•Size – 30 MWs plus 22 mile transmission system for a total $260 million capital cost ($20 million invested to date)
•Construction – 2013/2014 -- 200 construction period jobs
•Turbines – Latest Siemens 6 MW megawatt offshore turbine
•Cable – bidirectional cable connects wind farm and island to mainland grid
•Robust wind resource – +9.0 m/s average wind speed at site (30% stronger than typical northeast onshore site)
•Power sales – 20 year power purchase agreement for full project output with National Grid approved by regulators
•Permitting – Located within state waters in a site designated by the state as a “Renewable Energy Zone”
Block Island Wind Farm: The Nation’s First Offshore Wind Farm
![Page 3: Msp conference may 2012](https://reader034.vdocuments.us/reader034/viewer/2022050714/55ac2a5e1a28ab3c078b47e4/html5/thumbnails/3.jpg)
Block Island Wind FarmQuonset Point Port Facility
Utility-Scale Wind Farm in RI Sound Will Create Hundreds of Jobs at Quonset:Deepwater Wind Energy Center
PROPRIETARY AND CONFIDENTIAL 3
![Page 4: Msp conference may 2012](https://reader034.vdocuments.us/reader034/viewer/2022050714/55ac2a5e1a28ab3c078b47e4/html5/thumbnails/4.jpg)
Concept Plan for Quonset as an Offshore Wind Hub
Existing piers
New pier Area to be dredged
Airport Runway
![Page 5: Msp conference may 2012](https://reader034.vdocuments.us/reader034/viewer/2022050714/55ac2a5e1a28ab3c078b47e4/html5/thumbnails/5.jpg)
Direct Jobs Created by A Utility-Scale Offshore Wind Project
5
A 1,000 MW energy center creates approximately 1,000 local jobs