MRP Improvement in distribution center: to jump on
dynamic driven planning rulesIurii Moiseenko, system project manager, SAPDistribution center, FMCG+ supermarket retail chain12/10/16
What we need is 3 KPIs improvement Availability ->
Maximization of inventory turnover ->
Increasing of assortment - >Qwertyuiopo[asdfghjkl;’zxcvbnm,,.qwqwwertryuiopop[p[Adfghjkkll;L;zzxxccvvbnnmm,,../qwertyuiuioop[p[]’;lkjhgfdsazxcvbnm,.
DemandStock
How to reach thisIncreasing order regularity• increasing cross dock assortment• Increasing overall DC assortment • Increasing stock service level with decreasing
minimum order qty.
From
to iiiiiiiiiiiiiiii
Master data settings on Regular qualification ABC + XYX : • operation management strategy should depend
on dynamic characteristic rather than static and continuous update
From:
To:
KPI weekly monitoring From: - -- ----- - ------- ---------- - - - - - -To: ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
IT project: Application improvement regarding users expectation
From: To:
Main change
Current (not past) article behavior should start to dictate planning settings in SAP
Derived KPI – Weekly monitoring1st level 2n level for weekly control Responsible (business
or service)
Availability Zero stock items qty. registration Business
Availability Availability itself by category Business
Availability Qty. incorrect order with wrong time order Service
Inventory turnover Deviation from target turnover Business
Inventory turnover Qty. change/deletion of orders Service
Inventory turnover Master data change request Service
Increasing assortment Average basket increasing Business
Increasing assortment Present DC assortment in chain assortment Business
Increasing assortment Auto order assortment coverage Service
Mosaic of settings Maximum target
stockMinimum target
stock Safety stock
Allocation table recalculation Demand planning Minimum order
calculation
Calendars re assignments
Cross-dock lead and release timing
assignmentsSafe lead time
Mosaic of articles ABC - by qty. revenue in full
assortment
ABC - by qty. revenue in sub category
XYZ - by qty in full
assortment
CPAR - Distribution method (cross, push, article driven,
recipient driven)
HML-Expired write-off risk
qualification
A/B/C A/B/C X/Y/Z H/M/L C/P/A
Matching article and setting mosaicsArticle characteristics (ABC, XYS, write-off risks) and settings option should be matched with usage stock management policy, as example:
Max Min Safety Demand AllocationMin order Safe lead Calendars Time releaseA A X L C x x x x x x x x
A A X L P x x x x x xA A X L A x x x x x x x
A A X L C x x x x x
A A X L P x x x x
A A X L A x x x x x
A A Y L C x x x xA A Y L P x xA A Y L A x x x x xB A Y L C x xB A Y L P x x xB A Y L A x x xB A Z L C x
B A Z L P x x x
High level plan of deploymentWork Responsible Support Accountable Deadline
Qualification matching and settings Business Service Business In PM plan
Master data update Service Business Service In PM plan
BI reports deployment for KPI Service Business Service In PM plan
Application settings: new order, MRP type, distribution indicators
Service Business Service In PM plan
Testing (test script and testing) Business Service Business In PM plan
Go-live deployment Service Service Service In PM plan
Initial support Service Business Service In PM plan
KPI monitoring Business Service Business In PM plan
Continuality MD update Service Business Business monthly
Project management Service Business Iurii M. In PM plan
Next stepsBusiness case validation and project plan authorization.