3C Planning Process
Comprehensive
Cooperative
Continuing
Intermodal
Planning
-
7/31/2019 MPO Process
4/11
Regional Planning Documents
Regional Transportation Plan (RTP): 20 year planwith 4 year goals and objectives
Unified Planning Work Program (UPWP): annualdocument that sets out MPO staffs studies and tasks
Transportation Improvement Program (TIP): 4 yeardocument revised annually to reflect federallyfunded projects in a given region
-
7/31/2019 MPO Process
5/11
What is the TIP?
Transportation Improvement Program
Spans four years, endorsed annually (August)
Conforms to projects and goals set out by RTP
Federally mandated: all projects receiving federalfunding must be in the TIP
Includes highway and transit project listings
State Transportation Improvement Program (STIP):combination of the TIPs from all the MPOs, must beapproved by FHWA, FTA, DEP, and EPA
-
7/31/2019 MPO Process
6/11
What is the membership of the MPO?
CEO/Secretary of Transportation (Chair)
MassDOT Highway Division Administrator
Regional Planning Agency
Regional Transit Authority
Local elected officials
-
7/31/2019 MPO Process
7/11
What is the responsibility of an
MPO member?
Take approval action on documents that:
Set regional long-term transportation policies
Prioritize and program specific transportation
initiatives for funding
-
7/31/2019 MPO Process
8/11
How do we obtain the knowledge to
make these decisions?
RPA Staff tothe MPO
MPO AdvisoryCommittee
Highway DivisionDistricts
RTA Staff
Preparecertificationdocuments
Develop dataanalysis
Perform studies
Facilitate publicinput and feedback
Provide specializedand citizen input onspecific issues
Makerecommendations tothe MPO on specific
strategies or projects
Respond to transportationissues on the ground
Provide detailedinformation regarding projectdevelopment at all stages
Responsible for ensuring
implementation
Speaks to ongoingtransit issues anddevelopments
Responsible forensuringimplementation
-
7/31/2019 MPO Process
9/11
MassDOT - MPO Activities
Oversee all aspects of the 3C Planning Process within each ofthe MPOs.
Act as liaisons between MassDOT and the MPOs. Assist the MPO staff by providing guidance and support for
tasks such as composing TIPs, UPWPs, and RTPs.
Participate in steering committees organized by MPO staff.
Assist in identifying projects to be considered for TIP
programming. Support MassDOT Divisions in achieving their respective goals
and complying with specific standards.
-
7/31/2019 MPO Process
10/11
MPO votes to endorseamendment, include
project on TIP
PNF sent toMassDOT Highway
for approval
Highway Project Development Process
Presented to
MPO
Project needdetermined
Projects typically ~25% design, detailed
scope of work, projected cost estimate,design/construction schedule
MPO votes to releaseamendment for publicreview and comment
PIF submitted toPRC for approval,receives P-Info
number
Typically 30 days,fewer under certain
circumstances
Design, environmentalreview, ROW
determination, publicmeetings
Contract finalized,project advertised, bid
selected, construction
-
7/31/2019 MPO Process
11/11
TIP Development Process
FHWA provides MassDOT with allocation of funds
MassDOT develops regional targets as well as statewide programallocation in collaboration with feedback from MARPA
MPO develops prioritized list of projects (TIP) with MPOstaff, MassDOT Highway Division and OTP
TIP released for 30-day public
comment period
MPO votes on TIP amendment: to endorse as is orrevise in response to comments received
All 13 MPOs are gathered together into STIP for FHWA/FTA/DEP/EPA submittal