Module VFinal Wrap-Up
Module VFinal Wrap-Up
Module
Topic
0 Overview
I Introduction
IISoil Stabilization (SS) and Sediment Control (SC)
IIITracking, Wind Erosion, and Construction Site Management BMPs
IVIncorporation of Construction Site BMPs into the Design Process
V Final Wrap-Up
Module V ObjectivesModule V Objectives
• Review what we’ve discussed today• Take the Post-Test• Answer any remaining questions
2
• Caltrans Statewide NPDES Permit
• California General Construction Permit
• Caltrans Storm Water Management Plan
Regulatory BackgroundRegulatory Background
Final Wrap-Up
Final Wrap-Up
3
Department PolicyDepartment Policy
• The SWDR is to describe the strategy for
including Construction Site BMPs into the
contract documents.
• Must consider the BMPs as separate bid line
items for all projects.
• Design and Construction Divisions must concur
with the strategy.
Final Wrap-Up
Final Wrap-Up
4
Caltrans-Approved Best Management Practices
(BMPs)
Caltrans-Approved Best Management Practices
(BMPs)
• Design Pollution Prevention BMPs
• Treatment BMPs
• Maintenance BMPs
• Construction Site BMPs
5
Final Wrap-Up
Final Wrap-Up
Caltrans Storm Water Quality
Manuals
Caltrans Storm Water Quality
Manuals
Final Wrap-Up
Final Wrap-Up
6
• Splash erosion
• Sheet erosion
• Rill erosion
• Gully erosion
• Channel erosion
Types of Erosion
Types of Erosion
Final Wrap-Up
Final Wrap-Up
Sediment is the most common pollutant washed from construction sites.
7
Tracking, Wind Erosion, and Construction Site
Management
Tracking, Wind Erosion, and Construction Site
Management
8
Final Wrap-Up
Final Wrap-Up
• Prevent storm water contact with disturbed soil areas (DSAs)
• Protect DSAs from erosion
• Minimize sediment in storm water before discharge
• Control discharges of sediment from other sources
• Prevent non–storm water discharges
• Prevent storm water contact with other potential construction site pollutants
Water Pollution Control Strategies during
Construction
Water Pollution Control Strategies during
Construction
Final Wrap-Up
Final Wrap-Up
9
Minimum effective combination of soil stabilization and sediment controls
Minimum effective combination of soil stabilization and sediment controls
Figures and TablesFigures and TablesFinal Wrap-
UpFinal Wrap-
Up
10
Selection Process of
Construction Site BMPs
Selection Process of Construction Site
BMPs
Final Wrap-Up
Final Wrap-Up
11
Start with the Construction Site BMPs Consideration Form
Start with the Construction Site BMPs Consideration Form
Use of Checklist CS-1,
Parts 1 - 6Use of Checklist CS-1,
Parts 1 - 6
27.1 ac17.3 ac7.4 ac2.5 ac
12.4 ac
3
12
14
Example Project Proposed Construction Site
BMPs Deployment Plans (D-Plans)
Proposed Construction Site BMPs Deployment Plans
(D-Plans)
Designate separate bid line items for appropriate BMPs.
Designate separate bid line items for appropriate BMPs.
• Scheduling
• ESA Protection
• Soil Stabilization
• Slope Interrupter Devices
• Concentrated Flow Devices
• Sediment Control
• Tracking Control
• Wind Erosion Control
• Concrete Washouts
• Construction Site Management
Standard Special Provisions for
Construction Site BMPs
Standard Special Provisions for
Construction Site BMPs
Final Wrap-Up
Final Wrap-Up
15
•SSP 07-340 WPCP Preparation Requirements
•SSP 07-345 SWPPP Preparation Requirements
•SSP S5-630 Relations with the RWQCB
•SSP 07-346 Construction Site Management
Standard Special Provisions for
Construction Site BMPs
Standard Special Provisions for
Construction Site BMPs
Final Wrap-Up
Final Wrap-Up
16
• Include Water Pollution Control quantity sheets
• Include special provisions of selected bid line items
• Include details of selected bid line items
• Provide estimated quantities for selected bid line items
• Provide estimated costs for selected bid line items
Finalize PS&E Package for
Construction Site BMPs
Finalize PS&E Package for
Construction Site BMPs
Final Wrap-Up
Final Wrap-Up
17
At each design phase (PID, PA/ED,
PS&E), include the following:• Temporary BMP selected• Quantity and cost information• Construction Division
concurrence information
Final Wrap-Up
Final Wrap-Up
18
Include Construction Site BMP Strategy in the Storm Water
Data Report
Include Construction Site BMP Strategy in the Storm Water
Data Report
Course SummaryCourse Summary
You now should be able to
Select appropriate Construction Site BMPs
Incorporate Construction Site BMPs
Estimate quantities and costs for Construction Site BMPs
Incorporate a Construction Site BMP strategy into the Storm Water Data Report
19
A few last questionsA few last questions
The Construction Site BMPs Consideration Form must be initialed and included in the Storm Water Data Report at all phases of design. True or False?
21
Are rainfall intensity curves and average yearly rain days needed for the designer to select the appropriate soil stabilization and sediment controls?Name the three elements of the Construction Site BMPs strategy.
To be or not to be?
The Post-TestThe Post-Test
• Repeats the test given at the beginning of the course
• Has a time limit of 15 minutes
• Covers course topics
• Evaluates what you have learned
• Helps evaluate the effectiveness of this training
22
Remember your efforts will
improve the project delivery process by
Remember your efforts will improve the project delivery process by
24
Helping contractors develop more accurate, competitive bids for all Caltrans construction projects
Reducing construction costs arising from contract change orders (CCOs) and claims
Facilitating implementation of preferred temporary BMPs during construction of the project