moving faster in a digital world | empowering you in a bim world

38
Moving Faster in a Digital World Empowering you in a BIM world NBS – June 2016 Dale Sinclair

Upload: the-nbs

Post on 14-Jan-2017

148 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: Moving Faster in a Digital World | Empowering you in a BIM world

Moving Faster in a Digital World

Empowering you in a BIM world

NBS – June 2016

Dale Sinclair

Page 2: Moving Faster in a Digital World | Empowering you in a BIM world
Page 3: Moving Faster in a Digital World | Empowering you in a BIM world

“Change has never moved this fast and will never be as slow again”Jennifer Morgan, President, EY

Page 4: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016Presentation Title Page 4

Bell Curve

Level Two Text Subhead or Attribution. Insert picture below.

Page 5: Moving Faster in a Digital World | Empowering you in a BIM world

Computerisation

Page 6: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016Presentation Title Page 6

2040

Futurists

Page 7: Moving Faster in a Digital World | Empowering you in a BIM world

USA Manufacturing – 2040 Projection

Page 8: Moving Faster in a Digital World | Empowering you in a BIM world

Singularity

Page 9: Moving Faster in a Digital World | Empowering you in a BIM world
Page 10: Moving Faster in a Digital World | Empowering you in a BIM world

Top Tips From Contractor Clients

1. Listen to contractor clients to make sure you understand their key objectives and deliver value.

2. Collaborate fully with the project team and proactively facilitate optimum design solutions.

3. Immerse yourself in issues of buildability, risk and commercial viability.

4. Repossess the design management role, saving contractor clients the cost of hiring design managers.

5. Acknowledge the cultural shift needed to work as equal partners in contractor clients’ project teams.

Page 11: Moving Faster in a Digital World | Empowering you in a BIM world
Page 12: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016 Page 12

Drivers for Change

Page 13: Moving Faster in a Digital World | Empowering you in a BIM world
Page 14: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016Presentation Title Page 14

Page 15: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016Presentation Title Page 15

Who lays the bricks?

Page 16: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016Presentation Title Page 16

Automating traditional processes

Page 17: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016Presentation Title Page 17

Harnessing Complex Geometry

Page 18: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016Presentation Title Page 18

Visual Scripting

Page 19: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016Presentation Title Page 19

Design to Construction

Page 20: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016Presentation Title Page 20

Automated Construction

Page 21: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016Presentation Title Page 21

DfMA

Page 22: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016Presentation Title Page 22

The Site of the Future

Page 23: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016Presentation Title Page 23

Page 24: Moving Faster in a Digital World | Empowering you in a BIM world

Page 24

Level 3 and 4

Page 25: Moving Faster in a Digital World | Empowering you in a BIM world

UK Push-Pull Strategy

Page 26: Moving Faster in a Digital World | Empowering you in a BIM world

Level of Definition

Level of Detail - LOD-3 Level of Information - LOI-3

Page 27: Moving Faster in a Digital World | Empowering you in a BIM world

Level of Development

LOD200 LOD300 LOD350 LOD400

www.bimforum.org/lod © 2014 by BIMForum

Page 28: Moving Faster in a Digital World | Empowering you in a BIM world

June 19, 2016Presentation Title Page 28

Real-Time

Page 30: Moving Faster in a Digital World | Empowering you in a BIM world

one popular estimate suggests that 65% of today’s primary school children will end up in jobs that don’t yet exist

Page 31: Moving Faster in a Digital World | Empowering you in a BIM world

CraftStandard-

isationSystem-isation

No Charge On-line

Commons

Charge Online

Externalisation

©Susskind/Susskind

Commoditization

Page 32: Moving Faster in a Digital World | Empowering you in a BIM world

Standardisation - Bespoke or Commodity

Page 33: Moving Faster in a Digital World | Empowering you in a BIM world

Systemization - The Power of Collective Knowledge

Page 34: Moving Faster in a Digital World | Empowering you in a BIM world

Externalization

Page 35: Moving Faster in a Digital World | Empowering you in a BIM world

– Craftspeople

– Assistants

– Para-professionals

– Empathisers

– R+D Worker

– Knowledge Engineer

– Process Analyst

– Moderator

– Designers

– System Providers

– Data Scientist

– System Engineers

Page 36: Moving Faster in a Digital World | Empowering you in a BIM world

Innovation Curve

Page 37: Moving Faster in a Digital World | Empowering you in a BIM world

change

2020 2025 2030 2035 2040

Digital Pivot

Digital Pivot

Page 38: Moving Faster in a Digital World | Empowering you in a BIM world

Thank You

[email protected]

@dale_sinclair

June 1, 2016