Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

Upload: abbey-hagger

Post on 29-Mar-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

Naches River Water Treatment Plant Screen

Project

Naches River Water Treatment Plant Screen

Project

Why did the City install a Screen?

September 13, 2006David Brown

Water/Irrigation Division Manager

Page 2: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

Naches River Water Treatment Plant Screen Project

Naches River Water Treatment Plant Screen Project

Water Treatment Plant and Intake Structure built in 1969 – 1970

Moved to present location from Oak Flats Plant put on line in 1972 Idea was that water supply for the WTP would be from

PP&L’s Wapatox CanalTown of Naches Waste Water Effluent would be bypassedFish and debris screening done at Wapatox Canal diversion

Page 3: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

Naches River Water Treatment Plant Screen Project

Naches River Water Treatment Plant Screen Project

As the issue of returning fish surfaced John Easterbrook was instrumental in the installation of upstream barriers

Page 4: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

Naches River Water Treatment Plant Screen ProjectNaches River Water Treatment Plant Screen Project

The City’s WTP diversion was not addressed during Phase 1 of the BPA Screening

Wapatox had installed state of the art screens

Page 5: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

Naches River Water Treatment Plant Screen ProjectNaches River Water Treatment Plant Screen Project

Bureau of Reclamation and PP&L started conservations about shutting down the Wapatox

Looked like the canal would be down during the winter monthsThe City would need fish screens as water would no longer be screened by Wapatox

Page 6: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

Naches River Water Treatment Plant Screen ProjectNaches River Water Treatment Plant Screen Project

The City applied to BPA for fundsBPA grant for partial funding

The City applied to SRFB for fundingSRFB made small grant

Total Project cost $1,838,430$1,124,000 from BPA$300,000 from SRFB$414,430 from City funds

Page 7: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

Naches River Water Treatment Plant Screen Project

Naches River Water Treatment Plant Screen Project

Main Structure built by a contractor Chuck Lenberg and crew built and installed the

screens and upstream barriers

Page 8: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

BeforeBefore

Page 9: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

ScreenScreen

Page 10: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

ScreenScreen

Page 11: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

ScreenScreen

Page 12: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

Upstream Migrant BarrierUpstream Migrant Barrier

Page 13: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

Automatic Air Burst Backwash

Automatic Air Burst Backwash

Page 14: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

Automatic Air Burst Backwash

Automatic Air Burst Backwash

Page 15: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

Level ControlLevel Control

Page 16: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

IssuesIssues

Mud Behind ScreensLong way to run vacuum truck, but doable

Algal build up on screens in summerThought we could hand clean twice a year. Before Wapatox turns on and after they shut downThis year with the HOT we have had to hand clean about twice a month

– Takes about an hour

Page 17: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

IssuesIssues

Slush Ice

Page 18: Naches River Water Treatment Plant Screen Project Why did the City install a Screen? September 13, 2006 David Brown Water/Irrigation Division Manager

Naches River Water Treatment Plant Screen

Project

Naches River Water Treatment Plant Screen

Project Why did the City install a Screen?

September 13, 2006David Brown

Water/Irrigation Division Manager

Tour this afternoon

Questions?