Zewan Quarry vide their office letter number RIL/SBEL/NH-1A/2013/565 dated 12th June 2013.

The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/572 dated 15th June 2013 regarding the Force Majeure due to unseasonal rain fall.

The Concessionaire Submitted test results of Granular Sub Base material (Navayuga Tunnel Muck/Qazigund Screening Plant vide their office letter number RIL/SBEL/NH-1A/2013/580 dated 16th June 2013.

The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/601 dated 26th June 2013 regarding the Force Majeure due to unseasonal rain fall.

The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/602 dated 26th June 2013 regarding the Project Mile stone - I.

The Concessionaire informed Authority regarding the non availability of land acquisition at Major Structures vide their office letter number RIL/SBEL/NH-1A/2013/603 dated 26th June 2013.

The Concessionaire Submitted mix designs for all grades of concrete being used in our project with Vikram Premium & ACC OPC – 43 grades vide their office letter number

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

7

Page 8: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

RIL/SBEL/NH-1A/2013/630 dated 3rd July 2013 & RIL/SBEL/NH-1A/2013/631 dated 3rd July 2013 respectively.

The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/632 dated 6th July 2013 regarding the review of designs.

The Concessionaire informed Authority regarding the work could not get done on 9th & 10th July 2013 because of unseasonal rain fall vide their office letter number RIL/SBEL/NH-1A/2013/635 dated 10th July 2013.

The Concessionaire Submitted the TCI Max Cement test report vide their office letter number RIL/SBEL/NH-1A/2013/638 dated 13th July 2013.

The Concessionaire Submitted the Petrography test report from Zewan Quarry and Navayuga Tunnel rock vide their office letter number RIL/SBEL/NH-1A/2013/640 dated 13th July 2013.

The Concessionaire Submitted the inclusion of material in RC list vide their office letter number RIL/SBEL/NH-1A/2013/647 dated 18th July 2013.

The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/649 dated 22nd July 2013 regarding the Force Majeure due to Curfew in the Valley on 22nd July 2013.

The Concessionaire Submitted approval letters to the authority regarding the use of Shyam Steel vide their office letter number RIL/SBEL/NH-1A/2013/466 dated 07th July 2013.

The Concessionaire intimated the authority regarding the additional Hume Pipes Culverts to be provided for Irrigation purpose vide their office letter number RIL/SBEL/NH-1A/2013/467 dated 08th

July 2013.

The Concessionaire intimated the authority regarding the stoppage of work by the villagers from Ch. 258+700 to 259+200 on want of reduction in Embankment height vide their office letter number RIL/SBEL/NH-1A/2013/470 dated 13th July 2013.

The Concessionaire intimated the authority regarding the non availability of land for launching of Girders on both sides of the Abutments of MJB @ 277+076 vide their office letter number RIL/SBEL/NH-1A/2013/473 dated 15th July 2013.

The Concessionaire intimated the authority regarding the stoppage of work by the villagers at Ch 260+080, 260+210, 277+489 & 279+026 vide their office letter number RIL/SBEL/NH-1A/2013/477 dated 16th July 2013.

The Concessionaire intimated the authority regarding the assessment for cutting of Chinar trees vide their office letter number RIL/SBEL/NH-1A/2013/486 dated 31st July 2013.

The Concessionaire intimated authority regarding the construction of additional structure under change of scope vide their office letter number RIL/SBEL/NH-1A/2013/488, 500 & 505 dated 03 rd

Aug 2013, 24th Aug 2013 & 28th Aug 2013 respectively.

The Concessionaire submitted time extension intimated vide their office letter number RIL/SBEL/NH-1A/2013/495 dated 22nd Aug 2013.

The Concessionaire requested Authority regarding the additional land required for shifting of Graveyard from Ch. 271 + 600 to 272+000 vide their office letter number RIL/SBEL/NH-1A/2013/501 dated 25th Aug 2013.

The Concessionaire requested Authority regarding the additional land required for construction of Trumpet portion for Fly over vide their office letter number RIL/SBEL/NH-1A/2013/498 dated 24 th

Aug 2013.Srinagar Banihal Expressway Limited.

Srinagar Banihal Road Project8

Page 9: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

The Concessionaire replied Authority regarding the Non Achievement of Project Milestone vide their office letter number RIL/SBEL/NH-1A/2013/498 dated 24th Aug 2013.

The Concessionaire submitted design and drawing for ROB @ 243+012 vide their office letter number RIL/SBEL/NH-1A/2013/506 dated 28th Aug 2013.

The Concessionaire requested possessions of land @ 277+076 vide their office letter number RIL/SBEL/NH-1A/2013/507 dated 29th Aug 2013.

The Concessionaire submitted source approvals of TCI Max Cement vide their office letter number RIL/SBEL/NH-1A/2013/685 & 713 dated 03rd Aug 2013 & 29th Aug 2013.

The Concessionaire submitted replies of inspection report of Independent Engineer vide their office letter number RIL/SBEL/NH-1A/2013/688 dated 04th Aug 2013.

The Concessionaire submitted video recordings for quarter ending June 2013 vide their office letter number RIL/SBEL/NH-1A/2013/689 dated 31st July 2013.

The Concessionaire submitted details regarding the increase in cost of Toll Tax in the state of Jammu & Kashmir vide their office letter number RIL/SBEL/NH-1A/2013/692 dated 12th Aug 2013.The Concessionaire intimated Authority vide their office letter number RIL/SBEL/NH-1A/2013/696 dated 16th Aug 2013 regarding the Force Majeure due to Unseasonal rain fall, High security and strike in Valley from 13th to 16th Aug 2013.

The Concessionaire proposed Authority vide their office letter number RIL/SBEL/NH-1A/2013/705 dated 22nd Aug 2013 regarding the use of Evotherm Warm Mix Technology in Bituminous Works.

The Concessionaire applied entry tax exemption for equipments vide their office letter number RIL/SBEL/NH-1A/2013/700 dated 21st Aug 2013.

The Concessionaire submitted corrective action report for NCPN 27, 32 & 51 vide their office letter number RIL/SBEL/NH-1A/2013/712 dated 27th Aug 2013.

The Concessionaire submitted test and inspection report on composite Girders for Major Bridge @ 277+076 are being manufactured by M/s Lloyd Corporation Ltd. vides their office letter number RIL/SBEL/IE/NH-1A/2013/727 dated 05th Sept 2013.

The Concessionaire intimated Authority vide their office letter number RIL/SBEL/IE/NH-1A/2013/732 dated 10th Sept 2013 regarding the Force Majeure due to Kashmir shuts against Shopian Killings and Zublin Mehta Concert.

The Concessionaire submitted Geo-Technical Reports on High Embankment vides their office letter number RIL/SBEL/IE/NH-1A/2013/735 dated 12th Sept 2013.

The Concessionaire intimated Authority vide their office letter number RIL/SBEL/IE/NH-1A/2013/736 dated 14th Sept 2013 regarding the Force Majeure due to Curfew against Shopian Killings.

The Concessionaire intimated Authority vide their office letter number RIL/SBEL/IE/NH-1A/2013/755 dated 28th Sept 2013 regarding the Force Majeure due to non supply of cement because of strike called by truck union in Srinagar and attack by militants in Jammu region.

The Concessionaire submitted request for Extension of time vides their office letter number RIL/SBEL/NH-1A/2013/531 dated 28th Sept 2013 for 18 months.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

9

Page 10: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

A cumulative 15 working days lost in the month of Sept 2013 due to disturbance in Kahmir valley because of Zublin Mehta concert, Shopian killings, non supply of cement and attack by militant in Jammu region.

The Concessionaire requested Authorities for considering the composite girder in physical progress vide their office letter number RIL/SBEL/IE/NH-1A/2013/764 & 786 dated 05 th Oct 2013 & 19th Oct 2013 respectively.

The Concessionaire clarified the observation made on force majeure due to non supply of cement vide their office letter number RIL/SBEL/IE/NH-1A/2013/772 dated 08th Oct 2013.

The Concessionaire submitted land acquisition status as on 30th Sept 2013 vides their office letter number RIL/SBEL/NH-1A/2013/787 dated 19th Oct 2013 & RIL/SBEL/NH-1A/2013/540 dated 9th Oct 2013.

The Concessionaire requested Authority regarding the lifting of river bed material from Rambiyara Nalla vide their office letter number RIL/SBEL/NH-1A/2013/537 dated 06th Oct 2013.

The Concessionaire submitted the Company profile of M/s Teracom to Authority regarding the shifting of utilities vide letter number RIL/SBEL/NH-1A/2013/555 dated 02nd Nov 2013. Concessionaire also requested the approval of escalation clause.

The Concessionaire requested for extension of time Authority vides letter number RIL/SBEL/NH-1A/2013/556 & 841 dated 02nd Nov 2013 & 20th Nov 2013 respectively. Concessionaire also mentioned that Authority fail to provide the encumbrance free land and as a result the delayed in progress after mobilising more than sufficient resources at site.The Concessionaire intimated Authority regarding the substitute structure (Siphon near Lethpora) vides letter number RIL/SBEL/NH-1A/2013/557 dated 09th Nov 2013. Concessionaire also submitted the minutes of meeting held with the Deputy Commissioner, Pulwama regarding the Siphon vide their letter number RIL/SBEL/NH-1A/2013/562 dated 19th Nov 2013.

The Concessionaire intimated Authority regarding the arrangements of snow clearance has done vide letter number RIL/SBEL/NH-1A/2013/558 dated 11th Nov 2013.

The Concessionaire intimated Authority regarding the non availability of land at Banihal Section (Ch. 187+000 to 189+350) vide letter number RIL/SBEL/NH-1A/2013/559 dated 11th Nov 2013. Concessionaire also mentioned that Authority failed to provide the encumbrance free land and as a result Concessionaire forced to stop the work after mobilising resources at site.

The Concessionaire replied Authority regarding the Claim for damage under clause 12.4.2 of Concession arrangement vide letter number RIL/SBEL/NH-1A/2013/560 dated 12th Nov 2013.

The Concessionaire requested Authority regarding the reimbursement of amount spent due to frequent damages of PHE lines at different locations at Sampora Junction, Kadalbal and HP Gas storage and Awantipora junction vide letter number RIL/SBEL/NH-1A/2013/561 & 563 dated 16 th

Nov 2013 & 19th Nov 2013 respectively.

The Concessionaire submitted alternate proposal for ROB @ 243+018 vide letter number RIL/SBEL/NH-1A/2013/566 dated 21st Nov 2013.

The Concessionaire submitted source approval of water for Lasjan, Samthan & Vessu Camp vide letter number RIL/SBEL/NH-1A/2013/814 dated 06th Nov 2013.

The Concessionaire submitted errection methodology of composite girders vide letter number RIL/SBEL/NH-1A/2013/815 dated 11th Nov 2013.

The Concessionaire submitted company profile of M/s Kashmir Steel Rolling Mills vide letter number RIL/SBEL/NH-1A/2013/819 dated 11th Nov 2013 for source approval.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

10

Page 11: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

The Concessionaire submitted design and drawing for bearing details of Major Bridge @ Ch. 264+625, 268+065, 277+076 & 252+848 vide letter number RIL/SBEL/NH-1A/2013/820 dated 12th

Nov 2013, RIL/SBEL/NH-1A/2013/821 dated 12th Nov 2013, RIL/SBEL/NH-1A/2013/822 dated 12th

Nov 2013 & RIL/SBEL/NH-1A/2013/823 dated 12th Nov 2013 respectively for source approval.

The Concessionaire submitted company profile of M/s Steel Auto Industries (SAI) vide letter number RIL/SBEL/NH-1A/2013/824 dated 12th Nov 2013 for source approval.

The Concessionaire submitted Vertical Pile Load Test @ Km 245+890, Minor Bridge vide letter number RIL/SBEL/NH-1A/2013/825 dated 12th Nov 2013 for source approval.

The Concessionaire submitted reconstruction of existing culverts under change of scope vide letter number RIL/SBEL/NH-1A/2013/830 dated 16th Nov 2013.

The Concessionaire submitted design of retaining wall of various heights vide letter number RIL/SBEL/NH-1A/2013/831 dated 17th Nov 2013.

The Concessionaire submitted method statement for conducting routine vertical load test on routine piles at Fly Over @ Km 286+116 vide letter number RIL/SBEL/NH-1A/2013/831 dated 17th Nov 2013.

The Concessionaire submitted plan & profile of graveyards vide letter number RIL/SBEL/NH-1A/2013/845 dated 24th Nov 2013.The Concessionaire requested to Client regarding the cutting down of trees at Lasjan vide letter number RIL/SBEL/NH-1A/2013/569 dated 04th Dec 2013.

The Concessionaire requested Client to intervene in the matter of royalty with the geological and mining department vide letter number RIL/SBEL/NH-1A/2013/570 & 577 dated 05th & 15th Dec 2013 respectively.

The Concessionaire requested for Extension of time under clause 12.4.2 of Concession agreement vide letter number RIL/SBEL/NH-1A/2013/578 dated 16th Dec 2013.

The Concessionaire intimated authority regarding the stoppage of work by the villagers vide letter number RIL/SBEL/NH-1A/2013/579 dated 17th Dec 2013.

The Concessionaire intimated authority vide letter number RIL/SBEL/NH-1A/2013/580 dated 17 th

Dec 2013 regarding the land to be made available on the right hand side of Fly over so that the piling work can be taken up.

The Concessionaire intimated authority vide letter number RIL/SBEL/NH-1A/2013/581 dated 17 th

Dec 2013 regarding the stoppage of work of PUP @ Ch. 280+658 by the villagers. The demand of villagers is to increase the height and letter from the Chief Planning Commission is submitted and the decision from your end is pending.

The Concessionaire submitted report on joint visit of site with the supervision consultant and the Client vide letter number RIL/SBEL/NH-1A/2013/582 dated 22nd Dec 2013.

The Concessionaire intimated authority regarding the construction of additional structures vide letter number RIL/SBEL/NH-1A/2013/583 dated 19th Dec 2013.

The Concessionaire submitted vertical pile load test report for VUP @ 224+780 vide letter number RIL/SBEL/NH-1A/2013/863 dated 21st Dec 2013.

The Concessionaire submitted third party test report of VG 10 Bitumen from HPCL vide letter number RIL/SBEL/NH-1A/2013/864 dated 17th Dec 2013.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

11

Page 12: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

The Concessionaire submitted proposal of cast – in situ culverts to pre cast culverts vide letter number RIL/SBEL/NH-1A/2013/869 dated 21st Dec 2013.

The Concessionaire requested Client for vender approval of POT/PTFE bearings and expansion joint vide letter number RIL/SBEL/NH-1A/2013/876 dated 24th Dec 2013.

The Concessionaire requested for approval of Elastomeric bearings for various structures vides letter number RIL/SBEL/NH-1A/2013/879 & 900 dated 2nd Jan 2014 & 23rd Jan 2014 respectively.

The Concessionaire submitted compliance of the comments on report submission of vertical pile load test for MNB @ 245+890 vides letter number RIL/SBEL/NH-1A/2014/881 dated 4th Jan 2014.

The Concessionaire submitted summary of PDA test report and correlation done vide letter number RIL/SBEL/NH-1A/2014/885 dated 6th Jan 2014.

The Concessionaire intimated Authority regarding the progress affected due to heavy Snowfall & low temperature vide letter number RIL/SBEL/NH-1A/2014/889 dated 9th Jan 2014.

The Concessionaire submitted video recording (3 sets) for quarter Oct 2013 to Dec 2013 vide letter number RIL/SBEL/NH-1A/2014/890 dated 9th Jan 2014.

The Concessionaire submitted PDA test report for MJB @ 222+144 (P2 & P1 (LHS)), 245+890 (A2, P4 (LHS)) & 250+309 (A2, P17 (LHS)) vide letter number RIL/SBEL/NH-1A/2014/892 dated 11th

Jan 2014.

The Concessionaire submitted report on safety week observed from 11th Jan 2014 to 17th Jan 2014 vide letter number RIL/SBEL/NH-1A/2014/894 dated 13th Jan 2014.

The Concessionaire submitted report on safety week observed from 11th Jan 2014 to 17th Jan 2014 vide letter number RIL/SBEL/NH-1A/2014/894 dated 13th Jan 2014.

The Concessionaire submitted revised plan and profile of ROB at Km 243+012 vide letter number RIL/SBEL/NH-1A/2014/595 dated 10th Jan 2014.

The Concessionaire submitted extension of Performance Bank Guarantee vide letter number RIL/SBEL/NH-1A/2014/597 dated 16th Jan 2014.

The Concessionaire submitted revised GAD of ROB at Km 243+012 vide letter number RIL/SBEL/NH-1A/2014/598 dated 21st Jan 2014.

The Concessionaire submitted report on safety week observed from 11th to 17th Jan 2014 vide letter number RIL/SBEL/NH-1A/2014/599 dated 21st Jan 2014.

The Concessionaire intimated Authority regarding the Vehicle stranding near Chanderkut & Udhampur vide letter number RIL/SBEL/NH-1A/2014/600 dated 21st Jan 2014.

The Concessionaire submitted report on Vertical and Lateral Pile load test vide letter number RIL/SBEL/NH-1A/2014/904 dated 2nd Feb 2014.

The Concessionaire submitted SSI report for Major & Minor Bridges vide letter number RIL/SBEL/NH-1A/2014/906 dated 8th Feb 2014.

The Concessionaire requested I.E regarding the Force Majeure from 9th Feb 2014 to 11th Feb 2014 because of complete shutdown in the valley called by Hurriyat Conference on the first death Anniversary of Mohd. Maqbool Bhatt vide letter number RIL/SBEL/NH-1A/2014/908 dated 12 th Feb 2014.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

12

Page 13: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

The Concessionaire submitted Co-relation report between PDA & Static load test report vide letter number RIL/SBEL/NH-1A/2014/908 dated 12th Feb 2014.

The Concessionaire submitted observation on Environmental management plan vide letter number RIL/SBEL/NH-1A/2014/910 dated 13th Feb 2014.

The Concessionaire submitted factory visit report on SHYAM Steel Industries Ltd. vide letter number RIL/SBEL/NH-1A/2014/911 dated 15th Feb 2014.

The Concessionaire submitted factory visit report on SRMB SRIJAN Ltd. Regarding the supply of reinforcement steel for approval vide letter number RIL/SBEL/NH-1A/2014/911 dated 15th Feb 2014.

The Concessionaire submitted extension of Performance Bank Guarantee vide letter number RIL/SBEL/NH-1A/2014/605 dated 13th Feb 2014.

The Concessionaire submitted reports on Routine & Vertical Pile load test of Fly over vide letter number RIL/SBEL/NH-1A/2014/913, 914 & 915 dated 15th Feb 2014.

The Concessionaire submitted details of Pile load tests conducted at various structures vide letter number RIL/SBEL/NH-1A/2014/916 dated 16th Feb 2014.

The Concessionaire intimated Authority for Schedule “B” to be followed up for Design of Road Pavement vide letter number RIL/SBEL/NH-1A/2014/606 dated 13th Feb 2014.

The Concessionaire requested for uses of TCI Max Cement above M30 grade concrete vide letter number RIL/SBEL/NH-1A/2014/607 dated 18th Feb 2014.

The Concessionaire intimated Authority regarding the safety implication at site by putting more sign boards according to the specification of CA and also put blinkers at diversion vide letter number RIL/SBEL/NH-1A/2014/612 dated 23rd Feb 2014.

The Concessionaire submitted Escrow account statement for the period of 01.12.2013 to 31.12.2013 under clause 31.2&31.3 of Article 31 of CA vide letter number RIL/SBEL/NH-1A/2014/614 dated 24th Feb 2014.

The Concessionaire submitted variation in scope of structure work for Srinagar Project RIL/SBEL/NH-1A/2014/621 dated 03rd March 2014.

The Concessionaire intimated Authority regarding the Work stopped by the Villagers @ MJB 252+848 (Jammu Side) vide RIL/SBEL/NH-1A/2014/622 dated 08th March 2014.

The Concessionaire submitted Escrow account statement for the period of 01.01.2014 to 28.02.2014 under clause 31.2&31.3 of Article 31 of CA vide letter number RIL/SBEL/NH-1A/2014/625 dated 13th March 2014.

The Concessionaire requested Authority regarding the additional land required for Toll Plaza vide RIL/SBEL/NH-1A/2014/626 dated 13th March 2014.

The Concessionaire intimated Authority regarding the change in authorisation from Mr. C S Sastry to Mr. Ayaz Jawad Hussain vide RIL/SBEL/NH-1A/2014/627 dated 14th March 2014.

The Concessionaire replied Authority regarding the suspension of construction work of structures like Major & Minor Bridges/Flyover/VUPs vide RIL/SBEL/NH-1A/2014/628 dated 17th March 2014.

The Concessionaire intimated Authority regarding the closure of Main Gate by Local Villagers vide RIL/SBEL/NH-1A/2014/629 dated 17th March 2014.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

13

Page 14: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

The Concessionaire requested Authority regarding the shifting of 33 KVA electric line as per DPR vides RIL/SBEL/NH-1A/2014/632 dated 26th March 2014.

The Concessionaire submitted PDA tests and Correlation approach for minor Bridges vide RIL/SBEL/NH-1A/2014/924 dated 3rd March 2014.

The Concessionaire intimated Authority vide RIL/SBEL/IE/NH-1A/2014/932 dated 20th March 2014 regarding the Force Majeure due to heavy snowfall and curfew in Valley of Kashmir.

The Concessionaire submitted test reports of POT/PTFE bearing for Major Bridges at Location Km 252+848, 264+625, 268+065 & 277+076 vide RIL/SBEL/I.E/NH-1A/2014/938 dated 22nd March 2014.

The Concessionaire submitted video recording for the quarter ending March 2014 i.e from 1st Jan 2014 to March 2014 vide RIL/SBEL/I.E/NH-1A/2014/964 dated 25th April 2014.

The Concessionaire submitted revised plan & profile of Km 225 to Km 226 & 227 vide RIL/SBEL/I.E/NH-1A/2014/961 dated 24th April 2014.

The Concessionaire submitted detailed drawing for super structure & deck slab of MNB @ 261+026 vide RIL/SBEL/I.E/NH-1A/2014/960 dated 24th April 2014.

The Concessionaire submitted revised drawing for Elastomeric bearing for VUP @ 224+780, MNB @ 239+856, MNB @ 245+890, MNB @ 250+309, MNB @ 261+026 & Fly over @ 286+110 vide RIL/SBEL/I.E/NH-1A/2014/959 dated 24th April 2014.

The Concessionaire submitted drawing for deck slab details of Fly over @ Ch 287+466 vide RIL/SBEL/I.E/NH-1A/2014/952 dated 12th April 2014.

The Concessionaire submitted revised plan & profile at various locations from Ch. 222+600 to 275+600 vide RIL/SBEL/I.E/NH-1A/2014/950 dated 12th April 2014.

The Concessionaire intimated Client regarding the severe climatic condition in the valley and resulting poor progress of work for entire month vide RIL/SBEL/I.E/NH-1A/2014/942 dated 1st April 2014.

The Concessionaire submitted estimate & drawing for shifting of electrical utility along the National Highway in Banihal Section vide RIL/SBEL/I.E/NH-1A/2014/649 dated 28th April 2014.

The Concessionaire submitted the action taken report to Client regarding the meeting convened by Chief Secretary of J&K on 19th April 2014 vide RIL/SBEL/I.E/NH-1A/2014/646 dated 25th April 2014.

The Concessionaire submitted compliance on Critical issues & Maintenance of Existing Road vide RIL/SBEL/I.E/NH-1A/2014/645 dated 25th April 2014.

The Concessionaire submitted compliance on Maintenance of Existing Highway & Safety issues vide RIL/SBEL/I.E/NH-1A/2014/643 dated 22nd April 2014.

The Concessionaire submitted escrow account statement for the month of March 2014 under clause 31.2 & 31.3 of article 31 of CA vides RIL/SBEL/I.E/NH-1A/2014/638 dated 10th April 2014.

The Concessionaire submitted revised GAD of ROB @ 243+012 with single span of 45m vide RIL/SBEL/I.E/NH-1A/2014/637 dated 02nd April 2014.

The Concessionaire requested Authority to provide land for construction of service road from Ch. 224+400 to 225+300 vide RIL/SBEL/I.E/NH-1A/2014/636 dated 01st April 2014.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

14

Page 15: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

The Concessionaire submitted source approval of SRMB Srijan Reinforcement steel vide RIL/SBEL/I.E/NH-1A/2014/967 dated 04th May 2014.

The Concessionaire submitted pile integrity test reports for fly over 286 vide RIL/SBEL/I.E/NH-1A/2014/968 dated 04th May 2014.

The Concessionaire intimated to authority vide their office letters number RIL/SBEL/IE/NH1-A/2014/971 dated 05th May 2014 regarding the Force Majeure (Curfew in Valley of Kashmir) due to death of Youth in CRPF firing at Nawakadal from 01st May 2014 to 3rd May 2014 resulting all our works have come to stand still.

The Concessionaire submitted recheck test reports of Embankment, GSB & WMM layers for quality audit of NHAI vide RIL/SBEL/I.E/NH-1A/2014/974 dated 08th May 2014.

The Concessionaire submitted High Embankment designs with additional SSI reports vide RIL/SBEL/I.E/NH-1A/2014/975 dated 10th May 2014.

The Concessionaire requested approval of Speedway Petro Infra Pvt. Ltd. For CRMB vide RIL/SBEL/I.E/NH-1A/2014/978 dated 12th May 2014.

The Concessionaire submitted elastomeric bearing for Minor Bridges & Flyover vide RIL/SBEL/I.E/NH-1A/2014/981 dated 29th May 2014.

The Concessionaire submitted design & drawing of PSC superstructure, elastomeric bearing with pedestal for Minor Bridges vide RIL/SBEL/I.E/NH-1A/2014/982 dated 29th May 2014.

The Concessionaire intimated Authority regarding the maintenance of existing road from Pantha Chowk up to Qazigund including Banihal Section vide RIL/SBEL/I.E/NH-1A/2014/650 & 662 dated 01st & 15th May 2014 respectively.

The Concessionaire submitted Contractor All Risk insurance Policy vide to Authority vide RIL/SBEL/NH-1A/2014/652 dated 05th May 2014.

The Concessionaire intimated to Authority regarding the stoppage of work by local Villagers between Ch. 262+600 to 264+700 vide RIL/SBEL/NH-1A/2014/653 dated 05th May 2014.

The Concessionaire submitted variation/change of scope for additional structures to Authority vide RIL/SBEL/NH-1A/2014/654 dated 06th May 2014.

The Concessionaire submitted Escrow account statement to Authority for the month of April 2014 under clause 31.2 & 31.3 of Article 31 of Concession agreement vide RIL/SBEL/NH-1A/2014/659 dated 10th May 2014.

The Concessionaire deposited the welfare cess of workers under (RE & CS) Act 1969 vide RIL/SBEL/NH-1A/2014/660 dated 10th May 2014.

The Concessionaire intimated Authority regarding the restoration of irrigation bund which was cut while the execution of pile work at MJB 277 vide RIL/SBEL/NH-1A/2014/663 dated 20th May 2014.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

15

Page 16: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

16

Page 17: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

1.2.1 Contractual Details: (Total Project) Length of the Proposed Road : 67.76 Km. Fly-Over / Grade Separator : 01 Nos. ( Total Length 347.46 m) Railway Over Bridge : 01 Nos. Major Bridge : 8 Nos. Minor Bridge : 7 Nos. Box & Slab Culverts : 197 Nos. Pipe Culverts : 04 Nos. Vehicular Underpasses : 10 Nos. Pedestrian / Cattle Underpass : 8 Nos. Truck Lay Bay : 02 Nos. Bus Lay Bay : 17 Nos. Service Road : 4.8 Km. (Approx.) Toll Plaza : 1 No.

Si. No. Description Unit Total Quantity

1 Clearing & Grubbing Hector 400.52 Excavation Cum 383,3003 Earthwork in Embankment Cum 5,609,7984 Sub grade/Shoulder Cum 971,6395 GSB Cum 3,826,51.56 WMM Cum 329,719.57 DBM Cum 135,279.78 BC Cum 61,046.24

1.3 Important Features :

1 Total Project Length 67.76 Km2 Contract Value Rs. 1101 Crores. (As per Financial Closure)3 Date of Letter of Acceptance 27-06-20114 Concession Agreement Signed 28-12-20105 Appointed Date 27-06-20116 Appointment of IE 26-03-20127 Appointment of Safety Consultant Not Yet Appointed.

Financial Progress

Table: Physical Progress up to May-14. (As per new work program)

Scheduled Financial Progress till 31st May 2014

Achieved Financial Progress(Rs.) Fall/slippage +/-

(Rs.)Up to Last month This Month Up to This Month

815,82,73,037 476,86,70,980 52,81,000 477,39,51,980 338,43,21,057

Table: Physical Progress in %

Progress in %(of Total Project Cost )

Cumulative up to end of May- 2014 Planned 69.43

Actual 30.36

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

17

Page 18: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Shortfall 39.07%

1.4 Milestone: Contract Value - 1175.00 (As per Concession Agreement)

Project Mile Stone(MS)

Days from Appointment

Date

Expended Cost

Percentage Financial Package Remarks

MS-I 180 117.50 10% Construction of Project Highway Commenced

MS-II 450 411.25 35% Commenced Construction of all Bridges

MS-III 750 822.50 70% Commenced Construction of all Project Facilities

Four Laning 1095 - - As per Schedule 'G' of Concession Agreement

2.0 Project Length Division:

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

18

Project Km 187+000 to Km 189+350 & 220+700 to 286+110

Section IFrom Km 187+000 to

Km 189+350

Section IIIFrom Km 252+800 to

Km 286+110

Section IIFrom Km 220+700 to

Km 252+800

Page 19: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

ORGANISATION CHART SPV

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

19

Page 20: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

ORGANISATION CHART EPC

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

20

Page 21: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

MOBILISATION REPORT

Mobilisation for the various items of Road Work & Structure Work completed and furnished below. The Batching plant and allied machinery for Concrete, GSB & WMM and DBM plant are completed.

The major site operations in progress are as follows.

Structure Works:

Construction of Box culverts & Pipe under progress. Construction of Minor and all Major Bridges in progress. Construction of Fly-Over in Progress. Construction of VUP & PUP under progress. Pre-Cast concrete works under progress. Reinforcement (HYSD) works under progress for Structures. Composite Girder for Major Bridges stocked at site.

Road Works:

Excavation for Road Work is under progress. Construction of Embankment under progress. PFVD work is under progress. Laying of Sub-Grade under progress. Laying of GSB under progress. Laying of WMM under progress. Maintenance works of Existing Carriage Way under progress. Kerb laying in Progress. DBM Laying in progress

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

21

Page 22: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

LOGISTIC :

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

22

Page 23: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Lab Equipment Status Mobilized at Section – II (Ch. 220+700 to Ch. 252+800)

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

23

Page 24: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

24

Srinagar Banihal Road Project LAB -1

Sr. No. NAME OF LAB EQUIPMENTS   SOIL

1 Hot Oven (0 – 250 C) 60 X 60 X 60 cm, S.S.CHAMBER, With Digital temp. controller and forced air circulation √*

2 Max. Dry Density Mould (2250 cc) with rammer 4.89 kg √3 Max. Dry Density Mould (1000 cc) with rammer 4.89 kg √4 CBR Testing Machine set - With Proving ring, dial gauge & plunger √5 CBR Mould set (2250 cc) with perforated plate √6 Surcharge weight 147mm dia. 2.5 kg wt. (Annular) √7 Surcharge weight 147mm dia. 2.5 kg wt. (slotted) √8 Spacer disc 148mm dia, 47.5mm height with handle √9 Tripod stand for holding dial gauge (set) √

10 Cassagrande Apparatus Hand operated √11 Cone Penetro meter. As per IS:2720 √12 Sand equivalent apparatus (Automatic)

13 Proving Ring Cap. 50 kn. √14 Proving Ring Cap. , 30 kn. √15 Proving Ring Cap. 25 kn. √16 Nuclear Density Gauge

17 RADIATION SURVEY METER

18 Sand Pouring Cylinder (20 Cm)with Tray and Calibrating Container √19 Sand Pouring Cylinder (15 Cm)with Tray and Calibrating Container √20 Sand Pouring Cylinder (10 Cm)with Tray and Calibrating Container √21 Rapid moisture meters Deluxe quality √22 Hydrometer - Soil (0.75 to 1.0 & 1.0 to 1.3 gm/cc density range) each  23 Tray different size(60*30 CM) √24 Steel/Aluminium Container (Approx 100 ml.150 & 200.0 ml vol.) per group

60 nos. in each lab √  CONCRETE  

25 Mortar cube Vibrating Machine-With Crompton Motor  26 Cube Moulds Vibrating Table of 1m X 1m √27 Vicate Apparatus √28 Soundness apparatus (Le-Chatelier mould-set of 6) √29 Slump test Apparatus √30 Lab Concrete Trial Mixer (Cap. 1 cu. Feet) √31 Cube Testing Machine (2000 KN) Cap -Digital √32 Specific gravity bottle (1000 ml/ 100 ml/50ml)Cap √33 Concrete Cube Moulds (15X15X 15 cm) - Weight 9.5 kg √34 Cement test Mould size 7.07 *7.07 * 7.07 cm √35 Mortar Cube Mould of size 5cm X 5cm X 5cm  36 Le- chatelier flask for cement specific gravity test √   AGGREGATE  

37 Sieve Shaker- for 20cm and 45 cm dia sieves-Combined √ 

38 Aggregate Impact Value Apparatus √

39 Flakiness Gauge √

Page 25: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Lab Equipment Status Mobilized at Section –Section - III (Ch. 252+800 to 286+110)

Srinagar - Banihal Road Project LAB -2 LAB -3

NAME OF LAB EQUIPMENTS Sr. No. SOIL

1 CBR Testing Machine with Proving ring set √ √

2 Nuclear Density Gauge (5804&3780 at mordu) √ √

3 Max. Dry Density Mould (1000 cc) with 4.89kg rammer √ √

4 Max. Dry Density Mould (2250 cc) with 4.89kg rammer √ √

5CBR Mould set (2250 cc) With perforated plate, 01 annular weight (2.5kg) of slot hole and 01 annular weight(2.5kg) of center hole.

√ √

6 Sand Replacement apparatus (20 Cm) with tray and calibrating cylinder √ √

7 Sand Replacement apparatus (15 Cm) with tray and calibrating cylinder √ √

8 Sand Replacement apparatus (10 Cm) with tray and calibrating cylinder √ √

9 Hot Oven ( 0 – 250 C) 200lit √ √

10 Hot Oven ( 0 – 150 C) √ √

11 Rapid moisture meters with calcium carbide √ √

12 Cassagrande Apparatus √ √

13 Cone Penetration Test √ √

14 Hydrometer 1.00 to 1.500 √* √*

15 Hydrometer 0.950 to 1.000 √ √

16 Hydrometer 0.750 to 1.100 √ √

17 C and Phy value apparatus √* √*

18 Spatula √ √

19 Glass rod √* √*

  CONCRETE √ √

20 Mortar cube Vibrating Machine √ √

21 Cube Moulds Vibrating Table of 1m X 1m √ √

22 Vicate Apparatus √ √

23 Soundness apparatus √ √

24 Flexural Beam Mould (70X15X15 cm) √ √

25 Flexural Beam Mould Vibrating Table √ √

26 Slump test Apparatus with tamping rod √ √

27 Mortar Cube Mould of size 7.06cm X7.06cm X 7.06cm √ √

28 Mortar Cube Mould of size 5cm X5cm X 5cm √ √

29 Lab Concrete Trial Mixer √ √

30 Cube Testing Machine (2000 KN) Cap √ √

31 Cube Testing Machine (500 KN) Cap √ √

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

25

Page 26: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

32 Flexural Testing Machine ( 100 KN) Cap √ √

33 Pycnometer (50ML ) √ √

34 Concrete Cube Moulds (15X15X 15 cm) √ √

35 Concrete Cylinder Moulds √ √

36 Vibrating Hammer for DLC √ √

37 Air Entrainment meter √ √

38 Wheel Barrow √ √

39 Grouting cube mould (10cmX10cmX10cm) √ √

40 Compaction factor √ √

41 Flow table √ √

  AGGREGATE

42 Sieve Shaker √ √

43 Aggregate Impact Value Apparatus √ √

44 Flakiness Gauge √ √

45 Elongation Gauge √ √

46 Pycnometer (1000 ML) √ √

47 Wire Basket for density √ √

48 Los Angeles abrasion Test Apparatus √ √

49 Crushing Value Apparatus √ √

50 Riffle Box of (40mm) √ √

51 Riffle Box of (20mm ) √ √

52 10% fines value testing apparatus set √ √

53 Permeability test app √ √

BITUMEN/BITUMINOUS MIXES

54 Marshall Stability Apparatus set with 25 KN Pro. √ √

55 Marshall Holder √ √

56 Bitumen Penetration Apparatus √ √

57 Mould for Bitumen Penetration test √ √

58 Centrifugal Bitumen Extractor, electrical operated √ √

59 Centrifugal Bitumen Extractor, Hand operated √* √*

60 Watman filter paper 24" dia for Bitumen Extractor (100/packet) √ √

61 Marshall Moulds sets of 100mm dia √ √

62 Marshall Moulds sets of 150mm dia √ √

63 Max. Spe Gra. Appa. √ √

64 GMM bottle 1000ml √ √

65 GMM bottle 500ml √ √

66 Marshall compaction Pedestal for 100mm dia √ √

67 Marshall rammers of 100mm dia √ √

68 Marshall rammers of 150mm dia √ √

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

26

Page 27: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

69 Automatic compactor of 100mm dia for marshall moulds √ √

70 Automatic compactor of 150mm dia for marshall moulds √ √

71 Water bath(6 mould - 24X24X36) √ √

72 Specific gravity bottles of 50ml capacity set √ √

73 Softening Point Apparatus √ √

74 Ductility Apparatus √ √

75 Kinematic Viscometer with U tube √ √

76 Tar viscometer √ √

77 Core cutting machine,100mmdia &150mm dia √ √

78 Diamond core bit of 100mm dia with barrel √ √

79 Diamond core bit of 150mm dia with barrel √* √*

80 Straight edge √* √*

81 Bump integrator Apparatus √* √*

82 Marshel mould extractor 100mm / 150 mm √ √

83 Elastic recovery mould in set √ √

84 Max. Spe Gra. bottle - 5000ml √* √*

85 Max. Spe Gra. bottle - 2000ml √* √*

86 Gas stove √ √

87 LPG Gas cylinder-19kg √ √

88 Benzene √* √*

89 Thin film oven √ √

90 Asphalt mixer √ √

91 Vacuum pump for GMM test √ √

92 Flash point apparatus √ √

  GENERAL

93 Venire Calliper -Digital √ √

94 Hot Plate

95 Platform Electronic Weighing Balance (125Kg),10gm √ √

96 Electronic Weighing Balance (40 Kg),2gm √ √

97 Electronic Weighing Balance (60 Kg),1gm √ √

98 Electronic Weighing Balance (30 Kg),1gm √ √

99 Electronic Weighing Balance (12 Kg) , 1gm √ √

100 Electronic Weighing Balance (3 Kg), √ √

101 Electronic Weighing Balance (20 Kg) , 1gm √ √

102 Electronic Weighing Balance (15 Kg) √* √*

103 Electronic Weighing Balance (10 Kg) , 0.5gm √ √

104 Electronic Weighing Balance (6 Kg) , 0.1gm √ √

105 Electronic Weighing Balance (600G) , 0.2gm √ √

106 Tribul beam balance of 25kg capacity with 2gm accuracy √* √*

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

27

Page 28: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

107 Pan balance of 5kg capacity 0.5gm accuracy √* √*

108 Pan balance of 30kg capacity √ √

109 Pan balance of 25kg capacity √ √

110 Pan balance of 20kg capacity √ √

111 Standard Weights(20 Kg) √ √

112 Standard Weights(10 Kg) √ √

113 Standard Weights(05 Kg) √ √

114 Standard Weights(02 Kg) √ √

115 Standard Weights(01 Kg) √ √

116 Standard Weights(500 G) √ √

117 Standard Weights(200 G) √ √

118 Standard Weights(100 G) √ √

119 Standard Weights(50 G) √ √

120 Standard Weights(20 G) √ √

121 Standard Weights(10 G) √ √

122 Standard Weights(5 G) √ √

123 Digital Thermometer- 50 to 280 √ √

124 Infra red Thermometer - 0 to 250 √ √

125 Thermometer Glass Range - 0 to 360 √ √

126 Thermometer Glass Range - 10 to 110 √ √

127 Volume measuring container of 50lit capacity √ √

128 Volume measuring container of 20lit capacity √ √

129 Volume measuring container of 15lit capacity √ √

130 Volume measuring container of 10lit capacity √ √

131 Volume measuring container of 3lit capacity √ √

132 Sample trays of 1m X 1m √ √

133 Sample trays of 0.6m X 0.6m √ √

134 Sample trays of 0.45m X 0.45m √ √

135 Sampling containers of 500gm capacity (Moisture container) √ √

136 Sampling containers of 100gm capacity √* √*

137 Glass measuring jars of 500ml capacity 100mm dia √ √

138 Glass measuring jars of 1000ml capacity 100mm dia √ √

139 Glass measuring jars of 250ml capacity 40mm dia √ √

140 Glass measuring jars of 100ml capacity 20mm dia √ √

141 Glass measuring jars of 50ml capacity √ √

142 Glass beaker 1000ml capacity √ √

143 Glass beaker 500ml capacity √ √

144 Stop watch √ √

145 Glass thermometers of 250oc(300 c) √* √*

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

28

Page 29: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

146 Glass thermometers of 100oc √* √*

147 Dial gauge thermometers of 300oc √* √*

148 Spirit level √ √

149 Pipette glass of 25ml √ √

150 Rain gauge √ √

151 Spatula √ √

152 PVC jar - 1 lit √ √

153 PVC jar - 2 lit √ √

154 PVC jar - 500ml √ √

155 PVC bucket - 20 lit √ √

156 Hygrometer √ √

157 Steel trowel for cement test √ √

158 Pick axe √* √*

159 Shovel √* √*

160 mortar pan √* √*

161 Gas stove √* √*

162 Rubber hammer √ √

163 Wooden hammer √* √*

164 Proving ring - 50 KN √ √

165 Proving ring - 25 KN √ √

166 Steel tape 3 mtr √ √

167 Steel scale 1mtr √ √

168 Steel scale 300 mm √ √

169 Water testing kit √ √

170 Steel Hammer 2 kg √ √

171 Steel Hammer 1 kg √ √

172 Gas cylinder-05 kg with mounted burner √* √*

173 Chisel steel, 300mm long √* √*

174 Spanner 10/11, 14/15, 17/18, 20/21 both open & close √ √

175 Steel scoop 2 kg √ √

IS SIEVES

G.I Sieves (450 mm Dia) :

176 100 mm √* √*

177 75 mm √* √*

178 63 mm √* √*

179 53 mm √ √

180 45 mm √ √

181 37.5 mm √ √

182 26.5 mm √* √*

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

29

Page 30: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

183 25.0 mm √* √*

184 22.4 mm √* √*

185 20 .0 mm √* √*

186 19. 0 mm √* √*

187 18.0 mm √* √*

188 13.2 mm √* √*

189 12.5 mm √* √*

190 11.2 mm √ √

191 9.5 mm √* √*

192 6.3 mm √* √*

193 4.75mm √* √*

194 Pan √ √

195 Lid √* √*

  G.I Sieves (300 mm Dia) :

196 90 mm √ √

197 75 mm √* √*

198 63 mm √* √*

199 53 mm √ √

200 45 mm √* √*

201 40 mm √* √*

202 37.5 mm √ √

203 31.5 mm √* √*

204 26.5 mm √ √

205 25 mm √ √

206 22.4 mm √* √*

207 20 mm √* √*

208 19 mm √* √*

209 16 mm √ √

210 14 mm √* √*

211 13.2 mm √* √*

212 12.5 mm √ √

213 11.2 mm √* √*

214 10 mm √* √*

215 9.5 mm √* √*

216 6.3 mm √* √*

217 5.6 mm √* √*

218 4.75mm √* √*

219 Pan √* √*

220 Lid √* √*

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

30

Page 31: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

  Brass Sieves (200 mm Dia) :

221 10.0mm √ √

222 4.75mm √ √

223 3.35 mm √* √*

224 2.8 mm √* √*

225 2.36mm √ √

226 2.00 mm √ √

227 1.80mm √* √*

228 1.18mm √ √

229 1.00mm √ √

230 0. 710mm √ √

231 0. 600mm √ √

232 0. 425mm √ √

233 0. 300mm √ √

234 0. 150mm √ √

235 0. 090mm √ √

236 0. 075mm √ √

237 0. 045mm √ √

238 Pan √ √

239 Lid √ √

5.0 STATUS OF MATERIAL RESOURCES:Borrow areas approved details are as follows:

Package A Borrow Areas for Earth Work:

 

RAMKY INFRASTRUCTURE LIMITED QUALITY MANAGEMENT SYSTEM

SRINAGAR BANIHAL ROAD PROJECTMonthly Progress Report

May-14

For Section – II (220+700 to 252+800): Barrow Areas for Earth Work:

Sr. No. DescriptionList of Borrow Areas

Chainages Side Offset from NH (in Km) Status of Tests

1 Emb/ sub grade 23 227+700 LHS 6.7KM APPROVED2 Emb/ sub grade 13 222+140 RHS 4.500KM APPROVED

3 Emb/ sub grade 15A 224+800 LHS 8.500KM APPROVED

4 Emb/ sub grade 15B 229+100 LHS 4.500KM APPROVED

5 Emb/ sub grade 27 229+100 LHS 10KM APPROVED

6 Emb/ sub grade 07 229+300 LHS 3.100KM APPROVED

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

31

Page 32: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

7 Emb/ sub grade 02 229+300 LHS 5.200KM APPROVED

8 Emb/ sub grade 18 230+600 LHS 0.200KM APPROVED

9 Emb/ sub grade 26 232+200 RHS 1.2KM APPROVED

10 Emb/ sub grade 08 232+800 LHS 1.500KM APPROVED

11 Emb/ sub grade 17 233+600 RHS 0.100KM APPROVED

12 Emb/ sub grade 14 246+200 LHS 13.000KM APPROVED

13 Emb/ sub grade 25 247+000 RHS 7.800KM APPROVED

14 Emb/ sub grade 1 247+650 LHS 7.200KM APPROVED

15 Emb/ sub grade 11 247+660 LHS 7.000KM APPROVED

16 Emb/ sub grade 21 250+800 LHS 1.3KM APPROVED

17 Emb/ sub grade 22A 251+400 RHS 3.00KM APPROVED

18 Emb/ sub grade 31 232+700 LHS 0.500 KM APPROVED

19 Emb/ sub grade 32 232+700 LHS 0.500 KM APPROVED

20 Emb/ sub grade 33 247+645 LHS 5.500 KM APPROVED

21 Emb/ sub grade 34 240+070 LHS 12.5 KM APPROVED

22 Emb/ sub grade 35 240+070 LHS 18.5 KM APPROVED

GSB

Sr. No. DescriptionList of Borrow Areas

Chainage Side Offset from NH Approval Status

1 Package 1 

1 232+800 LHS 3.8 KM Submitted

2 233+100 RHS 1.5KM Submitted3 236+040 LHS 12KM Submitted

4 239+000 LHS 4KM Submitted

Section – III (252+800 to 286+110):

Borrow Areas for Earth work:

Approved Borrow area details are as follows:

Sr. No. DescriptionList of Borrow Areas

Chainages Side Offset from NH (in Km) Approval Status

1 Emb/ sub grade 6 253+000 LHS 2.5KM Approved

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

32

Page 33: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

2 Emb/ sub grade 12 253+000 RHS 4KM Approved

3 Emb/ sub grade 5 253+000 RHS 8KM Approved

4 Emb/ sub grade 22 256+800 RHS 3KM Approved

5 Emb/ sub grade 20 259+900 RHS 2.KM Approved

6 Emb/ sub grade 24 260+900 RHS 2.5KM Approved

7 Emb/ sub grade 10 267+300 RHS 9.4KM Approved

8 Emb/ sub grade 16 270+700 RHS .5KM Approved

9 Emb/ sub grade 19 278+450 LHS 14.5KM Approved

10 Emb/ sub grade 9 280+700 RHS 6KM Approved

11 Emb/ sub grade 3 281+000 LHS 13.2KM Approved

12 Emb/ sub grade 28 268+000 RHS 1KM Approved

13 Emb/ sub grade 4 281+000 RHS 18km Approved

14 Emb/ sub grade 30 275+600 RHS 1.5 KM Approved

Borrow Areas for GSB

Sr. No. Description

List of Borrow Areas

Chainages Side Offset from NH Approval Status

1 GSB 6 269+600 RHS 4 Submitted

2 GSB 5 286+110 RHS 3.5 Submitted

10.0 METHODOLOGY STATEMENT’S

The Source Approval and Method Statements submitted up to Month of March’14 are following below:

Sr. No. LETTER NO. DATE DESCRIPTION

1 RIL/SBEL/SPV/NH-1A/12-13/63 05.02.13 Test Pile at P2 major bridge (268+065)

2 RIL/SBEL/SPV/NH-1A/12-13/49 07.01.13 Construction of Major Bridge

3 RIL/SBEL/SPV/NH-1A/12-13/47 03.01.12 Lateral Pile load Test 277+070 A1 TEST PILE

4 RIL/SBEL/SPV/NH-1A/23 14.12.12 Construction of Box Culvert/Pipe culvert

5 RIL/SBEL/IE/NH-1A/11-12/36 09.12.12 Construction of Minor Bridge

6 RIL/SBEL/SPV/NH-1A/11-12/07 22.11.12 Plate load test

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

33

Page 34: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

7 RIL/SBEL/SPV/NH-1A/11-12/19 12.11.12 Pile Integrity test

8 RIL/SBEL/SPV/NH-1A/09 23.10.12 Lateral pile load Test

9 RIL/SBEL/SPV/NH-1A/07 22.10.12 Plate load test

10 RIL/SBEL/IE/NH-1A/11-12/04 21.10.12 Rock fill in Embankment

11 RIL/SBEL/IE/NH-1A/11-12/01 18.10.12 Pile load test

12 RIL/SBEL/IE/NH-1A/11-12/30 26.06.12 GSB methodology

13 RIL/SBEL/IE/11-12/12 28.05.12 Filter media (GSB & Dust)

14 RIL/SBEL/NH-1A/11-12/04 10.05.12 Construction methodology (QAP)

15 RIL/SBEL/NH-1A/11-12/07 14.03.12 Filter media (10mm & Sand)

16 RIL/SBEL/NH-1A/10-11/47 02.12.11 PQP (PD NH-1A)

17 RIL/SBEL/SPV/NH-1A/12-13/100 12.03.13 Methodology for Installation of PVD drains in High Embankment

18 RIL/SBEL/SPV/NH-1A/12-13/104 13.03.13 Design Methodology for A1 Test Pile at Km:261+026

11.0 STATUS OF CHANGES FOR VARIATIONS: So far no variation is coming under this project.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

34

Page 35: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

12.0 STATUS OF STRETCHES

Status of Land Acquired-- SRINAGAR – BANIHAL (Km. 187+000 To Km. 189+350 & Km. 220+700 To 286+110)

Sr. No.

ChainageDistrict

Length in Km

Land Acquired

Land Acquired

Hindrance free

Land Acquired with

Hindrance

Balance to be

AcquiredFrom To

1 187+000 189+350 RAMBAN 2.35 2.35 0 2.35 0

2 220+700 257+600 ANANTNAG 36.90 35.80 32.2 3.6 1.1

3 257+600 280+000 PULWAMA 22.40 18.3 16.9 1.4 4.1

4 280+000 284+400 BUDGAM 4.40 4.40 4.40 0 0

5 284+400 286+110 SRINAGAR 1.71 1 0 1 .71

Total 67.76 61.85 53.5 8.35 5.91

Utility Relocated: The Present status of Utility relocation is given belowUtility Relocation / Removal of Encroachments / Tree cutting Table 1 : Details and status of utilities, encroachments and trees- District: Anantnag

Ser Utility / encroachment Unit Quantity Removed Balance Status

Utilities: Electrical

1 HT tower No 8 0 0 Estimates approved

2 LT poles No 635 497 138LT poles shifting work at

Anantnag Dist in Progress

3 Transformers No 36 3 33

4 Telephone cable (OFC) Km 20.4 0 0 Not in Scope

Utilities: Public health

5 Water pipeline Km 16

Estimates approval awaited from NHAI, HQ.6 Hand pumps No 11

Encroachments No's Remove

dBalance

7Residential buildings No 251 211 40

Compensation not paid fully for all structures/buildings.

8 Shops No 855 712 143 Dismantling in progress where payment made.

9 Mosque No 12 1 11Matter lies with

Authorities. Both NHAI and Administration has to take quick decision

and shift the same.10 FCI go downs No 1 0 111 CRPF camps No 3 1 2

Trees Cut Balance12 Social forestry No 1942 1942 0

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

35

Page 36: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

13Under public(80% Compensation to be made for land)

No 21946 21126 820

14 Walnut No 1094 787 30715 Chinar No 32 17 15

1. Upon the compensation made for land, land owners will cut all the trees which are under public.

2. For Chinar trees & walnut trees, Divisional Commissioner has to give permission and later auction to be done.

3. Unless compensation made for land / building / encroachment cannot be removed.4. Authorities have to take action for shifting of Mosque, Go down and CRPF camps.

Details and status of utilities, encroachments and trees - District: Pulwama

Ser

Utility / encroachment

Unit Quantity Status

Utilities: Electrical Removed Balance1 HT tower No 1 0 1

2 LT poles No 385 97 288

3 Transformers No 25 1 24

4Telephone cable (OFC)

km 13.72 Not in Scope

Utilities: Public health

5 Water pipeline km 6.00

Estimates approval waited from NHAI, HQ.6 Hand pumps No 10

Encroachments

7Residential buildings

No 139 48 91 Compensation not paid fully for all structures/buildings.Dismantling in progress where payment made.

8 Shops No 376 356 20

9 Mosque No 6Matter lies with Authorities. Both NHAI and Administration has to take quick decision and shift the same.

10 FCI go downs No 1 1 Nil

11 CRPF camps No 1 1 Nil

Trees Cut Balance12 Social forestry No 794 794 0

13Under public(80% payment to made for land)

No 14073 12885 1188

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

36

Page 37: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

14 Walnut No 157 47 110

15 Chinar No 58 17 41

1. Upon the compensation made for land, land owners will cut all the trees which are under public.

2. For Chinar trees & walnut trees, Divisional Commissioner has to give permission and later auction to be done.

3. Unless compensation made for land / building / encroachment cannot be removed.4. Authorities has to take action for shifting of Mosque, Go down and CRPF camps.

Details and status of utilities, encroachments and trees - District: Budgam

Ser Utility / encroachment Unit Quantity Status

Utilities: Electrical

1 HT tower No Nil

Estimates approved 2 LT poles No 1

3 Transformers No Nil

4 Telephone cable (OFC) km Nil Not in Scope

Utilities: Public health

5 Water pipeline km NilNil

6 Hand pumps No Nil

Encroachments

7 Residential buildings No Nil

8 Shops No Nil

9 Mosque No Nil

10 FCI go downs No Nil

11 CRPF camps No NilTrees

12 Social forestry No Nil

13 Under public No 600 Compensation not paid.( Under process)

14 Walnut No Nil

15 Chinar No Nil

Details and status of utilities, encroachments and trees - District: SrinagarSer Utility / encroachment Unit Quantity Status

Utilities: Electrical

1 HT tower No Nil

Estimates approved2 LT poles No 4

3 Transformers No Nil

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

37

Page 38: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Ser Utility / encroachment Unit Quantity Status

4 Telephone cable (OFC) Km Nil Not in Scope

Utilities: Public health

5 Water pipeline No4

Crossings Estimates approved 6 Hand pumps No Nil

Encroachments7 Residential buildings No 18

Dismantling completed.8 Shops No Nil9 Mosque No Nil

10 FCI go downs No Nil11 CRPF camps No Nil

Trees Cut Balance

12 Social forestry No Nil Nil Nil

13 Under public No 800 800 Nil

14 Walnut No 10 10 Nil

15 Chinar No Nil Nil Nil

Approvals and Permits

Ser Description Status

(a) Permission of the State Government for extraction of boulders from quarry

Permission from state Geology & Mining department has been obtained.

(b) Permission of Village Panchayat and Pollution Control Board for installation of crushers

Permission from SIDCO and Pollution control board for the consent of establishment has been obtained.

(c) License for use of explosives Not required.

(d) Permission of the State Government for drawing water from river/reservoir

The State Government has no objection if we pay usage charges as per tariff.

(e) License from Inspector of Factories/ competent authority for setting up Batching Plant Obtained.

(f) Clearance of Pollution Control Board for setting up Batching Plant

Permission from PCB has been obtained.

(g) Clearance of Village Panchayat and Pollution Control Board for Asphalt Plant

Permission from PCB has been obtained.

(h) Permission of Village Panchayat and State Government for borrow earth

Agreement copies for the borrow areas were already obtained. Permission from consent authorities obtained.

(i) Permission of State Government for cutting of trees Obtained from all departments for cutting of Trees, except Chinar Trees

(j) Any other permits or clearances applicable Laws Sales Tax Registration obtained.

(k) Applicable permits in relation to environmental protection and conservation. Obtained by NHAI.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

38

Page 39: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Ser Description Status

(l) Sewage lines & Water Mains : Permission from local municipalities and development authorities

Obtained from all departments for shifting.

Note: - Copes of all NOC`s submitted to IE

14.0 STATUS OF CD WORKS & ROAD WORKS AS ON 31.05.2014:

Status of Highway – Up to May 2014

Sr. No.

Item Description Unit Total Scope Work Executed Achieved

1 C&G

New Carriageway & Existing Road

KM 67.76 40.8 60.20%

Service Road KM

2Embankment

Top

New Carriageway & Existing Road

KM 67.76 36.30 53.56%

Service Road KM

3 Sub grade Top

New Carriageway & Existing Road

KM 67.76 21.33 31.45%

Service Road KM

4 GSB Top

New Carriageway & Existing Road

KM 67.76 13.69 22.23%

Service Road KM

5 WMM Top

New Carriageway & Existing Road

KM 67.76 13.25 19.55%

Service Road KM

6 DBM Top

New Carriageway & Existing Road

KM 67.76 8.175 12.06%

Service Road KM

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

39

Page 40: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

13.1 Structure status

Status of Structures - Up to May 2014

Sr. No. Type of Structure Unit Total Scope Structure StartedStructure

Completed

1 Culverts No's 201 113 80

2 Minor Bridge No's 7 4 0

3 P.U.P. No's 8 5 3

4 V.U.P. No's 10 6 1

5 Major Bridge No's 8 5 0

6 Fly Over No's 1 1 0

7 ROB No's 1 0 0

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

40

Page 41: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

15.1 S-Curve: Attached as per Annexure – IV attached.

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

41

Page 42: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

16.0 MAJOR CORRESPONDENCE FROM SBEL in May 2014

Date Letter Number Subject04th May 2014. RIL/SBEL/I.E/NH-1A/

2014/966 Clarification on NCR no. 129

04th May 2014 RIL/SBEL/I.E/NH-1A/2014/967

Regarding Source Approval for SRMB Srijan Reinforcement Steel

04th May 2014 RIL/SBEL/I.E/NH-1A/2014/968 Submission of Pile Integrity Test Reports-286 Fly-Over

05th May 2014 RIL/SBEL/I.E/NH-1A/2014/969 Regarding Closing of NCPN 127

05th May 2014 RIL/SBEL/I.E/NH-1A/2014/971 Force Majeure (Curfew in Valley of Kashmir

06th May 2014 RIL/SBEL/I.E/NH-1A/2014/972 Submission of Drawings for MNB at KM 261+026

06th May 2014 RIL/SBEL/I.E/NH-1A/2014/973 Submission of Drawings for Fly-Over at 287+466

08th May 2014 RIL/SBEL/I.E/NH-1A/2014/974

Submission of recheck test reports of Embankment, GSB & WMM Layers-NHAI Quality Audit

10th May 2014 RIL/SBEL/I.E/NH-1A/2014/976

Submission of Drawings for Minor Bridges at KM 261+026 & 239+586

11th May 2014 RIL/SBEL/I.E/NH-1A/2014/977 Inspection Report of Independent Engineer

17th May 2014 RIL/SBEL/I.E/NH-1A/2014/979 Regarding Approval of M/s Shiva Bitumen

20th May 2014 RIL/SBEL/I.E/NH-1A/2014/980

Standard Deviation of Concrete Cubes compressive strength-Lasjan Batching Plant

29th May 2014 RIL/SBEL/I.E/NH-1A/2014/982

Submission of Design & Drawing of PSC Superstructure, Elastomeric Bearing with Pedestal along with compliance

for MNB at 220+809

31st May 2014 RIL/SBEL/I.E/NH-1A/2014/985 Corrective Action Report for NCPN No. 135

01st May 2014 RIL/SBEL/NH1-A/2013/650 Maintenance of Existing Highway & Safety Issues

03rd May 2014 RIL/SBEL/NH1-A/2013/651

Damages of Houses Falling within ROW while executing the Work

05th May 2014 RIL/SBEL/NH1-A/2013/652 Contractor’s All Risk Insurance Policy

06th May 2014 RIL/SBEL/NH1-A/2013/654 Variation- Change of Scope

08th May 2014 RIL/SBEL/NH1-A/2013/657 Damage of Existing Highway near Sempora

10th May 2014 RIL/SBEL/NH1-A/2013/659

Submission of Escrow Account Statement for the Month of April 2014

20th May 2014 RIL/SBEL/NH1-A/2013/663

Cutting of Existing Irrigation Bund for casting of Piles at MJB 277+076 P1 Location

23rd May 2014 RIL/SBEL/NH1-A/2013/671 Maintenance of Existing Highway

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

42

Page 43: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

43

Percentage of Establishment

Remarks

Office/Camp

100% Main Office/Camp Established at Ch 270 + 900 and at Ch 234+000.

100% Office/Camp Established at Ch 249 + 800.

100% Office/Camp Established at Ch 282+500

100% SPV office, Residential Qtr work Complete at Ch 270+900.

Lab 100%

1. Operational at km 270+900 camp.

2. Operational at km 282+500 camp.

3. Operational at km 234+000 camp

Crusher 100%Production started (Spalls Extracted 621345MT, Crushed

Aggregate Stocked 429139MT)

Plants (Batching

Plant, WMM &

HMP)

1. Batching Plant No. – 1(CP-30) at km 270+900, Batching

Plant No.– 2(CP-45) at KM 249+800 is in operation.

Batching Plant No. – 3 (CP-30) at km 282+500 is in

operation.

Batching Plant No –4 foundation work in progress at km

234+000

2. WMM Plant No - 1 Established at Km 282+500 & No.-2

Established at Km 249+800, WMM Plant No. –3 proposed

at km 234+000

3. Hot MIX Plant No – 1 At Km 282+500 is in operation&

, No.-2 At Km 234+000 is in operation.

Quarry 100%

1. Quarry & Crusher operation started from 9th September’12 and

crushing is in progress at Lassipora village.

2. Quarry & Crusher crushing is in progress at km 222+400

3. Quarry & Crusher operation started from and crushing is in

progress at Lasjan village CH 282+500.

4. Mobile crusher at Ch 270 is working.

5 Mobile Crusher is working at Ch.227

Page 44: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

44

Page 45: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Awantipora Town (Ch. 264+000) Barsoo (Ch 268+000)

Galandar (Ch. 274+500) Pampore (Ch. 277+080)

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

45

Page 46: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Vessu near Green Tunnel (Ch. 251+000) Vessu Town (Ch. 249+000)

Qazigund Town (Ch. 223+000) Qazigund Town (Ch. 222+100)

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

46

Page 47: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Safety Implication at Site

Safety Implication at Site

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

47

Page 48: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Progress of Pier @ MJB 285+848

Maintenance of Existing Road in Progress

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

48

Page 49: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Existing Road Maintenance

Staging in Progress at MJB 277+070

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

49

Page 50: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

50

Page 51: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

51

Page 52: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

52

Page 53: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

53

Page 54: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

54

Page 55: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

55

Page 56: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

56

Page 57: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

57

Page 58: NATIONAL HIGHWAY AUTHORITY OF INDIA - …nhai.org.in/spw/ConcessionaireDetails/MPR May 2014.docx · Web viewThe Concessionaire requested Authority regarding the shifting of 33 KVA

MPR – May 2014

Srinagar Banihal Expressway Limited.Srinagar Banihal Road Project

58