Page 1: Monthly safety report 2012 07_july

C270 (HK BIODIESEL PLANT) Safety Report

Page 2: Monthly safety report 2012 07_july

Month: Jun 2012 Jul 2012Accumulated man-hour: 242,361 279,201Days worked since project commenced: 234 265Accumulated man-day lost: 8 51Cumulative Accident Frequency Rate: 0.41 0.72

Safety is everyone’sResponsibility.

ALL are an important stakeholder !

SAFETY STATISTICS

C270 Monthly Safety Report – July 2012

Page 3: Monthly safety report 2012 07_july

SAFETY INSPECTION / MEETINGPhysical site safety walks

C270 Monthly Safety Report – July 2012

Page 4: Monthly safety report 2012 07_july

SAFETY INSPECTION / MEETING

Weekly Safety Meetings

C270 Monthly Safety Report – July 2012

Page 5: Monthly safety report 2012 07_july

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

FALL FROM HEIGHTFloor edge should be properly fenced

Improvement – Floor edge fenced by barrier

Page 6: Monthly safety report 2012 07_july

AREA NEED IMPROVEMENT

PROMPT RECTIFICATION

HOUSEKEEPINGConstruction waste should be disposed

Improvement – Construction waste disposed

Page 7: Monthly safety report 2012 07_july

POSITIVE POINTERS

Celebration of LO PAN Festival

C270 Monthly Safety Report – July 2012

Site Checking for PPE by Managers

Page 8: Monthly safety report 2012 07_july

SAFETY AWARD

Mr. Peter Chung (Project Manager) presented SAFETY SUBCONTRACTOR award to CNCEC’s site operatives

Commendations

C270 Monthly Safety Report – July 2012

Page 9: Monthly safety report 2012 07_july

SAFETY TRAINING

INDUCTION

TRAINING

Site Specific Safety Induction

Current MonthAccumulate

(Oct 2011 – July 2012)

No. of class 23 189

No. of Attendee 90 925

C270 Monthly Safety Report – July 2012

Page 10: Monthly safety report 2012 07_july

TOOL BOX TALKTRAININGSAFETY TRAINING

Topic No. of attendee

Occupational Safety Working at Height 37 nos.

Occupational Safety Safe Use of Scaffold 50 nos.

Occupational Health Fire Prevention 69 nos.

Occupational Safety Safe Use of Safety Harness 71 nos.

Environmental Dust Control 86 nos.

Current Month Total 313 nos.

Accumulated Total : 2,285 nos.

C270 Monthly Safety Report – July 2012

Page 11: Monthly safety report 2012 07_july

SAFETY Promotion

3/7/2012 Very Hot Weather Warning

4/7/2012 Very Hot Weather Warning

5/7/2012 Thunderstorm Warning

9/7/2012 Very Hot Weather Warning

10/7/2012 Very Hot Weather Warning

11/7/2012 Very Hot Weather Warning

12/7/2012 Very Hot Weather Warning

14/7/2012 Thunderstorm Warning

16/7/2012 Very Hot Weather Warning

18/7/2012 Thunderstorm Warning

Safety Alert

C270 Monthly Safety Report – July 2012

Page 12: Monthly safety report 2012 07_july

SAFETY Promotion

19/7/2012 Very Hot Weather Warning

20/7/2012 Very Hot Weather Warning

21/7/2012 Very Hot Weather Warning

23/7/2012 Emergency Preparedness for Typhoon (VICENTE)

24/7/2012 Emergency Preparedness for Typhoon (VICENTE)

25/7/2012 Thunderstorm Warning

26/7/2012 Thunderstorm Warning

27/7/2012 Thunderstorm Warning

30/7/2012 Very Hot Weather Warning

31/7/2012 Very Hot Weather Warning

Safety Alert

C270 Monthly Safety Report – July 2012

Page 13: Monthly safety report 2012 07_july

SAFETY Promotion

Other Safety Circulation

C270 Monthly Safety Report – July 2012

4/7/2012 Provide Adequate Drinking Water

5/7/2012 Statutory Requirement for Lifting Gear

5/7/2012 HSE News Sharing – Three workers buried in excavation pit

6/7/2012 Labour Department Step Up Measures

18/7/2012 HSE News Sharing – Worker fall from15/F Bamboo Scaffold

18/7/2012 Protection Against Lighting Strikes During Outdoor Works

19/7/2012 Compulsory Wearing of Safety Shoes

26/7/2012 HSE News Sharing – Electric Shock

26/7/2012 HSE News Sharing – Fall From Height

31/7/2012 Duties of Insured Contractors

Page 14: Monthly safety report 2012 07_july

ONE reportable injury accident recorded in July 2012

– a plaster fell from a height of 4.0m from external wall bamboo scaffold to ground level. He is recovering and suffers no permanent disability.

GOVERNMENT / AUTHORITIES VISIT

LD inspection on 17/7/2012 LD inspection on 21/7/2012

C270 Monthly Safety Report – July 2012

Page 15: Monthly safety report 2012 07_july

Thanks for watching!!

THE END

C270 Monthly Safety Report – July 2012