Page 1: NAIP 2011 Presentation for  NSGIC

NAIP 2011Presentation for NSGICNAIP 2011

Presentation for FSA State GIS Specialists August 31, 2010

Page 2: NAIP 2011 Presentation for  NSGIC

NAIP 2011Some things stay the same

• Flying Seasons – Crop growing season - determined by FSA

• <10% cloud cover• Deliverables

– available approximately 45 days after end of flying season– Quarter quads in uncompressed GeoTIFF format – Compressed County Mosaics in MG3 format, 15:1

• Absolute Horizontal Accuracy Specification– 6 meters from “true ground” position

• 1 meter resolution• Natural Color

2

Page 3: NAIP 2011 Presentation for  NSGIC

NAIP 2011Presentation for NSGIC

• NAIP Buy Ups• “4 Band”• Half Meter Resolution (Pilot Project in 2011)

• Firm, set price determined for each state in 2011 schedule• Based on estimated 2011 base price

• Written commitment needed by January 31, 2011.

NAIP 2011Buy-ups

How they work

3

Page 4: NAIP 2011 Presentation for  NSGIC

NAIP 2011Presentation for NSGIC

• Half meter resolution pilot project– Limited number of states

– Flown at lower altitude – increase flight lines/time– 4X volume of data

– Vendor survey– Very positive responses

NAIP 2011Pilot Project - Half Meter Buy-up

4

Page 5: NAIP 2011 Presentation for  NSGIC

NAIP 2011Presentation for NSGIC

• Deliverables– Quarter Quads in GeoTIFF

~ 580 MB in 3 band~773 MB in 4 band

– Looking at highly compressed mosaics (MG3)

• Absolute Horizontal Accuracy • 6 meters from “true ground” position

• Flying Seasons Crop growing season - determined by FSA

• <10% cloud cover

NAIP 2011Pilot Project-Half Meter Buy Up

5

Page 6: NAIP 2011 Presentation for  NSGIC

NAIP 2011Presentation for NSGIC

• Estimated at additional 50% of base costs • 1 meter (4 band) estimated at $230/quarter quad• ½ meter buy-up cost at $115/QQ• Total ½ meter project cost at $345/QQ

• FSA and federal partners pay $230• State partner pays $115

NAIP 2011Pilot Project - Cost

6

Page 7: NAIP 2011 Presentation for  NSGIC

7

Page 8: NAIP 2011 Presentation for  NSGIC

NAIP 2010 Acquisition Plans”Funding Probability Tiers”

• Tier 1 – Anticipated funding from FSA and Federal Cost Share Partners– States with 2009 imagery

• Tier 2– Additional Funding – States with 2009 imagery– Prioritized by FSA

• Level of farm program activity

• Tier 3 – Additional Funding – States with 2010 imagery– Prioritized by FSA

• Level of farm program activity

8

Page 9: NAIP 2011 Presentation for  NSGIC

NAIP 2010 Tier 1 States

Based on existing funding commitments by FSA and Federal partners

9

State TIER Base date Total QQs QQ base

costFull state

Cost 4 Band

Cost

1/2 meter QQ Buy Up Cost

1/2 Meter State Buy Up Cost

CO 1 2009 7345 $230 $1,689,350 $168,935 $115 $844,675

MT 1 2009 11,703 $230 $2,691,690 $269,169 $115 $1,345,845

AL 1 2009 3500 $230 $805,000 $80,500 $115 $402,500

WA 1 2009 5,762 $230 $1,325,260 $132,526 $115 $662,630

ID 1 2009 6,522 $230 $1,500,060 $150,006 $115 $750,030

SC 1 2009 2,146 $230 $493,580 $49,358 $115 $246,790

NM 1 2009 8,140 $230 $1,872,200 $187,220 $115 $936,100

NY 1 2009 3,878 $230 $891,940 $89,194 $115 $445,970

VA 1 2009 3,016 $230 $693,680 $69,368 $115 $346,840

OR 1 2009 7,440 $230 $1,711,200 $171,120 $115 $855,600

MD 1 2009 881 $230 $202,630 $20,263 $115 $101,315

UT 1 2009 6,097 $230 $1,402,310 $140,231 $115 $701,155

Page 10: NAIP 2011 Presentation for  NSGIC

NAIP 2010 Tier 2 States

Based on additional funding

10

State TIER Base date Total QQs QQ base

costFull state

Cost 4 Band

Cost

1/2 meter QQ Buy Up Cost

1/2 Meter State Buy Up Cost

ME 2 2009 2752 $230 $632,960 $63,296 $115 $316,480

NH 2 2009 774 $230 $178,020 $17,802 $115 $89,010

DE 2 2009 177 $230 $40,710 $4,071 $115 $20,355

TX 2 2010 17,564 $230 $4,039,720 $403,972 $115 $2,019,860

WV 2 2009 1,835 $230 $422,050 $42,205 $115 $211,025

WY 2 2009 7,458 $230 $1,715,340 $171,534 $115 $857,670

VT 2 2009 797 $230 $183,310 $18,331 $115 $91,655

Page 11: NAIP 2011 Presentation for  NSGIC

NAIP 2010 Tier 3 States

States that will be considered with additional funding

11

State TIERBase date

Total QQs

QQ base cost

Full state Cost

4 Band Cost

1/2 meter

QQ Buy Up Cost

1/2 Meter

State Buy Up Cost

NE 3 2010 5,873 $230 $1,350,790 $135,079 $115 $675,395

ND 3 2010 5,765 $230 $1,325,950 $132,595 $115 $662,975

MN 3 2010 6,834 $230 $1,571,820 $157,182 $115 $785,910

SD 3 2010 6,045 $230 $1,390,350 $139,035 $115 $695,175

KS 3 2010 6,260 $230 $1,439,800 $143,980 $115 $719,900

GA 3 2010 3921 $230 $901,830 $90,183 $115 $450,915

IL 3 2010 4138 $230 $951,740 $95,174 $115 $475,870

IA 3 2010 4723 $230 $1,086,290 $108,629 $115 $543,145

Page 12: NAIP 2011 Presentation for  NSGIC

2011 Deliverables

• Compressed County Mosaics – 3 band MG3 format

• Quick visual inspection

– Delivered to:• FSA state office specialists, • Partners• Available on USDA Geospatial Data Gateway

• Quarter Quads– GeoTIFF format (3 band and 4 band)– Sent to partners after entire state delivered from vendors

• After QA is complete, any new versions are sent out to partners.

12

Page 13: NAIP 2011 Presentation for  NSGIC

NAIP 2011 Contacts

• Partnership Information/Agreements– NAIP Partnership Coordinator

Bridget Barlow [email protected]

13