Humble introduction
• Name: Sr T. N. WONG
• FRICS, FHKIS, FCInstCES, RISM, MNZIS
• Chairman, NZIS (HK Branch) 2016
• Chairman, HKIS Land Surveying Division 1992-1994
• President, HKIS 1997/98
• FIG, Vice President (2003-2006)
![Page 2: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/2.jpg)
3D REALITY MODELING AND BIM
APPLICATION FOR CIVIL ENGINEERING
AND BUILDING CONSTRUCTION
![Page 3: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/3.jpg)
Contents
• 1. Role of Professional Land Surveyor
• 2. Present scenario working from 2D Working Drawing
and what are the shortfalls
• 3. BIM Levels
• 4. Actual case to share
• 5. Benefits of change
![Page 4: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/4.jpg)
Role and Duty of Professional Land Surveyor
1. Responsible to Principal Resident Engineer (PRE)
2. Lead, manage and supervise a team of professional land surveyor and Resident RSSOE/RSOE (Engineering) in all aspects of : -
a. Land
b. Engineering surveying;
c. GNSS;
d. ADMS;
e. Laser Scanning;
f. Hydrographic Surveying;
g. Geodetic Surveying;
h. Topographical Surveying; and
i. Photogrammetry.
3. Data capturing and data creation, quality data management and documentation.
4. Liaise with Contractors’ survey managers
5. Communication, Coordination and co-operation with engineers and inspectors on all work fronts
6. Ensure quality of data and hence quality of the works
7. Delivery quality of services
8. Safety
9. Training of young graduates to be RSOE and professional qualification
![Page 5: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/5.jpg)
BIM for construction
3D Information Model
Clashes
Quantity
4D? 5D?
![Page 6: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/6.jpg)
Present Situation
From Design Stage to Construction Stage
Generating and managing
from
2D working drawings
to
3D setting out and construction data
![Page 7: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/7.jpg)
Present Process
Before Concreting/construction:
• 1. Setting out by the Contractor
• 2. Setting out check by Resident Site Staff (Surveying)
After Concreting:
• 3. Join as-built record survey
• 4. Compared these as-built record survey data with
design data to determine the quality of the work.
• 5. Report on the quality of workmanship and monitor
mitigation works to meeting the standard.
• 6. Final as-built record survey in 3D
• 7. Final quantities and final account.
![Page 8: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/8.jpg)
Shortfalls
• 1. Difficult to check design faults due to lack of
existing ground information
• 2. Hard to detect clashes
• 3. Not easy to visualise
• 4. Rework or abortive work if not detected before
actual work being carried out
• So, We use “BIM” process to improve this.
![Page 9: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/9.jpg)
Different Levels of Development in BIM
• 5. Involve potential claims
• 6. Possible delay
• 7. Increase cost and time
• 8. Untimely completion causes unnecessary
disruption to implementation of mega transport
systems or development programs
• 9. Possible negative social and economical effects
![Page 10: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/10.jpg)
Different Levels of Development in BIM
Level 0
Separate sources of information covering the basic assets information in paper
documents
They are in CAD format as drawings, lines, arcs, text etc.
![Page 11: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/11.jpg)
Different Levels of Development in BIM
• 5. Involve potential claims
• 6. Possible delay
• 7. Increase cost and time
• 8. Untimely completion causes unnecessary
disruption to implementation of mega transport
systems or development programs
• 9. Possible negative social and economical effects
Level 1
Separate sources of information covering the range of assets information in semi-
structured electronic documents in 2D or 3D
![Page 12: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/12.jpg)
Different Levels of Development in BIM
• 5. Involve potential claims
• 6. Possible delay
• 7. Increase cost and time
• 8. Untimely completion causes unnecessary
disruption to implementation of mega transport
systems or development programs
• 9. Possible negative social and economical effects
![Page 13: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/13.jpg)
Different Levels of Development in BIM
• 5. Involve potential claims
• 6. Possible delay
• 7. Increase cost and time
• 8. Untimely completion causes unnecessary
disruption to implementation of mega transport
systems or development programs
• 9. Possible negative social and economical effects
![Page 14: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/14.jpg)
“BIM-enabled” Operations and Maintenance
“LEVEL 1” DESIGN
“LEVEL 2” CONSTRUCTION
“LEVEL 3”
OPERATIONS
![Page 15: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/15.jpg)
Different Levels of Development in BIM
• 5. Involve potential claims
• 6. Possible delay
• 7. Increase cost and time
• 8. Untimely completion causes unnecessary
disruption to implementation of mega transport
systems or development programs
• 9. Possible negative social and economical effects
Level 2
Federated file-based electronic information with some automated connectivity (BIM).
This information include: Architectural, Structural, Fire, Building Services, Bridges
and …etc.
![Page 16: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/16.jpg)
Different Levels of Development in BIM
• 5. Involve potential claims
• 6. Possible delay
• 7. Increase cost and time
• 8. Untimely completion causes unnecessary
disruption to implementation of mega transport
systems or development programs
• 9. Possible negative social and economical effects
Level 3
Integrated electronic Information with full automated connectivity and wed-based (iBIM)
Leading to Lifecycle Asset Management.
They are models, objects, collaboration integrate, interoperable data
![Page 17: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/17.jpg)
Parties Involved in Construction
Geotechnical
Investigation
(G.I)
Foundation Construction
Programmer
Pro
gra
mm
e C
ontr
acts
Procurement Setting Out
![Page 18: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/18.jpg)
Parties Involved in Construction
Geotechnical
Investigation
(G.I)
Foundation Construction
Programmer
Procurement
BIM Manager or group of experts
Setting Out
Pro
gra
mm
e C
ontr
acts
This can be a group/team of experts to plan and to
coordinate/ implement the sequence/schedules of each
stage of the construction
![Page 19: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/19.jpg)
Functions of BIM Manager
• Information Coordination
• 3D Information Model
• Resolution of Technical Query (TQ)
• Constructable (3D)
• Construction Schedule (4D)
• Costing (5D)
• As-built (6D)
• Asset Lifecycle (7D)
![Page 20: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/20.jpg)
Functions of BIM Manager
• Information Coordination
• 3D Information Model
![Page 21: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/21.jpg)
Overview of 3D Information Model in CWB Project
![Page 22: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/22.jpg)
3D Information Model of Mined Tunnel Underneath
the Existing Cross Harbour Tunnel
![Page 23: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/23.jpg)
Functions of BIM Manager
• Information Coordination
• 3D Information Model
• Resolution of Technical Query (TQ)
![Page 24: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/24.jpg)
Door clashes with Beam Louver clashes with Beam
Technical Query (TQ)
(Clash Finding)
![Page 25: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/25.jpg)
Missing Information detected
Beams found not connected from 3D
Technical Query (TQ)
(Missing Information)
![Page 26: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/26.jpg)
Wall is found missing, no support to slab
Advise to add the wall
Technical Query (TQ)
(Missing Information)
![Page 27: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/27.jpg)
Functions of BIM Manager
• Information Coordination
• 3D Information Model
• Resolution of Technical Query (TQ)
• Constructable (3D)
![Page 28: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/28.jpg)
Constructable Model (Ventilation Building)
![Page 29: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/29.jpg)
Constructable Model(Ventilation Building)
![Page 30: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/30.jpg)
Constructable Model (Tunneling)
![Page 31: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/31.jpg)
Constructable Model (Composite Structures)
![Page 32: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/32.jpg)
Box Culvert
![Page 33: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/33.jpg)
Retaining Wall
![Page 34: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/34.jpg)
Base Slab
![Page 35: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/35.jpg)
Tunnel Base
![Page 36: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/36.jpg)
Tunnel Wall
![Page 37: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/37.jpg)
Retaining Wall (Top of the Tunnel)
![Page 38: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/38.jpg)
Road (On Top of the Tunnel)
![Page 39: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/39.jpg)
Road (On Top of the Tunnel – Side View)
![Page 40: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/40.jpg)
Constructable Model (Composite Structures)
![Page 41: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/41.jpg)
Functions of BIM Manager
• Information Coordination
• 3D Information Model
• Resolution of Technical Query (TQ)
• Constructable (3D)
• Construction Schedule (4D)
![Page 42: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/42.jpg)
Progress Presentation
Time
![Page 43: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/43.jpg)
Progress Presentation
Time
![Page 44: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/44.jpg)
As-Built Record Survey in 3D By
Laser Scanning
![Page 45: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/45.jpg)
As-Built Record Survey in 3D By
Laser Scanning
![Page 46: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/46.jpg)
Functions of BIM Manager
• Information Coordination
• 3D Information Model
• Resolution of Technical Query (TQ)
• Constructable (3D)
• Construction Schedule (4D)
• Costing (5D)
• As-built (6D)
• Asset Lifecycle (7D)
![Page 47: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/47.jpg)
© Ney & Partners
Example: Bridge Construction (Pier Segment)
G.I. (Predrill for
founding level)
Piling
Central of gravity of starter
bars of column at cut-of-level
Pile Cap
![Page 48: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/48.jpg)
Example: Bridge Construction (Pier Segment)
Calculate Setting Out Point (SOP)
Check Setting Out Line (SOL)
Crossfall at particular Chainage
(CL of Carriageway) at Column (CL
of Structure) Position
![Page 49: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/49.jpg)
Example: Bridge Construction (Pier)
© http://www.rbdck.com/
![Page 50: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/50.jpg)
Pile Cap and Column Construction
Centreline of Column
![Page 51: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/51.jpg)
© Ney & Partners
Example: Bridge Construction (Pier)
G.I.
Piling
Central of gravity of starter
bars of column at cut-of-level
Pile Cap
Column Construction
![Page 52: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/52.jpg)
Example: Bridge Construction (Pier Segment)
Crossheads
Cast-in-situ Beam
© Nudeal Systems Corp. © CWB AECOM
Construction of crosshead for new
Island Eastern Corridor bridge
![Page 53: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/53.jpg)
© Ney & Partners
Example: Bridge Construction (Pier Segment)
Top of Column/Pier
℄ of Bearing
Pier Segment
℄ of Structure
℄ of Carriageway
Segmental Construction
100mm Tarmac (Black Top)
![Page 54: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/54.jpg)
Example: Bridge Construction (Pier Segment)
© Ney & Partners
• Type(s) of Materials
![Page 55: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/55.jpg)
Example: Bridge Construction (Pier Segment)
• Type(s) of Materials
• Name & Size of Rebar
• Class of Concrete
• Class & Type of Rock at Founding Level
• Class & Type of Grouting
• Quantity of Material(s)
• Logistics:
• Availability of Material(s)
• Sourcing
• Supplier(s)
• Location of supplier(s)
• Purchase Order (PO)
• Timing of Material(s)
• Shipping
• Storage
• Delay
• Timing of Construction
4D + 5D
© Ney & Partners
![Page 56: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/56.jpg)
Way forward:
Natural Reality Model to BIM Modeling
What is NEW and what we have been trying to
do??
![Page 57: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/57.jpg)
BIM Process by “Resident Land Surveyors”
A. Data Acquisition (Capture Reality for Conceptual
Design) in 3D
• 1980 Datum
• Google Map
• Ground & Existing information(Nature & Man-made)
• Environmental
B. Detailed Design Stage (Virtual Model)
1. 2D Drawings
2. 3D Models
C. BIM Model (Reality Model)
• (A) + (B)
• Constructable Model
![Page 58: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/58.jpg)
4. Conceptual Design
3. Natural Reality Model
From 1980 Datum, Existing Environment to BIM
Model (From the WHOLE to the PARTS)
5. Detail Design
1. HK1980 Datum
2. Google Map
6. BIM Model (Reality Model)
![Page 59: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/59.jpg)
© SMO, Lands Department, HKSAR
1. HK1980 Datum – Trig Points
![Page 60: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/60.jpg)
HK1980 Datum – Traverse Points
© SMO, Lands Department, HKSAR
![Page 61: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/61.jpg)
2. Google Map
![Page 62: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/62.jpg)
3. Natural Reality Model
![Page 63: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/63.jpg)
From Working Drawing to Conceptual Design
![Page 64: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/64.jpg)
4. Conceptual Design
4. Conceptual Design
![Page 65: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/65.jpg)
5. Detail Design
5. Detail Design
![Page 66: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/66.jpg)
6. BIM Model (Reality Model)
6. BIM Model (Reality Model)
![Page 67: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/67.jpg)
Lam Tin
Infrastructure Interchange Model
![Page 68: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/68.jpg)
The benefits of BIM is not only limited to
Design and Construction; but also
Operation and Maintenance
![Page 69: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/69.jpg)
Asset-Relationship Model : Bridge
Contractor
Properties • Project
Value
• Contract
Period
• Numbers of
Labor
• Experience
• Environmental
Monitoring Method
• Impact Assessment
Location: Easting/Northing
Chainage
East/Westbound
District
• Budgets
• Frequency
• Records
• Alert, Action
Limits
• Lifespan
• Method
• Duration
• Safety
Logistics Properties
• Locations
• Shipping
• Storage
• PO
Design
Requirement
Alignment Design
Design Properties
• Design Code (TPDM)
• Speed
• Sight Distance (HZ &Vz)
• Numbers of Lanes
• Geology
Supplier Lists
Test Results
• Tons
• Dimension
Preliminary Design
Bridge Section Section 1
Section 2
Spare:
C-No. 6793
C-No. 6792
C-No. 6791
Environmental
Qualification
Construction
Properties
Structures
Maintenance
BIM
![Page 70: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/70.jpg)
Asset-Relationship Model : Pump
Room
Properties • Normal
Temp,
Humid
• Accident
Temp,
Humid
• Rad Levels
• Qualification Method
• EQ Zone Rating
Location: Aux Building
Bldg 12
Level 5
Room 12561
• Test Frequency
• Test Method
• Test Parameters
• Alert, Action
Limits
• Fire Barrier
• Shield Wall
• Missile Shield
License Application
Requirement
CCS Pump Sizing Calculation
Design Pump Properties
• Design Disch Press
• Design Flowrate
• Design NPSH
Gould
Model CP-C-4020
Test Results
• Discharge
Press
• Flowrate
Flow Diagram
CCS Pump
VS2-CCS-MP-01A
Division 1
Division 2
Spare:
Serial 6793
Serial 6792
Serial 6791
Environmental
Qualification
Wall, Ceiling, Floor
Properties
Inservice
Test Program
BIM
Purchased Pump Properties
• Vendor Model Disch Press
• Vendor Model Flowrate
• Vendor Model NPSH
![Page 71: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/71.jpg)
(Level 3 BIM) Asset Management
![Page 72: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/72.jpg)
BIM Lifecycle (Ideal)
Blue Print (Development Plan)
![Page 73: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/73.jpg)
Blue Print
BIM Lifecycle (Ideal)
Geo-referenced 3D Reality
![Page 74: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/74.jpg)
BIM Lifecycle (Ideal)
Geo-referenced 3D Reality
Planning
Blue Print
![Page 75: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/75.jpg)
BIM Lifecycle (Ideal)
Geo-referenced 3D Reality
Planning
Conceptual Design
Blue Print
![Page 76: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/76.jpg)
BIM Lifecycle (Ideal)
Geo-referenced 3D Reality
Conceptual Design Planning
Detail Design
Blue Print
![Page 77: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/77.jpg)
BIM Lifecycle (Ideal)
Geo-referenced 3D Reality
Conceptual Design
Detail Design Planning
Construction
Blue Print
![Page 78: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/78.jpg)
Construction
BIM Lifecycle (Ideal)
Geo-referenced 3D Reality
Conceptual Design
Detail Design
Construction Planning
Facility Management
Blue Print
![Page 79: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/79.jpg)
BIM Lifecycle (Ideal)
Engineering Design & Validation
Design Coordination
& Construction Management
Facility Management
Geo-referenced 3D Reality
Conceptual Design
Detail Design
Construction Facility
Management
Construction Model As-built Model
Planning Blue Print
![Page 80: Name: Sr T. N. WONG FRICS, FHKIS, FCInstCES, RISM, MNZIS … Reality Modelling and... · 2018-04-25 · Humble introduction •Name: Sr T. N. WONG •FRICS, FHKIS, FCInstCES, RISM,](https://reader030.vdocuments.us/reader030/viewer/2022041015/5ec68b1a9e79340ed7665ad2/html5/thumbnails/80.jpg)
THANK YOU