  • 7/31/2019 MPO Process

    1/11

    The MPO Process

  • 7/31/2019 MPO Process

    2/11

    MG = Mark Guenard, Manager MPO Activities, X-8231

    RB= Rachel Bain, X-7635 ~

    TW= Trey Wadsworth, X-7344 ~

    GB= Guy Bresnahan, X-7884 ~

    CC = Calli Cenizal X-8079~ KP = Karen Pearson, X-7335

    TW

    GB

    GB

    CC

    TW

    TW

    CC

    RB

    RB

    RB

    KPKP

    CTPS

    KP

  • 7/31/2019 MPO Process

    3/11

    3C Planning Process

    Comprehensive

    Cooperative

    Continuing

    Intermodal

    Planning

  • 7/31/2019 MPO Process

    4/11

    Regional Planning Documents

    Regional Transportation Plan (RTP): 20 year planwith 4 year goals and objectives

    Unified Planning Work Program (UPWP): annualdocument that sets out MPO staffs studies and tasks

    Transportation Improvement Program (TIP): 4 yeardocument revised annually to reflect federallyfunded projects in a given region

  • 7/31/2019 MPO Process

    5/11

    What is the TIP?

    Transportation Improvement Program

    Spans four years, endorsed annually (August)

    Conforms to projects and goals set out by RTP

    Federally mandated: all projects receiving federalfunding must be in the TIP

    Includes highway and transit project listings

    State Transportation Improvement Program (STIP):combination of the TIPs from all the MPOs, must beapproved by FHWA, FTA, DEP, and EPA

  • 7/31/2019 MPO Process

    6/11

    What is the membership of the MPO?

    CEO/Secretary of Transportation (Chair)

    MassDOT Highway Division Administrator

    Regional Planning Agency

    Regional Transit Authority

    Local elected officials

  • 7/31/2019 MPO Process

    7/11

    What is the responsibility of an

    MPO member?

    Take approval action on documents that:

    Set regional long-term transportation policies

    Prioritize and program specific transportation

    initiatives for funding

  • 7/31/2019 MPO Process

    8/11

    How do we obtain the knowledge to

    make these decisions?

    RPA Staff tothe MPO

    MPO AdvisoryCommittee

    Highway DivisionDistricts

    RTA Staff

    Preparecertificationdocuments

    Develop dataanalysis

    Perform studies

    Facilitate publicinput and feedback

    Provide specializedand citizen input onspecific issues

    Makerecommendations tothe MPO on specific

    strategies or projects

    Respond to transportationissues on the ground

    Provide detailedinformation regarding projectdevelopment at all stages

    Responsible for ensuring

    implementation

    Speaks to ongoingtransit issues anddevelopments

    Responsible forensuringimplementation

  • 7/31/2019 MPO Process

    9/11

    MassDOT - MPO Activities

    Oversee all aspects of the 3C Planning Process within each ofthe MPOs.

    Act as liaisons between MassDOT and the MPOs. Assist the MPO staff by providing guidance and support for

    tasks such as composing TIPs, UPWPs, and RTPs.

    Participate in steering committees organized by MPO staff.

    Assist in identifying projects to be considered for TIP

    programming. Support MassDOT Divisions in achieving their respective goals

    and complying with specific standards.

  • 7/31/2019 MPO Process

    10/11

    MPO votes to endorseamendment, include

    project on TIP

    PNF sent toMassDOT Highway

    for approval

    Highway Project Development Process

    Presented to

    MPO

    Project needdetermined

    Projects typically ~25% design, detailed

    scope of work, projected cost estimate,design/construction schedule

    MPO votes to releaseamendment for publicreview and comment

    PIF submitted toPRC for approval,receives P-Info

    number

    Typically 30 days,fewer under certain

    circumstances

    Design, environmentalreview, ROW

    determination, publicmeetings

    Contract finalized,project advertised, bid

    selected, construction

  • 7/31/2019 MPO Process

    11/11

    TIP Development Process

    FHWA provides MassDOT with allocation of funds

    MassDOT develops regional targets as well as statewide programallocation in collaboration with feedback from MARPA

    MPO develops prioritized list of projects (TIP) with MPOstaff, MassDOT Highway Division and OTP

    TIP released for 30-day public

    comment period

    MPO votes on TIP amendment: to endorse as is orrevise in response to comments received

    All 13 MPOs are gathered together into STIP for FHWA/FTA/DEP/EPA submittal