MTAP 2 – Motor Test Access Panel
Offers
Increased Safety For Testing
Energized AC
Electric Motors
1
Avenir Technologies/Iqbal Ibrahim
Reduces Testing
time per motor
Reduces labour
cost
Increases Savings
![Page 2: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/2.jpg)
NFPA 70E 2
Avenir Technologies/Iqbal Ibrahim
For making connections on
live electrical circuits as per
NFPA 70E you have to wear
these PPE
![Page 3: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/3.jpg)
Spider Bite Near Ankle
3
Avenir Technologies/Iqbal Ibrahim
Thermal Image of the
temperature of the ankle
after a spider bite
No body loves to be
bitten by a spider
![Page 4: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/4.jpg)
Why are we afraid of this?
Avenir Technologies/Iqbal Ibrahim
4
![Page 5: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/5.jpg)
But not this?
5
Avenir Technologies/Iqbal Ibrahim
Picture of a Low Voltage
Metering panel after Arc
flash.
![Page 6: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/6.jpg)
And not this?
6
Avenir Technologies/Iqbal Ibrahim
Fingers burnt by Arc flash
![Page 7: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/7.jpg)
Arc Flash Explosion Damage
7
Avenir Technologies/Iqbal Ibrahim
Result of an Arc
Flash Explosion
![Page 8: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/8.jpg)
Arch Flash: Clothes Burned
8
Avenir Technologies/Iqbal Ibrahim
Think about the
person who
was in it
![Page 9: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/9.jpg)
Arc Flashes
Avenir Technologies/Iqbal Ibrahim
9
• Mainly occur in electrical devices that are 480 volt and up.
• Motor control centers and substations are a great source of faults.
![Page 10: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/10.jpg)
Arc Flash Explosion
Avenir Technologies/Iqbal Ibrahim
10
• – Forms the arc path through air
• – Expands to form blast wave • Vaporized metal and ionized air:
• Temperatures reach 35,000°F+
• Energy levels can reach 20-100 Cal/cm2
• Duration is less than 7/10ths of a second
• Proportional to energy and distance.
![Page 11: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/11.jpg)
Damages from Arc Flash
UETS/ AVERNR/Iqbal Ibrahim
11
• High temperatures burns to skin
• Melting of synthetic clothing to skin
• UV and IR burns to eyes and skin
• Temporary or permanent blindness
• Pressure Wave can knock you down
• Decibel can reach 160 DB
• Neurological effect of a magnetic field
• Temporary or permanent personality changes
![Page 12: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/12.jpg)
The End Results
Avenir Technologies/Iqbal Ibrahim
12
![Page 13: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/13.jpg)
Solution: Install MTAP 13
Avenir Technologies/Iqbal Ibrahim
MTAP2 meets both OSHA and NFP 70E
definitions for safe voltage
Time consuming tag
out and lock out
procedures are
eliminated and in
seconds you can
connect and collect
accurate data to
determine your motor
health.
![Page 14: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/14.jpg)
No More Direct Connection
Avenir Technologies/Iqbal Ibrahim
14
Tester Voltage Leads and
current probes direct
connections
![Page 15: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/15.jpg)
No More Direct Connection
Avenir Technologies/Iqbal Ibrahim
15
Voltage Leads
Current
Probes
MCC
![Page 16: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/16.jpg)
MTAP 2 – Motor Test Access Panel
16
Avenir Technologies/Iqbal Ibrahim
MTAP 2 Board
![Page 17: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/17.jpg)
PdMA’s Answer to Safe Testing
Direct connection to MCEmax Tester / MTAP2 One time Installation
Voltage connections
CT Cable Connections
Port connection
Avenir Technologies/Iqbal Ibrahim
![Page 18: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/18.jpg)
PdMA’s Answer to Safe Testing
Without MTAP2 With MTAP2 Installed
![Page 19: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/19.jpg)
MTAP 2 Installation 19
Avenir Technologies/Iqbal Ibrahim
All MTAP 2 Installed in a separate panel
![Page 20: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/20.jpg)
MTAP 2 Installation 20
Avenir Technologies/Iqbal Ibrahim
MTAP 2 Installed in a
separate panel
![Page 21: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/21.jpg)
MTAP 2 Provides protection from Arc Flash
Before MTAP2 you need PPE to protect against Arc Flash
while connecting test leads & current probes
After installing MTAP2 there is no need to open the MCC door to make connections.
Test cable is connected to the connector installed on MCC Door
21
Avenir Technologies/Iqbal Ibrahim
![Page 22: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/22.jpg)
MTAP 2 Installation
22
Avenir Technologies/Iqbal Ibrahim
MTAP 2 Test Port
to connect
MCEmax
![Page 23: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/23.jpg)
MTAP 2 Specifications
Avenir Technologies/Iqbal Ibrahim
23
Specifications
Voltage at MCC test port: 30V RMS nominal, <50V peak
Input voltages (select one when ordering): 120, 240, 480, 600 VAC
Motors rated over 600V, require the 120V/5A model and existing metering
PT’s and CT’s
Current input terminal strip (0-3V RMS input), current represented by voltage
Signal
MCC test port: Circular military style, 1-inch diameter, extends out ½ inch
![Page 24: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/24.jpg)
MTAP 2 Specifications
Avenir Technologies/Iqbal Ibrahim
24
Physical Dimensions
Size: 7.25 x 5.6 inches x 3.5 inches deep
Weight: less than 3 lbs.
Mounts to DIN rail via 2 mounting brackets
Mounting brackets provided, DIN rail not provided
Optional Mounting: Mount circuit board directly to MCC
4 mounting feet (must specify if required)
![Page 25: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/25.jpg)
MTAP 2 Specifications
Avenir Technologies/Iqbal Ibrahim
25
Circuit Protection and Isolation
3 primary and 3 secondary fast-acting fuses on potential
transformer
Transorbs used to limit voltage for current and voltage signals to
test port
Electrical Isolation: potential transformer rated 2000V DC High Potential
test
![Page 26: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/26.jpg)
MTAP 2 Specifications
Avenir Technologies/Iqbal Ibrahim
26
Standards and Certifications
Designed to UL508, UL845, and CSA 22.2 #14 standards
CSAus certification
Meets NFPA 70E guidelines for safe voltage level
![Page 27: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/27.jpg)
MTAP 2 Specifications – CT Information
Avenir Technologies/Iqbal Ibrahim
27
CT Primary Current Rating 5 A 100 A 400 A
CT Opening Size (inside
diameter in inches)
0.3 1.25 1.25
Design Iron Core Donut Iron Core Donut Iron Core Donut
Voltage Class (max continuous
voltage)
600V 600V 600V
Burden Resistor Built-in Built-in Built-in
Output (mV/A) 66.7 mV / A 3.3 mV / A 0.833 mV / A
Burden in VA at rated
current
0.003 0.04 0.14
Burden in VA at 10X rated
current
0.28 3.63 14.5
Wire Length 8 ft 8 ft 8 ft
ANSI / IEEE Standard # IEEE-C57.13 IEEE-C57.13 IEEE-C57.13
CSA Standard # CAN3-C13-M83 CAN3-C13-M83 CAN3-C13-M83
![Page 28: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/28.jpg)
MTAP 2 – Information Required when ordering
UETS/ AVERNR/Iqbal Ibrahim
28
When requesting a quote for MTAP 2 or Placing order, please provide the
following information:
Specify Motor Voltage, FLA and HP
Specify input voltage and CT current rating.
Requires one external cable to connect MCC test port
Cable Part Number ASY-00321
![Page 29: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/29.jpg)
MTAP 3
Avenir Technologies/Iqbal Ibrahim
29
Full range of MCEmax online tests including Power, Inrush / Start-
up, Demod, Rotor Evaluation and Eccentricity
![Page 30: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/30.jpg)
MTAP 3 – Current Only
Avenir Technologies/Iqbal Ibrahim
30
MTAP3 offers the ability to safely capture data in many of the smallest
enclosures where the MTAP2 cannot be installed or the PT’s are not available
at the motor MCC.
FEATURES
• In seconds you are able to collect accurate data to determine your motor
health
• Eliminate time consuming tag-out and lock-out procedures
• Nomex PPE NOT required
• Full range of MCEMAX online tests including Power, In-Rush/Start-Up, Demod,
Rotor Evaluation, and Eccentricity
• Meets OSHA and NFPA 70E definition for safe voltage
• Meets UL 508 and CSA 22.2 #14 standards .
![Page 31: Mtap 2 Presentation Pdf](https://reader034.vdocuments.us/reader034/viewer/2022050710/5597dae21a28abbd5e8b4830/html5/thumbnails/31.jpg)
MTAP 3 – Current Only
Avenir Technologies/Iqbal Ibrahim
31
With the current-only MTAP3, you can choose from one of four standard
ranges of CT’s – MTAP 3 CT’s are ordered as a separate line item
CT Primary Current Rating 5A 100A 400A
CT Opening Size (inside
diameter in inches) 0.3 1.25 1.25
Design Iron Core Donut Iron Core Donut Split-Core
Voltage Class (max
continuous voltage) 600V 600V 600V
Burden Resistor Built in Built in Built in
Output (mV/A) 66.7 mV / A 3.3 mV / A 0.833 mV / A
Burden in VA at rated current 0.003 0.04 0.0177
Burden in VA at 10X rated
current 0.28 3.63 1.778
Wire Length 8 ft 8 ft 8 ft
ANSI / IEEE Standard # IEEE-C57.13 IEEE-C57.13 IEEE-C57.13
CSA Standard # CAN3-C13-M83 CAN3-C13-M83 CAN3-C13-M83