construction progress for techtown 1st floor renovation | july 1 - july 31
DESCRIPTION
Progress continues despite this late posting of month number three of TechTown’s 1st Floor Renovation Project. Every month I track and post the construction progress of this project. My firm Centric Design Studio designed this space for Detroit based TechTown. You can view the previous two slide share months of progress (starting in May 2013) to see how far we’ve come. Come back next month and see the progress. Thanks for viewing.TRANSCRIPT
Slide Show of Construction Progress at TechTown - DetroitTechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Mail Boxes ProgressTechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Plumbing Work at Food Prep Room TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
View of Future Event SpaceTechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Future Event Space ProgressTechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Corridor 2 + Future Meeting RoomsTechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Future Co-Working Area Facing Burroughs St.TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Concrete Repair (Before) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Concrete Repair (After) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Fire Extinguisher (Future Location) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Overhead Door Structural Steel (at Event Space 1) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Overhead Door Structural Steel (at Event Spaces 1 & 2) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Overhead Door Structural Steel (at Event Spaces 1 & 2) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Structural Steel for Operable Partition (at Event Spaces 1 & 2) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Structural Steel for Operable Partition (at Event Spaces 1 & 2) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Soffit Enclosure of Structural Steel (at Event Spaces 1 & 2) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Soffit Enclosure of Structural Steel (at Event Spaces 1 & 2) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Enclosure of Overhead Structural Steel (at Event Space 1) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Co-Working Space - Polished Concrete Floor Mock-Up - 1 TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Co-Working Space - Polished Concrete Floor Mock-Up - 2 TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Painting Begins (at Conference Room 5) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Existing Lighting (Retrofitted) Mock-Up TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Future Co-Working Area (Looking West) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Exterior View of Future Co-Working Area (From Burroughs St.) TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
More Construction Progress Photos Will Be Posted Next Month TechTown 1st Floor Renovation
July 1 - July 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com