    Minnesota State University Moorhead | Renovation of Dahl & West Snarr Halls | 100% Pre-Design Report

    June 11, 2010 | Elness Swenson Graham Architects, Inc.

    section3:project description

    60

  • 7/30/2019 MSUM part 2

    2/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3A:DahlHallProjectDescription Architecture

    PredesignReport

    Page1of

    5

    Section3A:

    DahlHallProjectDescription Architecture

    ApplicableBuildingCodes:

    State:

    2007Minnesota

    State

    Building

    Code

    (2006

    IBC

    with

    Minnesota

    Amendments)

    2000GuidelinesfortheRehabilitationofExistingBuildings(GREB)

    Federal:

    ADA AmericanwithDisabilitiesAct(1990)

    1989 FairHousingAct (ResidentialUnits)

    Additional:

    MnSCUFacilityDesignStandards

    Alternatesthatwereconsideredduringthepredesignprocessarelistedinthefollowingnarrative.

    RefertoAlternateCostsSummary inSection5foroptionsthatare included inTotalConstruction

    Cost.

    Sitework

    Replacesidewalk/rampingfromvestibulestomainsidewalkforbetterdrainageandsafety.

    Provideadditionallandscapingbedsaroundentrances. Providea$6000budgetlineitemfor

    additionalsitefurnitureinpredesignbudget.

    SiteAlternate#1:Providealternatefor$50,000foradditionallandscaping/sitework. Replace

    exteriorconcretestairsandrampsatstairtowerexits.

    HazardousAbatement

    DahlHallhadbeensurveyedpreviouslybyTwinCityTestingandthefindingswererecordedinaHazardous

    MaterialSurvey

    Report

    dated

    July

    17,

    1987.

    MSUM

    contracted

    with

    Legend

    Technical

    Services

    in

    June,

    2010,

    toprovideanupdatedsurvey. Theupdatedsurveyindentifiesmaterials,includingCATIACM9floortile,th

    arerequiredtoberemovedpriortotherenovationprojectifthematerialsaretobeimpactedinsucha

    mannerastorenderthemfriable. Thesurveyalsoindentifiesmaterialsrequiredtoberemovedpriortothe

    renovationincludingRACMaircellinsulation,hardfittingsonaircelltankinsulation,andhardfittingsfor

    fiberglasspipeinsulation. Materialsinalldisturbedareasaretoberemovedbylicensedhazardousmaterials

    abatementcontractorspriortomainrenovationactivities.

    Basement

    Renovationstotheexistingbasementarenotincludedinthescopeofthepredesign,withthe

    exceptionofworkrequiredforrevisionstomechanicalandasrequiredforcoderevisions. Because

    theplasterceilingatthelowerlevelstorageroomwasremovedwithanearlierproject,theexposed

    steeljoists

    in

    that

    area

    are

    unprotected.

    Renovation

    will

    include

    anew

    fire

    rated

    ACT

    ceiling

    at

    the

    unprotectedsteeljoists.

    FirstfloorVestibules/AluminumEntrances

    Allaluminumentrancesandglazingwillbereplacedwithaluminumstorefronttypewithinsulating

    visionglassandequippedforkeyedaccessentryonlybyresidents&staff. Providenewquarrytile

    flooringandbase,paintedwallsandnewlightingatvestibules.

    61

  • 7/30/2019 MSUM part 2

    3/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3A:DahlHallProjectDescription Architecture

    PredesignReport

    Page2of

    5

    FirstFloorLobbyandReception/Offices

    Therenovationprojectwillincludedemolishingthereceptiondeskandofficeareaforanew

    configuration.ProvidenewInformation/welcomedeskwithwoodveneerfinishes,tilebase,and

    quartzcountertopincustomconfiguration,withaluminumsecuritygrille.Officestohavepainted

    wallswithVCTflooringandvinylbase,and2x2ACTceiling,andnewlighting.Newheavydutywelded

    hollowmetaldoorframes,flush,solidcorewooddoorsandnewhardwareatallfirstfloor

    lobby/office/custodial/loungefunctions. ProvidenewpairofdoorsonholdopenswithcardaccessbetweenLobbyandCorridor. LoungewallthatfacesLobbytohavefullheightceramictileaccent

    wall. Lobbyflooringtobedemolishedandnewceramictilefloorandbasetobeinstalled.

    FirstfloorToilet

    Providenewsingleuseraccessibletoiletroomatfirstfloorwithceramictilefloorandbaseoverliquid

    appliedwaterproofingmembrane,paintedgypsumboardwallsandceiling,andtoiletaccessories.

    FirstfloorCorridor

    TheexistingglazedtilewallsattheStair/Elevator/Trashcoreandlobbyaretobeskimcoatedand

    painted.Existingmailboxesaretobereused.

    FirstFloorLounge

    Therenovationofthefirstfloorloungewillincludeallnewfinishes,includingcarpetandbase,new

    ACTtileandgypsumboardsoffitsandlightingandpaintedwalls.Theexistingglazedtileexteriorwalls

    willbeskimcoatedandpainted.Providenewkitchenwith16ofwoodbaseanduppercabinets,solid

    surfacecountertopsandEnergyStarAppliancesincludingfullsizebottommountfreezer/refrigerator,

    sink,microwave,rangeandfullyventedhood. Existingfireplacetoremain.(Providealternateto

    modifyexistingfireplaceforgas confirmavailability.) Providenewratedhollowmetaldoorframe

    withsolidwoodcoredoorsandsideliteglazingtolounge.

    StaffandGradApartments

    The

    existing

    staff

    apartment

    and

    accessible

    unit

    will

    be

    demolished

    and

    reconfigured

    for

    a

    new

    two

    bedroomstaffapartmentandanewefficiencygradapartment.Thenewstaffapartmentwillhavea

    fullkitchenwithwoodbasecabinetsandsolidsurfacecountertopsandenergystarappliances.The

    unitwillhaveonefullbathroomwithatub. Thefinisheswillbecarpetwithwoodbaseintheliving

    room,dining,hallwayandbedrooms.Bathroomswillhaveceramictilefloorandbasewith

    waterproofingbelowandpaintedwalls. Kitchenwillhavesheetvinylandwoodbase.Theapartment

    willalsohavearesidentialstylelaundryroom. Theefficiencyapartmentwillhavesimilarkitchen,

    bathroomandfinishes,butwillhavea36x48showerinsteadofatub.

    CorridorImprovements

    Therenovationtothecorridorsonallfloorswillinclude: theadditionofanACTceilingsystem(to

    concealmechanical,electricalandtechnology)andnewlighting,paint,newcarpetandcarpetbase.

    Paintall

    hollow

    metal

    door

    frames.

    All

    wood

    doors

    to

    be

    refinished.

    Provide

    semi

    recessed

    fire

    extinguisherslocatedsoallfloorareasarewithin75traveldistanceofanextinguisher.Removeand

    replaceallexistingcabinets(allfloors.)

    62

  • 7/30/2019 MSUM part 2

    4/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3A:DahlHallProjectDescription Architecture

    PredesignReport

    Page3of

    5

    StudentRooms

    Therenovationtothestudentroomswillinclude: paintingallwallsandceilings,removingexisting

    builtinbeds/storageunit(whichareboltedtothefloors),removingbuiltinwardrobes,repairingwall

    plaster,removingexistingVATtileandinstallingnewVCTand4vinylbase.Providerobeshooksin

    room(2)perbed. Theupgradesincludemodifyingtwounitdoorsperfloortoenlargetheopening

    foranew36x80solidcorefireratedwooddoortoprovideaccessibility.

    Bathrooms

    Therenovationstotherestroomswillinclude: demolishingallexistingfixtures,toiletpartitions,

    finishes,andinteriorwalls(glazedtile).Providenewplumbing,electrical,mechanicalandfixtures,

    countertops,toiletandshowerplasticpartitionsinanewplanconfiguration.Existingglazedtile

    exteriorwallfinishistoremainandwillneedtobeprotected. Newwallswillhavefullheightceramic

    tile. Lavatoriesaretobesolidsurfacecountertopwithintegralbowlswithoverflowdrainswithfull

    metalframedmirrorabove. Existingtileflooringandshowerbasesaretobedemolished.New

    ceramictileflooringandmoldedstoneonepieceshowerreceptorsaretobeinstalledoverliquid

    appliedwaterproofingmembrane. Showerwallsaretobesolidsurfacepanelswithasealantjointat

    thecornersandperimeter.Provideallnewtoiletaccessoriesincludingtoiletpaperholders,soap

    dispensersand

    shower

    curtain

    rods.

    Provide

    (1)

    robe

    hook

    at

    each

    toilet

    stall

    and

    (2)

    at

    each

    shower

    stall. Enlargedooropeningtobathroomsandprovidenewhollowmetaldoorframeand36x80

    solidcoreflushratedwooddoor.Provide(1)accessibletoiletstallandshowerstallperfloor.

    FloorLaundry

    Provideanewfloorlaundryoneachfloor finallocationtobedetermined. Eachlaundrytohave(3)

    stackedwashersanddryersandasinkandplasticlaminatecountertop.NewflooringistobeVCT

    with4vinylbase.Wallsaretobepaintedgypsumboard.Provide2x2ACTceiling.Providenew

    ratedhollowmetaldoorframewith36x84solidcorestainedwooddoorandnewhardware.

    FloorLounges

    The

    renovation

    to

    the

    lounge

    areas

    on

    all

    floors

    will

    include:

    new

    flooring

    and

    base,

    wall

    repairs

    and

    paint,installationofanewACTceilingsystemandnewlighting. Theexistingtilewallalongthe

    bathroomwallistobeskimcoatedandpainted. Removeexistingceramictileatdrinkingfountainand

    replacewithnewceramictileatthewallandfloor.

    Stairwells

    Therenovationtothestairwellswillinclude: paintingallwallsandmetalatstairs,andinstallingnew

    floortile,basetreads,andnewlighting. Demolishexistingguardrailandhandrailandprovidenew

    paintedsteelguardrailsandhandrailstomeetcode. Handrailsshallbealuminumtubingwithfittings

    andterminations. (Confirm2hourfireratingatstairwalls.) Providenewpaintedsteelshipsladder

    atcenterstairattopfloortoroofwithroofhatch.

    ShaftWalls

    Provide(2)newtwohourratedshaftswithinsulatedsteelstudandgypsumboardconstructionper

    floorfornewmechanicalmakeupair.

    Elevators

    Providesmokesealatexistingelevators.Elevatorwallsareconstructedwith8lightweightblockwith

    plasterfinish.(verify2hourrating.)

    63

  • 7/30/2019 MSUM part 2

    5/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3A:DahlHallProjectDescription Architecture

    PredesignReport

    Page4of

    5

    Painting

    Paintingisasindicatedabove.Ceilingsshallbepaintedwithtwocoatsofeggshelllatex.

    Wallpaintshallbetwocoatsofsemiglosspaint. Painthollowmetaldoorsandframes,handrails,

    guardrails,mechanicalequipment,etc.

    InteriorWalls

    Typicalcorridorwallsandunitdemisingwallsareconstructedwith4PYROBARwithplasterfinish.Allexistingexposedglazedtilefinishistobeskimcoatedandpainted(excepttheexteriorwallsat

    bathrooms.)

    Newtypicalnonratedwallsaretobeconstructedwith35/8inchsteelstudsat16incheso.c.and

    onelayer5/8inch(paperlessmoistureresistant)gypsumboardoneachside. Bedroom&bathroom

    wallsshallinclude31/2inchfiberglassbattinsulation. Demisingwallsatapartmentaretohavetwo

    layersgypsumboardeachsideandfullinsulationfor55 59STC. Corridorwallstohave50 54STC.

    InteriorDoorsandFrames

    Existingdoorsandframesthataretoremainaretoberefinished.

    Newdoors,

    including

    common

    area

    doors,

    shall

    be

    flush,

    13/4

    inch

    thick,

    solid

    core,

    5ply,

    prefinishedstainedandvarnishedmapledoors,30x68typical.

    Heavydutyweldedhollowmetalframes,painted,foralldoors.

    InteriorDoorHardware

    Providenewdoorhardwareatalldoors.LocksetsshallbeANSIGrade1mortiselocksetswithlever

    handlesand6pincylindersmatchingcampusstandardsandexistingkeysystem,US26Dfinish.

    ClosersshallbeLCN4010/4110seriesorequivalent.

    Finishes

    Verifyifanypaintisleadbasedpaintwithhazardousmaterialsreports.

    All

    new

    finishes

    are

    to

    be

    Low

    Emitting

    Materials

    Substructure

    ExistingConditions:Existingfootingsarecastinplacereinforcedconcrete.Noknownsettlement

    issuesatthetimeofthispredesign.

    Proposed:Nomodificationstoexistingfootingsarerequired.

    Superstructure

    ExistingConditions: Existingstructureconsistsof3oflightweightconcreteon12(typ.)steelbar

    [email protected]/westdirectionandbearonsteelbeamsandcolumnsatthe

    exteriorwallandaninteriorrowofcolumnsandbeamstypically.Theexteriorwallsarenotload

    bearingtypically. Steelcolumnsattheexteriorareexposedtotheelementsandareexpressedasa

    verticalsteel

    column.

    Plaster

    ceiling

    throughout

    is

    assumed

    to

    provide

    fire

    rating

    (to

    be

    confirmed.)

    Proposed: Norevisionsareproposedtoexistingstructureexceptasrequiredformechanical

    revisions.

    64

  • 7/30/2019 MSUM part 2

    6/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3A:DahlHallProjectDescription Architecture

    PredesignReport

    Page5of

    5

    Exteriorwallconstruction

    ExistingConditions:Existingexteriorwallsareconcretemasonryunitconstructionwithbrickand

    glazedtileexterior.Thewallconstructionprovidesnoairspace,insulationorflashing.

    Theinteriorsideoftheexteriorwallshasglazedtilefinish mostofwhichhaveplasterfinish.Exterior

    wallsatbathroomsandcommonareasareexposedglazedfilefinish.

    Proposed:ExteriorWallAlternate#1:Providealternatetoprovide2rigidinsulation,stainlesssteel

    channelsandprefinishedcompositemetalpanelfinishatexteriorglazedtilewalls.

    ExteriorWallAlternate#2: Atinteriorsideofexteriorwalls,provide15/8furringchannels,

    1rigidinsulationoninteriorsideofexteriorwallsand5/8moistureresistantgypsumboard.

    Paintallwalls.

    Existingroofconstruction

    ExistingConditions: Existingroofconstructionis12steelbarjoistswith11/2steeldeckwithrigid

    insulationandbuiltuproofing. Noevidenceorreportsofrooffailuresatthetimeofthisreport.

    RoofAlternate#1: Providealternatefornewpenthousestohousemechanicalheatrecovery

    units.ExteriorWindows

    ExistingConditions: Exteriorwindowswerereplacedin1999.

    Proposed:Recaulkexterioratwindows.Replaceweatherstripping/sweepsatallwindows.

    WindowsAlternate#1: ProvidealternatetoreplaceallexistingwindowswithMnSCU

    approvedaluminumwindows.

    Exterior

    Doors

    ExistingConditions: Exteriordoorsarealuminumstorefronttypewithinsulatedvisionglassin

    curtainwallframesandareinpoorcondition.

    Proposed:Allexteriordoorsandframes(includinginnerframesatvestibules)shallberemovedand

    replacedwithaluminumstorefronttypewithinsulatingvisionglassandequippedforkeyedaccess

    entryonlybyresidents&staff. Allexitdoors,framesandhardwareatstairstobereplaced.

    Roofing

    ExistingConditions: MSUMFRRMreportsindicatethatroofisdueforreplacementin2038. Nonew

    roofisproposedexceptasrequiredformodificationstomechanicalsystems.

    Proposed:

    Patchabandonedopeningsandinstallnewopeningsasrequiredformechanical/electrical

    revisions. Lightningprotectionisnotproposed.

    65

  • 7/30/2019 MSUM part 2

    7/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3B:WestSnarrProjectDescription Architecture

    PredesignReport Page1of5

    Section3B:

    WestSnarrHallProjectDescription Architecture

    ApplicableBuildingCodes:

    State:

    2007Minnesota

    State

    Building

    Code

    (2006

    IBC

    with

    Minnesota

    Amendments)

    2000GuidelinesfortheRehabilitationofExistingBuildings(GREB)

    Federal:

    ADA AmericanwithDisabilitiesAct(1990)

    1989 FairHousingAct (ResidentialUnits)

    Additional:

    MnSCUFacilityDesignStandards

    Alternatesthatwereconsideredduringthepredesignprocessarelistedinthefollowingnarrative.

    RefertoAlternateCostsSummary inSection5foroptionsthatare included inTotalConstruction

    Cost.

    Sitework

    Existingconcreteatthenorthofthemainnorthentryiscrackingandisinneedofreplacement. The

    Renovationprojectincludesreplacingallconcretesidewalksatthenorthentry.

    SiteAlternate#1: Providebudgetallowanceof$50,000foradditionalsitework.

    HazardousAbatement

    WestSnarrHallhadbeensurveyedpreviouslybyTwinCityTestingandthefindingswererecordedina

    HazardousMaterialSurveyReportdatedMarch25,1987.MSUMcontractedwithLegendTechnicalServices

    June,2010,toprovideanupdatedsurvey. Theupdatedsurveyindentifiesmaterials,includingCATIACM9

    floortileandCATIIwindowcaulk,thatarerequiredtoberemovedpriortotherenovationprojectifthe

    materialsaretobeimpactedinsuchamannerastorenderthemfriable. Thesurveyalsoindentifiesmateria

    requiredtoberemovedpriortotherenovationincludingRACMaircellinsulation,hardfittingsonaircell,an

    hardfittingsforfiberglasspipeinsulationandexteriorwindowglazing.Materialsinalldisturbedareasareto

    beremovedbylicensedhazardousmaterialsabatementcontractorspriortomainrenovationactivities.

    Basement

    WestSnarrHalldoesnothaveafullbasement.Amechanicalroomandtunnelconnectionislocated

    belowthefirstfloor.NoworkisproposedinthisareaexceptasrequiredforrevisionstoMEP.

    FirstfloorVestibules/AluminumEntrances

    Allaluminumentrancesandglazingwillbereplacedwithaluminumstorefronttypewithinsulating

    visionglass

    and

    equipped

    for

    keyed

    access

    entry

    only

    by

    residents

    &

    staff.

    Provide

    new

    quarry

    tile

    flooringandbase,paintedwallsandnewlightingatvestibules.

    FirstFloorLobbyandReception/Offices

    Therenovationprojectwillincludedemolishingthereceptiondeskandofficeareaforanew

    configuration.ProvidenewInformation/welcomedeskwithwoodveneerfinishes,tilebase,and

    quartzcountertopincustomconfiguration,withaluminumsecuritygrille.Officestohavepainted

    gypsumboardwallswithcarpetflooringandcarpetbaseand2x2ACTceilingandnewlighting.New

    66

  • 7/30/2019 MSUM part 2

    8/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3B:WestSnarrProjectDescription Architecture

    PredesignReport Page2of5

    heavydutyweldedhollowmetaldoorframes,flush,solidcorewooddoorsandnewhardwareatall

    firstfloorlobby/office/custodial/loungefunctions. Providenewpairofdoorsonholdopenswithcard

    accessbetweenLobbyandCorridor. Lobbyflooringtobedemolishedandnewceramictilefloorand

    basetobeinstalled.

    FirstfloorAlternate#1: Providealternatecosttodemolishexistingstairbetweenfirstandsecond

    floorsandconstructnewonestoryadditionfornewstairtorunbetweenfirstandsecondfloors.Infillflooropeningwherestairisdemolished. Newadditionistohavefrostfootings,exteriorwalls

    constructedofCMUbackupwallsandmasonryveneerandcurtainwall.

    FirstfloorToilet

    Renovationincludesguttingtheexistingmenandwomenstoiletroomsonthefirstfloorand

    providingtwonewsingleuseraccessibletoiletrooms. Newbathroomsaretohaveceramictilefloor

    andbaseoverliquidappliedwaterproofingmembrane,fullheightceramicwalls,paintedgypsum

    ceiling,andtoiletaccessories.

    FirstfloorCorridor

    Providenew

    2x2

    ACT

    ceiling

    and

    gypsum

    board

    soffits,

    new

    lighting,

    painted

    gypsum

    board

    walls

    andceramictilefloorsandbase. Providenewrearloadinghorizontalmailboxeswithintegral

    directory,3x4x15anodizedaluminumfinish. Provide1boxforeachresidentroom,and1out

    goingmailbox. Eachboxistohaveremovablecorecylinderstobekeyedtomatchresidentroom

    doors.

    FirstfloorStudyatLink

    ExistingstudyroomatthenorthsideofthelinktoEastSnarrhasanexistingmetalgrillethat

    separatestheroomfromthelink.Removethegrilleandadd44highpaintedsteelrailingwith

    verticalpickets. Providenewcarpetandcarpetbase.

    First

    Floor

    Lounge

    Therenovationofthefirstfloorloungewillincludeallnewfinishes,includingcarpetandbase,new

    ACTtileandgypsumboardsoffitsandlightingandpaintedwalls.Providenewpairofsolidcorewood

    doorsinHMframeonholdopenswithsideliteswithfrostedglazing.

    Kitchen

    Therenovationincludesguttingtheexistingkitchenandinstallingnewkitchenwith16ofwoodbase

    anduppercabinets,solidsurfacecountertopsandEnergyStarAppliancesincludingfullsizebottom

    mountfreezer/refrigerator,sink,microwave,rangeandfullyventedhood.Wallstobepainted

    gypsumboard.Ceilingtobe2x2ACT. ProvideVCTfloorwith4vinylbase.

    StaffApartment

    Theexisting

    staff

    apartment

    will

    be

    demolished

    and

    reconfigured

    for

    the

    new

    two

    bedroom

    apartment.Thenewapartmentwillhaveafullkitchenwithwoodbasecabinetsandsolidsurface

    countertopsandenergystarappliances.Theunitwillhavetwofullbathrooms onewithafulltuband

    thesecondwitha3642shower. Thefinisheswillbecarpetwithwoodbaseinthelivingroom,

    dining,hallwayandbedrooms.Bathroomswillhaveceramictilefloorandbasewithwaterproofing

    belowandpaintedwalls. Kitchenwillhavesheetvinylandwoodbase.Theapartmentwillalsohavea

    residentialstylelaundryroom.

    67

  • 7/30/2019 MSUM part 2

    9/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3B:WestSnarrProjectDescription Architecture

    PredesignReport Page3of5

    CorridorImprovements

    Therenovationtothecorridorsonallfloorswillinclude: theadditionofanACTceilingsystem(to

    concealmechanical,electricalandtechnology)andnewlighting,paint,newcarpetandcarpetbase.

    Paintallhollowmetaldoorframesandprovidenewdoorhardwareatalldoors. Allwooddoorstobe

    refinished. Providesemirecessedfireextinguisherslocatedsoallfloorareasarewithin75travel

    distanceofanextinguisher.Removeandreplaceallexistingcabinets(allfloors.) Providealternateto

    keepexistingcarpetonupperfloors.

    StudentRooms

    Therenovationtothestudentroomswillinclude: paintingallwallsandceilings,removingexisting

    carpetandinstallingnewcarpetand4vinylbase.Removeexistingwoodlightvalence. Provide

    robeshooksinroom(2)perbed. Removeexistingwardrobesanddeskunits.

    StudentRoomsAlternate#1: Existingwardrobes,deskunitsandexistingcarpettoremain.

    Refinishexistingwardrobesanddeskunits.

    Bathrooms

    Therenovations

    to

    the

    restrooms

    will

    include:

    demolishing

    all

    existing

    fixtures,

    toilet

    partitions,

    finishes,andinteriorwalls(glazedtile).Providenewplumbing,electrical,mechanicalandfixtures,

    countertops,toiletandshowerplasticpartitionsinaconfigurationsimilartotheexisting.Newwalls

    willhavefullheightceramictile. Lavatoriesaretobesolidsurfacecountertopwithintegralbowls

    withoverflowdrainswithfullmetalframedmirrorabove. Existingtileflooringandshowerbasesare

    tobedemolished.Newceramictileflooringandmoldedstoneonepieceshowerreceptorsaretobe

    installedoverliquidappliedwaterproofingmembrane. Showerwallsaretobesolidsurfacepanels

    withasealantjointatthecornersandperimeter.Provideallnewtoiletaccessoriesincludingtoilet

    paperholders,soapdispensersandshowercurtainrods.Provide(1)robehookateachtoiletstalland

    (2)ateachshowerstall. Enlargedooropeningtobathroomsandprovidenewhollowmetaldoor

    frameand36x80solidcoreflushratedwooddoor.Provide(1)accessibletoiletstallandshower

    stall

    per

    floor.

    FloorLounges

    Therenovationtotheloungeareasonallfloorswillinclude: newcarpetand4vinylbase,

    installationofanewACTceilingsystemandnewlighting. ProvidenewHMdoorframewithsolid

    corewooddoorandsidelitewithfrostedglazing. Providenewkitchenwith12ofstainedwoodbase

    anduppercabinets,solidsurfacecountertopsandEnergyStarAppliancesincludingfullsizebottom

    mountfreezer/refrigerator,sink,microwave,rangeandfullyventedhood.

    Laundry/Custodial/StorageonStudentFloors

    TherenovationtotheLaundry/Custodial/Storageareasonallfloorswillinclude: NewVCTflooring

    andbase,paintatwallsandceiling,andnewlighting.AtLaundryonly,providenew2x2ACTceiling.

    Stairwells

    Therenovationtothestairwellswillinclude: paintingallwallsandmetalatstairs,andinstallingnew

    floortile,basetreads,andnewlighting. Demolishexistingguardrailandhandrailandprovidenew

    paintedsteelguardrailsandhandrailstomeetcode. Handrailsshallbealuminumtubingwithfittings

    andterminations. (Confirm2hourfireratingatstairwalls.)

    68

  • 7/30/2019 MSUM part 2

    10/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3B:WestSnarrProjectDescription Architecture

    PredesignReport Page4of5

    ShaftWalls

    Provide(2)newtwohourratedshaftswithinsulatedsteelstudandgypsumboardconstructionper

    floorfornewmechanicalmakeupair.

    Elevators

    Providesmokesealatexistingelevators.Elevatorwallsareconstructedwith8CMU.(verify2hour

    rating.)

    Painting

    Paintingisasindicatedabove.Ceilingsshallbepaintedwithtwocoatsofeggshelllatex.

    Wallpaintshallbetwocoatsofsemiglosspaint. Painthollowmetaldoorsandframes,handrails,

    guardrails,mechanicalequipment,etc.

    InteriorWalls

    Interiorwallsaretypicallypaintedconcretemasonryunits. Paintallnewandexistingwalls.

    Newtypicalnonratedwallsaretobeconstructedwith35/8inchsteelstudsat16incheso.c.and

    onelayer

    5/8

    inch

    (paperless

    moisture

    resistant)

    gypsum

    board

    on

    each

    side.

    Bedroom

    &

    bathroom

    wallsshallinclude31/2inchfiberglassbattinsulation. Demisingwallsatapartmentaretohavetwo

    layersgypsumboardeachsideandfullinsulationfor55 59STC. Corridorwallstohave50 54STC.

    InteriorDoorsandFrames

    Existingdoorsandframesthataretoremainaretoberefinished.

    Newdoors,includingcommonareadoors,shallbeflush,13/4inchthick,solidcore,5ply,

    prefinishedstainedandvarnishedmapledoors,30x68typical.

    Heavydutyweldedhollowmetalframes,painted,foralldoors.

    InteriorDoorHardware

    Provide

    new

    door

    hardware

    at

    all

    doors.

    Locksets

    shall

    be

    ANSI

    Grade

    1

    mortise

    locksets

    with

    lever

    handlesand6pincylindersmatchingcampusstandardsandexistingkeysystem,US26Dfinish.

    ClosersshallbeLCN4010/4110seriesorequivalent.

    Finishes

    Verifyifanypaintisleadbasedpaintwithhazardousmaterialsreports.

    AllnewfinishesaretobeLowEmittingMaterials

    Substructure

    ExistingConditions:Existingfootingsarecastinplacereinforcedconcrete.Foundationwallsare

    concretemasonryunits. Noknownsettlementissuesatthetimeofthispredesign.

    Proposed:Nomodificationstoexistingfootingsarerequired.

    Superstructure

    ExistingConditions: Existingstructureconsistsofsteelcolumnsencasedinconcreteand8

    reinforcedconcreteslabs. Existingcolumnshavesteelgrillageonallfloors.Thesecondfloor

    structurecantilevers4overfirstfloorbetweenmasonrywingwallsonallfoursides. Thereisa

    continuousreinforcedconcretebeamateachexteriorwallthatservesatthelintelforthewindow

    openings.

    69

  • 7/30/2019 MSUM part 2

    11/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3B:WestSnarrProjectDescription Architecture

    PredesignReport Page5of5

    Thefloortofloorheightsareasfollows:

    BasementMechanicalRoom: 68 Firstfloor: 118: SecondFloor: 94 ThirdFloor: 94Fourth

    Floor:

    9

    4

    Proposed: Norevisionsareproposedtoexistingstructureexceptasrequiredformechanical

    revisions.

    Exteriorwallconstruction

    ExistingConditions:Existingexteriorwallsareconcretemasonryunitconstructionwithbrickexterior

    and1cavityinsulation.Thecavityistypicallygroutedfull. Interiorfaceofexteriorwallsispainted.

    Proposed: Nonewexteriorwallsareproposedwiththepredesign.

    Existingroofconstruction

    ExistingConditions: Existingroofconstructionis8reinforcedconcretewith1rigidinsulationand

    builtup

    roofing.

    No

    evidence

    or

    reports

    of

    roof

    failures

    at

    the

    time

    of

    this

    report.

    Proposed:Nonewroofisproposedexceptasrequiredformodificationstomechanicalsystems.

    RoofAlternate#1: Providealternatefornewpenthousestohousemechanicalheatrecovery

    units.

    ExteriorWindows

    ExistingConditions: Exteriorwindowsareoriginal.Windowsaretypically50wideand40high.

    Thefirstfloorwindowstypicallyhavea26hightransomwindow. Firstfloorentranceshavea

    porcelainpanelbelowthewindow.Windowtransomheadsatthefirstflooraretypically955/8

    AFF.Window

    heads

    on

    second,

    third

    and

    fourth

    floor

    are

    typically

    at

    6

    8

    AFF.

    Proposed:Recaulkexterioratwindows.Replaceweatherstripping/sweepsatallwindows.

    WindowsAlternate#1: ReplaceallwindowswithMnSCUapprovedwindows.

    ExteriorDoors

    ExistingConditions: Exteriordoorsarealuminumstorefronttypewithinsulatedvisionglassin

    curtainwallframesandareinpoorcondition.

    Proposed:Allexteriordoorsandframesshallberemovedandreplacedwithaluminumstorefront

    typewithinsulatingvisionglassandequippedforkeyedaccessentryonlybyresidents&staff.

    RoofingMSUMFRRMreportsindicatethatroofisdueforreplacementin2027. Nonewroofisproposed

    exceptasrequiredformodificationstomechanicalsystems. Patchabandonedopeningsandinstall

    newopeningsasrequiredformechanical/electricalrevisions. Lightningprotectionisnotincludedin

    scope.

    70

  • 7/30/2019 MSUM part 2

    12/57

    !""#$%#$

    &'(

    $))

    *$ +,-./0-#.# 1/-

    23$4 /-05 /1-6,05

    !7"#$$#

    $(!"#$(

    "")#)

    "'(!%#$#"86$"#$"#$)

    &'(9"$)#7$"$"$6$$6

    6#"$""""6$#"

    6::6;:6$':

  • 7/30/2019 MSUM part 2

    13/57

    1

    ! 6 $ " $ "7$

    ')')$'(!"$

    )""=$)3#'$4

    7$6'76):$6

    "(!"$"$7)',00-):$

    7$ $ $' 7$ 6 ' 6 ' &>?$'7$)'&

    1($$$))$$

    "))$)(

    !7$'(8"

    37)'+000-4"#=$""$'$$":

    "(!"$$$'6$6'

    $$6&>?&>1(

    !#)$""

    $ $'( "6 ') "#)#(

    !

    8'#"$#)(

    9

    #$#'))()

    $3"$4")

    "$#$(!'')6")6

    $)(*')"#)$

    "(8"#)6"$(8

    )')$#$"

    )$#$(!$)#

    #$(!#$)$#)):"'"

    $)"')(":)

    ')$"')))(!

    ###$(

    )#'')(!$

    #)#)":($

    7)$#")'

    $#=$(

    )")#

    $#("#$$)$"

    ")($#)

    )))(

    72

  • 7/30/2019 MSUM part 2

    14/57

    $)')""

    "')($)"$#%00

    #'6"'/0@(A(

    !$(!')#

    #$$(!)')))(9"$'3##4"$

    )"):$')3##4(

    "

    !#$$':(

    !#$"#$':9-834=$)$#

    B.-(C$:6$"#$

    $$#$(-)#)(&7

    "#"("#=$#$

    0#)(!#

    "")9-8,(8"#$,0

    #

    !)))"(

    !)$(!#$$)

    $#''"')(8"'""1'

    ))$#:(

    8"=$)"#$A$8$)')(8)

    ";$#))(8""

    ()73)46$)#

    '(

    $

    8"DE"#'"$'

    ')(-%"#$'$

    ')"$$$)(@))

    ,'#$"$$)F$)$)"#=$"

    (

    '"97(

    )"97

    )97

    73

  • 7/30/2019 MSUM part 2

    15/57

    ,

    %&'&(!)*&'#

    ! " " # $%# $

    &'( $))

    *$ +,-./0-#.# 1/-

    23$4 /-05 /1-6,05

    !7"#$$#

    $(!"#$(

    "")#)"

    '(!%#$#"(8

    6$"#$"#$)&'(9"$)#7$"$"$6$$6

    6#"$""""6$#"

    6::6;:6$':?$'7$)

    '&>1"'7)'000-(

    !

    !#$$'

    74

  • 7/30/2019 MSUM part 2

    16/57

    ')"

    ))(

    !#$""$#

    $)$)%(&)1"'(!')#'"(!6)6

    )( * #)" ') $) )#))

    $#'')'(

    )')$$#($)"

    $)'%')=$);$#(

    "

    !#$$':(

    !#$"#$':9-834=$)$#

    B.-(C$:6$"#$

    $$#$(-)#)(&7"#"("#=$#$

    0#)(!#

    "")9-8,(8"#$,0

    #

    8#$"$))(

    $))6$)

    ')($))

    ":(

    $ 8"DE"#'"$'

    ')(-%"#$'$

    ')"$$$)(@))

    ,'#$"$$)F$)$)"#=$"

    (

    '"97(

    )"97

    )7End of Report

    J:\2010\201001400\DOCS\MSUM West Snarr and Dahl Halls Preliminary Mech Narrative draft.docx

    75

  • 7/30/2019 MSUM part 2

    17/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical

    PredesignReport Page1of11

    Section3D:

    DahlHallandWestSnarrHallProjectDescription Electrical

    ElectricalScope DahlHall

    POWERDISTRIBUTION

    ElectricalService

    Electricpowerisderivedfroma300kvapadmountedtransformerlocatedattheNWsideofthe

    building,viaanexistingundergroundfeederof1200amps.

    ThemainswitchboardisGeneralElectric1200amps,120/208volts,3phasewithfullneutral,extern

    TVSS,1200ampmainfusibleswitchandfuseddistributionswitcheswithfaultcurrentlimitingfuses,

    containedwithinmultiplesectionswithlimitedexpandability. Theswitchboardisabout15yearsold

    andingoodcondition.

    Groundingelectrodeconductorisconnectedtobuildingwaterservice.

    ElectronicdigitalmeteringsimilartoSiemensmodel9330willbeprovidedintheswitchboardfor

    connectiontocampusHoneywellBuildingEnergyManagerEMSsystemtoreplacetheexistingEmon

    Dmontypemetering.

    NormalPowerDistribution

    Powerdistributionsystemconsistsofcopperfeedersfromthemainswitchboardserving120/208vo

    1phase,3wire,circuitbreakertypepanelboardscontainingcopperbus. Theexisting100amp30

    circuit,1phase

    panelboards

    are

    grouped

    in

    three

    vertical

    locations,

    north

    central

    south,

    with

    each

    verticalgroupingofpanelboardsconnectedinafeedthruconfiguration.Theexistingpanelboardsar

    filledandhavenosparecapacitynorspace.Theexisting600amp,singlephase,fusibledistribution

    panelboard adjacenttothemainswitchboardwillbereplacedwithalargerthreephasepanelto

    house200amperecircuitbreakerstoservenewthreephasepanelboardsonthevariousfloors.

    Existingpanelboardswillbereplacedwithamodern42circuit,200amp120/208volt,3phase,4wir

    fullyrated,copperbussing,maincircuitbreakertypepanelboardscontaining25%sparespacesfor

    futuregrowth,locatedineachfloorelectricalroomtoserve120/208voltresidenceroomsand

    corridorcircuits. New200ampfeederswillbeprovidedfromthenewpowerdistributionpanelboar

    A100amp,120/208volt,3phase,4wireelectronicgradepanelboardwithcopperbus,oversized

    neutralbusandintegralTVSS(transientvoltagesurgesuppression),fullyrated,maincircuitbreaker

    type,willbeprovidedtoservethecomputerlabandsimilarhightechA/VandTVequipmentinthe

    mainfloorcommonareaandofficeareas.Isolatedgroundtypereceptacleswillbeprovidedtoserve

    equipmentfedfromthispanelboard.

    76

  • 7/30/2019 MSUM part 2

    18/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical

    PredesignReport Page2of11

    PowertoexistingHVACequipmentandelevatorwillbedistributedviaexistingcopperfeedersfrom

    themainswitchboardtotherespectiveequipment. Powertonewairhandlingequipmentwillbe

    distributedvianew208volt,3phase,3wirecopperfeeders fromthemainswitchboardfused

    distributionsection.

    Powerto

    new

    kitchenette

    in

    lounge

    Room

    110

    and

    to

    additional

    laundry

    washers

    &

    dryers

    will

    be

    derivedfromanew100Amp,208/120volt,3phase,4wire panelboardlocatedinthemain

    mechanical/electricalroom.

    Powerdistributionequipmentwillbefieldmarkedwithalabelcontainingtheavailableincident

    energyorrequiredlevelofPersonalProtectiveEquipmentforpotentialarcflashhazardsperNFPA

    70E.

    BranchCircuitry

    Newbranchcircuitswillbecopperconductors,withseparateneutralperphase,installedinEMT.

    Singlebedroomswillcontainonebranchcircuitperroom,withseparateneutralperphase. Doublebedroomswillcontaintwobranchcircuitsperroom,eachwithseparateneutralperphase. Branch

    circuitswillbecopperconductorsinstalledinEMTuptotheroomandthenextendedinsurface

    Wiremoldracewaywithintheresidencerooms. Allexistingbranchcircuitconductorsanddeviceswi

    bedisconnectedandremovedfromtheresidenceroomsandreplacedwithnew.

    Allbranchcircuitswillcontainaseparatecopper,insulatedgreengroundingconductor. Thesteel

    racewaywillnotbeusedastheonlygroundconductorforequipmentgroundingpurposes.

    Duplexreceptacleswillbespecificationgrade,20ampererated,andGFIratedwherelocatednextto

    sinks,wet

    areas,

    and

    exterior

    areas.

    Receptacles

    serving

    dedicated

    computer

    outlets

    will

    be

    isolated

    groundtypewithorangeface

    Alllightswitchesandduplexreceptacleswillbeprovidedwithnylonplatestoreducebreakage.

    LIGHTING

    ExteriorLighting

    Exteriorbuildingmountedareafloodlightingforperimetersecurityconsistsofroofmounted250

    wattHPSfloodlights and150wattHPSwallmountedlightsatvestibules101,102,103and104, all

    controlledbyphotocell.Thesefixtureswillnotbereplacedatthistime. Thenorthandsouthbuilding

    entriescontain500wattquartzfloodlightswhichwillbereplacedwithmodern,lowglare150wallH

    floodlightfixtures,controlledbyphotocell.

    AnyaddedexteriorwalkwaylightingwillbeacornshapedluminariessimilartoSternbergA850with

    internalindirectreflectortomatchcampusstandard,175wattMetalHalidelamps,mountedon14

    footpolestomatchcampusstandard. Lightswillbecontrolledbyphotocellandcontactor. Nonew

    lightsareanticipatedatthistime.

    77

  • 7/30/2019 MSUM part 2

    19/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical

    PredesignReport Page3of11

    InteriorLighting

    Commonareaswithlayinceilingswillbefluorescent1x4layinT5lampsandelectronicballasts,wit

    indirectinternalreflector,controlledbylocalswitchesincombinationwithoccupancysensors,and

    daylighgtingcontrolwhereapplicable,for30footcandlestomeettheStateofMinnesotaB3

    requirements.

    Corridorlightingconsistsoffourfootlong,singleT8lampsurfacemounteddownlightinstalledin

    1998. Thesefixtureswillallbereplacedwithamodern2lamp T5fluorescentdirectindirecttype

    fixtureprovidingbetterlightdistributionthroughoutthecorridorsfor30footcandlestomeetthe

    StateofMinnesotaB3requirements.

    Lightinginresidenceroomswillbetotallyreplacedwitha2x4surfaceceilingmounted2lamp,T5

    fluorescentfixturewithdurableDRroughdutyacrylicbasketcontrolledbylocalroomswitch.

    Portablefluorescenttasklightswillbeprovidedatstudydesklocationswithcordandplugfor

    connectiontoroomduplexreceptacle.

    Lightinginoffices,meetingroomsandspaceswithcomputerswillbefluorescent2x4layin orsurfac

    mountedT5lampsandelectronicballasts,withindirectinternalreflectorwithlouveredbottom

    basketforglarecontrolonVDTs,controlledbylocalswitchincombinationwithoccupancysensors,

    for50footcandlestomeettheStateofMinnesotaB3requirements.

    Existinglightinginthebasementstorageareaconsistsoffourfootfluorescentsurfacemountedwra

    aroundacryliclensfixturesandwillnotbereplacedatthistime.

    Existinglightinginstorageandutilityspaceswillbereplacedwithnewsurfaceorsuspended4foot

    industrialfluorescentstripswithT5lamps,electronicballastsandmetalwireguards,controlledby

    occupancysensors,for20footcandlestomeettheStateofMinnesotaB3requirements.

    Existinglightinginconferenceroomswillbereplacedwithnewfluorescent1X4pendantmounted,

    direct/indirectwithcenterbasket. Thefluorescentlightfixtureswillbeprovidedwith1%electronic

    dimmingballasts. Amanualdimmingsystemwillbeprovidedforalllightingwithinconferenceroom

    forA/Vpresentations.

    Existinglightinginloungeswillbereplacedwithmodernfluorescent1x4layin,recessedround

    compactfluorescent orsurfacemountedlinearfluorescentfixtureswithacryliclensesandelectroni

    ballasts,controlledbyoccupancysensorsandbuildinglightingcontrolpanel,for30footcandlesto

    meettheStateofMinnesotaB3requirements.

    Existingstairway

    lighting

    will

    be

    replaced

    with

    wall

    mounted

    up/down

    fluorescent

    rough

    duty

    type

    withDRacryliclensmountedforeaseofaccessformaintenance,controlledbybuildinglighting

    controlpaneltomeettheStateofMinnesotaB3requirements.

    Dualtechnologyoccupancysensorcontrolswillbeutilizedinstorageroomsandsimilarnon

    circulationspacestomeettheStateofMinnesotaB3requirements.

    78

  • 7/30/2019 MSUM part 2

    20/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical

    PredesignReport Page4of11

    Mechanicalandelectricalroomslightingwillbecontrolledbylocalswitchonlyforsafetypurposes,n

    occupancysensorcontrol.

    ExistingemergencyexitlightingisprovidedviamodernLEDexitlightscontainingbatterybackup,and

    willnotbereplacedatthistime,exceptforafewolderfluorescentexitlightfixturesscatteredaroun

    thebuilding.

    Existingemergencyegresslightingisprovidedbyduallowvoltagelampedunitlightingequipment

    locatedthroughouttheegresspathway,andwillnotbereplacedatthistime.

    LightningProtectionSystem

    Alightningprotectionsystemdoesnotexistandwillnotbeprovided.Avariancerequestmustbe

    submittedtoMNSCU.

    MiscellaneousSystems

    Twospare2inchconduitswillbeprovidedfromthemainmechanicalroominthebasementtothe

    penthouseforfutureequipmentneeds.

    Twospare1inchconduitswillbeprovidedbetweenallmechanicalroomsinadaisychain

    configurationwithjunctionboxesonallfloorsnotcontainingamechanicalroom.

    Aduplex120voltreceptaclewillbeprovidedwithin8feetofeveryEMSfieldpanel.

    COMMUNICATIONS

    Voiceand

    Data

    Thebuildingcontainsaverylimitedstructuredcablesystem(backbone)withhubatthefrontentrydeskand

    limitedwiredoutletsinthecomputerlab. Allresidenceroomsareservedbywirelessnetworkserviceonly.

    Noadditionalhardwiredvoiceordataoutletsarerequiredatthistime.CampusisconsideringaddingDSLas

    separateproject.

    EntertainmentCATV

    AseparateentertainmentCATVcoaxcabledistributionsystemexiststhroughoutthebuilding servin

    allresidenceroomsatthistime,providedbyCableOne,alocalcabletelevisionvendorat1024Page

    Drive,

    Fargo,

    ND.

    No

    changes

    are

    anticipated

    at

    this

    time.

    Further

    discussion

    with

    the

    Campus

    A/V

    Departmentwillberequiredtodeterminefuturecableservicearrangementsandcableownership

    issues. ThecablesystemispresentlymaintainedbyCableOne.

    79

  • 7/30/2019 MSUM part 2

    21/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical

    PredesignReport Page5of11

    ELECTRONICSAFETYANDSECURITY

    FireAlarm

    TheexistingSimplex4002nonaddressablefirealarmpanelwillbereplacedwithanewmultiplexed,

    microprocessorbased,networkedfirealarmsysteminthebuilding. Interconnectionofsprinklerflow

    and

    control

    valves

    will

    be

    provided

    for

    on

    campus

    central

    station

    annunciation.

    Main

    fire

    alarm

    controlpanelwillbelocatedinthemainelectricalroom. HoneywellXLS1000FireAlarmwithnetwo

    cardforoperatingonamultipriority,peertopeertokenringnetworkisthepreferredsupplierof

    equipmentforcompatibilitywithothercampusequipment.

    Aremotefirealarmannunciatorpanelwillbelocatedinthemainentrywherereadilyaccessibleto

    localFireDepartmentpersonnel.

    Alarmandtroubleindicationwillbetransmittedviaseparatefiberopticcabletothedatacenterinth

    LivingstonLordLibraryforinterconnectiontothecampusSecurityDispatchformonitoringpurposes

    Nonsecuritycorridordoorswillbefittedwithmagneticdoorholdersconnectedtofirealarmsystem

    tocloseuponalarm.Manycorridordoorscontainmagneticholdopensatthistimeandwillbe

    connectedtothenewfirealarmsystem.

    Existingductsmokedetectorswillbereplacedwithanalogaddressableductsmokedetectorsprovid

    forallAHUsandfire/smokedamperoperations.

    Existingareatypesmokedetectorswillbereplacedwithanalogaddressablephotoelectricsmoke

    detectorswithlocalalarminresidencerooms,andinelevatorlobbiesforsignalingtheelevatorand

    forfirealarm.

    Existingvisualandauralsignalalarmindicatingapplianceswillbereplacedwithnewappliances

    throughoutthebuilding. Combinationvisualandauralsignalalarmindictingapplianceswillbe

    providedineachhandicappedresidenceroom. Auralonlysignalalarmindicatingapplianceswillbe

    providedinallothernonhandicappedresidencerooms.

    Voiceannunciationcapabilitieswillbereviewedwiththecampussecurityforpotentialpublic

    announcementpurposes,suchasweatherdanger,terroristthreats,orothernecessaryemergency

    messages. CampushasanexistingE2CampusserviceconsistingofText/Voice/Emailbasedsystemfo

    massnotification. CoordinationwiththeDirectorofCampusSecuritywillbenecessaryforfurther

    requirements.

    Allwiringwillbeinstalledinconduit. Newconduitwillberedincolor.

    80

  • 7/30/2019 MSUM part 2

    22/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical

    PredesignReport Page6of11

    DoorSecuritySystem

    Conduitandbackboxesonlywillbeprovidedbythecontractoratentriesandexitsforfuture

    installationofcampusstandardsecuritydoorhardwareformonitoringandcontrolofselectdoors,

    whichisHoneywell accesssystems. Intercomstationsatmainentrieswillbeprovidedbythe

    contractorwithproductsimilartoVikingElectronicstomatchcampusstandard.Coordinationwithth

    Directorof

    Campus

    Security

    will

    be

    necessary

    for

    further

    requirements.

    Allwiringforintercomstationsandcardreaderswillbeinstalledinconduit.Cardreadersand

    intercomstationswillbeprovidedinthefuturebytheUniversity.

    VideoSurveillanceCamerasystem

    ThecontractorwillprovideconduitandbackboxesonlyforfutureinstallationofCCTVvideocameras

    inselectpublicspacesandentriestothebuildingforsecuritysurveillancepurposes. Conduitwill

    terminateinthemainmechanical/electricalroomforfutureinstallationofcable.Thesefuturevideo

    cameraswillberemotemonitoredandrecordedatcentralsecurityoncampusviaanIPbased

    HoneywellDigital

    Video

    Manager

    Version

    300.1.7283.

    Coordination

    with

    the

    Director

    of

    Campus

    Securitywillbenecessaryforfurtherrequirements.

    Allwiringinthefuturewillbeinstalledinconduit. CCTVcameraswillbeprovidedinthefuturebyth

    University.

    EndofReportforDahlHall

    ElectricalScopeforWestSnarrHall

    POWERDISTRIBUTION

    ElectricalService

    Electricpowerisderivedfroma500kvapadmountedtransformerservingthisbuildingwith600am

    of120/208volts,3phasepowerviaanundergroundfeedertothetunnelandthenroutedtoa600

    amp,3poledisconnectswitchlocatedinthetunnelaccess. Thisserviceisundersizedforthefuture

    remodelingandwillbeupgradedto1200Amps.ThesamepadmountedtransformeralsoservesEas

    SnarrHall.

    Anew1200ampmainswitchboardwillbeprovidedat120/208volts,3phase 4wirewithfullneutra

    copperbussing, externalTVSS,1200ampmaincircuitbreakerandfuseddistributionswitcheswith

    faultcurrent

    limiting

    fuses,

    contained

    within

    multiple

    sections

    for

    expandability.

    The

    existing

    TVSS

    unitwillberelocatedandreconnectedtothenewmainswitchboard. Entireassemblywillbesizedfo

    50%futuregrowth.

    Groundingelectrodeconductorwillbeconnectedtobuildingwaterservice,structuralsteeland

    auxiliarygroundrodsasnecessary.

    81

  • 7/30/2019 MSUM part 2

    23/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical

    PredesignReport Page7of11

    ElectronicdigitalmeteringsimilartoSiemensmodel9330willbeprovidedintheswitchboardfor

    connectiontocampusHoneywellBuildingEnergyManagerEMSsystem.

    Anew1200ampundergroundserviceentrancefeederinracewaywillbeprovidedfromthenew

    switchboardbacktotheservicepadmountedtransformer.

    NormalPowerDistribution

    Powerdistributionsystemwillconsistofcopperfeedersfromanewmainswitchboardserving

    120/208volt,3phase,4wire,fullyratedcircuitbreakertypepanelboardscontaining25%spare

    spaces. Thepanelboardswillbelocatedoneachbuildingleveltoservelighting,smallmotorandplu

    powerloads.

    Existing225amp,120/208volt,3phasecircuitbreakerpanelboardsarefilledwithcircuits,areserve

    by100ampratedfeeders, anddonotcontainsufficientcapacitynorsparebreakerstoservethe

    remodelingprojectwithinthisbuilding. Eachexistingpanelboardwillbereplacedwithamodern42

    circuit,200

    amp

    120/208

    volt,

    3phase,

    4wire,

    fully

    rated,

    copper

    bussing,

    main

    circuit

    breaker

    type

    panelboard locatedineachfloorlaundryroomtoserve120/208voltroomandcorridorcircuits. Ne

    200ampfeederswillbeprovidedfromtheswitchboardfuseddistributionsection.

    Electronicgradepanelboardswithcopperbus,oversizedneutralbusandintegralTVSS(transient

    voltagesurgesuppression),fullyrated,maincircuitbreakertype,willbeprovidedtoservecomputer

    andsimilarhightechA/VandTVequipmentinthemainfloorcommonareaandofficeareas.Isolate

    groundtypereceptacleswillbeprovidedtoserveequipmentfedfromthispanelboard.

    PowertoHVACequipmentandelevatorswillbedistributedvianewcopperfeedersfromthemain

    switchboardfuseddistributionsectiontotherespectivemotorizedequipment.

    Powertothenewaircooledcondenserunitservingthefirstfloorwillbedistributedviacopperfeede

    fromthemainswitchboardfuseddistributionsection.

    120voltoutletboxeswillbelocatedthroughoutthecorridorceilingplenumareaforfuture

    amplifier/repeatersforwirelessdatadistributiontoportablelaptopcomputers.

    Powerdistributionequipmentwillbefieldmarkedwithalabelcontainingtheavailableincident

    energyorrequiredlevelofPersonalProtectiveEquipmentforpotentialarcflashhazardsperNFPA

    70E.

    BranchCircuitry

    Newbranchcircuitswillbecopperconductors,withseparateneutralperphase,installedinEMT.

    Lightingandreceptacleswillbeonseparatebranchcircuits,exceptinresidenceroomscontainingon

    onebranchcircuit.

    82

  • 7/30/2019 MSUM part 2

    24/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical

    PredesignReport Page8of11

    Singlebedroomswillcontainonebranchcircuitperroom,withseparateneutralperphase. Double

    bedroomswillcontaintwobranchcircuitsperroom,eachwithseparateneutralperphase. Branch

    circuitswillbecopperconductorsinstalledinEMTformaximumflexibilityandchangesinthefuture.

    Allbranchcircuitswillcontainaseparatecopper,insulatedgreengroundingconductor. Thesteel

    racewaywill

    not

    be

    used

    as

    the

    only

    ground

    conductor

    for

    equipment

    grounding

    purposes.

    Duplexreceptacleswillbespecificationgrade,20ampererated,andGFIratedwherelocatednextto

    sinks,wetareas,andexteriorareas. Receptaclesservingdedicatedcomputeroutletswillbeisolated

    groundtypewithorangeface

    Alllightswitchesandduplexreceptacleswillbeprovidedwithnylonplatestoreducebreakage.

    LIGHTING

    ExteriorLighting

    ExteriorbuildingmountedareafloodlightingconsistsofwallmountedHighPressureSodiumtype

    fixtureswithinternalglarecontrol,allcontrolledbyphotocell,andwillremainunchangedatthistim

    ThenorthexteriorentrylightingconsistsofrecessedHPSdownlightswithglasslenscontrolledby

    photocell,andwillremainunchangedatthistime.

    AnynewexteriorwalkwaylightingwillbeacornshapedluminariessimilartoSternbergA850with

    internalindirectreflectortomatchcampusstandard,175wattMetalHalidelamps,mountedon14

    footpolestomatchcampusstandard. Lightswillbecontrolledbyphotocellandcontactor.

    InteriorLighting

    Lightingincommonloungeareasonfloors2,3,and4willbereplacedwithsurfacemounted1x4

    fluorescentlampsandelectronicballasts,withindirectinternalreflector,controlledbylocalswitches

    incombinationwithoccupancysensorsanddaylightingcontrolwhereappropriate,for30footcandle

    tomeettheStateofMinnesotaB3requirements.

    Corridorlightingconsistsoffourfootlong,twolamp,T8surfacemountedwraparound,electronic

    ballastedfluorescentfixturesinstalledin2003. Thesefixtureswillnotbereplacedatthistime.First

    floorcorridordoesnotcontainanymanualswitchingandwillrequireadditionofautomaticcontrol

    suchasoccupancysensororlightingcontrolpanel.

    Lightinginresidenceroomswillbetotallyreplacedwitha2x4surfaceceilingmounted2lamp,T5

    fluorescentfixturewithdurableDRroughdutyacrylicbasketcontrolledbylocalroomswitch.

    Portablefluorescenttasklightswillbeprovidedatstudydesklocationswithcordandplugfor

    connectiontoroomduplexreceptacle.

    Lightinginoffices,smallmeetingroomsandsimilarspaceswithcomputerswillbefluorescent2x4lay

    in orsurfacemountedT5lampsandelectronicballasts,withindirectinternalreflectorwithlouvere

    83

  • 7/30/2019 MSUM part 2

    25/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical

    PredesignReport Page9of11

    bottom basketforglarecontrolonVDTs,controlledbylocalswitchincombinationwithoccupancy

    sensors,for50footcandlestomeettheStateofMinnesotaB3requirements.

    Existinglightinginstorageandutilityspaceswillbereplacedwithnewsurfaceorsuspended4foot

    industrialfluorescentstripswithT5lamps,electronicballastsandmetalwireguards,controlledby

    occupancysensors,

    for

    20

    foot

    candles

    to

    meet

    the

    State

    of

    Minnesota

    B3

    requirements.

    Existinglightinginconferenceandlargermeetingroomswillbereplacedwithnewfluorescent1X4

    pendantmounted,direct/indirectwithmetalperforations. Thefluorescentlightfixtureswillbe

    providedwith1%electronicdimmingballasts. Amanualdimmingsystemwillbeprovidedforall

    lightingwithinconferenceroomsforA/Vpresentations.

    Existinglightingingangbathroomsandshowersconsistsofsurfacemountedfourfootlong,twoT8

    lamps,andwraparoundlens,andappearstobequiteadequate. Thesefixtureswillrelocatedto

    accommodatetheintendedremodeling. Asanoption,thesefixtureswillbereplacedwithnew

    shallow, surfacemounted,T5fluorescentfixtureswithelectronicballastsandDRacrylicwraparou

    lenswithwetlocationlabel.Newcontrolswillbelocaloccupancysensor.

    Existinglightinginlaundriesandkitchenswillbereplacedwithmodernfluorescent1x4layinor

    surfacemountedfixtureswithT5lamps,acryliclensesandelectronicballasts,controlledby

    occupancysensorsandbuildinglightingcontrolpanel,for30footcandlestomeettheStateof

    MinnesotaB3requirements.

    Existingstairwaylightingwillbereplacedwithwallmountedup/downfluorescentroughdutytype

    withDRacryliclensmountedforeaseofaccessformaintenance,controlledbybuildinglighting

    controlpaneltomeettheStateofMinnesotaB3requirements.

    Dualtechnologyoccupancysensorcontrolswillbeutilizedinstorageroomsandsimilarnon

    circulationspaces

    to

    meet

    the

    State

    of

    Minnesota

    B3

    requirements.

    Mechanicalandelectricalroomslightingwillbecontrolledbylocalswitchonlyforsafetypurposes,n

    occupancysensorcontrol.

    ExistingemergencyexitlightingisprovidedviamodernLEDexitlightscontainingbatterybackup,and

    willnotbereplacedatthistime.

    Existingemergencyegresslightingisprovidedbyduallowvoltagelampedunitlightingequipment

    locatedthroughouttheegresspathway,andwillnotbereplacedatthistime.

    LightningProtection

    System

    Alightningprotectionsystemdoesnotexistandwillnotbeprovided.Avariancerequestmustbe

    submittedtoMNSCU.

    COMMUNICATIONS

    VoiceandData

    84

  • 7/30/2019 MSUM part 2

    26/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical

    PredesignReport Page10of11

    Thebuildingcontainsalimitedstructuredcablesystem(backbone)withhubatthefrontentrydesk,wired

    outletsinthestaffapartmentandnorthstudentlounge. Residenceroomsareservedbywirelessnetwork

    serviceonly. Noadditionalhardwiredvoiceordataoutletsarerequiredatthistime.Campusisconsidering

    addingDSLasaseparateproject.

    EntertainmentCATV

    AseparateentertainmentCATVcoaxcabledistributionsystemexiststhroughoutthebuilding servin

    allresidenceroomsatthistime,providedbyCableOne,alocalcabletelevisionvendorat1024Page

    Drive,Fargo,ND.Nochangesareanticipatedatthistime.FurtherdiscussionwiththeCampusA/V

    Departmentwillberequiredtodeterminefuturecableservicearrangementsandcableownership

    issues. ThecablesystemispresentlymaintainedbyCableOne.

    ELECTRONICSAFETYANDSECURITY

    FireAlarm

    The

    existing

    Simplex

    4002

    non

    addressable

    fire

    alarm

    panel

    will

    be

    replaced

    with

    a

    new

    multiplexed,microprocessorbased,networkedfirealarmsysteminthebuilding. Interconnectionofsprinklerflow

    andcontrolvalveswillbeprovidedforoncampuscentralstationannunciation.Mainfirealarm

    controlpanelwillbelocatedinthemainelectricalroom. HoneywellXLS1000FireAlarmwithnetwo

    cardforoperatingonamultipriority,peertopeertokenringnetworkisthepreferredsupplierof

    equipmentforcompatibilitywithothercampusequipment. ThispanelalsoservesEastSnarrbuildin

    andconnectionswillbemaintainedtothisbuilding.

    Aremotefirealarmannunciatorpanelwillbelocatedinthemainentrywherereadilyaccessibleto

    localFireDepartmentpersonnel.

    Alarmand

    trouble

    indication

    will

    be

    transmitted

    via

    separate

    fiberoptic

    cable

    to

    the

    data

    center

    in

    th

    LivingstonLordLibraryforinterconnectiontothecampusSecurityDispatchformonitoringpurposes

    Nonsecuritycorridordoorswillbefittedwithmagneticdoorholdersconnectedtofirealarmsystem

    tocloseuponalarm.

    Existingductsmokedetectorswillbereplacedwithanalogaddressableductsmokedetectorsprovid

    forallAHUsandfire/smokedamperoperations.

    Existingareatypesmokedetectorswillbereplacedwithanalogaddressablephotoelectricsmoke

    detectorswith

    local

    alarm

    in

    residence

    rooms,

    and

    in

    elevator

    lobbies

    for

    signaling

    the

    elevator

    and

    forfirealarm.

    Existingvisualandauralsignalalarmindicatingapplianceswillbereplacedwithnewappliances

    throughoutthebuilding. Combinationvisualandauralsignalalarmindictingapplianceswillbe

    providedineachhandicappedresidenceroom. Auralonlysignalalarmindicatingapplianceswillbe

    providedinallothernonhandicappedresidencerooms.

    85

  • 7/30/2019 MSUM part 2

    27/57

    MSUM: RenovationofDahlandWestSnarrHalls Section3D:DahlandWestSnarr Electrical

    PredesignReport Page11of11

    Voiceannunciationcapabilitieswillbereviewedwiththecampussecurityforpotentialpublic

    announcementpurposes,suchasweatherdanger,terroristthreats,orothernecessaryemergency

    messages. CampushasanexistingE2CampusserviceconsistingofText/Voice/Emailbasedsystemfo

    massnotification. CoordinationwiththeDirectorofCampusSecuritywillbenecessaryforfurther

    requirements.

    Allwiringwillbeinstalledinconduit.

    DoorSecuritySystem

    Conduitandbackboxesonlywillbeprovidedbythecontractoratentriesandexitsforfuture

    installationofcampusstandardsecuritydoorhardwareformonitoringandcontrolofselectdoors,

    whichisHoneywellaccesssystems. Intercomstationsatmainentrieswillbeprovidedbythe

    contractorwithproductsimilartoVikingElectronicstomatchcampusstandard.Coordinationwithth

    DirectorofCampusSecuritywillbenecessaryforfurtherrequirements.

    Allwiringforintercomstationsandcardreaderswillbeinstalledinconduit.Cardreadersand

    intercomstationswillbeprovidedinthefuturebytheUniversity.

    VideoSurveillanceCamerasystem

    ThecontractorwillprovideconduitandbackboxesonlyforfutureinstallationofCCTVvideocameras

    inselectpublicspacesandentriestothebuildingforsecuritysurveillancepurposes. Conduitwill

    terminateinthemainmechanical/electricalroomforfutureinstallationofcable.Thesefuturevideo

    cameraswillberemotemonitoredandrecordedatcentralsecurityoncampusviaanIPbased

    HoneywellDigitalVideoManagerVersion300.1.7283. CoordinationwiththeDirectorofCampus

    Securitywill

    be

    necessary

    for

    further

    requirements.

    AnexistingCCTVcameramonitorsthevendingareawithcableconnectionbacktoaDVRinRoom

    J101. Thissystemwillremainoperational.

    Allwiringinthefuturewillbeinstalledinconduit. CCTVcameraswillbeprovidedinthefuturebyth

    University.

    End of Report for West Snarr HallJ:\2010\201001400\DOCS\MSUM West Snarr and Dahl Halls Preliminary Elect Narrative.docx

    86

  • 7/30/2019 MSUM part 2

    28/57

    Section 3E: Dahl Hall Predesign Space ProgramApril 23, 2010, Revised June 10, 2010

    Dahl HallProgram Use/ Space Quantity Area Total Notes

    Double Rooms 152 183 27,816 Quantity Beds Total Beds

    Doubles used as Doubles 143 2 286

    Designated Doubles used as Singles 2 1 2RA Unit (Double used as Single) 6 1 6Desk Manager (Double used as Single) 1 1 1

    295Assignable Beds

    Efficiency Staff Apartment 1 475 475Area Director Apartment 1 730 730 29,021

    Residential Total

    Activity/Lounge 6 384 2,304(2 per floor)

    Bathroom 6 556 3,336(2 per floor)

    Laundry 6 230 1,380(2 per floor)

    Study Room 2 178 356(1 per floor, floors 2-3)

    7,376

    Student Amenity Total

    Public Restroom 1 80 80

    Main Lobby 1 650 650Lounge 1 2,000 2,000Kitchen 1 250 250Vending 1 80 80Computer Lab 1 90 90

    3,150First Floor Common Total

    AdministrationReception / Work Room 1 300 300

    RD Director Office 1 178 178

    Hall Council Office 1 90 90

    3,718Admin Total

    Trash/ Recycling 3 68 204(1 per floor, floors 1-3)

    Custodial 3 136 408(1 per floor, floors 1-3)

    Custodial Closets 6 25 150

    (2 per floor, floors 1-3)

    762Trash/Cust Total

    Existing Basement Space Program is not included/ Basement is not a part of the renovation

    Electrical Closets 3 24 72

    Mechanical Penthouse 3 824 2,4722,544

    Mech/ Elec Total

    Total 43,421 Total Building Program Space

    1.25 Net to Gross Factor (circulation, exterior walls, etc.)54,485 Total Building Area

    MSUM: Dahl and West Snarr Halls Predesign Report

    Section 3E: Dahl Hall Predesign Space Program

    Page 1 of 1

    87

  • 7/30/2019 MSUM part 2

    29/57

    Section 3F: West Snarr Hall Predesign Space ProgramApril 23, 2010, Revised June 10, 2010

    West Snarr HallProgram Use/ Space Quantity Area Total Notes

    Doubles 51 178 9,078 Quantity Beds Total Beds

    Doubles used as Doubles 45 2 90

    RA Unit (Double used as Single) 3 1 3

    Desk Manager (Double used as Single) 2 1 2

    Showroom 1 0 0

    95

    Assignable Beds

    Hall Director Apartment 1 880 880 9,958

    Residential Total

    Activity/Lounge 3 222 666

    (1 per floor, floors 2-4)

    Bathroom 6 225 1,350

    (2 per floor, floors 2-4)

    Laundry 3 150 450

    (1 per floor, floors 2-4)

    2,466Student Amenity Total

    Public Restroom 2 150 300

    First Floor Lounge 1 500 500

    Meeting/Seminar (Honor's Lounge) 2 485 970

    Meeting/Seminar 2 170 340

    Meeting/Seminar 1 125 125

    Kitchen 1 170 170

    Vending 1 80 80

    2,485

    First Floor Commons Total

    Administration

    Reception / Work Room 1 250 250

    RD Director Office 1 150 150

    2,885

    Admin Total

    First Floor Mechanical 1 330 330

    Trash/ Recycling 3 95 285

    (1 per floor, floors 1-4)

    First Floor Custodial 1 80 80

    695

    Trash/Cust Total

    Basement Mechanical Existing

    Electrical Closets (floors 2-4) 3 24 72

    Mechanical Penthouse 1 824 824

    896

    Mech/ Elec Total

    Total 19,385 Total Building Program Space

    1.32 Net to Gross Factor (circulation, exterior walls, etc.)

    25,534 Total Building Area

    MSUM: Dahl and West Snarr Halls Predesign Report

    Section 3F: West Snarr Hall Predesign Space Program

    Page 1 of 1

    88

  • 7/30/2019 MSUM part 2

    30/57

    RENOVATIONOFDAHL&WESTSNARRHALLS:PRE-DESIgN

    Moorhead,Minnesota

    11June2010

    DAHLHALL:BasementPlan

    Storae

    ExistinLaundry

    Room

    Laundry

    Room

    ExistinStudWalls

    StaffLoune

    RHAssoc.Room

    ExistinCMUWalls

    ExerciseRoom(

    Closed)

    Kitchen

    Storae

    Mechanical

    Jan.

    gMW

    Linens

    gM

    W

    Laundry

    Shop

    NOTE:Basementisnotincludedin

    Pre-DesinScope,exceptasrequiredfor

    modicationstoM/E/P,asrequiredto

    addsprinkler&asrequiredtomeetcode.

    89

  • 7/30/2019 MSUM part 2

    31/57

    RENOVATIONOFDAHL&WESTSNARRHALLS:PRE-DESIgN

    Moorhead,Minnesota

    11June2010

    DAHLHALL:FirstFloorPlan

    Newplumbin,HVAC,

    xtures,

    nishes&lighting

    Seeoptiontocreate

    LaundryRoom

    Lounes&Corridors:

    New

    lighting&nishes

    Units:

    New

    nishes&

    lighting

    UpradeElectrical

    FirstFloorAmenities:

    Recongure,

    new

    nishes&

    newlihtin

    Bathrooms:

    Newplumbin,HVAC,

    xtures,

    nishes&lighting

    NOTE:Entireoorupgradesincludeadding

    sprinklersthroughout&M/E/PUpgrades

    Student

    Loune

    Loune

    Lobby

    Student

    Loune

    Receptio

    n

    Ofce

    A

    rea

    Dir

    ector

    Ofce

    Cust

    g

    RemodelStaff

    Apartment

    Recongure&

    Remodel

    Accessible

    Unit

    Trash

    Hall

    Council

    Ofce

    Computer

    Lab

    Ramps:

    RequireReplacement

    Steps:

    RequireReplacement

    SeeProposed

    Plan

    90

  • 7/30/2019 MSUM part 2

    32/57

    RE

    NOVATIONOFDAHLHALL:PRE-DEsIgN

    Moorhead,

    Minneota

    11June2010

    ProposedRenovationsto

    FirstFloorCommonsArea

    sTAFFAPARTMENT

    EFFICIENCY

    APARTMENT

    Recep

    tion

    Mail/Work

    Meetin

    Room

    AreaDirector

    Ofce

    Cutodian

    Elev.

    Trah

    Vetibule

    Vetibule

    Toilet

    Vending

    FireRated

    PartitionWall

    Loune

    New

    Fireplace

    Vet

    ibule

    Vetibu

    le

    Kitchen

    Bathroom

    Livin

    Bedroom2

    Kitchen

    Bedroom1

    Bathroom

    Livin/Bedroom

    Kitchen

    Counterseating

    V

    IE

    W

    s

    PartitionWall

    Caua

    lseatin/TVArea

    91

  • 7/30/2019 MSUM part 2

    33/57

    RENOVATIONOFDAHL&WESTSNARRHALLS:PRE-DESIgN

    Moorhead,Minnesota

    11June2010

    DAHLHALL:2&3FloorPlans

    Bathrooms:

    Newplumbin,HVAC,

    xtures,

    nishes&lighting

    Bathrooms:

    Newplumbin,HVAC,

    xtures,

    nishes&lighting

    Student

    Loune

    Stu

    dy

    Room

    Stor.

    T

    Corridors:

    Newlihtin&

    new

    nishes

    Amenities:

    New

    nishes&

    newlihtin

    Units:

    New

    nishes&lighting

    UpradeElectrical

    NOTE:Entireoorupgradesincludeadding

    sprinklersthroughout&M/E/PUpgrades

    Possiblyadd

    Laundryto

    eachoor-

    conrm

    location.

    92

  • 7/30/2019 MSUM part 2

    34/57

    RENOVATIONOFDAHL&WESTSNARRHALLS:PRE-DESIgN

    Moorhead,Minnesota

    11June2010

    WESTSNARRHALL:FirstFloorPlan

    FIRSTFLOORSCOPE:

    Gutrstooramenitiesspaces&recon-

    gureforstudentamenity,staffapart-

    ment&live/learnspaces

    NOTE:Entireoorupgradesincludeadding

    sprinklersthroughout&M/E/PUpgrades

    Student

    Loune

    Honors

    Loune

    OldWeiht

    Room

    Vendin

    Reception

    Ofce

    Work

    Staff

    Apartment

    T T

    Bathrooms:

    Newplumbin,HVAC,

    xtures,

    nishes&lighting

    93

  • 7/30/2019 MSUM part 2

    35/57

    RENOVATIONOFDAHL&WESTSNARRHALLS:PRE-DESIgN

    Moorhead,Minnesota

    11June2010

    WESTSNARRHALL:2-4FloorPlans

    NOTE:Entireoorupgradesincludeadding

    sprinklersthroughout&M/E/PUpgrades

    Bathrooms:

    Newplumbin,HVAC,

    xtures,

    nishes&lighting

    Corridors:

    Newlihtin&IT

    Units

    New

    nishes&lighting

    UpradeElectrical&IT

    Amenities:

    New

    nishes&lighting

    Amenities:

    New

    nishes

    &lihtin

    94

  • 7/30/2019 MSUM part 2

    36/57

    RENOVA

    TIONOfWESTSNARRHALL:PRE-DESIgN

    Moorhead,

    Minnesota

    24May2010

    FirstFloorPlan

    95

  • 7/30/2019 MSUM part 2

    37/57

    RENOVA

    TIONOfWESTSNARRHALL:PRE-DESIgN

    Moorhead,

    Minnesota

    24May2010

    2

    -4

    FloorPlans

    96

  • 7/30/2019 MSUM part 2

    38/57

    Minnesota State University Moorhead | Renovation of Dahl & West Snarr Halls | 100% Pre-Design Report

    June 11, 2010 | Elness Swenson Graham Architects, Inc.

    section4:sustainability/energy statutes

    97

  • 7/30/2019 MSUM part 2

    39/57

    !"""#$%&'((

    %)*%+,),-&$./01

    12#3%)0"

    (

    412#3

    1 """ #

    "1

    %5567896# -" 4#:.- 4#"" .""" 5 4### ";5"

    98

  • 7/30/2019 MSUM part 2

    40/57

    Minnesota State University Moorhead | Renovation of Dahl & West Snarr Halls | 100% Pre-Design Report

    June 11, 2010 | Elness Swenson Graham Architects, Inc.

    section5:financial information

    capital expenditures

    99

  • 7/30/2019 MSUM part 2

    41/57

    ! ""

    !"#

    ## ! ! ! $%&

    !&$$$'(!)

    ! *

    ++)

    Dahl Hall

    Estimated Construction Cost $4,885,138

    Design Contingency 10% $488,514

    Total Base Construction Cost $5,373,652

    Hazardous Abatement $390,000

    Construction Contingency 10% $537,365

    Total Construction Cost $6,301,017

    Total Soft Costs 2,313,298

    Total Project Cost $8,614,315

    West Snarr Hall

    Estimated Construction Cost $2,361,875Design Contingency 10% $236,188

    Total Base Construction Cost $2,598,063

    Hazardous Abatement $112,000

    Construction Contingency 10% $259,806

    Total Construction Cost $2,969,869

    Total Soft Costs 1,706,535

    Total Project Cost $4,676,404

    100

  • 7/30/2019 MSUM part 2

    42/57

    Section5B:

    PROJECTBUDGETWORKS

    HEET

    RENOVATIONOFDAHLHALL-

    S

    CHEDULEOPTION#2-

    CONSTRUCTIONSUMMEROF2011AND

    2012

    MINNESOTAST

    ATEUNIVERSITYMOORHEAD P

    redesign%

    PredesignBudget

    Appropriation

    Budget

    Comments

    1

    PropertyAcquisition

    Land,LandEasements,Options

    Buildings(Purchase)

    Legal

    Surveys

    SUBTOTAL

    0

    0

    2

    PredesignFees(0.5-1%

    of5a-d)

    DesignFees

    0

    Paidfromdifferentbudget

    SUBTOTAL

    0

    0

    3

    DesignFees(6-12%of

    5a-d)

    8%

    7%

    TotalA

    rchFees

    3.aReimbursables

    1%

    53,7

    37

    $376,156TotalA

    rchFees

    3.bSchematicDesign

    (20%o

    f3b-f)

    75,2

    31

    20%

    3.cDesignDevelopment

    (25%o

    f3b-f)

    94,0

    39

    25%

    3.d

    ConstructionDocuments

    (30%o

    f3b-f)

    112,8

    47

    30%

    3.eBidding

    (5%o

    f3b-f)

    18,8

    08

    5%

    3.fConstructionAdministr

    ation

    (20%o

    f3b-f)

    75,2

    31

    20%

    SUBTOTAL

    429,892

    0

    4

    ProjectManagement(3-10%5a-d)

    6.14%

    Advertising

    DesignerSelectionBoar

    d

    LegalFees

    StateStaffProgramManagement(.80%programcost)

    1.00%

    76,000

    1%ofT

    otalProjectCost

    Non-StateProjectManagement(0-3%o

    f5a-d)

    2.00%

    107,473

    SystemsCommissioning(0-1%o

    f5c)

    1.00%

    53,737

    OtherCosts(2-6%of

    5a-d)

    SiteProperty&TopographicSurvey

    0.37%

    20,000

    HazardousMaterialA

    batementDesign&Monitoring

    50,000

    SoilBorings&Geotec

    hnicalSurvey

    0.00%

    0

    StateCodeReview

    0.47%

    25,000

    A.DesignSupportConsultants

    0.37%

    20,000

    Design/ProjectManualReviews

    Geotechnical/Masonry/FlashingDesignReviews

    Window/Curtain

    WallDesignReviews

    MechanicalDesignReviews

    BrickMaterialsPre-SelectionTesting

    B.Inspection&Testi

    ngConsultants

    0.93%

    50,000

    AsphaltPaving

    Draintile

    Flashings

    Geotechnical

    HVACBalancing

    Masonry

    Roof

    Sealant

    SpecialTesting

    Structural

    Waterproofing

    101

  • 7/30/2019 MSUM part 2

    43/57

    Section5B:

    PROJECTBUDGETWORKS

    HEET

    RENOVATIONOFDAHLHALL-

    S

    CHEDULEOPTION#2-

    CONSTRUCTIONSUMMEROF2011AND

    2012

    MINNESOTAST

    ATEUNIVERSITYMOORHEAD

    0

    Predesign%

    PredesignBudget

    Appropriation

    Budget

    Comments

    5

    ConstructionCosts

    5.aSiteandBuildingPrepa

    ration

    5.bDemolition(Permanent

    removalofbuilding)

    54,485GSF

    5.cConstruction

    BaseConstructionCost

    5,3

    73,6

    52

    $99$/GSF

    baseme

    ntnotinlcudedinpredesign

    $18,216BaseC

    onstructionCost/Bed

    5.d

    Infrastructure,Roads,Utilities

    0

    5.eHazardousMaterialAb

    atement

    390,0

    00

    5.fConstructionContingen

    cy(5-10%o

    f5a-d)

    10

    %

    537,3

    65

    SUBTOTAL

    6,301,017

    0

    $116$/GSF

    6

    OnePercentforArt(1%

    of5a-d)

    SUBTOTAL

    0

    0notrequired

    7

    SUBTOTAL

    0

    0notincluded

    8

    Occupancy(4-10%of5a-d)

    FurnitureFixturesand

    Equipment

    ResidentRooms

    531,0

    00

    1800unitfurniturecostperbed

    CommonSpaces

    191,7

    50

    295assigna

    blebedsinDahl

    650commo

    nfurniturecostperbed

    Telecommunications(V

    oice&Data;ifnotincludedinConst.)

    150,0

    00

    includessecurity,AVandITatcommonareas

    SecurityEquipment(If

    notincludedinConst.)

    OtherCosts:

    PostOccupancyEva

    luation

    0

    SUBTOTAL

    872,750

    0

    TOTALSUBTOTAL

    8,005,869

    0

    9

    Inflation

    MidpointofConstruction(mo/yr)

    1/2012.

    InflationMultiplier

    7.60%

    InflationCost

    608,4

    46

    TotalP

    rojectInflation

    SUBTOTAL

    608,446

    0

    54,485GSF

    10GRANDTOTAL

    0

    8,614,315

    0

    $29,201TotaProjectCost/Bed

    $158TotalP

    rojectCost/GSF

    COMMENTS:

    2,313,298TotalS

    oftCosts

    1TotalProjectcostdoesn

    otincludeDebtServiceReserve,

    CapitalizedInterest,orIssueCosts

    OFFICEOFTHEC

    HANCELLOR

    [INSERTNAMEOFC

    OLLEGE/UNIVERSITY]

    By:_________________

    _____________________________________

    `

    Title:_____________________________________________________

    Date:_______________

    _____________________________________

    Relocation(Cannotbef

    undedbybondfunds)

    Title:___________

    Date:__________

    By:____________

    102

  • 7/30/2019 MSUM part 2

    44/57

    SECTION5C:PROJECTBUDGETWORK

    SHEET

    RENOVA

    TIONOFWESTSNARRHAL

    L-

    BASEDON

    SUMMER2013CONSTRUC

    TION

    MINNESOTA

    STATEUNIVERSITYMOORHEAD

    RENOVATIONOFWESTSNARRHALL

    Predesign%

    PredesignBudget

    Appropriation

    Budget

    Comments

    1

    PropertyAcquisition

    Land,LandEasements,Options

    Buildings(Purchase)

    Legal

    Surveys

    SUBTOTAL

    0

    0

    2

    PredesignFees(0.5-1%o

    f5a-d)

    DesignFees

    0

    Paidfromdifferentbudget

    SUBTOTAL

    0

    0

    3

    DesignFees(6-12%

    of5a-d)

    8%

    7%

    Arch

    Fees

    3.a

    Reimbursables

    1%

    25,981

    $181,864Total

    ArchFees

    3.b

    SchematicDesign

    (20%o

    f3b-f)

    36,373

    20%

    3.c

    DesignDevelopmen

    t

    (25%o

    f3b-f)

    45,466

    25%

    3.d

    ConstructionDocum

    ents

    (30%o

    f3b-f)

    54,559

    30%

    3.e

    Bidding

    (5%o

    f3b-f)

    9,093

    5%

    3.f

    ConstructionAdministration

    (20%o

    f3b-f)

    36,373

    20%

    SUBTOTAL

    207,845

    4

    ProjectManagement

    (3-10%5a-d)

    8.23%

    Advertising

    DesignerSelectionBoard

    LegalFees

    StateStaffProgram

    Management(.80%programcost)

    0.80%

    20,785

    Non-StateProjectM

    anagement(0-3%o

    f5a-d)

    2.00%

    51,961

    SystemsCommissio

    ning(0-1%o

    f5c)

    1.00%

    25,981

    OtherCosts(2-6%

    of5a-d)

    SiteProperty&T

    opographicSurvey

    0.77%

    20,000

    HazardousMaterialAbatementDesign&Monitoring

    50,000

    SoilBorings&Ge

    otechnicalSurvey

    0.00%

    0

    StateCodeReview

    0.96%

    25,000

    A.DesignSuppor

    tConsultants

    0.77%

    20,000

    Design/ProjectManualReviews

    Geotechnical

    /Masonry/FlashingDesignReviews

    Window/CurtainWallDesignReviews

    MechanicalD

    esignReviews

    BrickMateri

    alsPre-SelectionTesting

    B.Inspection&T

    estingConsultants

    1.92%

    50,000

    AsphaltPaving

    Draintile

    Flashings

    Geotechnical

    HVACBalan

    cing

    Masonry

    Roof

    Sealant

    SpecialTesting

    S t t l

    103

  • 7/30/2019 MSUM part 2

    45/57

    SECTION5C:PROJECTBUDGETWORK

    SHEET

    RENOVA

    TIONOFWESTSNARRHAL

    L-

    BASEDON

    SUMMER2013CONSTRUC

    TION

    MINNESOTA

    STATEUNIVERSITYMOORHEAD

    Predesign%

    PredesignBudget

    Appropriation

    Budget

    Comments

    5

    ConstructionCosts

    5.a

    SiteandBuildingPreparation

    5.b

    Demolition(Permanentremovalofbuilding)

    25,534GSF

    5.c

    Construction

    BaseConstructionCost

    2,598,063

    $102$/GSF

    5.d

    Infrastructure,Roa

    ds,Utilities

    $26,784Base

    ConstructionCost/Bed

    5.e

    HazardousMateria

    lAbatement

    112,000

    5.f

    ConstructionContingency(5-10%o

    f5a-d)

    10%

    259,806

    SUBTOTAL

    2,969,869

    0

    $30,617Total

    ConstructionCost/Bed

    6

    OnePercentforArt(1%o

    f5a-d)

    SUBTOTAL

    0

    0not

    required

    7

    SUBTOTAL

    0

    0not

    included

    8

    Occupancy(4-10%of5a-d)

    FurnitureFixturesandEquipment

    ResidentRooms

    6.72%

    174,600

    1800unitf

    urniturecostperbed

    CommonSpaces

    2.43%

    63,050

    97assignablebedsinWestSnarr

    FirstFloorSpaces

    200,000

    650comm

    onfurniturecostperbed

    Telecommunication

    s(Voice&Data;ifnotincludedinConst.)

    2.50%

    145,700

    includessecurity

    SecurityEquipment(IfnotincludedinConst.)

    OtherCosts:

    PostOccupancy

    Evaluation

    0

    SUBTOTAL

    11.65%

    583,350

    0

    TOTALSUBTOTAL

    4,024,791

    0

    9

    Inflation

    MidpointofConstruction(mo/yr)

    6/2013.

    InflationMultiplier

    16.19%

    InflationCost

    651,614

    TotalProjectInflation

    SUBTOTAL

    651,614

    0

    10GRANDTOTAL

    0

    4,676,404

    0

    1,706,535Total

    SoftCosts

    COMMENTS:

    25,534GSF

    1TotalProjectcostdo

    esnotincludeDebtServiceReserve,

    CapitalizedInterest,orIssueCosts

    $48,210TotaProjectCost/Bed

    $183Total

    ProjectCost/GSF

    OFFICEOFTH

    ECHANCELLOR

    [INSERTNAMEO

    FCOLLEGE/UNIVERSITY]

    By:______________________________________________________

    Title:____________

    _________________________________________

    Relocation(Cannotbefundedbybondfunds)

    Title:___________

    By:____________

    104

  • 7/30/2019 MSUM part 2

    46/57

    MSUM Predesign for Dahl and West Snarr HallsSection 5D: Dahl Hall- Alternate Costs Summary

    Dahl Hall Renovation

    Alt # Item

    EstimatedConstruction

    Cost w/accepted

    Alternates

    Alternate Costs- NOTINCLUDED IN BASE

    CONSTRUCTION

    COST Notes

    Base Cost Dahl Hall- First Floor 834,154$

    Dahl Hall- Second and Third Floors 1,113,032$

    Dahl Hall- Mechanical/Electrical 2,407,725$

    Basement (sprinkler/new ACT throughout) 153,793$

    Sitework 21,425$

    Alt 1 Penthouse 183,715$

    Alt 2 Gas Fireplace at Lounge 7,529$

    Alt 3 New Aluminum Windows 460,044$

    Alt 4

    Add 2" rigid insulation & composite metal panelon SS framing to exterior walls 650,000$ Either Alt 5 or 6- not both

    Alt 5

    Add 1" rigid insulation and 5/8" moisture

    resistant gypsum board on metal stud furring 93,765$ Either Alt 5 or 6- not both

    Alt 6 Additional Landscaping 50,000$

    Alt 7 New weatherstripping at existing windows 20,000$

    Estimated

    ConstructionCost

    Alternate Costs- NOTINCLUDED IN BASE

    CONSTRUCTIONCOST

    SubTotal Base Construction Cost 4,885,138$ 1,110,044$

    Design Contingency 10%$488,514

    Total Construction Cost (used on Project Budget Worksheet) 5,373,652$

    54,485 Building Area Does not include basement area

    99$ Cost/GSF

    285 Number of Beds

    18,855$ Cost per Bed

    105

  • 7/30/2019 MSUM part 2

    47/57

    MSUM Predesign for Dahl and West Snarr HallsSection 5E: West Snarr Hall- Alternate Costs SummaryRevised 06/02/10

    West Snarr Hall Renovation

    Alt # Item

    EstimatedConstruction

    Cost w/accepted

    Alternates

    Alternate Costs-NOT INCLUDED IN

    BASE

    CONSTRUCTION

    COST Notes

    Base Cost Renovate West Snarr Hall 2,028,225$

    Alt 1 New Entrance and Stair Addition 61,238$

    Alt 2 New Windows 210,019$

    Alt 3 Penthouse 244,953$

    Alt 4 New flooring, ACT and lighting at Links 27,459$

    Alt 5 Refinish existing wardrobes/ keep exist carpet 24,699$

    Alt 6

    New foundation/ exterior wall to bump-out meeting

    rooms 74,952$

    EstimatedConstruction

    Cost

    Alternate Costs-NOT INCLUDED IN

    BASE

    CONSTRUCTION

    COST

    SubTotal Base Construct ion Cost 2,361,875$ 309,670$

    Design Contingency 10%

    $236,188

    Total Construction Cost (used on Project Budget Worksheet) 2,598,063$

    25,534 Building Area Does not include basement area102$ Cost/GSF With Contingency

    97 Number of Beds26,784$ Cost per Bed With Contingency

    106

  • 7/30/2019 MSUM part 2

    48/57

    Minnesota State University Moorhead | Renovation of Dahl & West Snarr Halls | 100% Pre-Design Report

    June 11, 2010 | Elness Swenson Graham Architects, Inc.

    section6:financial information

    ongoing operating expenditures

    107

  • 7/30/2019 MSUM part 2

    49/57

    MSUM:RenovationofDahlandWestSnarrHalls Section6A:ProgramProformaAssumptions

    PredesignReport Page1of4

    Section6A:ProgramProformaAssumptionsRenovationofDahlHallandWestSnarrHallJune17,2010

    OverviewofMasterPlanInAugust2009,AlexanderandAssociates,inpartnershipwithAngeliniandAssociates,

    completedamasterplanforHousingandResidentialLifeatMinnesotaStateUniversity

    Moorhead.

    Themasterplanreportsuggestsrenovatingmostexistingfacilities,buildinganewsuitestyle

    residencehall,andengaginginapublic/privatepartnershipfortwoapartmentbuildingslocated

    oncampus. Atthistime,HousingandResidentialLifeisfocusingonrenovatingexisting

    facilitiesinstead

    of

    proposing

    anew

    residence

    hall.

    In

    addition,

    we

    will

    soon

    begin

    exploring

    theneedforandfeasibilityofadditionalhousing.

    ScheduleSummer2010: GranthamHall: Renovatestudentrooms

    JohnNeumaierHall: PurchasefurnitureforloungesSummer2011: DahlHall(PhaseOne): Renovaterooms,bathrooms,andcommonareas.

    Renovationwillnotincludebasement.

    Summer2012: DahlHall(PhaseTwo): Renovaterooms,bathrooms,andcommonareas.Renovationwillnotincludebasement.

    Summer2013: WestSnarrHall: Renovatestudentrooms,bathrooms,andcommonareas.

    Summer2013: EastSnarrHall: Renovatestudentrooms,bathrooms,andcommonareas.Summer2014: SouthSnarrHall: Renovatestudentrooms,bathrooms,andcommon

    areas.

    Summer2015 NelsonHall(PhaseOne): Renovatestudentrooms,bathrooms,andcommonareas.

    Summer2016: NelsonHall(PhaseTwo): Renovatestudentrooms,bathrooms,andcommonareas.

    FinancingThe

    proforma

    assumes

    the

    following

    projects

    will

    be

    bonded:

    Dahl,

    West

    Snarr,

    and

    Nelson.

    Theremainingprojects(Grantham,JohnNeumaier,EastSnarr,andSouthSnarr)willbepaidfor

    withR&Rfunds.

    RatesPartofthestrategyforaffordingtorenovatemanyoftheexistingfacilitiesinvolvescharginga

    higherroomrateforrenovatedfacilities. Theproformaassumesanannual4%rateincrease. In

    108

  • 7/30/2019 MSUM part 2

    50/57

    MSUM:RenovationofDahlandWestSnarrHalls Section6A:ProgramProformaAssumptions

    PredesignReport Page2of4

    addition,asafacilityisreopenedafterrenovation,anadditionalonetime14%feewillbe

    charged(4%+14%). Thefollowingyear,theroomrateincreasewillreturnto4%.

    OccupancyTheproformaassumesthefollowingoccupancyatthe10

    thclassdayofthefallsemester. The

    annualizedoccupancy

    assumption

    is

    94%.

    DoubleRoomsinBallard,Dahl,EastSnarr,SouthSnarr,WestSnarrHalls: 98%

    DoubleRoomsinNelsonHall: 94%

    SingleRooms: 99%

    DoubleasSingleRooms: 99%

    DahlHallandWestSnarrHallProformaAssumptionsDahlHallBondingRequirementTheprojectedbondingrequirementfortheDahlHallrenovationprojectis: $9,850,745. The

    followingassumptionsweremadetodeterminetheprojectedbondingrequirement:

    PHASEONE(Summer2011)

    Projectcostestimate: $5,228,175Annualconstructioninflation: 5.66%

    Inflatedprojectcost: $5,524,090

    Capitalizedinterest: $300,000

    Debtservicereserve: $516,099

    Otherissuecosts: $91,551

    PhaseOne

    bonding

    requirement:

    $6,431,740

    PHASETWO(Summer2012)

    Projectcostestimate: $2,777,694

    Annualconstructioninflation: 10.89%

    Inflatedprojectcost: $3,080,185

    Capitalizedinterest: $0

    Debtservicereserve: $274,350

    Otherissuecosts: $64,470

    PhaseTwobondingrequirement: $3,419,005

    TOTALDAHLHALLBONDINGREQUIREMENT: $9,850,745

    109

  • 7/30/2019 MSUM part 2

    51/57

    MSUM:RenovationofDahlandWestSnarrHalls Section6A:ProgramProformaAssumptions

    PredesignReport Page3of4

    WestSnarrHallBondingRequirement****NOTE: WestSnarrisnotincludedinthe2011BondSale. Theproformaassumesfundinginafuturebondsale(assume2013). ****TheprojectedbondingrequirementfortheWestSnarrrenovationprojectis: $5,486,532.

    Thefollowingassumptionsweremadetodeterminetheprojectedbondingrequirement:

    Projectcostestimate: $4,024,791

    Annualconstructioninflation: 19.14%

    Inflatedprojectcost: $4,672,551

    Capitalizedinterest: $300,000

    Debtservicereserve: $440,254

    Otherissuecosts: $73,727

    Totalbondingrequirement: $5,486,532

    BondAssumptionsThe

    proforma

    assumes

    a5%

    bond

    rate,

    and

    a20

    year

    term.

    DebtServiceTheproformaassumesthefollowingannualdebtservicepaymentsfortheDahlandWestSnarr

    renovationprojects:

    Dahl: $793,147

    WestSnarr: $437,556

    ****NOTE: WestSnarrisnotincludedinthe2011BondSale. Theproformaassumesfundinginthe2013BondSale. ****MnSCUFeeAssessmentInadditiontotheannualMnSCUfeeassessment,theproformaassumesanadditionalfeeof0.25%ofparvalueforthetermofthebond.

    RevenueCapacityDahlHallhastotalcapacityof302beds,comprisedof150doublerooms(300beds)and2

    designateddoubleassinglerooms(2beds). Ofthese302beds,288arerevenuegenerating.

    TheremainingbedsareoccupiedbyResidentAssistantsandaDeskManager.

    WestSnarrHallhasatotalcapacityof102beds,comprisedof51doublebeds. Ofthese102

    beds,94arerevenuegenerating. TheremainingbedsareoccupiedbyResidentAssistants,

    LearningCommunity

    Dragon

    Mentors,

    and

    ashow

    room

    used

    on

    Admissions

    tours

    gi