MIDDLE SCHOOL RENOVATION
WEEKLY PROGRESSJUNE 28 – JULY 1
6/28/10
A-POD 1ST FLOOR NORTH SIDE
6/28/10
C-POD 1ST FLOOR SOUTH SIDE
6/28/10
D-POD 2ND FLOOR EAST SIDE
6/28/10
E-POD 2ND FLOOR NORTH SIDE
6/28/10
F-POD 2ND FLOOR SOUTH SIDE
6/28/10
GYM
6/28/10
RESTROOMS 1ST FLOOR
6/30/10GYM
6/30/10A-POD 1ST FLOOR NORTH SIDE
6/30/10A-POD 1ST FLOOR NORTH SIDE
6/30/10DOORS REMOVED NORTH SIDE AT GYM ENTRANCE
6/30/10E-POD 2ND FLOOR NORTH SIDE STEEL WALL
STUDS
6/30/10F-POD 2ND FLOOR SOUTH SIDE
7/1/10GYM
7/1/10C-POD 1ST FLOOR SOUTH SIDEPAINTING OF BLOCK WALLS
7/1/10C-POD 1ST FLOOR SOUTH SIDE
7/1/10A-POD 1ST FLOOR NORTH SIDEMORE BLOCK WALLS ERECTED
7/1/10NEW ENTRANCE TO LIBRARY
7/1/10F-POD 2ND FLOOR SOUTH SIDE
DRYWALLING OF ROOMS