List of Bumiputera Main Work ContractorsNo Package Name LOA Date Contractor
PART A : ADVANCE WORKS
1 AW2 - Package C1 Construction and completion of working platform including Earthworks, Access Road, Drainage Works,TNB Substation, Retaining Walls, Utilities Protection and Ancillary Works for Semantan launching shaft
03/06/2011 Menta Construction Sdn Bhd
2 AW5 - Package D2Relocation of existing sewerage and water mains for Cochrane launching shaft
24/06/2011 Puncak Niaga (M) Sdn Bhd
3 AW12 - Package SYB1Relocation of existing water pipe line and traffic management for utilities relocation for KL Sentral
31/1/2012 Hatimuda Sdn Bhd
4 AW13 - Package TEL1The relocation of existing telecommunication lines for KL Sentral
14/12/2011 Sri Communication Sdn Bhd
5 AW14 - Package TCO1The relocation of existing fibre optic lines for KL Sentral
14/12/2011 Tenaga Nirwana (M) Sdn Bhd
6 AW15 - Package TNB1The relocation of existing power supply cables for KL Sentral and Merdeka
14/12/2011 Worktime Engineering Sdn Bhd
7 AW16 - Package TEL2The relocation of existing telecommunication lines for Merdeka
14/12/2011 Sri Communication Sdn Bhd
8 AW18 - Package TEL3Relocation of existing telecommunication lines for Maluri
19/1/2012 Sri Communication Sdn Bhd
9 AW19 - Package TCO2Relocation of existing fibre optic lines for Maluri
19/1/2012 Fastpro Sdn Bhd
10 AW20 - Package TNB2Relocation of existing power supply cables for Maluri
6/3/2012 Huls Transmission Sdn Bhd
PART B : VIADUCT GUIDEWAY
11 Elevated Section V1 - ViaductConstruction and completion of viaduct guideway and other associated works from Sungai Buloh to Kota Damansara Station
18/5/2012 Syarikat Muhibah & Perniagaan & Pembinaan Sdn Bhd
12 Elevated Section V6 - ViaductConstruction and completion of viaduct guideway and other associated works from Plaza Phoenix station to Bandar Tun Hussein Onn Station
16/2/2012 Ahmad Zaki Sdn Bhd
13 Elevated Section V7 - ViaductConstruction and completion of viaduct guideway and other associated works from Bandar Tun Hussein Onn to Taman Mesra
18/5/2012 MTD Construction Sdn Bhd
PART C : DEPOTS
14 Package Dpt1: Construction And Completion Of Sungai Buloh Maintenance Depot, Administration Building, External Works And Other Associated Works
18/5/2012 Trans Resources Corporation Sdn Bhd
15 Package Dpt2: Construction And Completion Of Kajang Maintenance Depot, External Works And Other Associated Works
24/7/2012 TSR Bina Sdn Bhd
PART D : UNDERGROUND WORKS
16 Underground works (Tunnel stations & associated structures) between Semantan north portal and Maluri south portal
30/3/2012 MMC Gamuda KVMRT (T) Sdn Bhd
PART E : MULTISTOREY CAR PARKS
17 Elev 1 - Package MSPR1 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works At Sungai Buloh Station
24/7/2012 TSR Bina Sdn Bhd
18 Elev 8 - Package MSPR9 : Construction And Completion Of Multi Storey Car Park Building, External Works And Other Associated Works at Kajang Station
18/3/2013 SMPP-IBWANI JOINT VENTURE
PART E : MULTISTOREY CAR PARKS
19 Elevated Section ST1 - StationsPackage S1: Construction And Completion Of Elevated Stations And Other Associated Works At Sungai Buloh, Kg. Baru Sungai Buloh And Kota Damansara
28/8/2012 Trans Resources Corporation Sdn Bhd
20 Elevated Section ST2 - StationsPackage S2 : Construction And Completion Of Elevated Stations And Other Associated Works At Taman Industrial Sungai Buloh, PJU 5 And Dataran Sunway
03/10/2012 Naim Engineering Sdn Bhd
Page 1 of 2MYMRT | MRT Corp - Official webpage for the Klang Valley My Rapid Transit.
9/15/2013http://www.mymrt.com.my/en/bumiputera-main-work-contractor
-
Routemap Stations Project Updates Traffic Announcements
21 C opyri gh t 20 13 Mas s Rapi d Tr ansi t Corpor ati on Sdn Bhd. ( 9028 84V) Al l Ri ghts Re ser ved. Home Cont act Us MRT Hotline 1800-82-6868
No Package Name LOA Date Contractor
21 Elevated Section ST4 - StationsPackage S4 : Construction And Completion Of Elevated Stations And Other Associated Works At Section 16, Bandar Damansara And Semantan
07/9/2012 Naim Engineering Sdn Bhd
22 Elevated Section ST6 - StationsPackage S6 : Construction And Completion Of Elevated Stations And Other Associated Works At Taman Suntex, Taman Cuepacs And Bandar Tun Hussein Onn
28/8/2012 Ahmad Zaki Sdn Bhd
23 Elevated Section ST7 - StationsPackage S7 : Construction And Completion Of Elevated Stations And Other Associated Works At Balakong And Taman Koperasi
28/8/2012 Apex Communication Sdn Bhd
24 Elevated Section ST8 - StationsPackage S8: Construction And Completion Of Elevated Stations And Other Associated Works At Saujana Impian, Bandar Kajang And Kajang
03/10/2012 Apex Communication Sdn Bhd
PART E : MULTISTOREY CAR PARKS
25 Package ECS1: Supply, Procurement, Installation, Testing And Commissioning Of Environmental Control System For Elevated Package V1 To V4 And Sungai Buloh Depot
18/3/2013 Kejuruteraan Astra Sdn Bhd
26 Package ECS2: Supply, Procurement, Installation, Testing And Commissioning Of Environmental Control System For Elevated Package V5 To V8 And Kajang Depot
18/3/2013 FastColl Corporation Sdn Bhd
27 Package FD3: Supply, Procurement, Installation, Testing And Commissioning Of Fire Detection and Protection System For Elevated Package V5 To V6
18/3/2013 Zulfan (M) Sdn Bhd
28 Package SDDT-E: Supply, Delivery And Supervision Of Installation, Testing And Commissioning Of Step Down Distribution Transformer For All Elevated Packages, Sungai Buloh and Kajang Depot
18/3/2013 PTIS Engineering Sdn Bhd
29 Package UPS-E: Supply, Delivery And Supervision Of Installation, Testing And Commissioning Of Uninterruptible Power Supply For All Elevated Stations
18/3/2013 Info-Matic Power Sdn Bhd