n nw ne · dublin bus depot mayeston lawn future connection future connection future connection...
TRANSCRIPT
H
H
H
H
H
H
H
H
LS
LS
LS
LS
LS
LS LS
ES
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
ES
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
Ram
p
Long Term Car Park
HO
RIZ
ON
LO
GIS
TIC
S P
AR
K
Car
Park
Car Park
Car Park
Car Park
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
ES
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
LS
Mh
Mh
Mh
H
Mh
H
Mh
Long Term Car Park
Spring
Long Term Car Park
LS
M
a
y
e
s
to
n
C
lo
s
e
Creston
Mh
Resevoir
(Covered)
MERRYFALLS
Merryfalls
MEAKSTOWN
Baile Maidheac
Sillogue Water
Pumping Station.
Water Tower
Under Const.
Tk
Playground
63.1
64.6
Mayeston GreenMayeston Green
Sports Ground
Golf Course
Golf Course
Mh
Mh
Mhs
Mh
LS
LS
LS
LS
LS
LS
T
LS
LS
T
1
0
k
v
SILLOGE
Saileog
Car Park
Car Park
Steps
Steps
Steps
Car Park
Car Park
Car Park
Under Const.
Sluice Gate
21 - 6
0
Dublin Bus Depot
Mayeston Law
n
Mayeston Law
n
FUTURE CONNECTION
FUTURE CONNECTION
FUTURE CONNECTION
PROPOSED
CONSTRUCTION
COMPOUND NO. 3
MH-14
MH-15
MH-18
MH-17
MH-16
MH-19
MH-21MH-20
MH-22
MH-23
MH-24
MH-27
MH-26
MH-25
AP-6
AP-7A
PROPOSED
CONSTRUCTION
COMPOUND NO. 10
EXISTING
WALKWAY TO
BEACH TO BE
MAINTAINED
MH-65
MH-66
MH-68
MH-69
MH-70
MH-67 0+000
0+050
0+100
0+150
0+200
0+250
0+300
0+350
0+400
0+450
0+500
0+550
0+600
AP-7A
AP-7B
AP-7A
MH-71
N
E
E
S
E
S
S
W
W
N
W
N
DECLAN CUNNINGHAM 2004
Ordnance Survey Ireland Licence number EN 0016018. © Ordnance Survey Ireland/Government of Ireland
N O T E S :
1. FIGURED DIMENSIONS ONLY TO BE TAKEN
FROM THIS DRAWING.
2. ALL DRAWINGS TO BE CHECKED BY THE
CONTRACTOR ON SITE
3. ENGINEER/EMPLOYERS REPRESENTATIVE, AS
APPROPRIATE, TO BE INFORMED BY THE
CONTRACTOR OF ANY DISCREPANCIES BEFORE
ANY WORK COMMENCES
4. THE CONTRACTOR SHALL UNDERTAKE A
THOROUGH CHECK FOR THE ACTUAL LOCATION
OF ALL SERVICES/UTILITIES, ABOVE AND BELOW
GROUND, BEFORE ANY WORK COMMENCES.
5. ALL LEVELS SHOWN RELATE TO ORDNANCE
SURVEY DATUM AT MALIN HEAD
Client:
Project:
Title:
Scale @ A1:
Prepared by: Checked: Date:
Project Director:
Drawing No.:
Revision:
Rev Date
Description
By
Chkd.
TOBIN Consulting Engineers will not be liable for any use of this document for
any purpose other than that for which it was originally prepared and provided.
Except where specifically and explicitly agreed in writing by TOBIN Consulting
Engineers, as copyright holder, no part of this document may be reproduced or
transmitted in any form and this document shall not be relied upon by any third
party for any purpose.
Drawing Status:
1:2,500
PROJECT ROUTE MAP
- Sheet 5 of 14 -
1:2,500
A. O'Callaghan B. DownesJune 2018
C. O'Keeffe
Planning
32102902-2005
P01
P01 08.06.18 ISSUE FOR PLANNING AOC BD
0 150m100m50m50m
KEY PLAN:
5
OSI 1:5,000 Sheet No's:
7029
OSI 1:2,500 Sheet No's:
3062-D, 3063-C, 3063-D, 3064-B, 3064-C, 3064-D, 3065-A,
3065-B, 3065-C, 3065-D, 3066-A, 3066-C, 3130-A, 3130-B,
3130-C, 3130-D, 3131-A.
OSI 1:1,000 Sheet No's:
3063-12, 3063-13, 3063-14, 3063-15, 3064-11, 3064-12,
3065-15, 3066-06, 3066-11, 3129-15, 3129-20, 3129-25,
3130-11, 3130-12, 3130-15, 3130-16, 3130-17, 3130-20,
3130-21, 3130-22, 3131-01, 3131-06, 3131-07.
FO
R C
ON
TIN
UA
TIO
N R
EF
ER
TO
D
RG
. N
O.: 32102902-2006
FO
R C
ON
TIN
UA
TIO
N R
EF
ER
TO
D
RG
. N
O.: 32102902-2004
MANHOLE
AIR VALVE
SCOUR VALVE
MH-1
AV-1
SCV-1
ACCESS CHAMBER
AC-1
LEGEND:
PLANNING BOUNDARY
CONSTRUCTION
COMPOUNDS
PROPOSED ORBITAL
SEWER ROUTE
(GRAVITY)
PROPOSED OUTFALL
PIPELINE ROUTE (LAND
BASED SECTION)
PROPOSED OUTFALL
PIPELINE ROUTE
(MARINE SECTION)
PROPOSED WWTP/PS
PROPOSED ORBITAL
SEWER ROUTE
(RISING MAIN)