Module 23Module 23
STEPS 15 & 16STEPS 15 & 16 Preconstruction Preconstruction
Engineering and Engineering and Design (PED) Design (PED)
and and Other Decision Documents Other Decision Documents
Module 23Module 23
STEPS 15 & 16STEPS 15 & 16 Preconstruction Preconstruction
Engineering and Engineering and Design (PED) Design (PED)
and and Other Decision Documents Other Decision Documents
Civil Works Orientation Course - FY 11
![Page 2: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/2.jpg)
Objective:Objective:Understand the process for execution of a PED
agreement.Understand what is the purpose of PED and
what documents are completed in the PED phase.
![Page 3: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/3.jpg)
STEP 15STEP 15 PED Agreement PED Agreement
STEP 15STEP 15 PED Agreement PED Agreement
![Page 4: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/4.jpg)
Preconstruction EngineeringPreconstruction Engineeringand Design and Design
Currently cost-shared: 75% - Federal
25% - Non-Federal*
NEW!! In-kind credits allowed per Section 2003 WRDA 2007
Model PED agreements & checklist on disc
*this is just a down payment – balance collected during
construction
![Page 5: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/5.jpg)
Preconstruction EngineeringPreconstruction Engineeringand Design Agreementand Design Agreement
There are models for: Single Purpose Navigation & Flood Risk
Management Only PED Agreement Checklist to HQ RIT for certification
- 30 days prior to DE signature Similar to FCSA HQUSACE approves all Other PED Agreements No PED work or issuance of contract until Agreement
executed District Engineer executes approved agreements
![Page 6: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/6.jpg)
Preconstruction EngineeringPreconstruction Engineeringand Design Agreement Checklistand Design Agreement Checklist
General information Cost sharing summary Funding history Special conditions Review requirements, Sponsor
and Corps
![Page 7: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/7.jpg)
STEP 16STEP 16 Conduct PED Conduct PED
STEP 16STEP 16 Conduct PED Conduct PED
![Page 8: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/8.jpg)
Purpose of PEDPurpose of PED Complete the detailed engineering & technical studies
and design needed to begin construction of the project recommended in the decision document.
Preparation of plans and specifications of first significant construction contract
(NEW!!) Section 2035 WRDA 07 Safety Assurance Review – Calls for independent review of flood and hurricane/storm projects if Chief of Engineers determines that it is necessary to assure public health, safety, and welfare.
![Page 9: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/9.jpg)
Preconstruction EngineeringPreconstruction Engineeringand Designand Design
Starts after Division Engineer’s Transmittal Letter & execution of PED agreement
Ends with completion of first set of construction plans and specifications
![Page 10: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/10.jpg)
Preconstruction EngineeringPreconstruction Engineeringand Designand Design
Usually requires about two years to complete
Usually overlaps with the end of the feasibility phase.
Must keep PED funds separate from feasibility review funds
![Page 11: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/11.jpg)
Preconstruction EngineeringPreconstruction Engineeringand Designand Design
Major Documents in PED: Plans and specifications (P&S) Design Documentation Report (DDR) Draft Project Partnership Agreement (PPA) Limited Reevaluation Reports (LRR) - Primarily for
required economic/environmental updates
Real Estate Design Memorandums
![Page 12: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/12.jpg)
Plans and specifications: Form the technical portion of the contract documents Used to solicit bids from private contractors Approved at the District Used to construct the project
Preconstruction EngineeringPreconstruction Engineeringand Designand Design
![Page 13: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/13.jpg)
PED Coordination TeamPED Coordination Team
Co-chaired by Corps project manager and sponsors counterpart
Oversees issues related to PED Scheduling Work Products Plans and Specifications Contract Award and Modification Other Related Activities
![Page 14: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/14.jpg)
Other DocumentsOther Documents
Other reports may be prepared during PED and/or other project phases for use as Decision Documents or Implementation Documents
![Page 15: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/15.jpg)
Implementation Documents
Any report prepared for the purpose of implementing a project in accordance with its authorization
- O&M Manual
- Detailed engineering reports
- Plans & Specifications
![Page 16: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/16.jpg)
Decision Document Any report prepared for the purpose of :
obtaining project authorization, modification, or Washington level approval;
obtaining commitment of Federal funds for project implementation; or
obtaining approval to spend and receive money as a result of entering into an agreement.
![Page 17: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/17.jpg)
Decision Documents Obtaining project authorization, modification, or verification:
Reconnaissance Report* Feasibility Report Limited Reevaluation Reports** General Reevaluation Reports (GRR)** Post Authorization Change (Section 902) Report Detailed Project Report* Major Rehabilitation Report
* Approval at MSC** Approval at MSC if no additional Congressional action required
![Page 18: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/18.jpg)
Decision Documents Obtaining project authorization -
modification: Dam Safety Report Design Deficiency Report Dredged Material Management Plans* Water Supply Reallocation Report
* Approval at MSC
![Page 19: Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11](https://reader036.vdocuments.us/reader036/viewer/2022062421/56649d9e5503460f94a887b7/html5/thumbnails/19.jpg)
Other Decision Points
Reports in defense of budgetary decision(s)
Project Partnership Agreements Credit Agreements Memorandums of Agreement Feasibility Cost Sharing Agreements PED Cost Sharing Agreements Water Supply Contracts