  • MRP & Production Planning

  • Course ObjectivesUnderstand the principles of Demand Management (DM)Define the Materials Requirements Planning (MRP) processDescribe how to valuate MRP planning runsPerform DM and MRP transactions

  • Table of contentsModule 1: Master DataModule 2: Demand ManagementModule 3: Material Requirements PlanningModule 4: MRP Planning RunsCourse MapModule 5: Summary

  • PP flow & Integration

    Sales & Ops Planning

    MRP

    Capacity Req. Planning

    Long Term Capacity Planning

    Demand Management

    Production Execution

  • Master Data Related Transactions Practice the following transactions

    MM03 Display Material MasterCS03 Display BOMCR03 Display Work CenterCA23 Display Rate routingMM03 Display Production Version

  • Table of contentsModule 1: Master DataModule 2: Demand ManagementModule 3: Material requirements PlanningModule 4: MRP Planning RunsCourse MapModule 5: Summary

  • What is Demand Management?Demand Management is used to determine requirement quantities and delivery dates for finished products Demand Management provides a demand program which is used by MRP to generate production plansDepending on the planning strategy chosen in the material master, the demand program can use forecasts of demand, actual demand, or combinations of bothActual demand is created in sales order management (customer orders) and materials management (warehouse replenishment)Forecasts of demand are represented by planned independent requirements which are copied from the Sales and Operations Plan

  • What is the DM Process (1)?SOP plans are transferred to Demand Management as Independent Requirements for end productsThe actual sales orders are for information purpose only and are not considered in planning.In case the sales orders significantly vary from the forecasted demand; Planners revise the demand before running MRP to generate manufacturing orders and purchase requisitions

  • Who is Responsible for DM?Planner (DEM)Responsible for managing the demand by comparing the actual demand with the forecast and manipulate the plan based on the actual demand before executing MRP

  • DM Related TransactionsPractice the following TransactionsMM03 Display StrategyMD63 - Display Independent RequirementsMD04 - Display Stock Requirements ListMD74 Reorganise Independent Requirements

  • Table of contentsModule 1: Master DataModule 2: Demand ManagementModule 3: Material Requirements PlanningModule 4: MRP Planning RunsCourse MapModule 5: Summary

  • Materials Requirements PlanningMRP compares the requirements for end products, from Demand Management, with the current stocks and creates planned manufacturing orders

    DemandProgram

  • MRP stands for: Materials Requirements Planning.

    The function of MRP is to provide material availability, that is, it is used to procure or produce the requirement quantities on time. This process involves the monitoring of stocks and demand, leading to the automatic creation of procurement proposals for purchasing or production.

    The main objective of MRP is to determine which material is required, the quantity required and by when it is required.

    What is MRP?

  • What is the MRP Process (1) ?MRP compares the requirements for end products, from Demand Management, with the current stocks and planned manufacturing ordersMRP chooses a Production Version which indicates the Bill of Material and Routing to be used MRP then explodes the product BOMs to determine the dependent requirements for intermediate products and purchased raw materials

  • What is the MRP Process (2) ?MRP will normally be run weekly.

    The MRP process assumes infinite capacityThe Rough-Cut Capacity Planning check in SOP ensures that the loading is broadly correct before MRP runs.

  • MRP Type For the MRP procedure, use MRP type PD in the material masterMRP creates planned orders or requisition receipts to balance the demand planSafety stock can be used to cover unplanned requirements

    TimeReceiptsRequirements

  • Who is Responsible for MRP?MRP ControllerResponsible for running and operating the material requirement planning to check and track the planned requirement for both finished products and raw material in order to generate Production Orders and Purchasing Requisitions

  • Table of contentsModule 1: Demand ManagementModule 2: Material requirements PlanningModule 3: Master DataModule 4: MRP Planning RunsCourse MapModule 5: Summary

  • EvaluationsThere are several options for analyzing the Planning runMRP listBy materialCollectivelyStock requirements listBy materialCollectivelyPrinted MRP list

    Planning ResultMRP list

  • MRP listUse the MRP list to analyze the planning resultThe MRP list displays the future stock/requirements situation at the time of the last planning run By using the collective display, you can select a specific MRP list based on plant and MRP controllerAnalyze the exception messages in the MRP list, judge and or solve problemsUse the processing indicator to indicate that you checked the material

  • Planned orderIs the output of an MRP runAre automatically createdPlanned orders may be converted to production / process orders or purchase requisitionsMRPPlanned Order102030

    Requirements

  • MRP Related TransactionsPractice the following exercise

    MD01 Total Planning Run OnlineMD02 Single-Item, Multi-LevelMDBT Total Planning in BackgroundMD07 Stock Requirements List CollectiveMD05 Evaluate MRP ListMD44 Planning Situation Material