Mortared Stack Stone Wall Do-It-Yourself Steps MATERIALS TOOLS Stack stone Shovel Cap stone Levels (string level, 2’, 4’) Concrete blocks (CMUs) Grade stakes & string #57 gravel Rock hammer Drain pipe (optional) Circular saw with Diamond blade Landscape fabric Trowels Concrete mix Grout bag Type s mortar Masonry sponge Masonry sand Wire brush Ready mix mortar (optional) Gloves, safety glasses Rebar Before Digging Call the 811 hotline to verify the locations of underground utility lines. Gently dig around any locator paint marks to actually find the utility lines or cables. They might not be where the paint mark appears as paint marks indicate approximate locations in a "tolerance zone." In Georgia, a tolerance zone is 24” on either side of a paint mark. Dig parallel to the paint marks. Use paint to outline the wall location and shape. Hammer grade stakes into the ground and attach string line as a digging guide. Calculate the square footage of the wall by multiplying its length by its width. Select stone and consult Stone Forest for the quantities needed. Similar stone sizes are easiest to work with, but 1 or 2 sizes of stone can improve aesthetics. Excavation Have a plan for reuse or removal of all excavated dirt. Determine whether the wall will be stepped or sloped if it is built on a slope. Determine if the wall will be a retaining or freestanding wall. Excavate soil about 6-7” deep. The trench should be about 2-4” wider on both sides of the finished wall. Start at the lowest point if you’re building the wall on a slope.

Upload: others

Post on 01-Apr-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mortared Stack Stone Wall Do-It-Yourself Steps MATERIALS TOOLS€¦ · Mortared Stack Stone Wall Do-It-Yourself Steps MATERIALS TOOLS Stack stone Shovel Cap stone Levels (string level,

MortaredStackStoneWallDo-It-YourselfStepsMATERIALS TOOLSStackstoneShovel

CapstoneLevels(stringlevel,2’,4’)

Concreteblocks(CMUs)Gradestakes&string

#57gravelRockhammer

Drainpipe(optional)CircularsawwithDiamondblade

LandscapefabricTrowels

Concretemix Groutbag

TypesmortarMasonrysponge

MasonrysandWirebrush

Readymixmortar(optional)Gloves,safetyglasses

Rebar

BeforeDigging

• Callthe811hotlinetoverifythelocationsofundergroundutilitylines.Gently

digaroundanylocatorpaintmarkstoactuallyfindtheutilitylinesorcables.

Theymightnotbewherethepaintmarkappearsaspaintmarksindicate

approximatelocationsina"tolerancezone."InGeorgia,atolerancezoneis

24”oneithersideofapaintmark.Digparalleltothepaintmarks.

• Usepainttooutlinethewalllocationandshape.

• Hammergradestakesintothegroundandattachstringlineasadigging

guide.

• Calculatethesquarefootageofthewallbymultiplyingitslengthbyitswidth.

• SelectstoneandconsultStoneForestforthequantitiesneeded.Similarstone

sizesareeasiesttoworkwith,but1or2sizesofstonecanimprove

aesthetics.

Excavation

• Haveaplanforreuseorremovalofallexcavateddirt.

• Determinewhetherthewallwillbesteppedorslopedifitisbuiltonaslope.

• Determineifthewallwillbearetainingorfreestandingwall.

• Excavatesoilabout6-7”deep.Thetrenchshouldbeabout2-4”wideronboth

sidesofthefinishedwall.Startatthelowestpointifyou’rebuildingthewall

onaslope.

Page 2: Mortared Stack Stone Wall Do-It-Yourself Steps MATERIALS TOOLS€¦ · Mortared Stack Stone Wall Do-It-Yourself Steps MATERIALS TOOLS Stack stone Shovel Cap stone Levels (string level,

2501SouthMainStreetKennesaw,GA30144|770-590-1700|stoneforest.net

• Ifyou’rebuildingasteppedwall,digaleveltrenchtoapointwherethewall

hasto“stepup”theslopetoaccommodatethenextcourse,including

concretefooterandstone.

• Continuediggingstepsuntilreachingalevelpoint.Thencontinuetotheend

ofthewall.

BuildingtheWall

• Anymortaredstructuremustbebuiltonaconcretefootingtoprevent

shiftingofthewall,crackinginthemortar,andweakeningofthestructure.

• Theexcavatedtrenchshouldbefilledwith2-3”ofpacked#57gravel.

Optimalwallstrengthcanbeachievedbyplacingsteelrebarabovethegravel

atalevelwhereitwillbeseatedintothepouredconcretefooting.

• Mixconcretewithwater,eitherusingabaggedproductinamixingpanorby

mixingyourownwithaconcretemixer.Poura3-4”thickconcretefooting.

Theconcreteshouldencompassthesteelrebarandbeasmuchofa

continuouspouraspossible.Ifthefootingisthewidthofthetrenchandthe

trenchisofcompactedsolidground,formboardswillnotbenecessaryto

pourthefooting.Trowelthemixaroundinsidethetrenchtoremoveair

pocketsandtoensureitcompletelyfillsthetrenchtothedesiredlevel.Wait

atleast24hoursforthefootingtoset.

• DeterminetheCMUblocknecessaryforthewall.Ifitisalowwallandif

you’reusingasmallstone,suchasTennesseethinstackstone,a4”or6”x8”

x16”blockisfine.Ifitisasubstantialretainingwall,usestandard8”x8”x

16”blocks.

• Laythefirstcourseofconcreteblocksusingmortarmix(nostonesinmix).

Blocksshouldbesetbackfarenoughfromthefrontedgeofthefootingto

allowformortaringstonetotheblock(measurethewidthofthestoneand

addabout1-2”formortar,leavingabout2”beyondtheoutsideedgeofthe

stone).Thebacksideofthewallshouldleaveenoughroomfora4”drain

pipeand#57drainagegravel.

• BuildcoursesofCMUsashighasneeded.Forstability,eachcourseshouldbe

staggeredovertheblocksinthecoursebelowit.Consultlocalbuildingcodes

oranengineerbeforebuildingawallhigherthan2.5-3’.

• MortarstonetothefaceoftheCMUwall.Staggerpiecesofstackedstoneas

thewallheightincreases.Youcanalsouseirregularshapedflagstoneor

dimensionallycutveneerstone.

Page 3: Mortared Stack Stone Wall Do-It-Yourself Steps MATERIALS TOOLS€¦ · Mortared Stack Stone Wall Do-It-Yourself Steps MATERIALS TOOLS Stack stone Shovel Cap stone Levels (string level,

2501SouthMainStreetKennesaw,GA30144|770-590-1700|stoneforest.net

• Placedrainagegravelandwastepiecesofstackstoneinthecorespacesof

theCMUblocks,addingstabilitytothewall.

• Beforefillingbehindthewall,placelandscapefabricacrossthetrenchandup

andoverthesoilbehindthewall.Placethe4”perforatedpipeatthebaseof

thewallandfilltothetopofthewallwith#57drainagegravel.Coveritwith

remainingfabric.

• Finishthewallbymortaringaflatcapstonetothetopofthestackstoneand

CMUwall.Leave1”jointsbetweenthecapstonesandfillthejointswith

mortarusingagroutbag.Intermsofconsistency,themortarshouldbethin

enoughtosqueezeoutofthebagbutnottoorunny.Filltothetopofthejoint.

Allowthismortartosetjustabitandthenuseamasonryspongetosmooth

themortarandwashanyexcessmortaroffthesurfaceofthecapstone.

• Ifthewallisfreestanding,suchasaseatwallaroundapatio,followthebasic

instructionsabovebutremembertopurchaseenoughstackingstonetocover

thebacksideofthewall.