C270 (HK BIODIESEL PLANT) Safety Report
C270 Monthly Safety Report – January 2013
Month: Dec 2012 Jan 2013Accumulated man-hour: 445,951 485,994Days worked since project commenced: 418 449Accumulated man-day lost: 605 814Cumulative Accident Frequency Rate: 0.90 1.03
Safety :Contribution from All Level ( Top to Shop )
SAFETY STATISTICS
C270 Monthly Safety Report – January 2013
SAFETY INSPECTION / MEETINGPhysical site safety walks
C270 Monthly Safety Report – January 2013
SAFETY INSPECTION / MEETING
Weekly Safety Meetings with Safety Representatives of Subcontractors
C270 Monthly Safety Report – January 2013
AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
C270 Monthly Safety Report – January 2013
HOUSEKEEPINGWorks area kept Tidy and Clean
AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
HOUSEKEEPINT – Safe AccessPlanning of storage of construction material in transit
Improvement – Construction material in transit removed to maintain safe access
C270 Monthly Safety Report – January 2013
AREA NEED IMPROVEMENT
PROMPT RECTIFICATION
NOISE NUISANCEExcessive noise generated to employees working near by
Improvement – Provision of Acoustic Barrier to minimize noise nuisance to protect occupational health of employee
C270 Monthly Safety Report – January 2013
POSITIVE SAFETY ATTITUDE
PRE-WORK MEETING
C270 Monthly Safety Report – January 2013
Installation of Pipe Bridge – Integration of safety consideration in both Planning Stage and Implementation Stage
POSITIVE SAFETY ATTITUDE
SITE SECURITY CONTROL
C270 Monthly Safety Report – January 2013
Security Guard Force + Electronic Recognition System + Managerial Regular Checking
POSITIVE SAFETY ATTITUDE
OCCUPATIONAL HEALTH & SAFETY CONTROL
C270 Monthly Safety Report – January 2013
Regular Physical Checking to Individual’s Safety HelmetOccupational Health Advice
POSITIVE SAFETY ATTITUDE
Regular Site Safety Inspection by Labour Department’s District Occupational Officer
C270 Monthly Safety Report – January 2013
QUALITY, SAFETY and ENVIRONMENT Inspection by Government Department
POSITIVE SAFETY ATTITUDE
Site Inspection by EPD and BD
C270 Monthly Safety Report – January 2013
QUALITY, SAFETY and ENVIRONMENT Inspection by Government Department
SAFETY TRAINING
Site Specific Safety Induction
Current MonthAccumulate (Oct 2011 –
Dec 2012)
No. of class 21 297
No. of Attendee 70 1365
INDUCTIONTRAINING
C270 Monthly Safety Report – January 2013
TOOL BOX TALKTRAININGSAFETY TRAINING
Topic No. of attendee
Task Specific Removal of Jetty Platform 11
Occupational Safety General Duties 80
Occupational Safety Prevent Slip & Trip 74
Occupational Safety Housekeeping 61
Occupational Safety Accident Reporting 100
Current Month Total 336 nos.
Accumulated Total : 4,550 nos.
C270 Monthly Safety Report – January 2013
SAFETY Promotion
5 nos. Safety News Sharing
7 nos. Safety Reminder to Subcontractors
1 no. General Safety Advice on Construction Safety
1 no. Internal – BDI interface – Hygiene issue
1 no. Risk Assessment – Dismantle of Jetty Platform
3 nos. Cold Weather Warning
1 no. Safety Advice to CHEC colleague