SULTANATE OF OMAN
MINISTRY OF TRANSPORT AND COMMUNICATIONS DIRECTORATE GENERAL OF ROADS & LAND TRANSPORT
MUSCAT
UPGRADING OF FALAJ AL QABAIL ROUNDABOUT TENDER NO. 51/2012
MONTHLY PROGRESS REPORT NO. 5
MAY 2014
CONSULTANT:
RENARDET S.A. & PARTNERS CONSULTING ENGINEERS LLC. P.O. Box 579, Muscat, P.C. 100, Sultanate of Oman
CONTRACTOR:
CONSOLIDATED CONTRACTORS CO. LLC P.O. Box 614, Muscat, P.C. 100, Sultanate of Oman
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 1
Table of Contents
S. No. Description Page No.
1. Project Particulars 2
2. Scope of Work 3
3. Typical Cross Sections 4
4. Site visits/ Meetings 6
5 Engineer’s Site Staff 7
6. Progress Review 8
7. Financial Status 16
8. Contractor’s Resources 17
9. QA/ QC Reports 22
10. Engineer’s Comments 28
11. Project Correspondence 29
12. Progress Photographs 33
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 2
Project Particulars
Client: Ministry of Transport &
Communications
P.O. Box 684, Muscat, Postal Code 113
Directorate General of Roads
Sultanate of Oman.
Consultant: Renardet S.A & Partners L.L.C.
P.O. Box 579, Muscat, Postal Code 100
Sultanate of Oman.
Contractor: Consolidated Contractors Company
L.L.C.
P.O. Box 614, Muscat, Postal Code 100
Sultanate of Oman.
Project Commencement Date: 30.10.2013
Mobilization Period: 60 Days
Construction Period: 548 Days
Completion date: 29.06.2015
Original Contract Value:
(Including Contingencies) R.O. 17,884,403.000
Amount of Contingencies: R.O. 1,402,155.613
Original Contract Value:
(Excluding Contingencies) R.O. 16,482,247.387
Planned physical progress
cumulative up to end of May 2014
23.21 %
Achieved physical progress
cumulative up to end of May 2014 10.66 %
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 3
Scope of Work
This project is located in Batinah Region on existing Batinah Highway in the Wilayat Sohar and
consists of construction of an interchange in place of existing roundabout along with allied works.
Total length of the project along Batinah highway is about 4.0 km which shall be converted from four
lanes to six lanes with tapering back to 4lanes, all as shown on plans. Also included in the scope of
work is the construction of service roads, pedestrian underpasses.
The work also includes expropriation of properties, relocation/protection of services (sewerage,
telephone, electricity, water, irrigation) road lighting works and traffic signals.
Major items within the scope of work consist of but not limited to the following:
Removal of existing asphalt surface, extension of existing embankment and earthwork to achieve
the designed profile and gradient.
Removal of existing drainage structures and construction of new ones including protection works
as shown on construction drawings and as directed.
Expropriation of open/built up properties and removal of existing structures thereupon.
Construction of interchange ramps, Box Girder Bridge, roundabout, pedestrian underpasses and
service roads.
Provision of new street lighting system/traffic signals and removal/disposal of existing street light
poles including conductors/cables, transformers, feeder pillars, foundations etc., all for the
proper completion of the job.
Construction of earthen embankment/sub grade, sub-base, aggregate base course, bituminous base
course and bituminous wearing course as per details on the construction drawings.
Installation of road side furniture (traffic signs, road marking etc.) and protection works on
embankment slopes.
Relocation/Protection of existing LT, 11KV and 33KV transmission lines and allied items
(transformers etc.) as per the requirements of concerned authority.
Relocation/Protection of existing utilities (sewerage, telephone, electricity, water lines and
irrigation) as per the requirements of concerned authorities.
Provision of ducts for future utilities as per the requirements of utility operator.
Construction of concrete safety barriers, fixing of guard rails and paving tiles.
Provision of traffic diversion in coordination with concerned authorities.
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 6
Site visits/ Meetings
S. No. Details of Site Visit Date Final Outcome/ Decisions
1 ROP Traffic Dept. visited the site in
the night and inspected the Traffic
Diversion arrangements in Detours.
02.05.2014 Traffic Diverted on the newly
constructed Detours successfully.
2 Eng. Waleed from DGR visited the
Project site and detours.
07.05.2014 Inspected the locations of access
location for Oman Oil and Shell
Filling Stations and informed about a
meeting to be attended at HE
Governor’s Office.
3 Meeting with HE Governer regarding
the access for Shell and Oman Oil
Filling Stations
08.05.2014 Decided to provide an additional lane
to provide access to the filling
stations.
4 Meeting with Eng. Salem Al Makbari,
in Sohar Municipality regarding the
drainage issues of the project region.
15.05.2014 Mr. Salem will write a letter to DGR
seeking clarification of hydraulic
design of the culverts provided in the
project.
5 Site visit of Wadi Al Zizi road along
with Col. Mohd. Rashid Al Shibli and
other companies
19.05.2014 ROP requested to take up the
rehabilitation of Existing Overpass
Bridge, Service Road adjacent to
Wadi and Irish Crossing across wadi.
6 Meeting with Eng. Fares Jawad at
Project Office.
21.05.2014 Discussed the following points:
Requirements at Wadi Al Zizi
Drainage layout of Bridge
Land Appropriation
Consultant’s Quantity Surveyor
Contractor’s proposal to
provide ABC Class B
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 7
Engineer’s Site Staff
1. Roberto Benigni Head Supervision Projects
2. Muneer Abdul Resident Engineer
3. Hussein Shah Material Engineer
4. Ernesto B. Paredes Bridge Engineer
5. Sande H Tangaras Civil Engineer
6. Mohamed Safie Land Surveyor
7. Aseef Iqbal Site Inspector
8. Alaa Aldin Abdelfatah Site Inspector
9. Walid Samy Abdoh Mostafa Material Inspector
10. Haneefa Mohmmed Al Zadjali Secretary
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 8
REV
.:0
PER
IOD
EN
DIN
G:
May-1
4
2013
De
cJan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
No
vD
ec
Jan
Fe
bM
ar
Ap
rM
ay
Ju
n
CL
14 P
lan
%0.3
0
8.6
7
19.2
3
26.8
9
31.7
7
36.6
4
41.5
1
46.3
9
51.2
6
56.1
3
61.0
1
65.8
8
70.7
6
75.6
3
80.5
0
85.3
8
90.2
5
95.1
3
100.0
0
Actu
al
-
6.6
2
13.0
3
22.3
6
37.3
1
43.0
0
CL
14 P
lan
%0.0
00.0
00.3
820.3
747.7
048.3
348.3
348.3
348.3
348.3
348.3
348.3
348.3
359.9
177.8
490.2
794.9
3100.0
0100.0
0
Actu
al
-
10.0
9
10.0
9
17.5
9
19.5
2
70.5
5
CL
14 P
lan
%0.0
00.0
00.0
00.7
86.5
816.7
629.3
841.3
758.6
466.6
074.1
882.8
584.7
584.7
585.2
492.3
492.3
498.3
6100.0
0
Actu
al
-
-
-
-
4.3
5
-
CL
14 P
lan
%0.0
00.0
01.0
19.2
129.3
045.9
156.9
062.2
464.5
967.9
469.0
869.0
875.0
582.8
593.4
898.6
4100.0
0100.0
0100.0
0
Actu
al
-
-
-
5.0
0
5.0
0
36.2
4
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.0
00.0
00.0
011.0
726.2
741.9
859.9
878.7
379.9
079.9
085.2
089.4
592.6
0100.0
0
Actu
al
-
-
-
-
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.0
00.0
00.0
00.0
00.0
87.7
719.3
231.2
244.9
451.9
852.1
490.1
490.1
4100.0
0
Actu
al
-
-
-
-
CL
14 P
lan
%0.0
00.0
00.2
31.4
32.9
710.1
723.6
536.5
151.4
763.0
674.2
675.9
777.3
780.0
582.4
088.9
792.1
398.5
5100.0
0
Actu
al
-
-
-
0.4
8
1.2
6
5.5
9
CL
14 P
lan
%0.0
00.0
04.0
215.2
134.6
257.8
969.2
681.4
083.3
883.4
684.5
092.8
999.9
6100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
-
-
-
0.0
1
6.0
5
14.7
3
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.3
81.2
12.6
33.4
24.2
35.5
06.0
86.0
834.3
599.3
899.7
699.7
6100.0
0100.0
0
Actu
al
-
-
-
2.5
0
14.3
9
14.3
9
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.0
00.0
02.8
017.8
743.8
561.5
972.9
881.1
583.9
484.4
285.3
592.8
696.3
9100.0
0
Actu
al
-
-
-
-
-
2.6
1
CL
14 P
lan
%0.0
00.0
00.0
04.4
317.2
333.3
649.1
365.0
780.7
993.8
2100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0100.0
0
Actu
al
0.0
0-
0.0
06.1
6
9.8
717.6
3
CL
14 P
lan
%0.0
00.0
00.0
00.0
00.0
00.1
70.7
91.4
35.6
513.4
121.8
430.5
632.9
470.9
475.0
494.0
296.4
3100.0
0100.0
0
Actu
al
-
-
-
0.1
3
5.5
2
9.2
6
CL
14 P
lan
0.0
1
0.2
6
1.6
7
5.9
1
13.1
5
23.2
1
32.6
4
42.3
7
52.5
8
62.3
7
70.8
6
76.5
9
81.1
3
84.6
9
87.4
8
91.3
1
94.8
6
98.3
3
100.0
0
Actu
al C
um
-
0.4
0
0.5
9
1.6
7
4.6
3
10.6
6
-
-
-
-
-
-
-
-
-
-
-
-
-
2013
De
cJan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
No
vD
ec
Jan
Fe
bM
ar
Ap
rM
ay
Ju
n
0.0
1
0.2
5
1.4
2
4.2
3
7.2
5
10.0
6
9.4
2
9.7
3
10.2
1
9.7
9
8.4
9
5.7
2
4.5
5
3.5
6
2.7
9
3.8
3
3.5
5
3.4
7
1.6
7
-
0.4
0
0.1
9
1.0
8
2.9
5
6.0
4
0.0
1
0.2
6
1.6
7
5.9
1
13.1
5
23.2
1
32.6
4
42.3
7
52.5
8
62.3
7
70.8
6
76.5
9
81.1
3
84.6
9
87.4
8
91.3
1
94.8
6
98.3
3
100.0
0
-
0.4
0
0.5
9
1.6
7
4.6
3
10.6
6
CU
MU
LA
TIV
E P
RO
GR
ES
SC
L14 O
rg P
lan
Cu
mu
lati
ve
%
Actu
al C
um
ula
tive
MM
EP
Wo
rks
&
Du
cts
52,6
46
2.4
9
TO
TA
L2,1
10,7
44
100.0
00
2014
2015
MO
NT
HL
Y P
RO
GR
ES
SC
L14 O
rg P
lan
pe
r M
on
th %
Actu
al p
er
Mo
nth
JD
rain
ag
e W
ork
s31,7
94
1.5
1
KIn
cid
en
tal
Co
ns
tru
cti
on
295,8
66
14.0
2
LM
SE
wa
lls
133,1
08
6.3
1
H
Co
nc
rete
fo
r
Bo
x C
ulv
ert
/Un
de
rpa
s
776,8
07
36.8
0
IC
on
cre
te f
or
Bri
dg
e24.9
2526,0
91
FS
ub
ba
se
&
Ag
gre
ga
te B
as
e2.8
459,8
58
GB
itu
min
ou
s
Pa
ve
me
nt
2.3
649,9
08
DE
mb
an
km
en
t62,3
20
2.9
5
ES
tru
ctu
ral
Ex
ca
va
tio
n16,2
25
0.7
7
BR
oa
d D
ive
rsio
ns
62,7
24
2.9
7
C
Cle
ari
ng
&
Re
mo
va
l o
f
Ob
str
uc
tio
ns
2.0
643,3
97
UP
GR
AD
ING
OF
FA
LA
J A
L Q
AB
AIL
RO
UN
DA
BO
UT
- O
MA
N
MA
NH
OU
RS
OV
ER
AL
L P
RO
JE
CT
S-C
UR
VE
Ite
mD
es
cri
pti
on
Bu
dg
et
Man
-Hrs
Wtd
.
%
Pla
n/
Actu
al
2014
2015
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 9
2013
De
cJan
Fe
bM
ar
Ap
rM
ay
Ju
nJu
lA
ug
Se
pO
ct
No
vD
ec
Jan
Fe
bM
ar
Ap
rM
ay
Ju
n
0.0
1
0.2
5
1.4
2
4.2
3
7.2
5
10.0
6
9.4
2
9.7
3
10.2
1
9.7
9
8.4
9
5.7
2
4.5
5
3.5
6
2.7
9
3.8
3
3.5
5
3.4
7
1.6
7
-
0.4
0
0.1
9
1.0
8
2.9
5
6.0
4
-
-
-
-
-
-
-
-
-
-
-
-
-
0.0
10.2
61.6
75.9
113.1
523.2
132.6
442.3
752.5
862.3
770.8
676.5
981.1
384.6
987.4
891.3
194.8
698.3
3100.0
0
-
0.4
0
0.5
9
1.6
7
4.6
3
10.6
6
CU
MU
LA
TIV
E P
RO
GR
ES
SC
L14 O
rg P
lan
Cu
mu
lati
ve
%
Actu
al C
um
ula
tive
2014
2015
MO
NT
HL
Y P
RO
GR
ES
SC
L14 O
rg P
lan
pe
r M
on
th %
Actu
al p
er
Mo
nth
0.0
0
20
.00
40
.00
60
.00
80
.00
10
0.0
0
12
0.0
0
- 2 4 6 8
10
12
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
20
13
20
14
20
15
% Cumulative
% MONTHLY
MO
NT
HS
UP
GR
AD
ING
OF
FA
LA
J A
L Q
AB
AIL
RO
UN
DA
BO
UT
PR
OJ
EC
T -
OM
AN
MO
NT
HLY
CL
14
PL
AN
NE
D V
S. A
CT
UA
L M
AN
HO
UR
S
CL
14
Org
Pla
n p
er
Mo
nth
%A
ctu
al p
er
Mo
nth
CL
14
Org
Pla
n C
um
ula
tive %
Actu
al C
um
ula
tiv
e
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 10
Progress of Permanent Works
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 11
PILE FOUNDATIONS CONSTRUCTION PROGRESS SCHEDULE
as of 31 MAY 2014
LOCATION PILE NO. CASTING
SEQUENCE SETTING
OUT
BORING, REBARS, & CONCRETE
INTEGRITY TEST
LOAD TEST
- EP 01 3 26/3/2014 26/3/2014 - 7-8/5/2014
- EP 02 2 25/3/2014 25/3/2014 - 16-17/4/2014
- EP 03 1 25/3/2014 25/3/2014 - 5-6/4/2014
- EP 04 4 26/3/2014 26/3/2014 - 13-14/5/2014
P3R 85 1 04-07-2014 04-08-2014 23/4/2014 -
P3R 87 2 04-07-2014 04-08-2014 23/4/2014 -
P3R 83 3 04-08-2014 04-09-2014 23/4/2014 -
P3R 81 4 04-08-2014 04-09-2014 23/4/2014 -
P3R 79 5 04-08-2014 04-09-2014 23/4/2014 -
P1R 63 6 04-09-2014 04-10-2014 28/4/2014 -
P1R 65 7 04-09-2014 04-10-2014 28/4/2014 -
P3R 86 8 04-10-2014 04-12-2014 23/4/2014 -
P3R 84 9 04-10-2014 04-12-2014 23/4/2014 -
P3R 82 10 04-10-2014 04-12-2014 23/4/2014 -
P1R 68 11 04-12-2014 13/4/2014 28/4/2014 -
P1R 66 12 04-12-2014 13/4/2014 28/4/2014 -
P1R 61 13 04-09-2014 13/4/2014 28/4/2014 -
P3R 80 14 13/4/2014 14/4/2014 23/4/2014 -
P3L 28 15 13/4/2014 14/4/2014 28/4/2014 -
P1R 62 16 04-12-2014 15/4/2014 28/4/2014 -
P1R 67 17 14/4/2014 15/4/2014 28/4/2014 -
P1R 69 18 14/4/2014 15/4/2014 28/4/2014 -
P3L 26 19 15/4/2014 16/4/2014 28/4/2014 -
P3L 30 20 15/4/2014 16/4/2014 28/4/2014 -
P3L 32 21 15/4/2014 16/4/2014 28/4/2014 -
P1R 64 22 16/4/2014 17/4/2014 28/4/2014 -
P1L 6 WP 23 16/4/2014 17/4/2014 05-11-2014 30/4/2014 to
1/5/2014
P1L 14 24 16/4/2014 17/4/2014 05-11-2014 -
P3L 25 25 17/4/2014 20/4/2014 28/4/2014 -
P3L 27 26 17/4/2014 20/4/2014 28/4/2014 -
P3L 29 27 17/4/2014 20/4/2014 28/4/2014 -
P2R 78 28 19/4/2014 21/4/2014 05-11-2014 -
P2R 76 29 19/4/2014 21/4/2014 05-11-2014 -
P2R 74 30 19/4/2014 21/4/2014 05-11-2014 -
P2L 23 WP 31 21/4/2014 22/4/2014 - -
P3L 24 32 21/4/2014 22/4/2014 28/4/2014 -
P3L 31 33 20/4/2014 22/4/2014 28/4/2014 -
P1L 8 34 22/4/2014 23/4/2014 05-11-2014 -
P1L 10 35 22/4/2014 23/4/2014 05-11-2014 -
P1L 12 36 22/4/2014 23/4/2014 05-11-2014 -
P2L 17 37 23/4/2014 24/4/2014 - -
P2L 18 38 23/4/2014 24/4/2014 - -
P2L 22 39 23/4/2014 24/4/2014 - -
P1L 7 40 24/4/2014 26/4/2014 05-11-2014 -
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 12
PILE FOUNDATIONS CONSTRUCTION PROGRESS SCHEDULE
as of 31 MAY 2014
LOCATION PILE NO. CASTING
SEQUENCE SETTING
OUT
BORING, REBARS, & CONCRETE
INTEGRITY TEST
LOAD TEST
P1L 9 41 24/4/2014 26/4/2014 05-11-2014 -
P1L 13 42 24/4/2014 26/4/2014 05-11-2014 -
P1L 11 43 26/4/2014 27/4/2014 05-11-2014 -
P2L 16 44 26/4/2014 27/4/2014 - -
P2L 15 49 28/4/2014 29/4/2014 - -
P2L 20 50 27/4/2014 29/4/2014 - -
P2R 70 51 28/4/2014 29/4/2014 05-11-2014 -
P2R 71 52 29/4/2014 30/4/2014 05-11-2014 -
P2R 73 53 29/4/2014 30/4/2014 05-11-2014 -
P2R 75 54 29/4/2014 30/4/2014 05-11-2014 -
P5R 105 55 05-04-2014 05-05-2014 18/5/2014 -
P5R 104 56 05-04-2014 05-05-2014 18/5/2014 -
P5R 103 57 05-04-2014 05-05-2014 18/5/2014 -
P5R 102 58 05-05-2014 05-06-2014 18/5/2014 -
P5R 101 59 05-05-2014 05-06-2014 18/5/2014 -
P5R 100 60 05-05-2014 05-06-2014 18/5/2014 -
P5R 97 61 05-06-2014 05-07-2014 18/5/2014 -
P5R 98 62 05-06-2014 05-07-2014 18/5/2014 -
P5R 99 63 05-06-2014 05-07-2014 18/5/2014 -
P5L 48 WP 64 05-07-2014 05-08-2014 - 24/5/2014 to
25/5/2014
P5L 49 65 05-07-2014 05-08-2014 - -
P5L 50 66 05-07-2014 05-08-2014 - -
P5L 42 67 05-10-2014 05-11-2014 - -
P5L 44 68 05-10-2014 05-11-2014 - -
P5L 46 69 05-10-2014 05-11-2014 - -
P5L 43 70 05-10-2014 05-12-2014 - -
P5L 45 71 05-10-2014 05-12-2014 - -
P5L 47 72 05-10-2014 05-12-2014 - -
AB1 R 56 73 05-12-2014 13/5/2014 21/5/2014 -
AB1 R 58 74 05-12-2014 13/5/2014 21/5/2014 -
AB1 R 60 75 05-12-2014 13/5/2014 21/5/2014 -
AB1 L 1 76 14/5/2014 15/5/2014 21/5/2014 -
AB1 L 3 77 14/5/2014 15/5/2014 21/5/2014 -
AB1 L 5 78 14/5/2014 15/5/2014 21/5/2014 -
AB1 R 57 79 13/6/2014 14/6/2014 21/5/2014 -
AB1 R 59 80 13/6/2014 14/6/2014 21/5/2014 -
AB1 L 2 81 15/5/2014 17/5/2014 21/5/2014 -
AB1 L 4 82 15/5/2014 17/5/2014 21/5/2014 -
AB2 L 51 83 19/5/2014 20/5/2014 - -
AB2 L 53 84 19/5/2014 20/5/2014 - -
AB2 L 55 85 19/5/2014 20/5/2014 - -
AB2 R 106 86 19/5/2014 20/5/2014 - -
AB2 L 54 87 20/5/2014 21/5/2014 - -
AB2 R 108 88 20/5/2014 21/5/2014 - -
AB2 R 110 89 20/5/2014 21/5/2014 - -
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 13
PILE FOUNDATIONS CONSTRUCTION PROGRESS SCHEDULE
as of 31 MAY 2014
LOCATION PILE NO. CASTING
SEQUENCE SETTING
OUT
BORING, REBARS, & CONCRETE
INTEGRITY TEST
LOAD TEST
AB2 L 52 90 21/5/2014 22/5/2014 - -
AB2 R 107 91 21/5/2014 22/5/2014 - -
AB2 R 109 92 21/5/2014 22/5/2014 - -
ACTIVITY AB1 L P1L P2L P3L P4L P5L AB2 L
PEDESTAL - - - - - - -
PIER N/A - - - - - N/A
2nd Lift - - - - - - -
Height (m) - - - - - - -
1st Lift - - - on-going - - -
Height (m) - - - - - - -
BIT. PAINTING - 28-May-14 - 17-May-14 - - -
PILE CAP - 17-May-14 - 08-May-14 - - -
F/P & BLINDING N/A 11-May-14 - 01-May-14 - on-going N/A
ACTIVITY AB1 R P1R P2R P3R P4R P5R AB2 R
PEDESTAL - - - - - - -
PIER N/A - - - - - N/A
2nd Lift - on-going - on-going - - -
Height (m) - - - - - - -
1st Lift - 20-May-14 on-going 26-May-14 - - -
Height (m) - 0.37 - 0.65 - - -
BIT. PAINTING - 12-May-14 25-May-14 08-May-14 - 31-May-14 -
PILE CAP - 04-May-14 13-May-14 30-04-2014 - 20-May-14 -
F/P & BLINDING N/A 27-Apr-14 07-May-14 22-Apr-14 - 14-May-14 N/A
PREVIOUS MONTH THIS MONTH
BRIDGE SUB-STRUCTURE PROGRESS SCHEDULE
As of 31 May 2014
SUB-STRUCTURE WORK PROGRESS (RHS)
SUB-STRUCTURE WORK PROGRESS (LHS)
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 14
Re
bar
sC
on
cre
teR
eb
ars
Co
ncr
ete
Re
bar
sC
on
cre
te
10+
000
- 0+
022
22.0
01.
0 x
2.0
on
-go
ing
--
--
--
-2
0+02
2 -
0+04
018
.00
1.0
x 2.
028
-May
-14
--
--
--
-3
0+04
0 -
0+05
212
.00
1.0
x 2.
015
-Ap
r-14
16-A
pr-
1416
-Ap
r-14
19-A
pr-
1419
-Ap
r-14
21-A
pr-
1421
-Ap
r-14
29-A
pr-
144
0+05
2 -
0+07
018
.00
1.0
x 2.
005
-Mar
-14
24-M
ar-1
424
-Mar
-14
08-A
pr-
1408
-Ap
r-14
12-A
pr-
1412
-Ap
r-14
19-A
pr-
145
0+07
0 -
0+10
030
.00
1.0
x 2.
002
-Mar
-14
05-M
ar-1
405
-Mar
-14
06-M
ar-1
406
-Mar
-14
11-M
ar-1
411
-Mar
-14
19-M
ar-1
46
0+10
0 -
0+10
44.
001.
0 x
2.0
10-M
ay-1
4-
--
--
--
70+
104
- 0+
122
18.0
01.
0 x
2.0
10-M
ay-1
417
-May
-14
17-M
ay-1
420
-May
-14
20-M
ay-1
424
-May
-14
24-M
ay-1
429
-May
-14
80+
122
- 0+
139
17.0
01.
0 x
2.0
10-M
ay-1
414
-May
-14
14-M
ay-1
417
-May
-14
17-M
ay-1
419
-May
-14
19-M
ay-1
429
-May
-14
90+
139
- 0+
150
11.0
01.
0 x
2.0
05-M
ar-1
401
-Ap
r-14
01-A
pr-
1405
-Ap
r-14
05-A
pr-
1408
-Ap
r-14
08-A
pr-
1412
-Ap
r-14
100+
150
- 0+
170
20.0
01.
0 x
2.0
02-M
ar-1
406
-Mar
-14
06-M
ar-1
405
-Ap
r-14
05-A
pr-
1412
-Ap
r-14
12-A
pr-
1410
-Ap
r-14
110+
170
- 0+
182
12.0
01.
0 x
2.0
19-M
ay-1
422
-May
-14
22-M
ay-1
4o
n-g
oin
g-
--
-12
0+18
2 -
0+20
018
.00
1.0
x 2.
019
-May
-14
21-M
ay-1
421
-May
-14
25-M
ay-1
425
-May
-14
on
-go
ing
--
130+
200
- 0+
213.
513
.50
1.0
x 2.
024
-Fe
b-1
427
-Fe
b-1
427
-Fe
b-1
401
-Mar
-14
01-M
ar-1
404
-Mar
-14
04-M
ar-1
410
-Mar
-14
140+
213.
5 -
0+23
218
.50
1.0
x 1.
5-
--
--
--
-15
0+23
2 -
0+25
018
.00
1.0
x 1.
510
-Ap
r-14
13-A
pr-
1413
-Ap
r-14
15-A
pr-
1415
-Ap
r-14
19-A
pr-
1419
-Ap
r-14
13-M
ay-1
416
0+25
0 -
0+25
88.
001.
0 x
1.5
23-A
pr-
1426
-Ap
r-14
26-A
pr-
1427
-Ap
r-14
27-A
pr-
1401
-May
-14
01-M
ay-1
413
-May
-14
170+
258
- 0+
267
9.00
1.0
x 1.
5-
--
--
--
-26
7.00
71.5
0
MA
RC
H 2
01
4A
PRIL
201
4M
AY
2014
BA
LAN
CE
(m)
=TO
TAL
LEN
GTH
(m
) =
Bit
um
ino
us
Pai
nt
(2 C
oat
s)
FALA
J R
CBC
PR
OG
RES
S SC
HED
ULE
As
of
31 M
ay 2
014
NO
.ST
ATI
ON
TYP
E (1
Ce
ll) &
DIM
ENSI
ON
(m
)
LEN
GTH
(m)
F/P
&
BLI
ND
ING
(Cha
inag
e 23
+411
.400
)
BA
SE S
LAB
WA
LLTO
P S
LAB
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 15
Re
bar
sC
on
cre
teR
eb
ars
Co
ncr
ete
Re
bar
sC
on
cre
te
121
+260
3 ce
lls
- 2.
0 x
1.5
49.0
790
--
--
--
--
221
+485
1 ce
ll -
2.0
x 1
.555
.790
0-
--
--
--
-3
21+8
382
x 4
cell
s -
2.0
x 1.
563
.250
0-
--
--
--
-4
21+9
72.4
11 x
4 c
ell
s -
3.0
x 2.
065
.647
0-
--
--
--
-B
lock
11
x 4
cell
s -
3.0
x 2.
028
.038
024
-May
-14
--
--
--
-B
lock
21
x 4
cell
s -
3.0
x 2.
028
.031
024
-May
-14
--
--
--
-B
lock
31
x 4
cell
s -
3.0
x 2.
028
.026
017
-May
-14
25-M
ay-1
425
-May
-14
--
--
-B
lock
41
x 4
cell
s -
3.0
x 2.
028
.022
018
-May
-14
--
--
--
-B
lock
51
x 4
cell
s -
3.0
x 2.
028
.019
018
-May
-14
29-M
ay-1
429
-May
-14
--
--
-B
lock
61
x 4
cell
s -
3.0
x 2.
028
.018
018
-May
-14
--
--
--
-B
lock
71
x 4
cell
s -
3.0
x 2.
028
.019
018
-May
-14
--
--
--
-B
lock
81
x 4
cell
s -
3.0
x 2.
028
.022
026
-May
-14
--
--
--
-B
lock
91
x 4
cell
s -
3.0
x 2.
028
.026
026
-May
-14
--
--
--
-B
lock
10
1 x
4 ce
lls
- 3.
0 x
2.0
28.0
310
28-M
ay-1
4-
--
--
--
Blo
ck 1
11
x 4
cell
s -
3.0
x 2.
028
.038
028
-May
-14
--
--
--
-B
lock
12
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
150
--
--
--
--
Blo
ck 1
31
x 4
cell
s -
3.0
x 2.
021
.010
0-
--
--
--
-B
lock
14
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
060
--
--
--
--
Blo
ck 1
51
x 4
cell
s -
3.0
x 2.
021
.003
0-
--
--
--
-B
lock
16
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
010
--
--
--
--
Blo
ck 1
71
x 4
cell
s -
3.0
x 2.
021
.000
0-
--
--
--
-B
lock
18
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
010
--
--
--
--
Blo
ck 1
91
x 4
cell
s -
3.0
x 2.
021
.003
0-
--
--
--
-B
lock
20
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
060
--
--
--
--
Blo
ck 2
11
x 4
cell
s -
3.0
x 2.
021
.010
0-
--
--
--
-B
lock
22
1 x
4 ce
lls
- 3.
0 x
2.0
21.0
150
--
--
--
--
Blo
ck 2
31
x 4
cell
s -
3.0
x 2.
06.
635
0-
--
--
--
-B
lock
24
1 x
4 ce
lls
- 3.
0 x
2.0
6.78
20
--
--
--
--
Blo
ck 2
51
x 4
cell
s -
3.0
x 2.
06.
819
0-
--
--
--
-B
lock
26
1 x
4 ce
lls
- 3.
0 x
2.0
7.21
70
--
--
--
--
Blo
ck 2
71
x 4
cell
s -
3.0
x 2.
07.
975
0-
--
--
--
-B
lock
28
1 x
4 ce
lls
- 3.
0 x
2.0
8.57
10
--
--
--
--
Blo
ck 2
91
x 4
cell
s -
3.0
x 2.
09.
267
0-
--
--
--
-B
lock
30
1 x
4 ce
lls
- 3.
0 x
2.0
9.94
90
--
--
--
--
Blo
ck 3
11
x 4
cell
s -
3.0
x 2.
010
.260
0-
--
--
--
-B
lock
32
1 x
4 ce
lls
- 3.
0 x
2.0
10.2
620
--
--
--
--
Blo
ck 3
31
x 4
cell
s -
3.0
x 2.
010
.265
0-
--
--
--
-
PR
EV
IOU
S
MO
NT
HTH
IS M
ON
TH
LHS
RH
S
RH
S
RCB
C P
RO
GR
ESS
SCH
EDU
LE (
BA
RR
EL)
As
of
31 M
ay 2
014
BA
SE S
LAB
WA
LLN
O.
TOP
SLA
BB
itu
min
ou
s
Pai
nt
(2 C
oat
s)LE
NG
TH (
m)
SKEW
( °
)F/
P &
BLI
ND
ING
TYP
E &
DIM
ENSI
ON
STA
TIO
N
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 16
Status of Payment Certificates Till May, 2014
Payment
Certificate
No.
Particulars
Contract
Amount
(RO)
Certified
Amount
(RO)
Approved
Amount
(RO)
Balance
Amount
Available (RO)
Original Contract Amount 17,884,403
1 Advance Payment 1,648,225 1,648,225
2 Interim Payment 514,442 513,608
3 Interim Payment 434,917
4 Interim Payment 407,538
Total Amount 17,884,403 3,005,122 2,161,833 14,879,281
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 17
List of Contractor’s Equipment at site
Sl. No. DESCRIPTION CCC HIRED
TOTAL
AVAILABLE
AT SITE
1 COMPRESSOR
2 AIR COMPRESSOR 0 1 1
3 GENERATOR 2 0 2
4 CRANES -
5 CRANES 30 TON / 25 TON / 70 TON 2 0 2
6 VEHICLES H.D.
7 DIESEL TANKER 0 0 0
8 FLAT TRAILER 0 1 1
9 HIAB TRUCK 0 2 2
10 P/MOVER + TIPPING TRAILER 3 0 3
11 TIPPER TRUCKS 12 0 12
12 WATER TANKER 5000 GAL 2 0 2
13 EARTH MOVING PLANT
14 BOBCAT 1 0 1
15 EXCAVATOR 0 2 2
16 JCB 4CX / 3CX 0 4 4
17 SHOVEL / WHEEL LOADER 3 0 3
18 DOZER D9N/D8R 0 1 1
19 TELEHANDLER 0 0 0
20 CIVIL ENGINEERING EQUIPMENT
21 CONCRETE MIXER 0 0 0
22 DYNAPAC S/ROLLER 0 0 0
23 E/WORK ROLLER 1 0 1
24 MOTOR GRADER 0 1 1
25 TITAN PAVER MACHINE 0 0 0
26 TYRE / PTR ROLLER 0 0 0
27 PAVER MACHINE 0 0 0
28 L. D. VEHICLES & TRUCKS
29 DYNA TRUCK 2 1 3
30 MAINTENANCE TRUCKS 1 0 1
31 ASHLOK 55 SEAT 5 0 5
32 TOYOTA COASTER BUS 24 S 1 0 1
33 TOYOTA COROLLA/CIVIC/YARIS 0 8 8
34 TOYOTA PICKUP/ISUZU 5 7 12
35 NISSAN PATHFINDER/X-TRAIL 0 5 5
37 TOYOTA LAND CRUISER/FORTUNER 0 4 4
34
Total 40 37 77
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 18
Ja
n-1
4Fe
b-1
4M
ar-
14
Ap
r-1
4M
ay
-14
Ju
n-1
4Ju
l-1
4A
ug
-14
Se
p-1
4O
ct-
14
No
v-1
4D
ec-1
4Ja
n-1
5Fe
b-1
5M
ar-
15
Ap
r-1
5M
ay
-15
Ju
n-1
5T
ota
l
PLA
NN
ED
TO
TA
L P
ER
MO
NTH
47
68
87
95
93
10
71
10
10
81
02
10
09
88
78
27
97
76
65
34
11
50
0
PLA
NN
ED
CU
MU
LA
TIV
E4
71
15
20
22
97
39
04
97
60
77
15
81
79
17
1,0
15
1,1
02
1,1
84
1,2
63
1,3
40
1,4
06
1,4
59
1,5
00
AC
TU
AL T
OTA
L P
ER
MO
NTH
33
55
66
68
77
29
9
AC
TU
AL C
UM
ULA
TIV
E3
38
81
54
22
22
99
CO
NS
OLID
AT
ED
CO
NT
RA
CT
OR
S C
O.
OM
AN
LLC
UP
GR
AD
ING
OF F
ALA
J A
L Q
AB
AIL
RO
UN
DA
BO
UT
EQ
UIP
ME
NT
HIS
TO
GR
AM
20
14
20
15
47
68
87
95
93
107
110
108
102
100
98
87
82
79
77
66
53
41
33
55
66
68
77
0
20
40
60
80
10
0
12
0Jan-14
Feb-14
Mar-14
Apr-14
May-14
Jun-14
Jul-14
Aug-14
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
Apr-15
May-15
Jun-15
No. of EQUIPMENT
PR
OJ
EC
T M
ON
TH
S
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
AC
TU
AL
TO
TA
L P
ER
MO
NT
H
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 19
LIST OF DIRECT & INDIRECT MANPOWER BY CATEGORY
Sl.No. Manpower Category Expat
Employees Omani Employees Total Employees
1 AC Mechanic 1 1
2 Asst Cook 2 2
3 Asst Electrician 1 1
4 Asst Security Supervisor 1 1
5 Asst. Surveyor 1 1 2
6 Asst. Lab Technician 1 1
7 Asst. Mechanic 1 1
8 Asst.Store Keeper 1 1
9 Auto Electrician 1 1
10 Butcher 1 1
11 C/H Auto Electrician 1 1
12 C/H Carpentry 19 19
13 C/H Civil 1 8 9
14 C/H Earth Works 5 5
15 C/H Electrician 2 2
16 C/H Masonary 14 14
17 C/H Mechanical (Plant) 1 1
18 C/H Plumbing 1 1
19 C/H Rigger 3 3
20 C/H Scaffolding 2 2
21 C/H Steel Fixing 4 4
22 Carpenter 70 70
23 Chainman / Level man 9 9
24 Cleaner 2 2
25 Clerk-Filling /Clerk Tech 4 4 8
26 Cook 5 5
27 Crane Operator 2 2
28 Dozer Operator 1 1
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 20
Sl.No. Manpower Category Expat
Employees
Omani
Employees Total Employees
29 Drill Operator 1 1
30 Earthwork Checker 1 1
31 Electrician 1 1
32 F/M Carpentry 1 1
33 Grader Operator 2 2
34 Heavy Duty Driver 8 23 31
35 Heavy Duty Mechanic 4 1 5
36 Helper/Store Helper 3 3
37 Kitchen Attendant 2 2
38 Lab Helper 4 4
39
Labour/Rockman/Fuel
attendant 113 25 138
40 Laundry Attendant. 3 3
41 Light Duty Driver 27 27
42 Maintenance Mechanic 1 1
43 Mason 71 71
44 Office Boy / Office Asst 6 6
45 Pastry Maker 1 1
46 Pipe Fitter 1 1
47 Rigger 5 3 8
48 Roller Operator 1 1 2
49 Room Attendant. 2 2
50 Safety Officer 1 1
51 Shovel Operator 2 1 3
52 Sign Bord Writer 1 1
53 Steel Fixer 55 2 57
54 Time Keeper 5 5
55 Trailer Driver 6 1 7
56 Transport Officer 1 1
57 Turner 1 1
58 Tyreman 2 2
59 Waiter 5 5
60 Watchman 39 39
Total 463 140 603
1
Sub Total of Direct +
Indirect Manpower 435 146 581
2
Site and Office Engineers &
Staff 47 7 54
3 Subcontractors 13 13
Grand Total 648
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 21
20
13
De
c-1
3Jan
-14
Fe
b-1
4M
ar-
14
Ap
r-14
May-1
4Ju
n-1
4Ju
l-14
Au
g-1
4S
ep
-14
Oct-
14
No
v-1
4D
ec-1
4Jan
-15
Fe
b-1
5M
ar-
15
Ap
r-15
May-1
5Ju
n-1
5T
ota
l
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
- (
DIR
EC
T )
634
186
375
586
791
792
799
794
793
701
480
381
269
246
307
307
305
149
8301
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
- (
IN
DIR
EC
T )
523
36
50
52
57
59
59
60
61
63
61
61
57
51
47
44
35
30
914
PL
AN
NE
D T
OT
AL
PE
R M
ON
TH
- (
DIR
EC
T +
IN
DIR
EC
T )
11
57
222
425
638
848
851
858
854
854
764
541
442
326
297
354
351
340
179
9215
PL
AN
NE
D C
UM
UL
AT
IVE
11
68
291
715
1,3
53
2,2
02
3,0
52
3,9
10
4,7
64
5,6
18
6,3
83
6,9
23
7,3
65
7,6
91
7,9
88
8,3
42
8,6
93
9,0
33
9,2
12
9,2
12
AC
TU
AL
TO
TA
L P
ER
MO
NT
H -
( D
IRE
CT
)322
365
550
581
603
691
3112
AC
TU
AL
TO
TA
L P
ER
MO
NT
H -
( IN
DIR
EC
T )
18
26
46
49
54
57
250
AC
TU
AL
TO
TA
L P
ER
MO
NT
H -
( D
IRE
CT
+ IN
DIR
EC
T )
340
391
596
630
657
748
00
00
00
00
00
00
03362
AC
TU
AL
CU
MU
LA
TIV
E340
731
1,3
27
1,9
57
2,6
14
3,3
62
3,3
62
3,3
62
3,3
62
3,3
62
3,3
62
3,3
62
3,3
62
3,3
62
3,3
62
3,3
62
3,3
62
3,3
62
3,3
62
CO
NS
OLID
AT
ED
CO
NT
RA
CT
OR
S C
O.
OM
AN
LLC
UP
GR
AD
ING
OF
FA
LA
J A
L Q
AB
AIL
RO
UN
DA
BO
UT
MA
NP
OW
ER
HIS
TO
GR
AM
(D
IRE
CT
& IN
DIR
EC
T)
20
14
20
15
11
57
222
425
638
848
851
858
854
854
764
541
442
326
297
354
351
340
179
340
391
596
630
657
748
0
0
0
0
0
0
0
0
0
0
0
0
0
0
10
0
20
0
30
0
40
0
50
0
60
0
70
0
80
0
90
0
Dec-13
Jan-14
Feb-14
Mar-14
Apr-14
May-14
Jun-14
Jul-14
Aug-14
Sep-14
Oct-14
Nov-14
Dec-14
Jan-15
Feb-15
Mar-15
Apr-15
May-15
Jun-15
No. of Men
PR
OJ
EC
T M
ON
TH
S
PL
AN
NE
D T
OT
AL P
ER
MO
NTH
- ( D
IRE
CT
+ IN
DIR
EC
T )
AC
TU
AL
TO
TA
L P
ER
MO
NT
H -
( D
IRE
CT
+ IN
DIR
EC
T )
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 22
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 23
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 24
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 25
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 26
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 27
Date
Su
bm
itte
d
CC
C/F
QI/
RE
N/M
AS
/001
MA
S/C
CC
/FQ
I/B
BC
/001
Bit
um
ino
us B
ase C
ou
rse
Tarm
ac Z
aw
aw
i L
LC
Om
an
22/1
2/2
013
Ren
ard
et
AP
PR
OV
ED
01/0
4/2
014
SO
/FQ
I/C
CC
/087
07/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/002
MA
S/C
CC
/FQ
I/G
TI/
002
Geo
tech
nic
al In
vesti
gati
on
Sw
issb
ori
ng
& C
om
pan
y L
LC
26/1
2/2
013
Ren
ard
et
AP
PR
OV
ED
02/0
2/2
014
SO
/FQ
I/C
CC
/015
12/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/003
MA
S/C
CC
/FQ
I/M
SE
/003
MS
E W
all S
yste
mF
rey
ssin
et
Ara
bia
n S
ea L
LC
26/1
2/2
013
Ren
ard
et
AP
PR
OV
ED
02/0
2/2
014
SO
/FQ
I/C
CC
/014
12/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/004
MA
S/C
CC
/FQ
I/P
VC
/004
UP
VC
Pip
es
Am
ian
tit
Om
an
26/1
2/2
013
Ren
ard
et
AP
PR
OV
ED
09/0
2/2
014
SO
/FQ
I/C
CC
/019
18/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/005
MA
S/C
CC
/FQ
I/H
DP
E/0
05
HD
PE
Pip
es &
Fit
tin
gs
Am
ian
tit
Om
an
26/1
2/2
013
Ren
ard
et
AP
PR
OV
ED
09/0
2/2
014
SO
/FQ
I/C
CC
/020
18/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/006
MA
S/C
CC
/FQ
I/P
W/0
06
Pilin
g W
ork
sA
PC
C L
LC
26/0
1/2
014
Ren
ard
et
AP
PR
OV
ED
19/0
2/2
014
SO
/FQ
I/C
CC
/026
25/0
2/2
014
CC
C/F
QI/
RE
N/M
AS
/007
MA
S/C
CC
/FQ
I/M
C/0
07
Bit
nu
min
ou
s P
rim
e C
oat
(MC
-70)
Em
irate
s L
ub
e O
il C
o. (M
uscat)
30/0
1/2
014
Ren
ard
et
AP
PR
OV
ED
09/0
3/2
014
SO
/FQ
I/C
CC
/069
27/0
3/2
014
CC
C/F
QI/
RE
N/M
AS
/008
MA
S/C
CC
/FQ
I/R
S/0
08
Rein
forc
ing
Ste
el
Mu
scat
Ste
el In
du
str
ies
02/0
2/2
014
Ren
ard
et
AP
PR
OV
ED
20/0
3/2
014
SO
/FQ
I/C
CC
/063
24/0
3/2
014
CC
C/F
QI/
RE
N/M
AS
/009-1
MA
S/C
CC
/FQ
I/P
T/0
09-1
Po
st
Ten
sio
nin
g W
ork
- A
nch
ora
ge
Fre
yssin
et
Ara
bia
n S
ea L
LC
22/0
2/2
014
Ren
ard
et
AP
PR
OV
ED
27/0
3/2
014
SO
/FQ
I/C
CC
/089
14/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/009-2
MA
S/C
CC
/FQ
I/P
T/0
09-2
Po
st
Ten
sio
nin
g W
ork
- D
uct
Fre
yssin
et
Ara
bia
n S
ea L
LC
22/0
2/2
014
Ren
ard
et
AP
PR
OV
ED
27/0
3/2
014
SO
/FQ
I/C
CC
/090
14/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/009-3
MA
S/C
CC
/FQ
I/P
T/0
09-3
Po
st
Ten
sio
nin
g W
ork
- S
tran
dF
rey
ssin
et
Ara
bia
n S
ea L
LC
22/0
2/2
014
Ren
ard
et
AP
PR
OV
ED
27/0
3/2
014
SO
/FQ
I/C
CC
/091
14/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/010A
-Rev
.1M
AS
/CC
C/F
QI/
PB
/010A
-Rev
.1B
rid
ge P
ot
Beari
ng
sA
l A
mm
ar
Inte
rnati
on
al
07/0
5/2
014
Ren
ard
et
Not
Approve
d--
-R
EN
/FQ
I/C
CC
/111
13/0
5/2
014
CC
C/F
QI/
RE
N/M
AS
/010B
MA
S/C
CC
/FQ
I/P
B/0
10B
Bri
dg
e P
ot
Beari
ng
sB
uild
ing
Su
pp
lies &
Serv
ices
11/0
5/2
014
Ren
ard
et
AP
PR
OV
ED
25/0
5/2
014
RE
N/F
QI/
CC
C/1
22
31/0
5/2
014
CC
C/F
QI/
RE
N/M
AS
/011
MA
S/C
CC
/FQ
I/H
DP
E/0
11
HD
PE
Wate
r P
ipes
Am
ian
tit
Om
an
22/0
2/2
014
Ren
ard
et
AP
PR
OV
ED
09/0
3/2
014
SO
/FQ
I/C
CC
/038
11/0
3/2
014
CC
C/F
QI/
RE
N/M
AS
/012
MA
S/C
CC
/FQ
I/R
CB
C/0
12
Sin
gle
cell P
recast
Bo
x C
ulv
ert
Am
ian
tit
Om
an
22/0
2/2
014
Ren
ard
et
AP
PR
OV
ED
25/0
3/2
014
SO
/FQ
I/C
CC
/064
26/0
3/2
014
CC
C/F
QI/
RE
N/M
AS
/013
MA
S/C
CC
/FQ
I/B
P/0
13
Bit
um
ino
us P
ain
t M
ate
rial (R
ub
beri
zed
)A
l In
ma B
uild
ing
Mate
rila
l L
LC
02/0
3/2
014
Ren
ard
et
Not
Approve
d20/0
4/2
014
RE
N/F
QI/
CC
C/1
05
05/0
5/2
014
CC
C/F
QI/
RE
N/M
AS
/014A
-Rev
.1M
AS
/CC
C/F
QI/
EJ/
014A
-Rev
.1B
rid
ge E
xpan
sio
n J
oin
tsA
l A
mm
ar
Inte
rnati
on
al
07/0
5/2
014
Ren
ard
et
AP
PR
OV
ED
20/0
5/2
014
RE
N/F
QI/
CC
C/1
23
31/0
5/2
014
CC
C/F
QI/
RE
N/M
AS
/015
MA
S/C
CC
/FQ
I/R
C/0
15
Rein
forc
ed
Co
ncre
te P
ipe (
450,6
00,7
00m
m d
ia)
Am
ian
tit
Om
an
02/0
3/2
014
Ren
ard
et
AP
PR
OV
ED
23/0
3/2
014
SO
/FQ
I/C
CC
/077
02/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/016 B
MA
S/C
CC
/FQ
I/W
S/0
16 B
Wate
r S
top
G E
E-2
5S
ika L
LC
Om
an
25/0
3/2
014
Ren
ard
et
AP
PR
OV
ED
16/0
4/2
014
RE
N/F
QI/
CC
C/0
99
28/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/017
MA
S/C
CC
/FQ
I/T
W/0
17
Tele
ph
on
e W
ork
sN
ati
on
al T
ele
ph
on
e S
erv
ices
12/0
3/2
014
Ren
ard
et
AP
PR
OV
ED
17/0
3/2
014
SO
/FQ
I/C
CC
/082
03/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/019
MA
S/C
CC
/FQ
I/E
W/0
19
Ele
ctr
ical W
ork
sU
nit
ed
En
gin
eeri
ng
Pro
jects
22/0
3/2
014
Ren
ard
et
CC
C/F
QI/
RE
N/M
AS
/020
MA
S/C
CC
/FQ
I/E
C/0
20
MV
& L
V C
ab
les
Un
ited
En
gin
eeri
ng
Pro
jects
19/0
3/2
014
Ren
ard
et
AP
PR
OV
ED
27/0
3/2
014
SO
/FQ
I/C
CC
/083
03/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/021
MA
S/C
CC
/FQ
I/P
S/0
21
Packag
e S
ub
sta
tio
nU
nit
ed
En
gin
eeri
ng
Pro
jects
22/0
3/2
014
Ren
ard
et
CC
C/F
QI/
RE
N/M
AS
/022
MA
S/C
CC
/FQ
I/L
L/0
22
Str
eet
Lig
hti
ng
Lu
min
ari
es
Un
ited
En
gin
eeri
ng
Pro
jects
27/0
3/2
014
Ren
ard
et
CC
C/F
QI/
RE
N/M
AS
/023A
MA
S/C
CC
/FQ
I/L
P/0
23A
Str
eet
Lig
hti
ng
Po
les (
Mid
-Hin
ged
)S
tars
Lig
ht
LL
C22/0
5/2
014
Ren
ard
et
CC
C/F
QI/
RE
N/M
AS
/024
MA
S/C
CC
/FQ
I/F
P/0
24
Str
eet
Lig
hti
ng
Feed
er
Pilla
rS
tars
Lig
ht
LL
C27/0
3/2
014
Ren
ard
et
CC
C/F
QI/
RE
N/M
AS
/025
MA
S/C
CC
/FQ
I/JS
/026
Join
t S
eala
nt
(Po
lyseal)
Al In
ma B
uild
ing
Mate
rila
l L
LC
27/0
3/2
014
Ren
ard
et
AP
PR
OV
ED
16/0
4/2
014
RE
N/F
QI/
CC
C/1
00
28/0
4/2
014
CC
C/F
QI/
RE
N/M
AS
/026
MA
S/C
CC
/FQ
I/G
T/0
26
Geo
text
ile
Mo
dern
East
Tra
din
g &
Co
n.
21/0
5/2
014
Ren
ard
et
Ma
teri
al A
pp
rov
al S
tatu
s
Re
nard
et
Le
tte
r
Date
d
Re
fere
nce
No
.M
AR
No
.M
ate
rial/
Wo
rkS
up
pli
er/
Su
bco
ntr
acto
rS
ub
mit
te
d T
o
Re
mark
s
By M
OT
C
MO
TC
Co
mm
en
t
s d
ate
d
Via
Re
nard
et
Le
tte
r R
ef.
No
.
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 28
Engineer’s Comments
The percentage of progress as per the construction program is 23.21%.
The percentage of progress as per the actual work is 10.66%.
There is a shortfall of 12.55% in progress which needs to be recovered in the
coming 03 months.
Traffic is diverted on to the Detours on 03.05.2014 early hours and traffic is moving
smoothly without any hiccups.
Construction works for relocation of Falaj completed in 190m out of 270m.
Load testing of 02 no. expendable piles and 02 no. working piles completed and the
results are in compliance with standards.
Pile Foundation works are completed for all Piers except Pier No. 4 by 22.05.2014.
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 29
S.
No
.
Da
te
Rec
eive
dF
rom
Ref
eren
ce N
oSu
bje
ctR
eply
da
teR
efer
ence
No
.R
ema
rks
13
/25
/20
14
CC
CF
QI/
RE
NA
RD
ET
/91
Rei
mb
urs
emen
t o
f E
mb
ank
men
t fi
ll
mat
eria
l un
der
bo
th d
eto
urs
RH
S&L
HS
5/1
3/2
01
4R
EN
/FQ
I/C
CC
/11
0
24
/1/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
01
Co
ntr
act
No
.51
/20
12
- u
p-g
rad
atio
n o
f
fala
j al-
qab
ail R
ou
nd
abo
ut
5/1
3/2
01
4R
EN
/FQ
I/C
CC
/10
9
34/
14/2
014
CC
CFQ
I/R
ENA
RD
ET/1
16C
on
cre
te m
ix d
esi
gn c
alcu
lati
on
s (C
15,C
30
and
C35
)
44/
15/2
014
CC
CFQ
I/R
EN/M
AS/
014A
Ap
pro
al f
or
bri
dge
exp
aris
ion
join
ts
MA
R.N
o. M
AS/
CC
C/F
QI/
EJ/0
14A
4/24
/201
4R
EN
/FQ
I/C
CC
/09
3
54/
17/2
014
CC
CFQ
I/R
EN/T
R-0
63SO
L- 1
( B
atin
ah H
igh
way
) c
ross
se
ctio
n a
t
CH
. 21
+140
to
CH
.21+
320
4/22
/201
4A
pp
rove
d
64/
19/2
014
CC
CFQ
I/R
EN/T
R-0
65SO
L-1(
Bat
inah
Hig
hw
ay )
cro
ss s
ect
ion
at
CH
.22+
580
to C
H: 2
3+26
04/
24/2
014
Ap
pro
ved
74/
22/2
014
CC
CFQ
I/R
ENA
RD
ET/1
19St
atic
lo
ad t
est
fo
r e
xpe
nd
able
(n
on
-
wo
rkin
g )
pil
e E
P-0
24/
24/2
014
SO/F
QI/
CC
C/0
97
84
/22
/20
14
CC
CF
QI/
RE
NA
RD
ET
/12
0C
lau
se 1
4 p
rogr
am -
( R
ev. 2
)5
/11
/20
14
RE
N/F
QI/
CC
C/1
07
94/
23/2
014
CC
CFQ
I/R
ENA
RD
ET/1
21Ex
ten
sio
n o
f p
ile
s at
Ab
utm
en
t 1
and
Ab
utm
en
t 2
5/3/
2014
RE
N/F
QI/
CC
C/1
04
10
4/23
/201
4C
CC
FQI/
REN
AR
DET
/122
Up
grad
ing
of
fala
j alq
abai
l Ro
un
dab
ou
t
11
4/24
/201
4D
GR
23
91St
arti
ng
at p
roje
cts
wo
rk .(
MA
S o
f P
ot
Be
arin
g)
5/1
4/2
01
4R
EN
/FQ
I/D
GR
/03
3/1
4
12
4/24
/201
4C
CC
FQI/
REN
/TR
-069
SOL-
1 (
Bat
inah
Hig
hw
ay )
cro
ss s
ect
ion
at
CH
. 21
+150
to
CH
.21+
320
4/27
/201
4A
pp
rove
d
13
4/28
/201
4C
CC
FQI/
REN
/TR
-071
Dim
en
sio
n a
nd
de
tail
s o
f ce
ll B
ox
culv
ert
1
(2.0
*1.5
)ske
w A
ngl
e 0
@ C
H.2
4+57
05/
15/2
014
Ap
pro
ved
14
4/28
/201
4C
CC
FQI/
REN
/TR
-072
Bar
Be
nd
ing
sch
ed
ula
l fo
r 9
cell
Bo
x
culv
ert
up
stre
am5/
15/2
014
Re
vise
& R
esu
bm
it
15
4/30
/201
4C
CC
FQI/
REN
AR
DET
/124
Stat
ic l
oad
te
stin
g f
or
wo
rk p
ile
# 06
at
pie
r 1
LHS.
16
4/30
/201
4C
CC
FQI/
REN
/TR
-074
SOL-
1 (
Bat
inah
Hig
hw
ay )
cro
ss s
ect
ion
at
CH
. 21
+340
to
CH
.22+
240
5/11
/201
4A
pp
rove
d
CO
RR
ESP
ON
DE
NC
E R
EC
OR
D F
OR
TH
E M
ON
TH
OF
MA
Y 2
01
4
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 30
S.
No
.
Da
te
Rec
eive
dF
rom
Ref
eren
ce N
oSu
bje
ctR
eply
da
teR
efer
ence
No
.R
ema
rks
17
5/1
/20
14
CC
CF
QI/
RE
NA
RD
ET
/12
7M
on
thly
Pro
gres
s R
epo
rt N
o.4
18
5/1
/20
14
CC
CF
QI/
RE
N/T
R-0
77
Dim
ensi
on
an
d d
etai
ls o
f ce
ll B
ox
culv
ert
1 (
2.0
*1.5
)sk
ew A
ngl
e 0
@ C
H.2
4+
23
55
/3/2
01
4
Re
vise
& R
esu
bm
it
19
5/1
/20
14
CC
CF
QI/
SM/0
4W
ork
ing
on
Fri
day
20
5/4
/20
14
CC
CF
QI/
RE
N/T
R-0
79
Sho
pe
dra
win
g fo
r B
rid
ge B
eari
ng
sett
ing
-
ou
t @
CH
.23
+2
69
.50
TO
23
+5
09
.50
5/6
/20
14
Ap
pro
ved
21
5/4
/20
14
CC
CF
QI/
RE
NA
RD
ET
/13
2R
evis
ed p
lan
an
d p
rofi
le (
( R
ev.3
0))
22
5/4
/20
14
CC
CF
QI/
RE
NA
RD
ET
/12
5Sa
fety
off
icer
s at
sit
e
23
5/4
/20
14
CC
CF
QI/
RE
NA
RD
ET
/12
6C
alib
rati
on
cel
l ch
eck
cer
tifi
cate
-lo
ad
5/1
1/2
01
4R
EN
/FQ
I/C
CC
/10
6
24
5/4
/20
14
CC
CF
QI/
RE
NA
RD
ET
/12
8
Alt
ern
ativ
e So
urc
e fo
r B
itu
min
ou
s B
ase
cou
rse
5/1
5/2
01
4R
EN
/FQ
I/C
CC
/11
4
25
5/4
/20
14
CC
CF
QI/
RE
NA
RD
ET
/12
9Q
uo
tati
on
fo
r A
dd
itio
nal
Ele
ctri
cal w
ork
s
26
5/4
/20
14
CC
CF
QI/
RE
NA
RD
ET
/13
3
Pro
ject
pro
gres
s p
ho
togr
aph
s &
vid
eeo
s
soft
co
py
27
5/4
/20
14
CC
CF
QI/
RE
N/T
R-0
84
SOL
- 1
( B
atin
ah H
igh
way
)cro
ss s
ecti
on
at C
H.2
3+
52
0 t
o C
H. 2
3+
94
05
/6/2
01
4A
pp
rov
ed
28
5/4
/20
14
CC
CF
QI/
RE
N/T
R-0
85
Bar
Ben
din
g Sc
hed
ule
fo
r 4
4 c
ell B
ox
culv
ert
up
stre
am -
Blo
ck :
01
to
11
5/8
/20
14
Ap
pro
ved
29
5/4
/20
14
CC
CF
QI/
RE
N/T
R-0
86
Bar
Ben
din
g Sc
hed
ule
fo
r 4
4 c
ell B
ox
culv
ert
Do
wn
stre
am -
Blo
ck :1
2 t
o 3
35
/8/2
01
4A
pp
rov
ed
30
5/5
/20
14
CC
CF
QI/
RE
N/T
R-0
87
Dim
ensi
on
Co
-ord
inat
es d
etai
ls P
lan
an
d
sect
ion
5 c
ell B
ox
culv
ert(
3.0
*2.0
sk
ew
An
gle
0 )
@ C
H.2
3+
49
05
/11
/20
14
Ap
pro
ved
31
5/5
/20
14
CC
CF
QI/
RE
N/T
R-0
88
Dim
ensi
on
an
d d
etai
ls o
f 3
cel
l Bo
x
culv
ert
3 (
2.0
*1.5
)sk
ew A
ngl
e 0
@
CH
.21
+2
60
5/6
/20
14
Ap
pro
ved
32
5/5
/20
14
CC
CF
QI/
RE
N/T
R-0
89
Dim
ensi
on
an
d d
etai
ls o
f 1
cel
l Bo
x
culv
ert
1 (
2.0
*1.5
)sk
ew A
ngl
e 0
@
CH
.21
+4
85
5/1
5/2
01
4A
pp
rov
ed
33
5/6
/20
14
CC
CF
QI/
RE
N/T
R-0
90
Dim
ensi
on
an
d d
etai
ls o
f 1
cel
l Bo
x
culv
ert
1 (
2.0
*1.5
)sk
ew A
ngl
e 0
@
CH
.23
+9
97
5/1
5/2
01
4A
pp
rov
ed
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 31
S.
No
.
Da
te
Rec
eive
dF
rom
Ref
eren
ce N
oSu
bje
ctR
eply
da
teR
efer
ence
No
.R
ema
rks
34
5/6
/20
14
CC
CF
QI/
RE
N/T
R-0
91
Dim
ensi
on
an
d d
etai
ls o
f 1
cel
l Bo
x
culv
ert
1 (
2.0
*1.5
)sk
ew A
ngl
e 0
@
CH
.24
+2
35
5/1
5/2
01
4A
pp
rov
ed
35
5/6
/20
14
CC
CF
QI/
RE
NA
RD
ET
/13
4Sa
fety
off
icer
s D
iver
sio
n
36
5/7
/20
14
CC
CF
QI/
RE
NA
RD
ET
/13
5R
elo
cati
on
of
Tel
eph
on
e C
able
s
37
5/7
/20
14
CC
CF
QI/
RE
NA
RD
ET
/13
6St
reet
ligh
tin
g p
ole
s
38
5/7
/20
14
CC
CF
QI/
RE
NA
RD
ET
/13
7A
ggre
gate
Bas
e C
ou
rse
5/1
8/2
01
4R
EN
/FQ
I/C
CC
/11
5
39
5/1
2/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
40
Stat
ic lo
ad t
est
of
Exp
end
able
pil
e A
bu
t
#2
- C
h.2
3+
90
0
40
5/1
3/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
41
Cla
use
14
pro
gram
- (
Rev
. 2 )
41
5/1
4/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
42
En
tran
ce a
nd
Exi
t p
oin
ts t
o F
QI
Site
fro
m
Det
ou
r
42
5/1
7/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
43
Ap
pro
ved
Gen
eral
lay
ou
t p
lan
- R
ev .
C -
Un
der
pas
ses
loca
tio
n
43
5/1
9/2
01
4C
CC
FQ
I/R
EN
/TR
-10
0
Sho
p d
raw
ing
of
the
po
st t
ensi
on
ing
wo
rks
Bri
dge
1.2
.3.4
44
5/1
9/2
01
4C
CC
FQ
I/R
EN
/TR
-10
1
Co
- O
rdin
ates
pla
n f
or
Dra
in C
han
nel
at
ch.2
3+
40
05
/21
/20
14
Ap
pro
ved
45
5/2
0/2
01
4C
CC
FQ
I/R
EN
/TR
-10
2
Exi
stin
g R
ipra
p (
To
be
rem
ov
ed )
at
Ch
.24
+2
29
.24
2 t
o 2
4+
34
3.3
00
To
ch.2
5+
50
3.2
03
&2
4+
57
3.9
75
5/3
1/2
01
4A
pp
rov
ed
46
5/2
0/2
01
4C
CC
FQ
I/R
EN
/TR
-10
3
Cle
anin
g an
d G
rab
ing
at C
H.2
1+
15
0
to2
5+
22
3.0
09
47
5/2
1/2
01
4C
CC
CC
C/F
QI/
RE
N/M
AS/
02
6Ap
pro
val
fo
r G
eto
text
ile
MA
R.N
O.M
AS/
CC
C/F
QI/
GT
/02
65
/27
/20
14
RE
N/F
QI/
CC
C/1
19
48
5/2
1/2
01
4C
CC
FQ
I/R
EN
/TR
-10
4
Exi
stin
g B
oll
ard
( T
o b
e re
mo
ved
) a
t
Ch
.24
+1
45
.38
1 t
o 2
4+
18
6.5
74
5/2
5/2
01
4A
pp
rov
ed
49
5/2
1/2
01
4C
CC
FQ
I/R
EN
/TR
-10
5
SOL
- 1
( B
atin
ah H
igh
way
)cro
ss s
ecti
on
at C
H.2
3+
34
9.5
00
to
CH
. 23
+4
29
.50
05
/31
/20
14
Ap
pro
ved
50
5/2
1/2
01
4C
CC
FQ
I/R
EN
/TR
-10
6B
eari
ng
loca
tio
n S
chem
e5
/27
/20
14
Ap
pro
ved
51
5/2
1/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
44
Dra
inag
e L
ayo
ut
Pla
n5
/28
/20
14
RE
N/F
QI/
CC
C/1
21
52
5/2
1/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
45
Agg
rega
te B
ase
Co
urs
e
53
5/2
1/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
46
Stat
ic lo
ad t
est
for
Exp
end
able
(N
on
-
wo
rkin
g) p
ile
# E
P-0
15
/25
/20
14
RE
N/F
QI/
CC
C/1
16
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 32
S.
No
.
Da
te
Rec
eive
dF
rom
Ref
eren
ce N
oSu
bje
ctR
eply
da
teR
efer
ence
No
.R
ema
rks
54
5/2
1/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
47
Stat
ic lo
ad t
est
for
Exp
end
able
(N
on
-
wo
rkin
g) p
ile
# E
P-0
45
/27
/20
14
RE
N/F
QI/
CC
C/1
20
55
5/2
2/2
01
4C
CC
FQ
I/R
EN
/TR
-10
7
Dra
inag
e in
let
typ
e -
I D
etai
ls o
f 3
cel
l
Bo
x B
OX
Cu
lver
t @
Ch
.21
+2
60
6/1
/20
14
Ap
pro
ved
56
5/2
2/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
48
Stat
ic lo
ad t
esti
ng
5/2
6/2
01
4R
EN
/FQ
I/C
CC
/11
8
57
5/2
2/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
49
Stat
ic L
oad
Tes
t o
f w
ork
ing
pil
e#4
8, A
bu
t-
5 L
HS
58
5/2
2/2
01
4C
CC
CC
C/F
QI/
RE
N/M
AS/
02
3AA
pp
rov
al f
or
Stre
et li
ghti
ng
po
les
MA
R.N
O.M
AS/
CC
C/F
QI/
LP
/02
3A
59
5/2
5/2
01
4C
CC
FQ
I/R
EN
/TR
-10
8
Dra
inag
e in
let
typ
e -
I D
etai
ls @
Ch
.21
+3
80
to
1 C
ell B
ox
Cu
lver
t @
Ch
.21
+4
85
6/1
/20
14
Ap
pro
ved
60
5/2
5/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
51
Co
mp
leti
on
of
pil
ing
wo
rks
- E
xclu
din
g
loca
tio
n p
ier
4 (
RH
S&L
HS)
61
5/2
5/2
01
4C
CC
FQ
I/R
EN
/TR
-10
9Sh
op
dra
win
g o
f 3
way
# 1
50
mm
UP
VC
ele
ct5/2
5/2
01
5A
pp
rov
ed
62
5/2
6/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
52
Sum
mer
Wo
rkin
g H
ou
rs (
JU
NE
, Ju
ly &
Au
gust
)20
14
63
5/2
6/2
01
4C
CC
FQ
I/R
EN
/TR
-11
0
Dra
inag
e in
let
typ
e -
I D
etai
ls @
Ch
.21
+5
60
to
Ch
.21
+6
20
6/1
/20
14
Ap
pro
ved
64
5/2
7/2
01
4C
CC
FQ
I/R
EN
/TR
-11
1
Dra
inag
e In
let
Ty
pe
-III
Det
ails
8 c
ell B
ox
culv
ert
@ C
h 2
1+
83
86
/1/2
01
4A
pp
rov
ed
65
5/2
8/2
01
4C
CC
FQ
I/R
EN
/TR
-11
2
Pie
r B
eari
ng
lev
el D
etai
ls @
Ch
.23
+3
49
.50
0 t
o C
h.2
3+
42
9.5
00
5/2
8/2
01
4A
pp
rov
ed
66
5/2
9/2
01
4C
CC
FQ
I/R
EN
/TR
-11
3
Pie
r B
eari
ng
lev
el D
etai
ls @
Ch
.23
+3
09
.50
0 t
o C
h.2
3+
46
9.5
00
( P
1 L
& P
1R
) T
O (
P5
L&
P5
R)
1.6
.20
14
Ap
pro
ved
67
5/2
9/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
53
Pen
din
g D
raw
ing
Sub
mit
tals
68
5/3
1/2
01
4C
CC
FQ
I/R
EN
AR
DE
T/1
54
RO
P. A
pp
rov
al D
eto
ur
Pla
n
69
25
/20
14
CC
CF
QI/
RE
NA
RD
ET
/15
0A
L-I
sraa
Wa
l Mi r
aj 2
01
4
70
CC
CF
QI/
RE
NA
RD
ET
/13
8In
teri
m p
aym
ent
Ap
pli
cati
on
#0
4
71
CC
CF
QI/
RE
NA
RD
ET
/13
9
Stat
ic lo
ad t
est
Rep
ort
fo
r 1
00
0m
m
wo
rkin
g p
ile
#SO
P 0
65
/11
/20
14
RE
N/F
QI/
CC
C/1
08
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 33
PROGRESS PHOTOGRAPHS
Bed Preparation for Construction of Falaj in progress
Blinding Concrete for construction of Falaj in Progress
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 34
Placing of Epoxy coated reinforcement for Falaj in Progress
Waterproofing of Completed Falaj
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 35
Traffic Diversion in Detours
Traffic Diversion in Detours – U Turn
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 36
Removal of Existing Asphalt in Progress
Removal of Existing Asphalt in progress
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 37
Bed Preparation for Blinding Concrete of Pile Cap in Progress
Blinding Concrete for Pile Cap in Progress
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 38
Piles for Abutment No. 1 Completed to Ground Level
Placing of Reinforcement for Abutment Piles in Progress
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 39
Pile Integrity Test in Progress
Curing of Pile Cap in Progress
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 40
Protection of Reinforcement while Curing of Pile Cap in Progress
Waterproofing of Completed Pile Cap
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 41
Placing of Reinforcement for Pier in Progress
Fixing of Shuttering for Pier in Progress
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 42
Reinforcement Fixing in 44 Cells Box Culvert in Progress
Removal of Street Lighting Poles in Progress
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 43
Unloading of Precast Box Culverts in Progress
Investigation of Underground Utilities in Progress
Upgrading of Falaj Al Qabail Roundabout Monthly Progress Report – May 2014
RENARDET S.A. & PARTNERS Page 44
Pre-casting of New Jersey Barriers
Installation of Future Utility Ducts in Progress