Page 1: Nabil Saimi

1

Moroccan Solar Plan

Page 2: Nabil Saimi

2

Status of the CSP Market Development – S1 2012

Source: Bloomberg New Energy Finance

419 419 483 640

1,614

4,054

7,656

8,814

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

Pre 2006 2006 2007 2008 2009 2010 2011 2012

Commissioned Financing secured / under construction Permitted Cumulative

Page 3: Nabil Saimi

3

Status of the CSP Market Development Country – S1 2012

20

20

38

51

100

180

300

435

634

2,738

4,271

0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000

Algeria

Egypt

Greece

Australia

United Arab Emirates

Morocco

South Africa

China

India

Spain

United States

Commissioned Financing secured / under construction Permitted

Source: Bloomberg New Energy Finance

Page 4: Nabil Saimi

MIN Capacity 2 000 MW

Deadline 2020

5 sites defined

The Moroccan Solar Plan

Sites Capacity in MW

Ouarzazate 500

Ain Beni Mathar 400

Sebkha Tah 500

Foum El Oued 500

Boujdour 100

5 sites defined

4

Page 5: Nabil Saimi

5

Training

R&D

Industrial Integration

Valuation of a unique resource

An Integrated and Multi-dimensional Vision

2,000 MW by 2020

14% installed cap

Morocco

Europe

World (CO²) Optimal Valuation

Of Solar

Ressource

Page 6: Nabil Saimi

Masen, in charge of the Moroccan Solar Plan

6

Purpose Lead the development of integrated solar projects of 2 000 MW or more by 2020 (utility-scale solar power production, local industry developement, R&D, training)

Legal form :

Governance :

Capital share allocation:

Modalities, technical requirements and financial balance guarantee for each project throughout the realization of the solar plan

– Rules and terms guaranteeing purchasing, transporting, and commercializing the electric power produced

Framework State-MASEN (decree) Framework State-ONE-MASEN

Management Board and Advisory Board

Joint stock created in March 2010

500 000 000 dirhams State, ONE, Fonds Hassan II et SIE

(equallly)

A clear Institutional Framework, supporting Masen action

Page 7: Nabil Saimi

7

Ouarzazate Solar Complex, operational priority for Masen

Virtual aerial view for the Ouarzazate Solar Complex

Page 8: Nabil Saimi

Conférence de presse xx janvier 2011 8

Ouarzazate Complexe (OZZ1), multi-phases et technologies

R&D Platform dedicated to solar technologies

Multiple phases

Phase 1 : entre 125 MW et 160 MW

Technology Agnostic

Concentrated Solar Power/ Parabolic Trough

Phase 2

Phase …

CSP (Parabolic Trough, Tower…)

Photovoltaic

+

Operational priority Ouarzazate complex

500MW By 2015

Phase 1 : 125 – 160 MW

Ouarzazate

Tender final steps underway

Common infrastructure buildup under way

Page 9: Nabil Saimi

Conférence de presse xx janvier 2011 9

OZZ Project key miletones

Pour un développement harmonieux des sites

Initial studies

For the entire site including most key topics

Technical Configuration

According to best international practices

Institutional and financial structure

Innovative to reduce costs

Selection process

with intense competition

Industrial integration

Maximise Economic Effects

Site infrastructure

– Strong participation of most major global market players, present in different parts of the value chain

– Bidders Engagement to maximise local industrial value and job creation from the first project

– Competitive offers, demonstrating Morocco’s attractiveness for solar power projects.

Structured approched…. …with initial results in OZZ1, despite current economic climate

Improve visibility and optimize risks for developers

Page 10: Nabil Saimi

10

OZZ 1, tender finalisation in Q3 2012

Etape 1 Etape 2

Avis de Non Objection des IFIs

OZZ 1 160 MW Tender Progress

18/05 27/06 19/08

Etapes futures PPA

Signature

T4 2012

07/02 21/03

Évaluation des offres

techniques

Echange individuels (signature

PVs)

Réponse candidats

(offre technique finale et

financière)

Réponse candidats

(offre technique)

Retour sur les term

sheet (TS) et Addendum

Lancement de l’AO (1ère

étape)

Préparat. lancement de

l’AO (2ème étape)

Finalisation du rapport évaluation

T3 2012

Adjudi-cation

• Appel à manifestation d’intérêt

• Préqualification

Evaluation des offres/

et Contractualis.

Membres Opérationnels

Membre Leader

Abengoa Solar, Mitsui, Taqa

Abeinsa

Aries Ingenieria y Sistemas, TSK Electronica y Electricidad

ACWA

ACS Servicios Comunicaciones y Energía

ENEL

3 consortia still competing

Page 11: Nabil Saimi

Conférence de presse xx janvier 2011 11

Planning for the remaining capacity (350 MW)

CSP

Including CSP Tower

PV

300 MW

To be defined

50 MW

Pre-qualification process launch by end of 2012

Pre-qualification process launch by end of 2012

Following CSP

Next phases for OZZ complex

Page 12: Nabil Saimi

Conférence de presse xx janvier 2011 12

Solar projects, development lever for remote regions

Preparing an inclusive sustainable development pamphlet for the ongoing and the upcoming power project and common infrastructure tenders with special attention to local employment and the strenghtening of regional capacities

Implementing comprehensive program for the region, in partnership with the relevant local authorities and regional/national institutions

Several volunteer and socially responsible actions for the region (equipping and setting up solar panels for an orphanage, educating local students on sustainable development,…)

Conducting initial studies on supporting local villages ( roads, potable water, waste management…) and overall investment inclusive of relevant infrastructures

OZZ solar complex, first actions Masen undertook to maximize socio-economic impact in region of power project developement

Key

act

ion

s u

nd

erta

ken

Page 13: Nabil Saimi

Conférence de presse xx janvier 2011 13

Increasing local content and developing a targeted industrial capacity

for the international market

R&D and

training

Industrial

Development Advocacy

Targeted industrial solutions addressing the

international market

Technological transfer, innovation

Industrial marketability,

Cluster development

Demonstration, experimentation,

dissemination

Page 14: Nabil Saimi

Conférence de presse xx janvier 2011

North and South Mediterranean Integration

14

Optimize solutions to meet

European needs

Strong assets for the production

and the transmission of solar

electricity

International National I N T E G R A T I O N

Worldwide interest and European leadership (public institutions, industry players, market

development professional associations…)

Favorable regulatory framework: • % REN by 2020: 20% • Article 9, in favor of energy

cooperation with non EU countries

Uncertainty in regards to European countries to meet the 2020 objective (subsidy reduction,

infrastructure costs….)

Intrinsic assets

Solar Irradiation

Well-suite land EU Proximity

Country maturity in establishing PPP and in delivering large-scale industrial development

projects

Existing interconnexions : + Morocco – Spain + Maroc – Algeria

Page 15: Nabil Saimi

Conférence de presse xx janvier 2011

Raising awareness for more solar adoption and well-suited sustainable support mechanisms...

15

Page 16: Nabil Saimi

16 16 16

Thank you for your attention