monthly project report (operation & maintenance)...
TRANSCRIPT
DESIGN, ENGINEERING, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND
MAINTENANCE OF 4 LANING OF PUNE-SOLAPUR SECTION OF NH-9 (NEW N.H. 65)
FROM KM144.400 (NEW KM 150.050) TO KM 249.000 (NEW KM 252.000) IN THE
STATE OF MAHARASHTRA UNDER NHDP PHASE III ON DESIGN, BUILT, FINANCE,
OPERATION AND TRANSFER (DBFOT) BASIS
Monthly Project Report (Operation & Maintenance)
Month - June 2014
Concessionaire : Pune Sholapur Road Development Company Ltd
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 2
PSRDCL
CHAPTER 1: THE PROJECT
National Highway No. 65 is one of the Major arteries of the road network system of the country
connecting the city of Peshvas,Pune with Solapur, the Second largest city of South Maharashtra State. It
traverses through 4- States viz., Maharashtra, Andhra Pradesh,,karnatka and Tamilnadu. It connects a
number of Major urban centres like Pune Solapur ,Hyderabad, on its way to Machlipatnam .The zero
(0) kilometer of the Pune-Solapur Section of this NH-65 is situated at .Pune.Total Length of Higway 690
km.
Nearly 101.5 Km. long Project Highway section of NH-65, starts from Km. 150.050 near Bhima
Nagar village on Pune side and traverses in a North-South direction and ends at 252.00 near Solapur at
Solapur by pass which is an existing 4-lane divided toll road, which was chosen for implementation along
with other DBFOT sections along this highway. The above section is developed as partially access
controlled toll way. Thus in order to provide a better motorable road with improved level of service to
the vehicular traffic, it has been decided to augment the capacity of the Bhima Nagar (Km. 150.50) –
Solapur (Km. 252..000) section of NH-65 in State of Maharashtra by widening the existing 2-lane to 4-
lane divided carriageway facility,
SCOPE OF PROJECT:
This Project has been executed on the site, which is described in Project Site chapter of the
Concession Agreement. The scope of the project shall include performance and execution by the
Concessionaire of all Design, Engineering, Financing, Procurement, Construction, Completion, Operation
and Maintenance of the Project Highway. It includes Improvement, Operations, Maintenance,
Rehabilitation and Strengthening of the Existing 2-lane road and widening it to a 4-lane divided Highway
of Bhima Nagar-Solapur section of NH-65 from Km. 150.500 to Km. 252.000 in the State of Maharashtra
on Design, Build, Finance Operate and Transfer (DBFOT) basis.
NHAI appointed M/s Intercontinental Consultants and Technocrats Pvt.Ltd. as the Independent
Consultant for the Project.
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 3
PSRDCL
1.2 PROJECT DETAILS
1.2.1. CONTRACT DETAILS
Project
Design, Engineering, Construction, Development, Finance, Operation
And Maintenance of the Existing 2-lane road and widening it to a 4-lane
divided Highway of Bhima Nagar-Solapur section of NH-65 from Km.
150.500 to Km. 252.000 in the State of Maharashtra on Design, Build,
Finance, Operate and Transfer (DBOT) basis.
State Maharashtra
National Highway No. NH – 65
Section Km. 150.050 to Km. 252.000 section on NH-65
(Bhima Nagar – Solapur)
Length of the Project 101.3 Km
Employer National Highway Authority of India
Independent Consultant M/s Intercontinental Consultants and Technocrats Pvt. Ltd.
Concessionaire Pune- Solapur Road Development Company Ltd.
Location of Toll Plaza’s At Km. 178+572 and 229.350
Date of Concession
Agreement 30.09.2009
Appointed Date 28th
Sept 2011
Concession Period 19 years 295 days.
Construction Period 840 days.
Provisional Completion
certificate Issued on Date 23
rd August 2013
Toll started on 31st
August 2013
Toll Completion Date
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 4
PSRDCL
1.2.2. SCOPE DETAILS
Main Carriageway Length : 101.30 km
Service Road : 83.05 km
ROB : 2 Nos
Major Bridge : 7 Nos
Minor Bridge : 21 Nos
Grade Separator : 1 No
Box / Pipe Culvert : 197 Nos
Vehicular Underpass : 12 Nos
Pedestrian Under Pass : 12 Nos
At Grade Junction : 28 Nos
Toll Plaza : 2 Nos
Stretches covered under Provisional Completion Certificate
Sl. Chainages Length
(Km.) From To
1 150.850 157.650 6.800
2 165.000 166.300 1.300
3 167.900 169.900 2.000
4 170.800 187.350 16.550
5 188.450 189.950 1.500
6 190.900 214.700 23.800
7 216.350 220.300 3.950
8 220.650 240.780 20.130
9 241.080 244.150 3.070
10 246.750 248.500 1.750
Total 80.850
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 5
PSRDCL
CHAPTER 2: THE CONCESSIONAIRE (O&M OPERATOR)
2.1 Scope of Work
The Concessionaire is involved in the Design, Engineering, Construction, Development, Finance,
Operation and Maintenance activity of 4 laning of Pune-Solapur Section of N.H.9 (New N.H.65) from km
144.400 (New Ch.No. 150.050) to 249.000 (New Ch.No.252.000) the project stretch along with other
project facilities and services and is taking care of the following activities on regular basis.
2.1.1 Operation Management
The concessionaire is operating one toll plaza at km. 178.572 and second at Km. 229.350 that houses the
operation management staffs, all necessary equipment, accessories, servers, software and other
communication devices. The main objectives are to collect and record the traffic data on regular basis,
counting and classification of the vehicles, recording of weigh-in-motion bridge data on sample basis
and collection of user fees from the vehicles passing through the toll plaza.
2.1.2 Maintenance Management
The concessionaire is also administering the maintenance management of the project highway and the
other facilities through an experienced fleet of professionals located in the administrative building
adjacent to the toll plaza. Also, the maintenance management team monitors different maintenance
aspects (detailed below) through its mobile units patrolling on a continuous basis throughout the project
corridor. The maintenance team is primarily looking after the following maintenance aspects as per the
maintenance schedule laid down in the Annual Maintenance Programme.
2.1.2.1Highway Maintenance
The objective of (Project) Highway Maintenance is to maintain the safety, durability and functionality of
the (Project) highway throughout the concession period. This contains regular and preventive
maintenance for the corridor carriageway and project facilities. Broadly, it will include maintenance of
the carriageway, crust, shoulder, slopes, side drains and cross drainage works.
2.1.2.2Project Property Management
The objective of Project Property Management is to preserve the inventories and investments in the
project road intact throughout the operation and maintenance phase. This includes identification of
encroachments and ribbon development, land acquisition as desired by NHAI, enforcement of
regulations, liaison with the relevant authorities for the above and maintenance of road furniture and
road signs.
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 6
PSRDCL
2.1.2.3Incident Management
The Incident Management is aimed to take immediate response measures to any incident occurring in
the corridor. Road patrols and surveillance, first aid, basic ambulance assistance, tow away cranes and
road safety works.
2.1.2.4Environment Management
The basic objective of Environment Management is to preserve and protect the compatibility of the road
system with the environment. The activities related to this are project horticulture including requisite
planting and maintaining of existing trees, plants, shrubs and other suitable vegetation in the median
and right of way.
2.1.2.5 Engineering Improvements
Engineering Improvement is aimed at enhancing the project functionalities, deteriorated over time and
rehabilitation of the project elements at specified intervals of time. This covers junction improvements,
providing crash barriers, resurfacing and management of access.
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 7
PSRDCL
2.2.2. Equipment/Plant/Machinery
Name/Description of Equipment No’s Remarks
Kam Avida-Sweeping and Broomer Machine. 1
Tow way Crane 2
Water Tanker 5
2.2.3. Provision for User Services
a. Ambulance
Vehicle Type and Model Staff Deployed
Date of
mobilization
of Vehicle
Remarks
MH13-B 7286
MH 13-B 7287
� Paramedic = 07
� Helper = 08
� Driver = 08
30th
August
2013
b. Route Patrol Vehicles
Vehicle Typeand Model Staff Deployed
Date of
mobilization
of Vehicle
Remarks
MH13-AN 7663
(Warwade Toll Plaza)
� Route Patrol Officer = 04
� Patrol Assistant = 04
� Driver = 04
30TH
August
2013
MH 13-AN- 7664
(Sawleshwar Toll Plaza)
� Route Patrol Officer = 04
� Patrol Assistant = 04
� Driver = 04
30th
August
2013
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 8
PSRDCL
c. Tow Away Vehicle
Date of mobilization 30th
August 2013
Type & Capacity of Towing Vehicle TATA TRUCK MOUNTED TOW SYSTEM 12.5.mtric
d. Toll Software/Equipment
Name of Equipment/Software Date of Mobilization Remarks
ITNL-TMS 30th
August 2013
e. Status of Control Room/Emergency Contact Information
1) Help Line No. 9545295452 (24 hours)
2) Customer Care No.8554984020/21.
f. Establishment Contact Details
Name Name, Address E-Mail Address Telephone
Project Director, NHAI
The Project Director,
National Highways Authority of India,
Project Implementation Unit-Plot
No.80,Old Santosh Nagar,Infront of
Devika Gas Agency,Jule
Solapur,Solapur-04
Tel : (0217)2303379
Fax(0217) 2372800
Team Leader, IC
The Team Leader,
M/s Intercontinental Consultants and
Technocrats Pvt.Ltd.
Gote Niwas,Plot No.76,Old Santosh
Nagar,Jule Solapur,Bijapur Road,Opp
Devika Gas Agency,Solapur-
413004.Maharastra.
Tel: (0217)2341500
Fax:(0217)2341600.
Concessionaire/O&M
Team
Pune Sholapur Road Development
Company Ltd. Unit No. 101-105,
Cross Road Commercial
complex,Pune Naka,Solapur-413002.
[email protected] Tele:(0217)2623202/203
Fax : (0217)-2623201.
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 9
PSRDCL
CHAPTER 3. MONTHLY FEE STATEMENT
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 10
PSRDCL
SCHEDULE - M
( See Clause 19.5)
MONTHLY FEE STATEMENT
Project Highway:Pune Month: June, 2014
Solapur (Pkg II)
Type Of
Vehicle
For Corresponding
Month of Previous
Year
For Preceding Month For Month Reported upon
No.of
Vehicles
Fee
Collected
(in Rs)
No. of Vehicles
Fee
Collected
(in Rs.)
Fee per
Vehicle
(in Rs)
Fee per
Vehicle
(in Rs)
No. of Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
Single
Journey
Return
Journey Total
Fee
Collected
Single
Journey
Return
Journey
Single
Journey
Return
Journey Total
Fee
Collected
(in Rs)
A) Car
N.A
177145 57586 234731 10540960 40 60 141412 51878 193290 8769160
B) LCV 42198 7229 49427 3429625 65 95 39909 6761 46670 3236380
C) Bus 18154 13223 31377 5095390 135 200 16035 12024 28059 4569525
D) Truck 37142 2461 39603 5506370 135 200 38088 2605 40693 5662880
E) Multi-
axle Truck 151702 5604 157306
33622680 210 315
160379 6220 166599
35638890
F)
Oversized
Vehicle 124 0
124
31620
255 385
100 0
100
25500
G Total 512568 58226645 475411 57902335
Note 1: The above statement does not include Local Users vehicles travelling on Passes
Note 2: Monthly Fee Statements for Passes have been prepared separately in the above formats and are enclosed
Remarks if any:
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 11
PSRDCL
MONTHLY FEE STATEMENT (OVERLOADING)
Project Highway:Pune Month:June, 2014
Solapur (Pkg II)
Type Of
Vehicle
For Corresponding Month of
Previous Year For Preceding Month For Month Reported upon
No.of
Vehicles
Fee Collected (in
Rs) No. of Vehicles
Fee per
Vehicle
(in Rs)
Fee per Vehicle (in Rs) No. of Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
Overload
Single
Over Load
Return
Overload
Empty Total
Fee
Collected
Overload
Single
Over
Load
Return
Overload
Empty
Overload
Single
Over
Load
Return
Overload
Empty Total
Fee
Collected
(in Rs)
B) LCV 963 136 59 1158 156575 135 165 70 903 138 48 1089 148035
D)
Truck 1753 293 88 2134 455305 210 275 75 2033 267 97 2397 507630
E)
Multi-
axle
Truck 2915 59 71 3045 767760 255 355 45 3593 60 86 3739 941385
G Total 6337 1379640 7225 1597050
Note :Total Toll Collection
User Fee 5,79,02,335
Overload Charges 15,97,050
POS Charges 7,22,120
Total 6,02,21,505
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 12
PSRDCL
MONTHLY FEE STATEMENT -(SINGLE JOURNEY)
Project Highway:Pune Month:June 2014
Solapur (Pkg II)
Type Of Vehicle
For Corresponding
Month of Previous
Year
For Preceding Month For Month Reported upon
No.of
Vehicles
Fee
Collected
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs.)
Fee per
Vehicle
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
A) Car
N.A
177145 7085800 40 141412 5656480
B) LCV 42198 2742870 65 39909 2594085
C) Bus 18154 2450790 135 16035 2164725
D) Truck 37142 5014170 135 38088 5141880
E) Multi-axle Truck 151702 31857420 210 160379 33679590
F) Oversized Vehicle 124 31620 255 100 25500
G Total 426465 49182670 395923 49262260
Note 1: The above statement does not include Local Users vehicles travelling on Passes
Note 2: Monthly Fee Statements for Passes have been prepared separately in the above formats and are enclosed
Remarks if any:
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 13
PSRDCL
Single Journey TP-I (Varwade)
SCHEDULE - M
( See Clause 19.5)
MONTHLY FEE STATEMENT -(SINGLE JOURNEY) - Annex-3
Project Highway:Pune Month: June 2014
Solapur (Pkg II)
Type Of Vehicle For Corresponding
Month of Previous
Year
For Preceding Month For Month Reported upon
No.of
Vehicles Fee
Collected
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs.)
Fee per
Vehicle
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
A) Car
N.A
72288 2891520 40 57485 2299400
B) LCV 21081 1370265 65 19742 1283230
C) Bus 6981 942435 135 5959 804465
D) Truck 20501 2767635 135 21149 2855115
E) Multi-axle Truck 96658 20298180 210 101465 21307650
F) Oversized
Vehicle 80 20400 255 62 15810
G Total 217589 28290435 205862 28565670
Single Journey TP-II (Sawaleshwar)
MONTHLY FEE STATEMENT -(SINGLE JOURNEY)
Project Highway:Pune Month: June 2014
Solapur (Pkg II)
Type Of Vehicle For Corresponding
Month of Previous
Year
For Preceding Month For Month Reported
upon
No.of
Vehicles
Fee
Collected
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs.)
Fee per
Vehicle
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
A) Car
N.A
104857 4194280 40 83927 3357080
B) LCV 21117 1372605 65 20167 1310855
C) Bus 11173 1508355 135 10076 1360260
D) Truck 16641 2246535 135 16939 2286765
E) Multi-axle Truck 55044 11559240 210 58914 12371940
F) Oversized Vehicle 44 11220 255 38 9690
G Total 208876 20892235 190061 20696590
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 14
PSRDCL
MONTHLY FEE STATEMENT (RETURN JOURNEY) - Annex-2
Project Highway:Pune Month:June 2014
Solapur (Pkg II)
Type Of Vehicle For Corresponding Month of
Previous Year
For Preceding Month For Month Reported upon
No.of
Vehicles Fee Collected (in
Rs)
No. of
Vehicles
Fee
Collected
(in Rs.)
Fee per
Vehicle (in
Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
A) Car
N.A
57586 3455160 60 51878 3112680
B) LCV 7229 686755 95 6761 642295
C) Bus 13223 2644600 200 12024 2404800
D) Truck 2461 492200 200 2605 521000
E) Multi-axle Truck 5604 1765260 315 6220 1959300
F) Oversized Vehicle 0 0 385 0 0
G Total 86103 9043975 79488 8640075
Note 1: The above statement does not include Local Users vehicles travelling on Passes
Note 2: Monthly Fee Statements for Passes have been prepared separately in the above formats and are enclosed
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 15
PSRDCL
Return Journey TP-I (Varwade)
MONTHLY FEE STATEMENT (RETURN JOURNEY) - Annex-4
Project Highway:Pune Month: June 2014
Solapur (Pkg II)
Type Of Vehicle For Corresponding
Month of Previous
Year
For Preceding Month For Month Reported
upon
No.of
Vehicles
Fee
Collected
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
Fee per
Vehicle
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
A) Car
N.A
17189 1031340 60 15066 903960
B) LCV 2321 220495 95 1948 185060
C) Bus 3719 743800 200 3471 694200
D) Truck 919 183800 200 845 169000
E) Multi-axle Truck 2423 763245 315 2545 801675
F) Oversized Vehicle 0 0 385 0 0
G Total 26571 2942680 23875 2753895
Return Journey TP-II (Sawaleshwar)
MONTHLY FEE STATEMENT (RETURN JOURNEY) - Annex - 6
Project Highway:Pune Month: June 2014
Solapur (Pkg II)
Type Of Vehicle
For Corresponding
Month of Previous
Year
For Preceding Month For Month Reported
upon
No.of
Vehicles
Fee
Collected
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs.)
Fee per
Vehicle
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
A) Car
N.A
40397 2423820 60 36812 2208720
B) LCV 4908 466260 95 4813 457235
C) Bus 9504 1900800 200 8553 1710600
D) Truck 1542 308400 200 1760 352000
E) Multi-axle Truck 3181 1002015 315 3675 1157625
F) Oversized Vehicle 0 0 385 0 0
G Total 59532 6101295 55613 5886180
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 16
PSRDCL
MONTHLY FEE STATEMENT -(MONTHLY TRIP)
Project Highway:Pune Month:June 2014
Solapur (Pkg II)
Type Of Vehicle For Corresponding
Month of Previous
Year
For Preceding Month For Month Reported
upon
No.of
Vehicles Fee
Collected
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs.)
Fee per
Vehicle
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
A) Car
N.A
7 9240 1320 5 6600
B) LCV 6 12780 2130 13 27690
C) Bus 113 504545 4465 123 549195
D) Truck 3 13395 4465 4 17860
E) Multi-axle Truck 8 56000 7000 7 49000
F) Oversized Vehicle 0 0 8525 0 0
G Total 137 595960 152 650345
Note 1: The above statement does not include Local Users vehicles travelling on Passes
Note 2: Monthly Fee Statements for Passes have been prepared separately in the above formats and are enclosed
Remarks if any:
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 17
PSRDCL
Monthly Trip TP-I (Varwade)
SCHEDULE - M
( See Clause 19.5)
MONTHLY FEE STATEMENT -(MONTHLY TRIP)
Project Highway:Pune Month: June 2014
Solapur (Pkg II)
Type Of Vehicle
For Corresponding
Month of Previous
Year
For Preceding Month For Month Reported
upon
No.of
Vehicles
Fee
Collected
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
Fee per
Vehicle
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
A) Car
N.A
0 0 1320 0 0
B) LCV 0 0 2130 0 0
C) Bus 51 227715 4465 52 232180
D) Truck 1 4465 4465 2 8930
E) Multi-axle Truck 1 7000 7000 1 7000
F) Oversized Vehicle 0 0 8525 0 0
G Total 53 239180 55 248110
Monthly Trip TP-II (Sawaleshwar)
SCHEDULE - M
( See Clause 19.5)
MONTHLY FEE STATEMENT -(MONTHLY TRIP)
Project Highway:Pune Month: June 2014
Solapur (Pkg II)
Type Of Vehicle
For Corresponding
Month of Previous
Year
For Preceding Month For Month Reported
upon
No.of
Vehicles
Fee
Collected
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs.)
Fee per
Vehicle
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
A) Car
N.A
7 9240 1320 5 6600
B) LCV 6 12780 2130 13 27690
C) Bus 62 276830 4465 71 317015
D) Truck 2 8930 4465 2 8930
E) Multi-axle Truck 7 49000 7000 6 42000
F) Oversized Vehicle 0 0 8525 0 0
G Total 84 356780 97 402235
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 18
PSRDCL
MONTHLY FEE STATEMENT -(LOCAL MONTHLY PASS )
Project Highway:Pune Month:June 2014
Solapur (Pkg II)
Type Of Vehicle
For Corresponding
Month of Previous
Year
For Preceding Month For Month Reported upon
No.of
Vehicles
Fee
Collected
(in Rs)
No. of
Vehicles
Fee
Collected
(Rs.)
Fee per
Vehicle
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
A) Car 324 72900 225 319 71775
B) LCV
Not Applicable
C) Bus
D) Truck
E) Multi-axle Truck
F) Oversized Vehicle
G Total 324 72900 225 319 71775
Note 1: The above statement does not include Local Users vehicles travelling on Passes
Note 2: Monthly Fee Statements for Passes have been prepared separately in the above formats and are enclosed
Remarks if any:
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 19
PSRDCL
Local Monthly Pass TP-I (Varwade)
MONTHLY FEE STATEMENT -(LOCAL MONTHLY PASS )
Project Highway:Pune Month: June 2014
Solapur (Pkg II)
Type Of Vehicle For Corresponding
Month of Previous
Year
For Preceding Month For Month Reported
upon
No.of
Vehicles
Fee
Collected
(in Rs)
No. of
Vehicles
Fee
Collected
(Rs.)
Fee per
Vehicle
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
A) Car 18 4050 225 16 3600
B) LCV
Not Applicable
C) Bus
D) Truck
E) Multi-axle Truck
F) Oversized Vehicle
G Total 18 4050 225 16 3600
Local Monthly Pass TP-II (Sawaleshwar)
SCHEDULE - M
( See Clause 19.5)
MONTHLY FEE STATEMENT -(LOCAL MONTHLY PASS )
Project Highway:Pune Month: June 2014
Solapur (Pkg II)
Type Of Vehicle
For Corresponding
Month of Previous
Year
For Preceding Month For Month Reported
upon
No.of
Vehicles
Fee
Collected
(in Rs)
No. of
Vehicles
Fee
Collected
(Rs.)
Fee per
Vehicle
(in Rs)
No. of
Vehicles
Fee
Collected
(in Rs)
1 2 3 4 5 6 7 8
A) Car 306 68850 225 303 68175
B) LCV
Not Applicable
C) Bus
D) Truck
E) Multi-axle Truck
F) Oversized Vehicle
G Total 306 68850 225 303 68175
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 20
PSRDCL
Chapter :4 Highway Maintenance Report
4.1 : DAILY O&M REPORT
For the Month of June 2014
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
1-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump
sum 2
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 4
179+250 TP1 Ambulance Helper 1 Nos 1
229+000 229+500 Both side Road Sweeping 1000 Meter 7
179+250 TP1 Toll Plaza Cleaning with water tanker 1 Lump
sum 2
170+000 170+600 LHS Shoulder side grass cutting 600 Meter 4
170+000 171+000 RHS Shoulder side grass cutting 1000 Meter 11
186+000 187+500 RHS Shoulder side grass cutting 1500 Meter 7
186+800 187+600 LHS Shoulder side grass cutting 800 Meter 11
230+000 230+500 Median Watering of median plants 500 Meter 2
229+000 229+300 Median Median grass cutting 300 Meter 4
229+300 229+600 Median Median grass cutting 300 Meter 5
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 21
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
2-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
2
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 4
179+250 TP1 Ambulance Helper 1 Nos 1
238+700 239+000 RHS Road Sweeping 300 Meter 3
244+400 244+800 RHS Road Sweeping 400 Meter 3
247+400 RHS Spacer fixing of MBCB 12 Nos 3
190+000 RHS Diversion Board fixing 2 Nos 2
165+000 RHS Diversion Board Removing 2 Nos 1
150+050 Median Diversion Board Removing 1 Nos 1
227+000 227+200 Median Median grass cutting 200 Meter 3
227+200 227+450 Median Median grass cutting 250 Meter 4
227+450 227+650 Median Median grass cutting 200 Meter 3
227+650 227+950 Median Median grass cutting 300 Meter 4
230+000 230+400 Median Watering of median plants 400 Meter 2
248+100 248+600 Both side Divider grass cutting 500 Meter 7
233+900 234+300 Median Median grass cutting 400 Meter 3
226+000 226+300 Median Median grass cutting 300 Meter 4
193+900 194+700 LHS ROW and Shoulder side grass cutting 800 Meter 13
194+700 195+500 RHS ROW and Shoulder side grass cutting 800 Meter 11
173+000 174+600 RHS ROW grass cutting 1600 Meter 23
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 22
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
3-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
2
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 7
179+250 TP1 Ambulance Helper 1 Nos 1
220+500 221+000 RHS Thread destructing of MBCB bolt 500 Meter 3
234+450 234+800 Median Median grass cutting 350 Meter 3
238+600 238+800 Median Median grass cutting 200 Meter 3
239+400 239+700 Median Median grass cutting 300 Meter 4
240+600 240+900 Median Median grass cutting 300 Meter 4
211+000 211+200 Median Median grass cutting 200 Meter 4
218+600 219+000 Both side ROW Grass cutting by grass cutter 400 Meter 5
212+000 212+300 Median Median grass cutting 300 Meter 4
213+000 213+200 Median Median grass cutting 200 Meter 3
218+000 218+250 Median Median grass cutting 250 Meter 4
169+000 169+800 RHS ROW Grass cutting 800 Meter 10
165+800 166+400 Both side ROW and Shoulder side grass cutting 1200 Meter 10
190+000 190+700 Both side Shoulder side grass cutting 1400 Meter 7
191+700 192+400 RHS Shoulder side grass cutting 700 Meter 9
191+700 192+200 LHS Shoulder side grass cutting 500 Meter 7
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 23
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
4-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
2
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 5
179+250 TP1 Ambulance Helper 1 Nos 1
179+250 TP1 Toll Plaza lane repairing 5 Nos 2
151+000 152+000 Median Boulder removing 1000 Meter 2
150+050 151+000 LHS Road Sweeping 950 Meter 5
151+000 152+200 LHS Road Sweeping 1200 Meter 4
151+000 151+900 RHS Road Sweeping 900 Meter 2
192+200 193+300 LHS Shoulder side grass cutting 1100 Meter 10
192+400 193+600 RHS Shoulder side grass cutting 1200 Meter 14
151+000 151+200 Both Side Shoulder side grass cutting 400 Meter 5
150+050 150+100 LHS Shoulder side grass cutting 50 Meter 1
230+000 230+500 Median Watering of Median Plants 500 Meter 2
234+450 234+650 Median Median grass cutting 200 Meter 4
238+800 239+000 Median Median grass cutting 200 Meter 4
239+700 239+900 Median Median grass cutting 200 Meter 4
225+000 226+500 RHS Shoulder side grass cutting 1500 Meter 4
214+000 215+000 Both side ROW Grass cutting by grass cutter 1000 Meter 4
213+000 213+400 Median Median grass cutting 400 Meter 5
213+400 213+600 Median Median grass cutting 200 Meter 4
213+600 214+000 Median Median grass cutting 400 Meter 6
211+000 211+500 Median Median grass cutting 500 Meter 5
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 24
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
5-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
1
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 6
179+250 TP1 Ambulance Helper 1 Nos 1
150+050 151+000 RHS Road Sweeping 950 Meter 9
153+000 154+100 RHS Road Sweeping 1100 Meter 3
152+200 153+300 LHS Road Sweeping 1100 Meter 4
151+000 154+000 Both side Signages cleaning 3000 Meter 2
193+000 193+900 LHS Shoulder side grass cutting 900 Meter 10
193+600 194+400 RHS Shoulder side grass cutting 800 Meter 10
240+000 240+300 Median Median grass cutting 400 Meter 5
240+300 240+600 Median Median grass cutting 300 Meter 5
240+900 241+200 Median Median grass cutting 300 Meter 5
237+000 237+100 RHS Divider grass cutting 100 Meter 2
204+000 204+200 Both side ROW grass cutting 400 Meter 6
204+000 204+200 Median Median grass cutting 400 Meter 4
204+200 204+400 Median Median grass cutting 400 Meter 4
209+000 209+300 Median Median grass cutting 400 Meter 5
209+000 209+300 Both side ROW grass cutting 800 Meter 4
209+300 209+500 Median Median grass cutting 800 Meter 4
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 25
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
6-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
2
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 5
179+250 TP1 Ambulance Helper 1 Nos 1
241+200 241+800 RHS Road Sweeping 600 Meter 10
200+000 200+300 RHS Road Sweeping 300 Meter 4
153+300 155+000 LHS Road Sweeping 1700 Meter 6
200+000 207+000 Both side Signages cleaning 7000 Meter 2
154+100 155+000 LHS Road Sweeping 900 Meter 4
170+900 171+800 LHS Road Sweeping 900 Meter 5
153+000 154+000 Median Boulder removing 1000 Meter 3
237+000 237+500 RHS Divider grass cutting 500 Meter 6
241+000 241+300 RHS Divider grass cutting 400 Meter 4
200+000 200+300 Median Median grass cutting 300 Meter 4
203+000 203+400 Median Median grass cutting 400 Meter 6
202+000 202+500 Both side ROW grass cutting with grass cutter 1000 Meter 5
200+000 200+400 Both side ROW grass cutting 800 Meter 6
173+000 173+200 RHS ROW grass cutting 200 Meter 5
192+000 193+000 LHS ROW grass cutting 1000 Meter 12
193+400 195+200 RHS Shoulder side grass cutting 1800 Meter 8
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 26
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
7-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
4
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 4
179+250 TP1 Ambulance Helper 1 Nos 1
235+300 235+600 LHS Road Sweeping 300 Meter 4
244+400 244+800 LHS Road Sweeping 400 Meter 5
241+500 241+800 LHS Road Sweeping 300 Meter 4
244+000 252+000 Both side Signages cleaning 8000 Meter 2
193+900 194+700 LHS ROW and Shoulder side grass cutting 800 Meter 13
151+500 152+400 LHS Shoulder side grass cutting 900 Meter 7
151+500 152+300 RHS Shoulder side grass cutting 800 Meter 7
241+800 242+600 Median Median grass cutting 800 Meter 11
8-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
2
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 6
179+250 TP1 Ambulance Helper 1 Nos 1
244+000 244+500 RHS PGR Washing 500 Meter 3
244+000 244+400 RHS Road Sweeping 400 Meter 4
152+400 152+900 RHS ROW and Shoulder side grass cutting 500 Meter 9
152+400 152+900 LHS ROW and Shoulder side grass cutting 500 Meter 7
152+500 153+000 LHS Shoulder side grass cutting 400 Meter 1
194+700 195+500 LHS ROW and Shoulder side grass cutting 800 Meter 11
244+000 244+400 RHS Divider grass cutting 400 Meter 4
242+600 243+600 Median Median grass cutting 1000 Meter 12
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 27
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
9-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
2
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 5
179+250 TP1 Ambulance Helper 1 Nos 1
207+000 213+000 Both side Signages cleaning 6000 Meter 2
243+600 244+800 Median Median grass cutting 1200 Meter 22
200+000 200+500 Both side Row grass cutting 500 Meter 6
152+900 153+000 RHS ROW and Shoulder side grass cutting 100 Meter 5
153+000 153+200 RHS ROW and Shoulder side grass cutting 200 Meter 4
152+900 153+400 RHS ROW and Shoulder side grass cutting 500 Meter 8
153+000 154+000 Median Median grass cutting 1000 Meter 15
153+000 154+000 Both side Shoulder side grass cutting 2000 Meter 2
195+500 196+000 LHS Shoulder side grass cutting 500 Meter 6
195+200 196+200 RHS Shoulder side grass cutting 1000 Meter 13
10-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump
sum 1
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 5
179+250 TP1 Ambulance Helper 1 Nos 1
207+000 213+000 Both side Modnimb police station 1 Lump
sum 3
213+000 221+000 Both side Signages cleaning 8000 Meter 2
160+000 LHS Radium stickring 1 Lump
sum 14
245+200 245+800 Median Median grass cutting 600 Meter 8
202+000 203+000 Median Median grass cutting 1000 Meter 16
196+200 196+800 RHS ROW and Shoulder side grass cutting 600 Meter 9
196+000 196+400 LHS ROW and Shoulder side grass cutting 400 Meter 8
153+400 154+200 RHS ROW and Shoulder side grass cutting 800 Meter 16
153+300 153+800 RHS ROW and Shoulder side grass cutting 500 Meter 10
200+500 201+000 Both side Row grass cutting 1000 Meter 6
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 28
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
11-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
2
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 5
179+250 TP1 Ambulance Helper 1 Nos 1
190+000 Both side Diversionn board shifting 25 Nos 6
221+000 228+000 Both side Signages cleaning 7000 Meter 2
160+000 LHS Redium stickring 1 Lump sum
3
245+800 246+000 Median Median grass cutting 200 Meter 4
246+000 247+000 Median Median grass cutting 1000 Meter 15
153+200 154+800 RHS ROW and Shoulder side grass cutting 1600 Meter 10
154+200 154+800 LHS ROW and Shoulder side grass cutting 600 Meter 10
196+400 197+800 LHS ROW and Shoulder side grass cutting 1400 Meter 14
196+800 197+300 RHS ROW and Shoulder side grass cutting 500 Meter 6
203+000 204+000 Median Median grass cutting 1000 Meter 15
201+000 201+600 Both side RoW grass cutting 600 Meter 6
201+600 202+200 LHS RoW grass cutting with grass cutter 600 Meter 4
12-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
2
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 6
179+250 TP1 Ambulance Helper 1 Nos 1
188+300 RHS Modnimb police station 1 Lump
sum 6
154+300 154+900 RHS Road sweeping 600 Meter 16
203+000 203+600 Both side Road sweeping 600 Meter 6
247+000 248+000 Median Median grass cutting 1000 Meter 15
248+100 248+600 Both side Divider grass cutting 1000 Meter 10
197+800 198+300 LHS ROW and Shoulder side grass cutting 500 Meter 5
197+300 198+200 RHS ROW and Shoulder side grass cutting 900 Meter 9
154+800 155+200 LHS ROW and Shoulder side grass cutting 400 Meter 5
204+000 205+000 Median Median grass cutting 1000 Meter 15
202+000 202+700 LHS RoW grass cutting with grass cutter 700 Meter 4
201+600 202+000 Both side RoW grass cutting 800 Meter 6
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 29
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
13-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
2
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 12
179+250 TP1 Ambulance Helper 1 Nos 1
251+000 251+500 RHS PGR washing 500 Meter 4
250+000 250+500 Both side Road sweeping 1000 Meter 6
203+600 204+000 Both side Road sweeping 800 Meter 6
221+500 RHS Wadwal camp guard 1 Lump
sum 1
235+000 243+000 LHS Road sweeping with sweeper machine 8000 Meter 2
150+050 151+000 Both side Road sweeping 1900 Meter 10
151+000 152+300 Both side Road sweeping 2600 Meter 6
248+000 249+000 Median Median grass cutting 1000 Meter 10
248+600 249+200 Both side Divider grass cutting 1200 Meter 10
205+000 206+000 Median Median grass cutting 1000 Meter 10
198+200 199+200 RHS ROW and Shoulder side grass cutting 1000 Meter 7
198+300 199+200 LHS ROW and Shoulder side grass cutting 900 Meter 7
150+050 150+400 RHS Shoulder grass cutting 350 Meter 3
202+500 203+000 LHS RoW grass cutting with grass cutter 500 Meter 4
202+000 202+500 Both side RoW grass cutting 1000 Meter 6
202+000 207+000 Median Watering of median plantation 5000 Meter
205+000 210+000 Median Watering of median plantation 5000 Meter
150+050 150+400 Both side Shoulder grass cutting 350 Meter 4
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 30
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
14-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
2
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 7
179+250 TP1 Ambulance Helper 1 Nos 1
250+000 251+000 RHS PGR washing 1000 Meter 4
165+200 167+000 Both side Road sweeping 3600 Meter 9
179+250 183+300 Both side Road sweeping 4050 Meter 13
221+500 RHS Wadwal camp guard 1 Lump
sum 1
243+000 249+800 LHS Road sweeping with sweeper machine 6800 Meter 2
165+200 167+000 Median Median grass cutting 1800 Meter 5
155+000 155+800 RHS Shoulder grass cutting 800 Meter 5
155+300 155+400 Median Median grass cutting 100 Meter 2
191+700 192+400 RHS ROW and Shoulder side grass cutting 700 Meter 9
191+700 192+200 Both side ROW and Shoulder side grass cutting 1000 Meter 7
249+200 250+000 Both side Divider side grass cutting 1600 Meter 13
249+000 250+000 Median Median grass cutting 1000 Meter 13
206+000 207+000 Median Median grass cutting 1000 Meter 10
203+000 203+500 Both side ROW grass cutting 1000 Meter 10
204+000 205+000 Both side Row grass cutting by grass cutter 1000 Meter 6
205+000 205+500 Both side ROW grass cutting 1000 Meter 10
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 31
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
15-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump
sum 8
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 11
179+250 TP1 Ambulance Helper 1 Nos 1
156+400 157+000 Both side Road sweeping 600 Meter 3
170+000 171+200 Both side Road sweeping 1200 Meter 6
221+500 RHS Wadwal camp guard 1 Lump sum
1
250+000 252+000 Both side Road sweeping with sweeper machine 4000 Meter 2
183+300 187+500 Both side Road sweeping 4200 Meter 12
203+500 204+000 Both side ROW grass cutting 1000 Meter 10
156+000 156+800 LHS Shoulder grass cutting 800 Meter 4
205+500 206+000 Both side ROW grass cutting 1000 Meter 10
209+000 210+000 Median Median grass cutting 1000 Meter 15
250+000 251+500 Median Median grass cutting 1500 Meter 20
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 32
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
16-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
5
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 11
179+250 TP1 Ambulance Helper 1 Nos 1
230+200 TP2 Toll plaza washing 1 Lump sum
4
222+000 RHS Guard at wadwal camp 1 Nos 1
244+700 246+000 LHS Road sweeping 1300 Meter 4
216+000 217+000 Both side Road sweeping with sweeper machine 2000 Meter 1
242+000 244+000 Both side Road sweeping with sweeper machine 4000 Meter 1
152+000 152+700 Median Median grass cutting 700 Meter 5
155+400 156+100 Median Median grass cutting 700 Meter 5
195+000 196+000 Median Median grass cutting 1000 Meter 7
156+600 157+500 LHS ROW and Shoulder side grass cutting 900 Meter 10
197+400 197+700 LHS median grass cutting at split carrigeway 300 Meter 3
199+200 199+800 LHS Shoulder grass cutting 600 Meter 7
251+500 251+700 Median Median grass cutting 200 Meter 4
206+000 207+000 LHS RoW grass cutting 1000 Meter 10
210+000 210+700 Median Median grass cutting 700 Meter 5
207+000 215+000 Median Watering of median plantation 8000 Meter
220+000 220+500 LHS RoW grass cutting 500 Meter 10
209+000 214+000 LHS Watering of ROW plantation 5000 Meter
248+000 252+000 Median Watering of median plantation 4000 Meter
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 33
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
17-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
5
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 6
179+250 TP1 Ambulance Helper 1 Nos 1
220+000 221+000 Both side Kerb Washing 2000 Meter 2
222+000 RHS Guard at wadwal camp 1 Nos 1
150+300 151+000 Both side Road sweeping 1400 Meter 8
248+000 252+000 RHS Road sweeping with sweeper machine 4000 Meter 2
251+000 RHS Soil removing and levelling the drain 1 Lump sum
28
196+000 197+000 Median Median grass cutting 1000 Meter 7
197+700 199+800 Median Median grass cutting 2100 Meter 7
199+200 200+200 RHS RoW grass cutting 1000 Meter 6
199+800 200+000 LHS ROW and Shoulder side grass cutting 200 Meter 2
156+800 157+700 RHS ROW and Shoulder side grass cutting 900 Meter 13
220+500 220+800 LHS RoW grass cutting 300 Meter 7
229+500 230+000 Median Median grass cutting 500 Meter 4
18-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
4
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 6
179+250 TP1 Ambulance Helper 1 Nos 1
249+800 RHS Drain cleaning 1 Lump
sum 16
189+300 190+700 Both side Kerb Cleaning 2800 Meter 5
191+700 193+000 Both side Road sweeping 2600 Meter 6
230+200 TP2 Plantation in TP2 18 Nos 4
230+200 TP2 Watering of Toll plaza plantation 1 Nos 2
231+000 231+500 LHS RoW grass cutting 500 Meter 4
211+000 213+000 LHS RoW grass cutting 2000 Meter 10
179+300 179+600 LHS Plantation in TP1 25 Nos 8
155+700 156+800 RHS ROW and Shoulder grass cutting 1100 Meter 21
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 34
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
19-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
4
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 5
179+250 TP1 Ambulance Helper 1 Nos 1
251+000 RHS Drain cleaning 100 Meter 10
193+000 194+000 Both side Kerb Cleaning 2000 Meter 5
248+000 250+000 RHS Road sweeping by sweeper machine 2000 Meter 1
239+000 242+000 RHS Road sweeping by sweeper machine 3000 Meter 1
193+500 193+800 Median Median Drain cleaning 300 Meter 5
230+200 TP2 Plantation in TP2 19 Nos 5
155+000 156+000 Both side Shoulder side grass cutting 2000 Nos 4
204+000 204+500 Median Median grass cutting 500 Meter 4
204+000 204+500 LHS RoW grass cutting 500 Meter 2
179+300 179+600 LHS Plantation in TP1 30 Nos 8
155+000 155+700 RHS ROW and Shoulder grass cutting 700 Meter 14
251+700 252+000 Median Median grass cutting 300 Meter 5
202+000 203+000 Median Median grass cutting 1000 Meter 2
222+000 222+500 Median Median grass cutting 500 Meter 5
155+000 156+000 Median Median grass cutting 1000 Meter 2
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 35
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
20-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump
sum 3
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 6
179+250 TP1 Ambulance Helper 1 Nos 1
251+000 RHS Drain cleaning 20 Meter 15
155+000 157+000 Both side Kerb Cleaning 4000 Meter 5
245+000 248+000 Both side Road sweeping by sweeper machine 6000 Meter 2
180+000 186+000 Median Median grass cutting 6000 Nos 16
203+000 203+200 Median Median grass cutting 200 Nos 3
251+500 252+000 RHS Divider grass cutting 500 Meter 4
221+000 221+200 Median Median grass cutting 200 Meter 6
200+000 205+000 Median Watering of median plantation 5000 Nos 0
213+000 219+000 Median Watering of median plantation 6000 Meter 0
230+200 TP2 Watering of plantation at TP2 1 Lump
sum 3
179+250 TP1 Plantation at TP1 1 Lump
sum 6
154+800 155+000 RHS ROW and Shoulder grass cutting 200 Meter 5
157+000 157+300 Median Median grass cutting 300 Meter 3
154+800 155+600 Median Median grass cutting 800 Meter 5
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 36
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
21-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
5
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 6
179+250 TP1 Ambulance Helper 1 Nos 1
251+000 RHS Security guard at wadwal 1 Nos 1
151+050 151+400 Both side Road sweeping 700 Meter 14
242+000 245+000 Both side Road sweeping by sweeper machine 6000 Meter 1
240+000 241+000 Both side Road sweeping by sweeper machine 2000 Meter
226+000 227+000 Both side Road sweeping by sweeper machine 2000 Meter 1
186+000 192+000 Both side ROW grass cutting 6000 Meter 13
228+750 228+800 Median Median grass cutting 50 Nos 2
223+200 223+400 Median Median grass cutting 200 Meter 3
223+100 223+150 Median Median grass cutting 50 Meter 2
219+800 220+400 Median Median grass cutting 600 Nos 7
200+000 202+800 Both side ROW grass cutting 5600 Meter 30
152+600 154+000 Median Median grass cutting 1400 Meter 6
230+200 TP2 Plantation at TP2 1 Lump sum
7
168+700 169+300 Median Median grass cutting 600 Meter 4
207+000 211+000 TP1 plantation at TP1 1 Lump
sum 4
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 37
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
22-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump
sum 3
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 10
179+250 TP1 Ambulance Helper 1 Nos 1
251+000 RHS Security guard at wadwal 1 Nos 1
216+000 219+000 Both side Road sweeping by sweeper machine 6000 Meter 1
238+000 240+000 Both side Road sweeping by sweeper machine 4000 Meter 1
183+300 183+600 Median Median soil filling 300 Meter 2
192+000 192+300 Median Median grass cutting 300 Nos 5
193+000 195+000 Median Median grass cutting 2000 Meter 10
151+400 152+000 LHS ROW and shoulder grass cutting 600 Meter 10
169+300 169+800 Median Median grass cutting 500 Meter 5
171+600 172+000 Median Median grass cutting 400 Meter 4
230+000 230+500 Median Waterting of media plantation 500 Meter 2
230+200 TP2 Plantation at TP2 1 Lump
sum 3
202+800 203+000 Both side ROW grass cutting 400 Meter 8
226+500 227+000 Median Median grass cutting 500 Meter 10
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 38
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
23-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
4
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 6
179+250 TP1 Ambulance Helper 1 Nos 1
251+000 RHS Security guard at wadwal 1 Nos 1
234+000 238+000 Both side Road sweeping by sweeper machine 8000 Meter 1
238+000 239+000 Both side Road sweeping by sweeper machine 1000 Meter 1
179+250 TP1 Excavation for electrical cable repairing 1 Lump
sum 7
150+050 200+000 Both side With RPV 1 Lump sum
2
226+600 227+000 RHS Road sweeping 400 Meter 5
245+000 LHS Diversion board fixing 25 Nos 7
192+700 193+000 Median Boulder removing 300 Meter 3
195+100 199+000 Median Median grass cutting 3900 Nos 12
151+300 152+400 Median Median grass cutting 1100 Meter 6
151+300 152+000 LHS ROW and shoulder grass cutting 700 Meter 12
212+000 212+300 Median Median grass cutting 300 Meter 5
235+000 236+000 Median Median grass cutting 1000 Meter 12
230+000 230+500 Median Watering of median plantation 500 Meter 2
230+200 TP2 Plantation at TP2 1 Lump
sum 6
20+300 203+200 Both side ROW grass cutting 400 Meter 8
237+000 237+800 Median Divider grass cutting 800 Meter 10
224+500 225+000 Median Median grass cutting 500 Meter 10
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 39
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
24-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
8
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 12
179+250 TP1 Ambulance Helper 1 Nos 1
251+000 RHS Security guard at wadwal 1 Nos 1
235+000 242+000 LHS Road sweeping by sweeper machine 7000 Meter 1
235+000 242+000 RHS Road sweeping by sweeper machine 7000 Meter 1
150+050 RHS Metal Beam Realignment 50 Meter 4
150+050 200+000 Both side With RPV 1 Lump
sum 2
203+000 204+000 Both side Hectometer stone repairing 5 Nos 4
230+200 TP2 Plaza washing and watering at median
plantation at TP2 1
Lump
sum 2
150+050 Median Diversion board fixing 14 Nos 3
150+050 Median Diversion board removing 12 Nos 3
150+050 LHS Metal Beam Fixing 8 Meter 1
150+050 RHS Metal Beam Fixing 8 Meter 1
184+200 184+800 Median Boulder removing 600 Meter 2
195+000 196+000 Median Median grass cutting 1000 Nos 5
195+000 195+200 LHS Median grass cutting 200 Meter 3
152+000 153+000 LHS ROW and shoulder grass cutting 1000 Meter 12
196+000 197+000 Median Median grass cutting 1000 Meter 8
203+300 204+000 Both side ROW grass cutting 1400 Meter 14
221+200 222+000 Median Median grass cutting 800 Meter 10
222+000 223+000 Median Median grass cutting 1000 Meter 12
236+000 237+000 Both side Median grass cutting 1000 Meter 10
235+100 235+250 RHS Divider grass cutting 150 Meter 3
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 40
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
25-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
5
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 11
179+250 TP1 Ambulance Helper 1 Nos 1
251+000 RHS Security guard at wadwal 1 Nos 1
229+000 235+000 Both side Road sweeping by sweeper machine 12000 Meter 2
200+000 214+000 LHS HM Stone and KM Stone painting 14000 Meter 2
182+200 182+500 Median Concrete removing from median 1 Lump
sum 2
197+400 197+700 Both side Concrete removing from median 1 Lump
sum 3
150+050 20+000 Both side With RPV 1 Lump
sum 2
230+200 TP2 Plaza washing and watering at median
plantation at TP2 1
Lump
sum 2
150+050 Median Diversion board fixing 5 Nos 3
166+000 Median Diversion board removing 3 Nos 3
150+050 LHS Metal Beam Fixing 16 Meter 3
218+200 219+000 LHS ROW grass cutting 800 Meter 12
197+000 199+000 Median Median grass cutting 2000 Nos 10
223+000 223+600 LHS ROW grass cutting 600 Meter 18
153+000 154+800 LHS ROW and shoulder grass cutting 1800 Meter 19
237+000 237+200 Median Median grass cutting 200 Meter 4
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 41
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
26-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
3
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 13
179+250 TP1 Ambulance Helper 1 Nos 1
251+000 RHS Security guard at wadwal 1 Nos 1
235+000 249+000 LHS Road sweeping by sweeper machine 14000 Meter 1
217+000 217+600 Both side Road sweeping 1200 Meter 7
245+500 246+200 Both side Road sweeping 1400 Meter 8
244+800 245+000 RHS Road sweeping service road 200 Meter 3
150+050 252+152 Both side With RPV 1 Lump sum
5
190+000 RHS Diversion board fixing 40 Nos 3
190+500 Median Diversion board removing 20 Nos 2
205+000 RHS Metal Beam removing 30 Meter 3
235+000 241+000 RHS Road sweeping by sweeper machine 6000 Meter
235+000 237+000 LHS Road sweeping by sweeper machine 2000 Meter 1
214+000 252+000 LHS Hectometer and Km stone painting 38000 Meter 1
217+000 252+000 RHS Hectometer and Km stone painting 35000 Meter 1
249+000 249+400 LHS Median grass cutting 400 Meter 6
245+400 245+600 Median Median grass cutting 200 Nos 4
181+000 182+000 Median Median cleaning 1000 Meter 2
154+200 154+800 Median Median grass cutting 600 Meter 3
245+500 246+000 RHS Divider grass cutting 500 Meter 5
245+600 247+000 Median Boulder removing 1400 Meter 12
217+000 217+200 RHS Divider grass cutting 200 Meter 4
181+000 182+000 LHS Shoulder side grass cutting 1000 Meter 7
185+000 185+600 LHS Shoulder side grass cutting 600 Meter 5
150+050 150+300 RHS Shoulder side grass cutting 250 Meter 6
154+800 156+600 LHS Shoulder side grass cutting 1800 Meter 9
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 42
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
27-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
3
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 13
179+250 TP1 Ambulance Helper 1 Nos 1
251+000 RHS Security guard at wadwal 1 Nos 1
247+400 LHS Concrete removing 1 Lump sum
3
250+400 250+600 LHS Road sweeping 200 Meter 6
237+700 237+850 LHS Road sweeping 150 Meter 3
235+100 235+500 Both side Road sweeping 800 Meter 3
235+500 235+550 RHS Crash barrier washing 50 Meter 1
239+000 239+050 RHS Crash barrier washing 50 Meter 0
235+500 235+700 Both side Kerb washing 200 Meter 1
239+000 239+100 RHS Kerb washing 100 Meter 1
246+000 251+000 LHS Road sweeping by sweeper machine 5000 Meter 1
249+000 252+000 RHS Road sweeping by sweeper machine 3000 Meter 1
166+000 LHS Diversion Board fixing 1 Nos 2
157+000 LHS Diversion Board fixing 8 Nos 2
190+000 LHS Sand bag filling 100 Nos 2
247+000 Median Diversion Board fixing 2 Nos 2
184+000 187+000 Both side Kerb washing 3000 Meter 13
184+000 186+000 Median Drain cleaning 2000 Meter 3
189+000 RHS Modnimb police station 1 Lump sum
5
150+050 150+400 LHS Boulder removing from shoulder 350 Meter 8
237+600 237+800 Median Median grass cutting 200 Meter 4
225+000 225+200 Median Median grass cutting 200 Meter 6
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 43
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
28-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
6
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 10
179+250 TP1 Ambulance Helper 1 Nos 1
251+000 RHS Security guard at wadwal 1 Nos 1
187+000 190+600 LHS Kerb washing 3600 Meter 12
242+000 243+000 RHS Road sweeping 1000 Meter 6
240+800 241+000 LHS Road sweeping 200 Meter 4
235+700 235+800 LHS Road sweeping 100 Meter 4
244+800 245+200 RHS RCC Crash barrier washing 400 Meter 5
245+000 252+152 LHS Road sweeping by sweeper machine 7152 Meter 1
237+000 252+152 RHS Road sweeping by sweeper machine 15152 Meter 1
189+000 LHS Modnimb police station 1 Lump
sum 3
157+700 160+000 LHS Given to ITNL for Patch repairing for existing road 1 Lump sum 8
167+200 167+300 Both side Road sweeping 200 Meter 7
157+000 LHS Diversion Board fixing 1 Nos 8
245+300 245+400 Median Median grass cutting 100 Meter 3
245+500 245+600 Median Median grass cutting 100 Meter 2
245+500 245+600 LHS Shoulder side grass cutting 100 Meter 2
238+000 239+000 RHS Divider side grass cutting 1000 Meter 15
200+000 217+000 Median Waste plants removing 17000 Meter 2
219+800 221+000 Median Median grass cutting 1200 Meter 8
222+200 222+400 Median Median grass cutting 200 Meter 4
156+000 156+800 LHS Shoulder side grass cutting 800 Meter 8
179+250 TP1 Plantation at TP1 1 Lumpsum 3
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 44
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
29-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump
sum 9
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 16
179+250 TP1 Ambulance Helper 1 Nos 1
251+000 RHS Security guard at wadwal 1 Nos 1
230+200 TP2 Toll Plaza washing 1 Lump
sum 2
238+000 238+200 Both side Road sweeping 400 Meter 4
238+800 239+000 Both side Road sweeping 400 Meter 4
228+600 228+800 Both side Road sweeping 400 Meter 2
223+100 223+300 Both side Road sweeping 400 Meter 2
200+000 219+000 RHS Road sweeping by sweeper machine 19000 Meter 2
150+050 152+200 Both side Road sweeping 4300 Meter 10
189+000 LHS Modnimb police station 1 Lump
sum 6
150+900 LHS Given to ITNL for Patch repairing of Bridge 1 Lump sum
9
225+400 225+600 Median Median grass cutting 200 Meter 4
219+600 219+800 Median Median grass cutting 200 Meter 4
239+000 239+300 RHS Divider side grass cutting 300 Meter 3
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 45
PSRDCL
Date Chainage
Action taken Total Work Done Unit No of LaboursFrom To Side
30-Jun-14
230+200 TP2 Toll Plaza Cleaning & House keeping 1 Lump sum
14
179+250 TP1 Toll Plaza Cleaning & House keeping 1 Lump
sum 6
179+250 TP1 Ambulance Helper 1 Nos 1
251+000 RHS Security guard at wadwal 1 Nos 1
217+000 Both side RCC crash barrier washing of bridge 2 Nos 2
245+000 245+100 RHS Road sweeping service road 100 Meter 6
250+500 250+700 Median Drain cleaning 200 Meter 6
250+500 250+900 LHS Road sweeping 400 Meter 7
185+000 Both side Bus shelter cleaning 2 Nos 2
200+000 213+000 LHS Road sweeping by sweeper machine 13000 Meter 2
199+000 201+000 LHS Kerb Cleaning 2000 Meter 6
189+000 LHS Modnimb police station 1 Lump sum 2
151+600 151+700 LHS Road sweeping service road 100 Meter 1
151+600 LHS Bus shelter cleaning 1 Nos 1
172+000 175+400 LHS Kerb Cleaning 3400 Meter 6
210+000 210+300 Median Median grass cutting 300 Meter 5
244+600 244+800 Median Median grass cutting 200 Meter 4
184+500 185+600 Median Median grass cutting 1100 Meter 5
210+000 210+200 LHS ROW grass cutting 200 Meter 5
220+000 220+300 Median Median grass cutting 300 Meter 5
220+000 220+200 LHS ROW grass cutting 200 Meter 6
225+000 225+300 Median Median grass cutting 300 Meter 4
225+000 225+100 LHS ROW grass cutting 100 Meter 3
192+200 192+600 LHS ROW grass cutting 400 Meter 5
152+000 153+400 Median Median grass cutting 1400 Meter 7
155+000 155+800 LHS ROW grass cutting 800 Meter 8
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 46
PSRDCL
4.2 : Executive Summary
Operation & Maintenance Report
Monthly Report
Report for the Year : 2014 Month: June 2014
Date: 30/06/2014
(A) ROUTINE MAINTENANCE
Description of Activities Status of Activites / Action Taken
Cleaning of pavement, removal of
debris or any unwanted material
from Project highway.
Cleaning of pavement, removal of dead animal & debris etc. is being done on regular basis.
Maintenance of plants & shrubs to
ensure proper growth.
Trimming, manuring & watering have been done regularly to ensure its proper growth. For Quantity of work please refer Daily Work Report
Removal of weeds & other
vegetation from median, earthen
shoulders & slopes.
Removal of weeds and other unwanted vegetation from median and side slopes have been carried out Regularly. For Quantity of Work please refer Daily Work Report
(B) EMERGENCY MAINTENANCE
Description of Activities
Status of Activites / Action Taken
Development of Emergency
Response Protocol in consultation
with police, hospital, fire department
& other authorities
Emergency Response Protocol has been developed with local police, fire stations and hospitals within the project length.
Highway Patrolling
Round the clock Highway patrolling is being done by one Patrolling vehicle for security and safety of the project and to prevent the unauthorized encroachment/Obstruction in the entire project length.
Attending emergencies in case of
accidents or any other incident
Ambulance is well maintained and is in good condition to take care of any emergency. The First Aid treatment is being given to the injured persons immediately at the time of Accidents by Medical Staff.
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 47
PSRDCL
(C) OTHER MAINTENANCE
Description of Activities Status of Activites / Action Taken
Highway sign, painting, road marking, and road furniture.
All signs board, marking & painting have been kept clean, visible & in correct alignment and position to serve the better safety for road users.
Maintenance of highway landscape
Watering, mowing & maturing have been done regularly for proper growth of Plantation. Weed removal work is in progress.
Maintenance of median drains and longitudinal drains
Cleaning of median drains which are deposited with silt, sand and waste. Cleaning and disposal of debris from unlined drains, so that there is smooth flow for surface water.
(D) SAFETY AND TRAFFIC MAINTENANCE
Description of Activities
Status of Activites / Action Taken
Safety during the Main Tenancy of Road
All the road maintenance works have been carried out with the use of proper safety requirments like Flag men with necessary Jacket, red / green Batons / flashes, safety cones, etc to avoid any mishap to the Project facility / traffic as well as the people who are involed in the maintenance work.
Safety during the Road Accidents
Necessary actions like towing of damaged vehicles from the Carriageway to safe location, shifting of injured pepole to the nearest hospitals, First aid treatment to injured person, information of accidents to the nearby police station and temporary traffic diversion by use of traffic safety equipments have been done as & when required. If shifting of accidental vehicles is not possible, proper precauations have been taken to ensure the safety and security to the road users.
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 48
PSRDCL
CORRIDOR MAINTENANCE
Description of Activities Status of Activities / Action Taken
New Encroachments within ROW
New encroachments have been stopped by Patrolling Team. Any cases observed shall be referred to HUDA / IC for their assistance with the use of Local Administration.
Safety of Project Facilities
Close monitoring have been done by the Patrolling team to avoid any damage / pileferage of the Project facilities provided.
Description
Status / Action Taken
O & M
Activities
1. O & M Activities are being carried out as per O & M Manual. However accident incidents are tackled on top priority when & where ever it is observed.
2. Vegetation growth in median plantation has been controlled, and will be maintained so that it will not grow too much.
3. Regular C & G Work in Main Carriageway Shoulders & in Service road area are in progress.
4. Road Cleaning on Main carriageway & Service Road has been cleaning on regular basis, so as to maintain the cleanliness on Road. For this Purpose Broomer is used as well as this work is carried out by Manual Labours Also.
5. VUP & PUP’s are cleaned at regular interval so as to provide free flow for vehicles & pedestrations.
6. Grass and Shrubs above stone pitching and grass pitching has been removed. 7. Grass and Shrubs in Shoulders areas in both sides on MCW have been cleaned 8. Both Toll Plaza 1 & Toll Plaza 2 have been cleaned regularly. 9.
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 49
PSRDCL
4.2 Photographs –
I. Maintenance Activities
Medium Plantation-at ch.no.127+600
Upkeep Of Mediums And Row
TOLL Palza House Keeping:TP2
Toll Plaza Cleaning: Tp1
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 50
PSRDCL
Kerb Cleaning at ch.no.228.00
Road Cleaning At Ch.No.217+600
Maintenance Of Earthen Shoulder At Ch.No.187+500
ROW and Road Side Grass Cutting At Ch.No 154+800
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 51
PSRDCL
II. Incident Management Photographs
Providing Private Ambulance Services Assisting Highway Users-Providing Break Down Services
Emergency Services-Providing extra Services
Handling Accident –Providing Tow Away Services
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 52
PSRDCL
Emergency tow service at ch. No.221 Handling Accident At Ch.No.163+200
Handling Accident At Ch.No.151+100 Providing Emergency Service At Ch.No.151.000
Four Laning of Pune Solapur Package-II DBFOT Project (Ch. 150.050 to 252.000) on NH-65 in the State of Maharashtra
Page 53
PSRDCL
Accident
A :
B :
C :
D :
E :
F :
G :
H :
A B C D E F G H
Accident
Location
Nature of
Accident
Classification
of AccidentCauses
Road
Feature
Road
Condition
Intersecti
on Type
and
Control
Weather
ConditionFatal
Greavi
ousMinor
Non
Injured
1 01.06.2014 4:28 185+200LHS 3 3 2 2 4 4 10 BIKE AND BIKE 3 RPV and Ambulance
2 01.06.2014 4:30 AM 207+00RHS 2 3 2 2 4 3 10 BUS & TRUCK 4 RPV and Ambulance
3 04.06.2014 3:40 191+600RHS 8 4 2 2 2 4 9 TRAVELS BUS 1 RPV and Ambulance
4 04.06.2014 5:35 211+500RHS 2 3 2 2 4 3 12 BIKE & CAR 1 RPV and Ambulance
5 07.06.2014 10:05 215+300LHS 8 4 3 2 4 2 9 CAR 1 RPV and Crane
6 08.06.2014 12:25 187+800LHS 3 3 2 2 2 1 10 TRUCK &CAR 2 RPV and Ambulance
7 08.06.2014 5:20 225+100RHS 2 3 2 2 4 2 9 TRUCK AND CAR 1 RPV and Ambulance
8 10.06.2014 9:15 168+500LHS 2 3 3 2 2 3 10 SUMO AND CAR 1 RPV, Ambulance and Crane
9 10.06.2014 11:05 215+700LHS 2 1 2 2 4 1 9 TRUCK AND BIKE 1 RPV, Ambulance and Crane
10 10.06.2014 3:45 236+500RHS 3 3 2 2 4 2 10 TRUCK AND APE 2 RPV, Ambulance and Crane
11 12.06.2014 4:50 241+800RHS 3 4 2 2 2 3 10 TEMPO AND BIKE 1 RPV and Crane
12 13.06.2014 11:20 183+200RHS 6 3 3 2 4 2 10 BIKE 3 RPV and Ambulance
13 14.06.2014 7:45 182+600LHS 6 3 2 2 2 3 9 BIKE 2 RPV and Ambulance
14 14.06.2014 8:30 186+600LHS 2 3 3 2 4 2 9 TRUCK AND BIKE 2 RPV and Ambulance
15 14.06.2014 4:40 215+400LHS 2 3 2 2 2 3 10 TRUCK AND TRUCK 1 RPV, Ambulance and Crane
16 15.06.2014 12:25 218+100RHS 3 3 2 2 2 2 9 CAR AND BIKE RPV, Ambulance and Crane
17 17.06.2014 12:15 242+500LHS 2 3 2 2 2 2 10 TRUCK AND PICKUP 1 RPV, Ambulance and Crane
18 18.06.2014 8:30 240+00LHS 6 3 3 2 2 2 8 BIKE 1 RPV and Ambulance
19 19.06.2014 11:30 245+600RHS 3 3 3 2 2 10 2 TRUCK AND DUMPAR 1 RPV, Ambulance and Crane
20 20.06.2014 4:30 170+000LHS 3 3 2 2 2 2 9 BIKE AND TATA 1 RPV, Ambulance and Crane
21 20.06.2014 5:30 234.05RHS 3 3 2 2 2 2 10 BIKE AND TRUCK 2 RPV, Ambulance and Crane
22 21.06.2014 8:32 173+800LHS 3 1 2 2 2 2 10 BIKE AND CAR 1 RPV and Ambulance
23 22.06.2014 10:20 236+850LHS 6 4 3 2 2 2 9 TRUCK 1 RPV, Ambulance and Crane
24 23.06.2014 12:40 204+900RHS 6 4 3 2 2 2 9 TRUCK 1 RPV and Crane
25 23.06.2014 9:10 206+000RHS 6 4 3 2 2 2 10 TRUCK 1 RPV and Crane
26 25.06..2014 5:05 250+150RHS 6 4 3 2 2 2 9 TRUCK 1 RPV and Crane
27 26.06.2014 12:45 215+000LHS 3 3 2 2 2 2 10CAR AND
CONTANIER3 RPV, Ambulance and Crane
28 27.06.2014 1:30 230+200RHS 3 3 3 2 4 3 10 CAR AND BIKE 2 RPV, Ambulance and Crane
29 27.06.2014 10:30 214+200LHS 3 4 3 2 4 2 8 CAR AND TRUCK 1 RPV and Crane
30 28.06.2014 1:00 151+000RHS 3 1 2 2 4 2 9 UNKNOWN VEHICLE 1 RPV and Ambulance
31 28.06.2014 6:15 201+700LHS 6 4 3 2 4 2 10 Mahindra 1 RPV and Crane
32 29.06.2014 2:30 163+200Singal 3 4 2 2 2 2 9MINI BUS AND
BOLERO1 RPV and Crane
33 29.06.2014 3:25 154+100RHS 3 3 2 2 2 2 8 TRUCK AND BIKE 2 RPV and Ambulance
34 29.06.2014 3:15 220+000RHS 4 4 2 2 2 2 10 CAR 1 RPV and Crane
35 29.06.2014 7:20 212+700RHS 6 2 2 2 2 2 9 CAR 2 RPV and Ambulance
36 30.06.2014 7:20 219+800RHS 2 2 2 2 2 2 10 Omini AND TANKER 3 1 RPV and Ambulance
Total 3 5 35 12
1-Drunken, 2-Overspeeding, 3-Vehicle out of control, 4-Fault of driver of motor vehicle/driver of other vehicle/cyclist/pedestrian/passenger, 5-Defect in mechanical condition of motor vehicle/road
PSRDCL-ACCIDENT REPORT- June 2014Legends
Urban/Rural and Details of Surrounding Land use
1-Overturning, 2-Head on collision, 3-Rear End Collision, 4-Collision Brush/Side Wipe, 5-Right Turn Collision, 6-Skidding, 7-Right Turn Collision, 8-Others (Pl.Specify)
1-Fatal, 2-Grievious Injury, 3-Minor Injured, 4-Non Injury
No. of animals
killed if any
Help provided by Ambulance/
PatrolRemarks
1-Single lane, 2-Two lanes, 3-Three lanes or more without central divider (median), 4-Four lanes or more with central divider
1-Straight Road, 2-Slight Curve, 3-Sharp Curve, 4-Flat Road, 5-Gentle incline, 6-Steep incline, 7-Hump, 8-Dip
1-T Junction, 2-Y Junction, 3-Four arm junction, 4-Staggered junction, 5-Junction with more than 4 arms, 6-Roundabout junction, 7-Manned Rail crossing, 8-Unmanned Rail crossing
1-Fine, 2-Mist/Fog, 3-Cloud, 4-Light rain, 5-Heavy rain, 6-Hail/sleet, 7-Snow, 8-Strong Wind, 9-Dust Storm, 10-Very Hot, 11-Very Cold, 12-Other extraordinary weather condition
Road Accident Report
Sl.
No.Date
Time of Acc.
(am/pm)Vehicle Responsible
No. of affected persons