mrt bumiputera main work contractor

2
MRT INFO PROJECT UPDATES MEDIA EVENTS MRT CORP BUMI PARTICIPATION CONTACT US SEARCH LANGUAGE EN | BM LIST OF BUMIPUTERA CONTRACTORS HOME | BUMI PARTICIPATION | LIST OF BUMIPUTERA MAIN WORK CONTRACTORS List of Bumiputera Main Work Contractors No Package Name LOA Date Contractor PART A : ADVANCE WORKS 1 AW2 - Package C1 Construction and completion of working platform including Earthworks, Access Road, Drainage Works,TNB Substation, Retaining Walls, Utilities Protection and Ancillary Works for Semantan launching shaft 03/06/2011 Menta Construction Sdn Bhd 2 AW5 - Package D2 Relocation of existing sewerage and water mains for Cochrane launching shaft 24/06/2011 Puncak Niaga (M) Sdn Bhd 3 AW12 - Package SYB1 Relocation of existing water pipe line and traffic management for utilities relocation for KL Sentral 31/1/2012 Hatimuda Sdn Bhd 4 AW13 - Package TEL1 The relocation of existing telecommunication lines for KL Sentral 14/12/2011 Sri Communication Sdn Bhd 5 AW14 - Package TCO1 The relocation of existing fibre optic lines for KL Sentral 14/12/2011 Tenaga Nirwana (M) Sdn Bhd 6 AW15 - Package TNB1 The relocation of existing power supply cables for KL Sentral and Merdeka 14/12/2011 Worktime Engineering Sdn Bhd 7 AW16 - Package TEL2 The relocation of existing telecommunication lines for Merdeka 14/12/2011 Sri Communication Sdn Bhd 8 AW18 - Package TEL3 Relocation of existing telecommunication lines for Maluri 19/1/2012 Sri Communication Sdn Bhd 9 AW19 - Package TCO2 Relocation of existing fibre optic lines for Maluri 19/1/2012 Fastpro Sdn Bhd 10 AW20 - Package TNB2 Relocation of existing power supply cables for Maluri 6/3/2012 Huls Transmission Sdn Bhd PART B : VIADUCT GUIDEWAY 11 Elevated Section V1 - Viaduct Construction and completion of viaduct guideway and other associated works from Sungai Buloh to Kota Damansara Station 18/5/2012 Syarikat Muhibah & Perniagaan & Pembinaan Sdn Bhd 12 Elevated Section V6 - Viaduct Construction and completion of viaduct guideway and other associated works from Plaza Phoenix station to Bandar Tun Hussein Onn Station 16/2/2012 Ahmad Zaki Sdn Bhd 13 Elevated Section V7 - Viaduct Construction and completion of viaduct guideway and other associated works from Bandar Tun Hussein Onn to Taman Mesra 18/5/2012 MTD Construction Sdn Bhd PART C : DEPOTS 14 Package Dpt1: Construction And Completion Of Sungai Buloh Maintenance Depot, Administration Building, External Works And Other Associated Works 18/5/2012 Trans Resources Corporation Sdn Bhd 15 Package Dpt2: Construction And Completion Of Kajang Maintenance Depot, External Works And Other Associated Works 24/7/2012 TSR Bina Sdn Bhd PART D : UNDERGROUND WORKS 16 Underground works (Tunnel stations & associated structures) between Semantan north portal and Maluri south portal 30/3/2012 MMC Gamuda KVMRT (T) Sdn Bhd PART E : MULTISTOREY CAR PARKS 17 Elev 1 - Package MSPR1 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works At Sungai Buloh Station 24/7/2012 TSR Bina Sdn Bhd 18 Elev 8 - Package MSPR9 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works at Kajang Station 18/3/2013 SMPP-IBWANI JOINT VENTURE PART E : MULTISTOREY CAR PARKS 19 Elevated Section ST1 - Stations Package S1: Construction And Completion Of Elevated Stations And Other Associated Works At Sungai Buloh, Kg. Baru Sungai Buloh And Kota Damansara 28/8/2012 Trans Resources Corporation Sdn Bhd 20 Elevated Section ST2 - Stations Package S2 : Construction And Completion Of Elevated Stations And Other Associated Works At Taman Industrial Sungai Buloh, PJU 5 And Dataran Sunway 03/10/2012 Naim Engineering Sdn Bhd Page 1 of 2 MYMRT | MRT Corp - Official webpage for the Klang Valley My Rapid Transit. 9/15/2013 http://www.mymrt.com.my/en/bumiputera-main-work-contractor

Upload: aridaconcept

Post on 11-Nov-2015

46 views

Category:

Documents


0 download

DESCRIPTION

mrt

TRANSCRIPT

  • MRT INFO PROJECT UPDATES MEDIA EVENTS MRT CORP BUMI PARTICIPATION CONTACT US SEARCHLA NGU AG EE N | BM

    LIST OF BUMIPUTERA CONTRACTORSHOME | BUMI PARTICIPATION | LIST OF BUMIPUTERA MAIN WORK CONTRACTORS

    List of Bumiputera Main Work ContractorsNo Package Name LOA Date Contractor

    PART A : ADVANCE WORKS

    1 AW2 - Package C1 Construction and completion of working platform including Earthworks, Access Road, Drainage Works,TNB Substation, Retaining Walls, Utilities Protection and Ancillary Works for Semantan launching shaft

    03/06/2011 Menta Construction Sdn Bhd

    2 AW5 - Package D2Relocation of existing sewerage and water mains for Cochrane launching shaft

    24/06/2011 Puncak Niaga (M) Sdn Bhd

    3 AW12 - Package SYB1Relocation of existing water pipe line and traffic management for utilities relocation for KL Sentral

    31/1/2012 Hatimuda Sdn Bhd

    4 AW13 - Package TEL1The relocation of existing telecommunication lines for KL Sentral

    14/12/2011 Sri Communication Sdn Bhd

    5 AW14 - Package TCO1The relocation of existing fibre optic lines for KL Sentral

    14/12/2011 Tenaga Nirwana (M) Sdn Bhd

    6 AW15 - Package TNB1The relocation of existing power supply cables for KL Sentral and Merdeka

    14/12/2011 Worktime Engineering Sdn Bhd

    7 AW16 - Package TEL2The relocation of existing telecommunication lines for Merdeka

    14/12/2011 Sri Communication Sdn Bhd

    8 AW18 - Package TEL3Relocation of existing telecommunication lines for Maluri

    19/1/2012 Sri Communication Sdn Bhd

    9 AW19 - Package TCO2Relocation of existing fibre optic lines for Maluri

    19/1/2012 Fastpro Sdn Bhd

    10 AW20 - Package TNB2Relocation of existing power supply cables for Maluri

    6/3/2012 Huls Transmission Sdn Bhd

    PART B : VIADUCT GUIDEWAY

    11 Elevated Section V1 - ViaductConstruction and completion of viaduct guideway and other associated works from Sungai Buloh to Kota Damansara Station

    18/5/2012 Syarikat Muhibah & Perniagaan & Pembinaan Sdn Bhd

    12 Elevated Section V6 - ViaductConstruction and completion of viaduct guideway and other associated works from Plaza Phoenix station to Bandar Tun Hussein Onn Station

    16/2/2012 Ahmad Zaki Sdn Bhd

    13 Elevated Section V7 - ViaductConstruction and completion of viaduct guideway and other associated works from Bandar Tun Hussein Onn to Taman Mesra

    18/5/2012 MTD Construction Sdn Bhd

    PART C : DEPOTS

    14 Package Dpt1: Construction And Completion Of Sungai Buloh Maintenance Depot, Administration Building, External Works And Other Associated Works

    18/5/2012 Trans Resources Corporation Sdn Bhd

    15 Package Dpt2: Construction And Completion Of Kajang Maintenance Depot, External Works And Other Associated Works

    24/7/2012 TSR Bina Sdn Bhd

    PART D : UNDERGROUND WORKS

    16 Underground works (Tunnel stations & associated structures) between Semantan north portal and Maluri south portal

    30/3/2012 MMC Gamuda KVMRT (T) Sdn Bhd

    PART E : MULTISTOREY CAR PARKS

    17 Elev 1 - Package MSPR1 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works At Sungai Buloh Station

    24/7/2012 TSR Bina Sdn Bhd

    18 Elev 8 - Package MSPR9 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works at Kajang Station

    18/3/2013 SMPP-IBWANI JOINT VENTURE

    PART E : MULTISTOREY CAR PARKS

    19 Elevated Section ST1 - StationsPackage S1: Construction And Completion Of Elevated Stations And Other Associated Works At Sungai Buloh, Kg. Baru Sungai Buloh And Kota Damansara

    28/8/2012 Trans Resources Corporation Sdn Bhd

    20 Elevated Section ST2 - StationsPackage S2 : Construction And Completion Of Elevated Stations And Other Associated Works At Taman Industrial Sungai Buloh, PJU 5 And Dataran Sunway

    03/10/2012 Naim Engineering Sdn Bhd

    Page 1 of 2MYMRT | MRT Corp - Official webpage for the Klang Valley My Rapid Transit.

    9/15/2013http://www.mymrt.com.my/en/bumiputera-main-work-contractor

  • Routemap Stations Project Updates Traffic Announcements

    21 C opyri gh t 20 13 Mas s Rapi d Tr ansi t Corpor ati on Sdn Bhd. ( 9028 84V) Al l Ri ghts Re ser ved. Home Cont act Us MRT Hotline 1800-82-6868

    No Package Name LOA Date Contractor

    21 Elevated Section ST4 - StationsPackage S4 : Construction And Completion Of Elevated Stations And Other Associated Works At Section 16, Bandar Damansara And Semantan

    07/9/2012 Naim Engineering Sdn Bhd

    22 Elevated Section ST6 - StationsPackage S6 : Construction And Completion Of Elevated Stations And Other Associated Works At Taman Suntex, Taman Cuepacs And Bandar Tun Hussein Onn

    28/8/2012 Ahmad Zaki Sdn Bhd

    23 Elevated Section ST7 - StationsPackage S7 : Construction And Completion Of Elevated Stations And Other Associated Works At Balakong And Taman Koperasi

    28/8/2012 Apex Communication Sdn Bhd

    24 Elevated Section ST8 - StationsPackage S8: Construction And Completion Of Elevated Stations And Other Associated Works At Saujana Impian, Bandar Kajang And Kajang

    03/10/2012 Apex Communication Sdn Bhd

    PART E : MULTISTOREY CAR PARKS

    25 Package ECS1: Supply, Procurement, Installation, Testing And Commissioning Of Environmental Control System For Elevated Package V1 To V4 And Sungai Buloh Depot

    18/3/2013 Kejuruteraan Astra Sdn Bhd

    26 Package ECS2: Supply, Procurement, Installation, Testing And Commissioning Of Environmental Control System For Elevated Package V5 To V8 And Kajang Depot

    18/3/2013 FastColl Corporation Sdn Bhd

    27 Package FD3: Supply, Procurement, Installation, Testing And Commissioning Of Fire Detection and Protection System For Elevated Package V5 To V6

    18/3/2013 Zulfan (M) Sdn Bhd

    28 Package SDDT-E: Supply, Delivery And Supervision Of Installation, Testing And Commissioning Of Step Down Distribution Transformer For All Elevated Packages, Sungai Buloh and Kajang Depot

    18/3/2013 PTIS Engineering Sdn Bhd

    29 Package UPS-E: Supply, Delivery And Supervision Of Installation, Testing And Commissioning Of Uninterruptible Power Supply For All Elevated Stations

    18/3/2013 Info-Matic Power Sdn Bhd

    Page 2 of 2MYMRT | MRT Corp - Official webpage for the Klang Valley My Rapid Transit.

    9/15/2013http://www.mymrt.com.my/en/bumiputera-main-work-contractor