33
Mohamed Helmi Bassal Project Portfolio CV - 1 - 1. Expansion Of Prophet's Mosque & Piazza 2. King Abdul Allah Financial District 3. Classrooms Building 2100 4. Laboratories and Auditoriums Building 2200 5. Festival and Lecture Hall 6. Boys Restaurant 7. Faculty Of Dawa 8. Restoration Of Lecture Hall & Library 9. Classrooms Building 23 10. Lecture Halls Building 23H 11. Mena Al Wady Hospital 12. Extension Building of Egyptian Radio &Televisions 13. Golden Beach Touristic Village 14. Consultary Center For Design

Upload: mohamed-bassal

Post on 08-Apr-2017

33 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 1 -

1. Expansion Of Prophet's Mosque & Piazza

2. King Abdul Allah Financial District

3. Classrooms Building 2100

4. Laboratories and Auditoriums Building 2200

5. Festival and Lecture Hall

6. Boys Restaurant

7. Faculty Of Dawa

8. Restoration Of Lecture Hall & Library

9. Classrooms Building 23

10. Lecture Halls Building 23H

11. Mena Al Wady Hospital

12. Extension Building of Egyptian Radio &Televisions

13. Golden Beach Touristic Village

14. Consultary Center For Design

Page 2: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 2 -

Expansion Of Prophet's Mosque & Piazza

Employer Saudi Bin Ladin Group (SBG) – Architecture & Building

Construction Division (ABCD)

Project Client/Sponsor Ministry Of Finance , Ministry Of High Education

Project Designer/

Developer

Dar Al-Handasah

Project Supervisor Al-Alamiya

Project Main Contractor SBG - ABCD

Project Footprint Area 1414634 sqm

Project Built-up Area 4733959 sqm

Project Budget /Contract 44 billion / Cost + Design/Build

Period between January 2013 till Date

Job title Architecture Dept. Technical Manager

Roles Leading team for:

-Review design drawings/documents

-Contacting with designer for clarification & solving conflicts

-Coordinate with the site team for construction process requirements

-Review project plan schedule & assist in drafting the time schedule

-Checking change notices and price analysis

-Review shop drawing submitted from sub-contractors

-Making architectural detailing and proposals for special items

-Preparing technical packages for finishing items

-Coordinating with other disciplines (Civil, Structure, MEP, material,

Planning …..)

-Monitor & track progress of activities executed by related parties

-Attending site/technical meetings with sub-contractors, supervisor and site

team and distribute the minutes of meetings

-Managing all required corresponding and documentation

-Following submitting drawings & materials

-Package/Material management through PROSPER & SPEAR (Material

Management platforms)

Project Location:

Madinah Haram

Madinah

Kingdom of Saudi Arabia

https://www.sbgksa.com

Page 3: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 3 -

Expansion Of Prophet's Mosque & Piazza

Page 4: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 4 -

King Abdul Allah Financial District

Employer Saudi Bin Ladin Group (SBG) – Public Building &

Airports Division (PBAD)

Project Client/Sponsor Rayadah Investment Company

Project Designer/Developer Varies (See next pages)

Project Supervisor Dar Al Riyadh

Project Main Contractor SBG - PBAD

Project Footprint Area Varies

Project Built-up Area Varies (See next pages)

Project Budget Varies

Period between May 2010 till December 2013

Job title Senior Architecture Coordinator

Roles Leading team for:

-Design review and coordination with designers (Fx fowle,

Foster, Gensler, Adrian Smith, HLA,RTKL,SOM ….)

-Preparing architectural workshop & detailing drawings

-Attending site meetings with designers, consultants and site team

-Making all required corresponding and documentation

-Coordinating with other disciplines (Civil, Structure, MEP,

material, Planning …..)

-Following submitting drawings through PWS & prolog and direct

contact with consultant

Project Location:

King Fahd Rd/Thumama Rd

/ North Ring Road

Riyadh

Kingdom of Saudi Arabia

http://www.sbgpbad.ae

Page 5: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 5 -

King Abdul Allah Financial District

Page 6: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 6 -

Zone – 03 Buildings 3.09, 3.10

Page 7: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 7 -

Zone – 05 Buildings 5.01, 5.02

Page 8: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 8 -

Zone – 05 Buildings 5.03, 5.04

Page 9: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 9 -

Zone – 05 Buildings 5.05, 5.06

Page 10: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 10 -

Classrooms Building 2100

Employer South Star establishment For Contracting

Project Client/Sponsor King Abdul Aziz University - Projects Directorate

Project Designer/

Developer

Fluor Arabia Limited

Project Supervisor Fluor Arabia Limited

Project Main Contractor South Star establishment For Contracting

Project Footprint Area 2460 sqm

Project Built-up Area 10560 sqm

Project Budget / Contract 34 million SAR / Unit Rate

Period between May 2008 till March 2010

Job title Construction Manager

Roles - Assigning day-to-day work to the site team and subcontractors and

following up

- Study job specifications to determine appropriate construction methods.

- Requisition of materials, tools, equipment and all requirements to

complete construction activities

- Collaborate with engineering, planning, procurement, contracting, cost

control and other construction departments.

- Select, schedule, and coordinate subcontractor activities

- Following and implement quality control plan

- Oversee and monitor the compliance with safety regulations and legal

requirements onsite and offsite.

- Following up contractual conditions performance of subcontractors.

- Review the work progress on daily basis.

- Review the project in-depth to schedule deliverables and estimate costs,

quantities, due dates …etc.

- Respond to work delays, emergencies, and other problems.

- Prepare reports pertaining to job status, team performance, and required

material onsite.

- Following up issuance and approval of material and shop drawings.

- Following up material inspection, delivery, storage, handling …. Etc.

- Coordinate risks with PM analyzing, managing, mitigating ….. Etc.

Project Location:

King Abdul Aziz University

Jeddah

Kingdom of Saudi Arabia

http://www.southstar.com.sa

Page 11: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 11 -

Classrooms Building 2100

Page 12: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 12 -

Laboratories and Auditoriums Building 2200

Employer South Star establishment For Contracting

Project Client/Sponsor King Abdul Aziz University - Projects Directorate

Project Designer/

Developer

Fluor Arabia Limited

Project Supervisor Fluor Arabia Limited

Project Main Contractor South Star establishment For Contracting

Project Footprint Area 3470 sqm

Project Built-up Area 13880 sqm

Project Budget / Contract 55 million SAR / Unit Rate

Period between May 2008 till March 2010

Job title Construction Manager

Roles - Assigning day-to-day work to the site team and subcontractors and

following up

- Study job specifications to determine appropriate construction methods.

- Requisition of materials, tools, equipment and all requirements to

complete construction activities

- Collaborate with engineering, planning, procurement, contracting, cost

control and other construction departments.

- Select, schedule, and coordinate subcontractor activities

- Following and implement quality control plan

- Oversee and monitor the compliance with safety regulations and legal

requirements onsite and offsite.

- Following up contractual conditions performance of subcontractors.

- Review the work progress on daily basis.

- Review the project in-depth to schedule deliverables and estimate costs,

quantities, due dates …etc.

- Respond to work delays, emergencies, and other problems.

- Prepare reports pertaining to job status, team performance, and required

material onsite.

- Following up issuance and approval of material and shop drawings.

- Following up material inspection, delivery, storage, handling …. Etc.

- Coordinate risks with PM analyzing, managing, mitigating ….. Etc.

Project Location:

King Abdul Aziz University

Jeddah

Kingdom of Saudi Arabia

http://www.southstar.com.sa

Page 13: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 13 -

Laboratories and Auditoriums Building 2200

Page 14: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 14 -

Festival and Lecture Hall

Employer South Star establishment For Contracting

Project Client/Sponsor King Faisal University - Al Ahsa Campus

Project Designer/Developer TAC/DMJM International/DSG // Arch Center

Project Supervisor Arch Center

Project Main Contractor South Star establishment For Contracting

Project Footprint Area 6890 sqm

Project Built-up Area 10320 sqm

Project Budget / Contract 42 million SAR / Unit Rate

Period between Aug. 2006 till May 2008

Job title Project Architecture Engineer

Roles -Preparing architectural & plumbing workshop drawings

-Preparing concrete dimension drawings for some structure elements

-Preparing the composite drawings and coordinating with other trades

-Following submitting of above drawings & materials

-Studying project material management plan

-Extracting material lists from contract documents

-Preparing material supply requisitions for each items/package

-Preparing item breakdown

-Revising technical terms & conditions of supply contracts

-Studying contract timeline frame along with the project base line time

schedule

-Fulfill negotiations with subcontractor/supplier

-Managing daily tasks in the site

-Contacting with consultant for submittals, RFI’s, IR’s….etc.

-Contacting with suppliers for contracting, quotations, material delivery,

Payments…etc.

Project Location:

King faisal University

Al Hofof

Eastern Province

Kingdom of Saudi Arabia

http://www.southstar.com.sa

Page 15: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 15 -

Festival and Lecture Hall

Page 16: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 16 -

Boys Restaurant

Employer South Star establishment For Contracting

Project Client/Sponsor King Faisal University - Al Ahsa Campus

Project Designer/Developer TAC/DMJM International/DSG // Arch Center

Project Supervisor Al-Naim Architects, Engineers & Planning Consultants

Project Main Contractor South Star establishment For Contracting

Project Footprint Area 3310 sqm

Project Built-up Area 8640 sqm

Project Budget / Contract 23 million SAR / Unit Rate

Period between Aug. 2006 till May 2008

Job title Project Architecture Engineer

Roles -Preparing architectural & plumbing workshop drawings

-Preparing concrete dimension drawings for some structure elements

-Preparing the composite drawings and coordinating with other trades

-Following submitting of above drawings & materials

-Studying project material management plan

-Extracting material lists from contract documents

-Preparing material supply requisitions for each items/package

-Preparing item breakdown

-Revising technical terms & conditions of supply contracts

-Studying contract timeline frame along with the project base line time

schedule

-Fulfill negotiations with subcontractor/supplier

-Managing daily tasks in the site

-Contacting with consultant for submittals, RFI’s, IR’s….etc.

-Contacting with suppliers for contracting, quotations, material delivery,

Payments…etc.

Project Location:

King faisal University

Al Hofof

Eastern Province

Kingdom of Saudi Arabia

http://www.southstar.com.sa

Page 17: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 17 -

Boys Restaurant

Page 18: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 18 -

Faculty Of Dawa

Employer South Star establishment For Contracting

Project Client/Sponsor Islamic University In Madinah

Project Designer/Developer DAR Al Riyadh

Project Supervisor Beeah, Planners, Architects & Engineers

Project Main Contractor South Star establishment For Contracting

Project Footprint Area 9770 sqm

Project Built-up Area 29430 sqm

Project Budget / Contract 58 million SAR / Unit Rate

Period between Sep. 2004 till Aug. 2006

Job title Project Architecture Engineer

Roles -Preparing architectural & plumbing workshop drawings

-Preparing concrete dimension drawings for some structure elements

-Preparing the composite drawings and coordinating with other trades

-Following submitting of above drawings & materials

-Studying project material management plan

-Extracting material lists from contract documents

-Preparing material supply requisitions for each items/package

-Preparing item breakdown

-Revising technical terms & conditions of supply contracts

-Studying contract timeline frame along with the project base line time

schedule

-Fulfill negotiations with subcontractor/supplier

-Managing daily tasks in the site

-Contacting with consultant for submittals, RFI’s, IR’s….etc.

-Contacting with suppliers for contracting, quotations, material delivery,

Payments…etc.

Project Location:

Islamic University

Madinah

Kingdom of Saudi Arabia

http://www.southstar.com.sa

Page 19: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 19 -

Faculty Of Dawa

Page 20: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 20 -

Restoration Of Lecture Hall & Library

Employer South Star establishment For Contracting

Project Client/Sponsor Islamic University In Madinah

Project Designer/Developer Islamic University In Madinah

Project Supervisor Islamic University In Madinah – Projects Directorate

Project Main Contractor South Star establishment For Contracting

Project Restoration Area 3120 sqm

Project New Built-up Area 465 sqm

Project Budget / Contract 6.5 million SAR / Unit Rate

Period between Sep. 2004 till May 2005

Job title Project Architecture Engineer

Roles -Preparing architectural & plumbing workshop drawings

-Preparing concrete dimension drawings for some structure elements

-Preparing the composite drawings and coordinating with other trades

-Following submitting of above drawings & materials

-Studying project material management plan

-Extracting material lists from contract documents

-Preparing material supply requisitions for each items/package

-Preparing item breakdown

-Revising technical terms & conditions of supply contracts

-Studying contract timeline frame along with the project base line time

schedule

-Fulfill negotiations with subcontractor/supplier

-Managing daily tasks in the site

-Contacting with consultant for submittals, RFI’s, IR’s….etc.

-Contacting with suppliers for contracting, quotations, material delivery,

Payments…etc.

Project Location:

Islamic University

Madinah

Kingdom of Saudi Arabia

http://www.southstar.com.sa

Page 21: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 21 -

Restoration Of Lecture Hall & Library

Page 22: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 22 -

Classrooms Building 23

Employer South Star establishment For Contracting

Project Client/Sponsor General Presidency for Girls Education

Project Designer/Developer Devecon Engineers and Architects

Project Supervisor General Presidency for Girls Education – Projects Directorate

Project Main Contractor South Star establishment For Contracting

Project Footprint Area 4670 sqm

Project Built-up Area 18760 sqm

Project Budget / Contract 32 million SAR / Unit Rate

Period between Feb. 2004 till Sep. 2005

Job title Project Architecture Engineer

Roles -Preparing architectural & plumbing workshop drawings

-Preparing concrete dimension drawings for some structure elements

-Preparing the composite drawings and coordinating with other trades

-Following submitting of above drawings & materials

-Studying project material management plan

-Extracting material lists from contract documents

-Preparing material supply requisitions for each items/package

-Preparing item breakdown

-Revising technical terms & conditions of supply contracts

-Studying contract timeline frame along with the project base line time

schedule

-Fulfill negotiations with subcontractor/supplier

-Managing daily tasks in the site

-Contacting with consultant for submittals, RFI’s, IR’s….etc.

-Contacting with suppliers for contracting, quotations, material delivery,

Payments…etc.

Project Location:

Gils Colleges

Exit – 9

Riyadh

Kingdom of Saudi Arabia

http://www.southstar.com.sa

Page 23: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 23 -

Classrooms Building 23

Page 24: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 24 -

Lecture Halls Building 23H

Employer South Star establishment For Contracting

Project Client/Sponsor General Presidency for Girls Education

Project Designer/Developer Devecon Engineers and Architects

Project Supervisor General Presidency for Girls Education – Projects Directorate

Project Main Contractor South Star establishment For Contracting

Project Footprint Area 4770 sqm

Project Built-up Area 18880 sqm

Project Budget / Contract 34 million SAR / Unit Rate

Period between Feb. 2004 till Sep. 2005

Job title Project Architecture Engineer

Roles -Preparing architectural & plumbing workshop drawings

-Preparing concrete dimension drawings for some structure elements

-Preparing the composite drawings and coordinating with other trades

-Following submitting of above drawings & materials

-Studying project material management plan

-Extracting material lists from contract documents

-Preparing material supply requisitions for each items/package

-Preparing item breakdown

-Revising technical terms & conditions of supply contracts

-Studying contract timeline frame along with the project base line time

schedule

-Fulfill negotiations with subcontractor/supplier

-Managing daily tasks in the site

-Contacting with consultant for submittals, RFI’s, IR’s….etc.

-Contacting with suppliers for contracting, quotations, material delivery,

Payments…etc.

Project Location:

Gils Colleges

Exit – 9

Riyadh

Kingdom of Saudi Arabia

http://www.southstar.com.sa

Page 25: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 25 -

Lecture Halls Building 23H

Page 26: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 26 -

Mena Al Wady Hospital

Employer Sait Group Construction & development

Project Client/Sponsor Ministry Of Health

Project Designer/Developer Ministry Of Health–Directorate of projects & Maintainance

Project Supervisor --

Project Main Contractor Sait Group Construction & development

Project Footprint Area 4385 sqm

Project Built-up Area 13255 sqm 160 Bed – 18 Outpatient Clinics

Project Budget / Contract 37 million SAR / Unit Rate

Period between Mrch. 2009 till Sep. 2009

Job title Project Architecture Engineer (FreeLancer)

Roles -Preparing architectural & plumbing workshop drawings

-Preparing concrete dimension drawings for some structure elements

-Preparing the composite drawings and coordinating with other trades

-Following submitting of above drawings

Project Location:

Mena Hajj Campus

Mena

Makkah

Kingdom of Saudi Arabia

//www.saitgroup.comhttp:

Page 27: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 27 -

Mena Al Wady Hospital

Page 28: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 28 -

Extension Building of Egyptian Radio &Televisions

Employer Construction & Reconstruction Company CRC

Project Client/Sponsor Egyptian Radio &Television Union ERTU

Project Designer/Developer Arc.: Architecture Center Group

Struc.: Engineering Consultation Office E.C.O.

MEP: Allied Consultants Ltd.

Project Supervisor Egyptian Consultant Office ECOGIM

Project Main Contractor Construction & Reconstruction Company CRC

JV/ Control Y Montajes Industrials CYMI

Project Footprint Area 3685 sqm

Project Built-up Area 47900 sqm

Project Budget / Contract 132 million LE / Unit Rate

Period between Feb. 2002 till Dec. 2003

Job title Site Architecture Engineer

Roles Execution of machines foundations all over the building

Execution of the skeleton of 9th and 10th floors (columns, ribs & slab)

Execution of high quality finishing of floors: basement, ground &first

3750m2/floor

Works handing-over partially & preliminary for the client (ERTU)

Coordination between sub-contractors &cost control office

Preparing reports about activities progress & planning + partial time

schedule for expected works

Project Location:

Maspiro,

Cornish El-Nile,

Cairo

Egypt

http://www.dorra.com/crc

Page 29: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 29 -

Extension Building of Egyptian Radio &Televisions

Page 30: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 30 -

Golden Beach Touristic Village

Employer EHAF Consulting Engineers

Project Client/Sponsor Borg El-Arab Touristic Village Company BATCO

Project Designer/Developer EHAF Consulting Engineers

Project Supervisor EHAF Consulting Engineers

Project Main Contractor Construction & Reconstruction Company CRC

Project Footprint Area 393742 sqm

Project Built-up Area 121740 sqm

Project Budget / Contract 343 million LE / Unit Rate

Period between Apr. 2000 till Jan. 2002

Job title Site Architecture Engineer

Roles -Inspection of high quality finishing works in villas and chalets

-Checking swimming pools & landscape location & dimensions

-Preparing reports about activities progress in & out of units

-Checking workshop drawings from contractor and sub-contractors

-Following execution of modifications from the side of clients in units

-Handing-over the units for clients (units' owners)

Location:Project

Maspiro,

Cornish El-Nile,

Cairo

Egypt

http://www.ehafws.com

Page 31: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 31 -

Golden Beach Touristic Village

Page 32: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 32 -

CONSULTARY CENTER FOR DESIGN

Employer Consultary Center For Design

Period between Sep. 1999 till Apr. 2000

Job title Designer

Projects 3Residential building / El-Mashaya St., Mansoura (Owners:El-Morsy Mahallawy)

Islamic Center / Bani Hassan, Sharkeya ( Ownar: Ibrahim Elseddek)

Islamic Center / Mansoura, (Owner: Int. Islamic Relief Org.)

Red Crescent Hospital / Touriel, Mansoura (Owner: Red Crescent Society)

Administration Building of Road Department / Mansoura (Owner: Dakahlia

Governorate)

Elasafra Tower / Alexandria (Owner: Utilities &Housing Organization)

Several residential buildings

Roles Preparing the initial concepts & making the final designs

Discussing the client (project owner) about his notes

Preparing the workshop drawings

Checking the formwork drawings from the architectural point of view

Coordination between the architectural requirements & both of structural &

electromechanical requirements

Making quantity survey of main items of some projects above

Location: Office

Thawra St.,

Mansoura,

Egypt

Page 33: Mohamed Helmi Project Portfolio TM-03h

Mohamed Helmi Bassal Project Portfolio

CV- 33 -

CONSULTARY CENTER FOR DESIGN