multi-build software cost estimation using coincomo who can multi-build the longest presentation...
TRANSCRIPT
![Page 1: MULTI-BUILD SOFTWARE COST ESTIMATION USING COINCOMO Who can multi-build the longest presentation title?](https://reader036.vdocuments.us/reader036/viewer/2022082423/5697c0201a28abf838cd218d/html5/thumbnails/1.jpg)
MULTI-BUILD SOFTWARE COST ESTIMATION USING COINCOMOWho can multi-build the longest presentation title?
![Page 2: MULTI-BUILD SOFTWARE COST ESTIMATION USING COINCOMO Who can multi-build the longest presentation title?](https://reader036.vdocuments.us/reader036/viewer/2022082423/5697c0201a28abf838cd218d/html5/thumbnails/2.jpg)
WHAT IS COINCOMO?
• Tool for COCOMO II and COPSEMO model calculations
• Only CSSE COCOMO related tool that’s being actively developed
• Latest stable release is 2.00
• Available on CSSE website
• Runs on Java, therefore available on all major platforms (Windows, OS X, Unix derivatives)
• Currently being used for CSCI577 and 510
![Page 3: MULTI-BUILD SOFTWARE COST ESTIMATION USING COINCOMO Who can multi-build the longest presentation title?](https://reader036.vdocuments.us/reader036/viewer/2022082423/5697c0201a28abf838cd218d/html5/thumbnails/3.jpg)
INCREMENTAL DEVELOPMENT
• Related to agile development
• Most common development nowadays
• Need to reflect in COCOMO-related tools
![Page 4: MULTI-BUILD SOFTWARE COST ESTIMATION USING COINCOMO Who can multi-build the longest presentation title?](https://reader036.vdocuments.us/reader036/viewer/2022082423/5697c0201a28abf838cd218d/html5/thumbnails/4.jpg)
INCREMENTAL DEVELOPMENT IN COINCOMO
• Adaptation in multiple steps
• First step is to have same level of productivity decline for all increments
• Later levels can be set per increment
![Page 5: MULTI-BUILD SOFTWARE COST ESTIMATION USING COINCOMO Who can multi-build the longest presentation title?](https://reader036.vdocuments.us/reader036/viewer/2022082423/5697c0201a28abf838cd218d/html5/thumbnails/5.jpg)
PROTOTYPE