![Page 1: MTA Planned Commitments for 2020 and beyond from Prior … · 2020-01-28 · MTA Planned Commitments for 2020 and 2021 from Prior Capital Plans (2015-19, 2010-14 & Sandy)](https://reader033.vdocuments.us/reader033/viewer/2022052423/5f07cf9e7e708231d41edda4/html5/thumbnails/1.jpg)
MTA Planned Commitments
for 2020 and 2021
from Prior Capital Plans(2015-19, 2010-14 & Sandy)
![Page 2: MTA Planned Commitments for 2020 and beyond from Prior … · 2020-01-28 · MTA Planned Commitments for 2020 and 2021 from Prior Capital Plans (2015-19, 2010-14 & Sandy)](https://reader033.vdocuments.us/reader033/viewer/2022052423/5f07cf9e7e708231d41edda4/html5/thumbnails/2.jpg)
Highlights:
• Signal modernization on Eighth Avenue Line
• Penn Station-33 St Corridor, Phase 1
• ADA accessibility at Livonia Av / Canarsie
• Metro-North Harlem River Lift Bridge
Q1 2020: $964.3 Million
2
![Page 3: MTA Planned Commitments for 2020 and beyond from Prior … · 2020-01-28 · MTA Planned Commitments for 2020 and 2021 from Prior Capital Plans (2015-19, 2010-14 & Sandy)](https://reader033.vdocuments.us/reader033/viewer/2022052423/5f07cf9e7e708231d41edda4/html5/thumbnails/3.jpg)
Q2 2020: $2,546.2 Million
Highlights:
• Penn Station-33rd Street Corridor, Phase 2
• ADA accessibility at 4 stations in the Bronx
o Westchester Square / Pelham
o 149 Street – Grand Concourse Complex
(two-station)
o Tremont Av / Concourse
• Elevator and escalator improvements at 11 stations
• Infrastructure repairs on the 2/3/4/5 line in Brooklyn
• New Elmont station
• New rolling stock
o LIRR train cars and service locomotives
o Work hybrid locomotives for NYCT
• Harold Interlocking Catenary
3
![Page 4: MTA Planned Commitments for 2020 and beyond from Prior … · 2020-01-28 · MTA Planned Commitments for 2020 and 2021 from Prior Capital Plans (2015-19, 2010-14 & Sandy)](https://reader033.vdocuments.us/reader033/viewer/2022052423/5f07cf9e7e708231d41edda4/html5/thumbnails/4.jpg)
Q3 2020: $1,670.5 Million
Highlights:
• ADA accessibility at 6 stations:
o 14th Street & 6th-7th Avenues Complex (three stations)
o 8 Avenue / Sea Beach (southbound)
o Woodhaven Boulevard / Jamaica
o Queensboro Plaza
• Structural repairs on the Flushing (7) Line, including renewals at 7 stations
• Sandy Repairs: Rutgers Tube (F) rehabilitation
• LIRR signal modernization, Babylon to Patchogue
• Four station renewals on Jamaica Line (J/Z)
4
![Page 5: MTA Planned Commitments for 2020 and beyond from Prior … · 2020-01-28 · MTA Planned Commitments for 2020 and 2021 from Prior Capital Plans (2015-19, 2010-14 & Sandy)](https://reader033.vdocuments.us/reader033/viewer/2022052423/5f07cf9e7e708231d41edda4/html5/thumbnails/5.jpg)
Q4 2020: $1,323.9 Million
Highlights:
• Penn Station Access
• ADA accessibility at 3 stations
o 68 St-Hunter College / Lexington Av
o Bay Ridge-95 St / 4 Av
o Court Sq / Crosstown
• New substation at Canal St / 8 Av
• Second Avenue Subway Phase II (initial commitment)
• 45 new electric buses and electrification of 6 bus depots
• Sandy resiliency at West Side Yard and East River Tunnel
5
![Page 6: MTA Planned Commitments for 2020 and beyond from Prior … · 2020-01-28 · MTA Planned Commitments for 2020 and 2021 from Prior Capital Plans (2015-19, 2010-14 & Sandy)](https://reader033.vdocuments.us/reader033/viewer/2022052423/5f07cf9e7e708231d41edda4/html5/thumbnails/6.jpg)
2021: $2,293.3 Million
6