nabb forms watermark
TRANSCRIPT
-
7/29/2019 NABB FORMS Watermark
1/35
TABLE OF CONTENTS
TAB SAMPLE FORMS
Report Title ........................................................................................................... 1
Certification........................................................................................................... 2
Instrument Calibration Report...............................................................................3
Air Handling Unit (Central Station)........................................................................ 4
Air Handling Unit (Packaged/Unitary Belt Drive)................................................... 5
Air Handling Unit (Packaged/Unitary Direct Drive) ...............................................6
Fan Test Report (Belt Drive)................................................................................. 7
Fan Test Report (Direct Drive >1/8 hp).................................................................8
Fan Test Report (Direct Drive
-
7/29/2019 NABB FORMS Watermark
2/35
Cooling Coil Test Data (Hydronic) ...................................................................... 21
Cooling Coil Test Data (DX) ............................................................................... 22
Heating Coil Test Data (Hydronic) ...................................................................... 23
Heating Coil Test Data (Steam)..........................................................................24
Heating Coil Test Data (Electric) ........................................................................25
Chiller Test Report (Water Cooled) .................................................................... 26
Chiller Test Report (Air Cooled).......................................................................... 27
Cooling Tower Test Report................................................................................. 28
Hot Water Boiler Test Report.............................................................................. 29
Heat Exchanger Test Report (Water to Water)...................................................30
Heat Exchanger Test Report (Steam to Water).................................................. 31
Energy Recovery Wheels Test Data................................................................... 32
Duct Air Leakage Test Data (Optional)............................................................... 33
-
7/29/2019 NABB FORMS Watermark
3/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
1
CERTIFIED TEST, ADJUST, AND
BALANCE REPORT
DATE:_____________
PROJECT:
NAME ________________________________________________________________
ADDRESS____________________________________________________________________________________________________________________________
DESIGN ENGINEER:NAME ________________________________________________________________
HVAC CONTRACTOR:NAME ________________________________________________________________
NEBB TAB FIRM:NAME ________________________________________________________________
ADDRESS___________________________________________________________________________________________________________________________
TAB CERTIFICATION NUMBER: _______________
-
7/29/2019 NABB FORMS Watermark
4/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
2
SEAL
PROJECT____________________________________________________________________
THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS ANFINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURREEDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, ABALANCING OF ENVIRONMENTAL SYSTEMS. ANY VARIANCES FROM DESIGN QUANTITIE
WHICH EXCEED NEBB TOLERANCES, ARE NOTED IN THE TEST- ADJUST- BALANCE REPOPROJECT SUMMARY.
SUBMITTED & CERTIFIED BY:
NEBB CERTIFIED TAB FIRM NAME _____________________________________________
CERTIFICATION NO. ____________ CERTIFICATION EXPIRATION DATE___________
REPORT DATE __________________________
NEBB QUALIFIED TAB SUPERVISOR NAME _____________________________________
NEBB QUALIFIED TAB SUPERVISOR SIGNATURE________________________________
CERTIFICATION
-
7/29/2019 NABB FORMS Watermark
5/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
3
PROJECT ____________________________________________________________________
INSTRUMENTTYPE
MANUFACTURER MODELNUMBER
SERIALNUMBER
DATES OF USE INSTRUMENTCALIBRATION
DATE
NEBB TAB FIRM
TAB SUPERVISOR
INSTRUMENT CALIBRATION REPORT
-
7/29/2019 NABB FORMS Watermark
6/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
4
PROJECT SYSTEM/UNIT
LOCATION DATE
UNIT DATA
Unit Designation
Manufacturer
Model Number
Serial Number
FAN DATA DESIGN ACTUAL
Supply Air CFM (L/s)
Outside Air CFM (L/s)
Return Air CFM (L/s)
Total Outlet Air CFM (L/s)
Fan Discharge S.P. in.(Pa)
Fan Suction S.P. in. (Pa)
Fan Total S.P in. (Pa)
External S.P. in. (Pa)
Fan RPM
REMARKS:
TEST DATE:READINGS BY:
AIR HANDLING UNIT TEST REPORT
(Central Station)
MOTOR DATA DESIGN ACTUAL
HP (Kw)
RPM
Rated Volts
Rated Amps
Phase
Operating Hz
Service Factor
Operating Volts
Operating Amps
OTHER DATA DESIGN ACTUALMotor Sheave OD
Motor Sheave Bore
Fan Sheave OD
Fan Sheave Bore
Sheave Center Distance
Number of BeltsBelt Size
-
7/29/2019 NABB FORMS Watermark
7/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
5
PROJECT SYSTEM/UNIT
LOCATION DATE
UNIT DATA
Unit Designation
Manufacturer
Model Number
Serial Number
FAN DATA DESIGN ACTUALSupply Air CFM (L/s)
Outside Air CFM (L/s)
Return Air CFM (L/s)
Total Outlet Air CFM (L/s)
External Discharge S.P.in. (Pa)
External Suction S.P. in.
(Pa)External S.P. in. (Pa)
Fan RPM
REMARKS:
TEST DATE:
READINGS BY:
AIR HANDLING UNIT TEST REPORT
(Packaged/Unitary Belt Drive)
MOTOR DATA DESIGN ACTUAL
HP (Kw)
RPM
Rated Volts
Rated Amps
Phase
Operating Hz
Service Factor
Operating Volts
Operating Amps
OTHER DATA DESIGN ACTUALMotor Sheave OD
Motor Sheave Bore
Fan Sheave OD
Fan Sheave Bore
Sheave Center Distance
Number of BeltsBelt Size
-
7/29/2019 NABB FORMS Watermark
8/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
6
PROJECT SYSTEM/UNIT
LOCATION DATE
UNIT DATA
Unit Designation
Manufacturer
Model Number
Serial Number
FAN DATA DESIGN ACTUALSupply Air CFM (L/s)
Outside Air CFM (L/s)
Return Air CFM (L/s)
Total Outlet Air CFM (L/s)
External Discharge S.P.in. (Pa)
External Suction S.P. in.(Pa)
Fan RPM
REMARKS:
TEST DATE:
READINGS BY:
AIR HANDLING UNIT TEST REPORT
(Packaged/Unitary Direct Drive)
MOTOR DATA DESIGN ACTUAL
HP (Kw)
RPM
Rated Volts
Rated Amps
r Phase
Operating Hz
Service Factor
Operating Volts
Operating Amps
OTHER DATA DESIGN ACTUAL
-
7/29/2019 NABB FORMS Watermark
9/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
7
PROJECT __________________________________________________________________
FAN DATA FAN NO. FAN NO. FAN NO.Unit Designation
Type of Service
Manufacturer
Model Number
Serial Number
TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL
Total Airflow CFM (L/s)
Total Outlet Airflow CFM(L/s)
Fan Suction SP in. (Pa)Fan Discharge SP in. (Pa)
Total SP or ESP in. (Pa)
Motor HP (Kw)
Motor RPM
Motor Rated Volts
Motor Rated Amps
Motor Phase
Motor Operating Hz
Motor Service Factor
Motor Sheave OD
Motor Sheave Bore
Fan Sheave OD
Fan Sheave Bore
Sheave Center Distance
Number of Belts
Belt Size
Fan RPM
Operating Voltage
Operating Amps T1/T2/T3
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
FAN TEST REPORT
(Belt Drive)
-
7/29/2019 NABB FORMS Watermark
10/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
8
PROJECT __________________________________________________________________
FAN DATA FAN NO. FAN NO. FAN NO.Unit Designation
Type of Service
Manufacturer
Model Number
Serial Number
TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUALTotal Airflow CFM (L/s)
Total Outlet Airflow CFM(L/s)
Fan Suction SP in. (Pa)
Fan Discharge SP in. (Pa)Total SP or ESP in. (Pa)
Motor HP (Kw)
Motor RPM
Motor Rated Volts
Motor Rated Amps
Motor Phase
Motor Operating Hz
Motor Service Factor
Operating Voltages
Operating Amperages
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
FAN TEST REPORT
(Direct Drive) >1/8 hp
-
7/29/2019 NABB FORMS Watermark
11/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
9
PROJECT __________________________________________________________________
FAN DATA FAN NO. FAN NO. FAN NO.Unit Designation
Type of Service
Manufacturer
Model Number
TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUALTotal Airflow CFM (L/s)
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
FAN TEST REPORT
(Direct Drive) < 1/6 hp
-
7/29/2019 NABB FORMS Watermark
12/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
10
PROJECT ______________________________ SYSTEM DESIGNATION_____________
OUTLET MANUFACTURER __________________ TEST APPARATUS________________
AREA OUTLET DESIGN FINAL
SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW
* NOTE: If AK = 1.00, velocity information and measurements are not required.
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
AIR OUTLET TEST REPORT
-
7/29/2019 NABB FORMS Watermark
13/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
11
PROJECT ______________________________ SYSTEM DESIGNATION_____________
OUTLET MANUFACTURER _________________ OUTLET TEST APPARATUS________
VAV TERMINAL DATA
NUMBER DESIGN ACTUAL
TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)
SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)
HEATING AIRFLOW CFM (L/S)
VAV OUTLET DATA
AREA OUTLET DESIGN FINAL
SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW
VAV TERMINAL DATA
NUMBER DESIGN ACTUAL
TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)
SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)
HEATING AIRFLOW CFM (L/S)
VAV OUTLET DATA
AREA OUTLET DESIGN FINALSERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW
* NOTE: If AK = 1.00, velocity information and measurements are not required.
REMARKS:
TEST DATE _________________________READINGS BY ______________________
VAV TERMINAL UNIT TEST REPORT(Pressure Dependent)
-
7/29/2019 NABB FORMS Watermark
14/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
12
VAV TERMINAL UNIT TEST REPORT
(Pressure Independent)
PROJECT _______________________________ SYSTEM DESIGNATION____________
OUTLET MANUFACTURER ______________ OUTLET TEST APPARATUS__________
VAV TERMINAL DATA
NUMBER DESIGN ACTUAL
TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)
SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)
DDC CF HEATING AIRFLOW CFM (L/S)
DDC MAX/MIN AIRFLOWS CFM (L/S) -------- /
VAV OUTLET DATA
AREA OUTLET DESIGN FINAL
SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW
VAV TERMINAL DATA
NUMBER DESIGN ACTUAL
TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)
SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)
DDC CF HEATING AIRFLOW CFM (L/S)
DDC MAX/MIN AIRFLOWS CFM (L/S) -------- /
VAV OUTLET DATA
AREA OUTLET DESIGN FINAL
SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW
* NOTE: If AK = 1.00, velocity information and measurements are not required.
REMARKS:TEST DATE _________________________ READINGS BY ______________________
-
7/29/2019 NABB FORMS Watermark
15/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
13
PROJECT ___________________________________ SYSTEM DESIGNATION_____________
OUTLET MANUFACTURER ____________________ OUTLET TEST APPARATUS___________
VAV TERMINAL DATA
NUMBER DESIGN ACTUAL
TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)
SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)
HEATING AIRFLOW CFM (L/S)
FAN AIRFLOW CFM (L/S)
DDC CF FAN SPEED (Hi,med,low,variable,etc) --------
VAV OUTLET DATA
AREA OUTLET DESIGN FINAL
SERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW
* NOTE: If AK = 1.00, velocity information and measurements are not required.
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
FAN TERMINAL UNIT TEST REPOR(Pressure Dependen
-
7/29/2019 NABB FORMS Watermark
16/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
14
PROJECT _________________________________________ SYSTEM DESIGNATION_____________OUTLET MANUFACTURER ___________________________ OUTLET TEST APPARATUS___________
VAV TERMINAL DATA
NUMBER DESIGN ACTUAL
TYPE PRIMARY MAXIMUM AIRFLOW CFM (L/S)
SIZE PRIMARY MINIMUM AIRFLOW CFM (L/S)
HEATING AIRFLOW CFM (L/S)
FAN AIRFLOW CFM (L/S)
DDC ADDR FAN SPEED (Hi,med,low,variable,etc) --------
DDC CF DDC MAX/MIN AIRFLOWS CFM (L/S) -------- /
VAV OUTLET DATA
AREA OUTLET DESIGN FINALSERVED NO TYPE SIZE AK* VEL FLOW VEL FLOW
* NOTE: If AK = 1.00, velocity information and measurements are not required.
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
FAN TERMINAL UNIT TEST REPORT(Pressure Independent
-
7/29/2019 NABB FORMS Watermark
17/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
15
PROJECT_______________________________ SYSTEM DESIGNATION___________________LOCATION ______________________________ TRAVERSE DESIGNATION________________INSTRUMENTATION_______________________
DUCTSize I.D. ____________
Area ft (m)____________S.P. in. w.g. (Pa)________
DESIGN AIRFLOWSCFM (sL/s) _______________CFM (L/s) _________________
ACTUAL AIRFLOWSCFM (sL/s) _______________FPM (m/s) _________________CFM (L/s) _________________
POSITION 1 2 3 4 5 6 7 8 9 10 11 12
1
2
3
4
5
6
7
8
9
10
11
1213
VELOCITYSUBTOTALS
.
REMARKS:
TEST DATE _________________________
READINGS BY ________________________
DUCT TRAVERSE TEST REPORT
(Rectangular)
-
7/29/2019 NABB FORMS Watermark
18/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
16
PROJECT_______________________________ SYSTEM DESIGNATION____________________
LOCATION ______________________________ TRAVERSE DESIGNATION_________________INSTRUMENTATION_______________________
DUCTSize Diameter__________
Area ft (m)____________S.P. in. w.g. (Pa)________
DESIGN AIRFLOWSCFM (s/Ls) _______________CFM (L/s) _________________
ACTUAL AIRFLOWSCFM (s/Ls) _______________FPM (m/s) _________________CFM (L/s) _________________
REMARKS:TEST DATE _________ READINGS BY _______________________
DUCT TRAVERSE TEST REPOR
(Roun
-
7/29/2019 NABB FORMS Watermark
19/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
17
PROJECT _________________________________________________________________________
UNIT DATA UNIT NO. UNIT NO. UNIT NO.
Unit Designation
Type of Service
Manufacturer
Model Number
Design Flow GPM (L/s)
Design Head Ft (kPa)
Impeller Size Inches (mm)
Serial Number
Motor Manufacturer
TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL
Motor Hp (Kw)
Pump/Motor Speed RPM
No Flow Suction Pressure ft (kPa)
No Flow Discharge Pressure ft (kPa)
No Flow Differential Pressure ft (kPa)
Actual Impeller Size
Final Suction Pressure ft (kPa)
Final Discharge Pressure ft (kPa)
Total Dynamic Head ft (kPa)
Final Flow GPM (L/s)
Motor Rated Amperage
Final Operating Voltages
Final Operating Amperages T1/T2/T3
Final Operating HZ
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
HYDRONIC PUMP TEST REPORT
-
7/29/2019 NABB FORMS Watermark
20/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
18
PROJECT
UnitDesignation
Service Manufacturer ModelNumber
Size Design FlowGPM(L/s)
ValveSetting/Position
P Final FlowGPM(L/s)
REMARKS:
TEST DATE _________________________
READINGS BY ________________________
BALANCING VALVE TEST REPORT
(Fixed or Adjustable Orifice)
-
7/29/2019 NABB FORMS Watermark
21/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
19
PROJECT
UnitDesignation
Service Manufacturer ModelNo.
Size DesignFlow
GPM (L/s)
OperatingPressureRange
P Final FlowGPM (L/s)
REMARKS:
TEST DATE _________________________
READINGS BY________________________
BALANCING VALVE TEST REPORT
(Self Adjusting)
-
7/29/2019 NABB FORMS Watermark
22/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
20
PROJECT
ReadingNo. ___
ReadingNo. ___
ReadingNo. ___
ReadingNo. ___
ReadingNo. ___
ReadingNo. ___
ReadingNo. ___
DESIGN
Reading Designation
Service
Location
Design Flow GPM (L/s)
ACTUAL
Pipe Size
Pipe MaterialPipe Wall Thickness
Transducer Size
Spacing Distance
Application
Final Flow GPM (L/s)
REMARKS:
TEST DATE _________________________
READINGS BY ________________________
ULTRASONIC FLOW
MEASUREMENT TEST DATA
-
7/29/2019 NABB FORMS Watermark
23/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
21
PROJECT _________________________________________________________________________
CoilDesignation
SystemServed
CoilLocation
Design AirFlow
CFM (L/s)
Design WaterFlow GPM (L/s)
Actual AirflowCFM (L/s)
Actual WaterFlow GPM (L/s)
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
COOLING COIL TEST DATA
(Hydronic)
-
7/29/2019 NABB FORMS Watermark
24/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
22
PROJECT _________________________________________________________________________
CoilDesignation
SystemServed
CoilLocation
Design AirflowCFM (L/s)
Final ActualAirflow
CFM (L/s)
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
COOLING COIL TEST DATA
(DX)
-
7/29/2019 NABB FORMS Watermark
25/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
23
PROJECT _________________________________________________________________________
CoilDesignation
SystemServed
CoilLocation
Design Air FlowCFM (L/s)
Design WaterFlow GPM (L/s)
Actual AirflowCFM (L/s)
Actual WaterFlow GPM (L/s)
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
HEATING COIL TEST DATA
(Hydronic
-
7/29/2019 NABB FORMS Watermark
26/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
24
PROJECT ________________________________________________________________
CoilDesignation
SystemServed
CoilLocation
Design Air FlowCFM (L/s)
Actual AirflowCFM (L/s)
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
HEATING COIL TEST DATA
(Steam)
-
7/29/2019 NABB FORMS Watermark
27/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
25
PROJECT _________________________________________________________________________
CoilDesignation
SystemServed
CoilLocation
DesignAirflow
CFM (L/s)
DesignKw
DesignVoltage
Phase ActualAirflow
CFM (L/s)
ActualVoltage
ActualAmperage
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
HEATING COIL TEST DATA
(Electric)
-
7/29/2019 NABB FORMS Watermark
28/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
26
PROJECT
UNIT DATA DESIGN ACTUALUnit Designation
Manufacturer
Model Number
Serial Number
EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)
Pressure Drop
CONDENSER DATAFlow GPM (L/s)
Pressure Drop
UNIT DATA DESIGN ACTUAL
Unit Designation
Manufacturer
Model Number
Serial Number
EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)
Pressure Drop
CONDENSER DATA
Flow GPM (L/s)
Pressure Drop
REMARKS:
TEST DATE:
READINGS BY:
CHILLER TEST REPORT
(Water Cooled)
UNIT DATA DESIGN ACTUALUnit Designation
Manufacturer
Model Number
Serial Number
EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)
Pressure Drop
CONDENSER DATAFlow GPM (L/s)
Pressure Drop
UNIT DATA DESIGN ACTUALUnit Designation
Manufacturer
Model Number
Serial Number
EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)
Pressure Drop
CONDENSER DATAFlow GPM (L/s)
Pressure Drop
-
7/29/2019 NABB FORMS Watermark
29/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
27
PROJECT
UNIT DATA DESIGN ACTUALUnit Designation
Manufacturer
Model Number
Serial Number
EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)
Pressure Drop
UNIT DATA DESIGN ACTUAL
Unit Designation
Manufacturer
Model Number
Serial Number
EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)
Pressure Drop
REMARKS:
TEST DATE:
READINGS BY:
CHILLER TEST REPORT
(Air Cooled)
UNIT DATA DESIGN ACTUALUnit Designation
Manufacturer
Model Number
Serial Number
EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)
Pressure Drop
UNIT DATA DESIGN ACTUALUnit Designation
Manufacturer
Model Number
Serial Number
EVAPORATOR DATA DESIGN ACTUALFlow GPM (L/s)
Pressure Drop
-
7/29/2019 NABB FORMS Watermark
30/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
28
PROJECT _________________________________________________________________________
UnitDesignation
Manufacturer Model No. Serial No. Design WaterFlow GPM (L/s)
Actual WaterFlow GPM (L/s)
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
COOLING TOWER TEST REPORT
-
7/29/2019 NABB FORMS Watermark
31/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
29
PROJECT _________________________________________________________________________
UNIT DATA UNIT NO. UNIT NO. UNIT NO.
Unit Designation
Manufacturer
Model Number
Serial Number
TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL
Water Flow GPM (L/s)
Water Pressure Drop
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
HOT WATER BOILER TEST REPORT
-
7/29/2019 NABB FORMS Watermark
32/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
30
PROJECT ___________________________
UNIT DATA UNIT NO. UNIT NO. UNIT NO.
Unit Designation
Location
Service
Manufacturer
Model No.
Serial No.
TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL
PRIMARY WATER
Water Flow GPM (L/s)Water Pressure Drop
SECONDARY WATER
Water Flow GPM (L/s)
Water Pressure Drop
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
HEAT EXCHANGER TEST REPORT
(Water to Water)
-
7/29/2019 NABB FORMS Watermark
33/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
31
PROJECT _________________________________________________________________
UNIT DATA UNIT NO. UNIT NO. UNIT NO.
Unit Designation
Location
Service
Manufacturer
Model No.
Serial No.
TEST DATA DESIGN ACTUAL DESIGN ACTUAL DESIGN ACTUAL
Water Flow GPM (L/s)
Water Pressure Drop
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
HEAT EXCHANGER TEST REPORT
(Steam to Water)
-
7/29/2019 NABB FORMS Watermark
34/35
COPYRIGHT, NEBB 2005 National Environmental Balancing Bureau Page _____ of _____
32
PROJECT ___________________________________________________________________
DESIGN DATAUnit System Designation
Service
Location
Manufacturer
Model Number
Serial Number
Primary Air Flow CFM (L/s)
Primary AirP
Secondary Air Flow CFM (L/s)
Secondary AirP
ACTUAL DATA
Primary Air Flow CFM (L/s)
Primary AirP
Secondary Air Flow CFM (L/s)Secondary AirP
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
ENERGY RECOVERY WHEELS TEST DATA
-
7/29/2019 NABB FORMS Watermark
35/35
PROJECT ______________________________________________________________________
DESIGN DATASection
No.Section
No.Section
No.Section
No.Section
No.Section
No.
System Designation
Type of Service
Location
Zone
Altitude
Density
Leakage Class
Design Static PressurePressure Class
Seal Class
Airflow CFM (L/s)
Surface Area
Airflow per Surface Factor
Percent Allowable Leakage
ACTUAL DATAActual Static Pressure
Test Section Air Leakage
Test Section % Air Leakage
Test Witness
REMARKS:
TEST DATE _________________________
READINGS BY ______________________
DUCT AIR LEAKAGE TEST DATA
(Optional)