MODULAR SPREADER SYSTEMS
MODULAR SPREADER SYSTEMS
Anthony Culshaw: Senior Design Engineer Spreader & Lifting Beams: Setting the Standard
MODULAR SPREADER SYSTEMS
• About Modulift
Contents
• Lifting Equipment and associated Standards
• QA and Project Specifications
• Conclusions
MODULAR SPREADER SYSTEMS
Offshore Oil & Gas
• Modulift is the premier supplier of below the hook lifting equipment
Spreader beams
Lifting beams
Various frames and custom solutions
• Lifting various load types in excess of 2000t and up to 100m long. (Jackets, Cable Reels, Monopiles)
MODULAR SPREADER SYSTEMS
Lifting Beams
These, along with custom fabrications and frames, are non-fixed lifting attachments Main benefits include:
Spreader Beams - weight and cost effective Lifting beams – reduced headroom required
MODULAR SPREADER SYSTEMS
Spreader Rig Arrangements
• Versatility • Re-useable means good value • Complex rigging requires
knowledge and experience
MODULAR SPREADER SYSTEMS
Other Lifting Attachments
• Semi Spreaders • Combination Rigs • Lattice Beams • Spreader & Lifting Frames • Hanging Plates • Tension Beams/Slings
MODULAR SPREADER SYSTEMS
Certificate no. JXXXX-1
Certificate of Conformity
Issued to: Date: C t N
XX/XX/XXCustomer Name
Customer Address Client ref: PO #
Our ref: JXXXX
AustraliaSheet: 1 of 1
Description of goods:
ITEM Identification no.
1 Mod 12 components:
6 x End Units
6 x End Units
3 x 1.0m struts
6 x 1m struts
2 0 75 t t
Description
Mod12/DL/G388, G396, G400, G401, G403, G408
Mod12/S1.5/G189, G191, G199
Mod12/S1/G343, G344, G345, G348, G349, G350
M d12/S0 75/G109 G111
Mod12/EU/G376, G377, G380, G381, G384, G387
2 x 0.75m struts
2 x 0.5m struts
2 x 0.25m struts
Mod12/S0.75/G109, G111
Mod12/S0.5/G184, G194
Mod12/S0.25/G139, G142
These items are components from the Modulift 12 sy stem.
For more information on SWL (Safe Working Load) and set
configurations at different spans, please refer to table no. 2
'Load v Span' on the User Instructions.
Hereby, Modulift UK Ltd, Poole, Dorset, United Kingdom, declares that the Modulift Spreader Systemor Modulift Spreader components or Modulift compone nt referenced hereon conform to your purchaseorder, and are in compliance with the essential requirements and other relevant provisions of the MachineryDirective 2006/42/EC and The Lifting Operations and Lifting Equipment Regulations (1998) (LOLER).We can confirm that these products were thoroughly examined before despatch.
Applied Technical Standards:
- AS 4991 - 2004: Lifting Devices
- BS2573: Rules for the Design of Cranes: Part 1: Spec. for classification, stress calcs
& design criteria for structures.ASME B30 20 2010 (R i i f ASME B30 20 2006) f b l th h k lifti d i- ASME B30.20-2010 (Revision of ASME B30.20-2006) for below-the-hook lifting devices.
- ASME BTH-1-2008: Design of Below the Hook Lifting Devices
Signature:
For and on Behalf of Modulift UK Ltd
Modulift UK Ltd, Unit 12, A lbany Business Park, Cabot Lane, Poole, BH17 7BX, United Kingdom
Tel: +44 (0)1202 621511 Fax: +44 (0)1202 632811 Email: [email protected] Web: www.modulift.co.ukTel: 44 (0)1202 621511 Fax: 44 (0)1202 632811 Email: [email protected] Web: www.modulift.co.ukRegistered in England and W ales Registered No. 4601952
VAT No. 803 2566 52
Quality Standards
• Spreader standards in the last year:
15
• ASME, AS,BS,DNV, NORSOK, AISC, etc.
• All of these Standards have differences which need reviewing…
Same timescale and cost for a 2t beam as that of a 2,000t beam
MODULAR SPREADER SYSTEMS
Standard Similarities
Drop Link – At each end of our Spreaders
• Modulift’s standard range of equipment passes all of these standards …
• BS 2573-1:1983 Rules for the design of cranes uses permissible stress
• ASME:BTH-1:2011 uses factored loads – but only small changes
MODULAR SPREADER SYSTEMS
Setting the Standard
• LOLER – Lifting Operation and Lifting Equipment Regulations
• EC Machinery Directive
• What do they include? = Must use a standard = New Design must be proven = 6 Monthly Inspections
• What does this mean?
What Does The Law Say?
MODULAR SPREADER SYSTEMS
Cost: 60% - 70%
Cost: 75% - 80%
Cost: 100%
Lead: Next Day
Lead: 3-6 Weeks
Lead: 6+ Weeks
Option 1
• WPQR, WPS
• 3.1 Material Certs
• Standard Paint
• Certificate of Conformity (shows compliance with UK law)
• -20°C Standard
As per previous box plus:
• ITP
• Weld Maps
• 3rd Party Witness
• Offshore Paint Spec
• Calculations Report
• NDT & Procedure
• Proof Load Test & Procedure
As per previous boxes plus:
• 3.1/3.2 Material Certification
• Full Welding Book inc. Weld Maps
• DNV Certification of Conformity for Manufacture
• Supplementary Procedures
• Weld Consumable Storage Procedure
• Materials Handling & Storage Procedures
• Up to -40°C - Low Temperature Material
Option 2
Option 3
*Based on a 100t Spreader
• Type approval
MODULAR SPREADER SYSTEMS
In Conclusion
• Keep an open mind
• Know what is available
• Consider your specifications
• Safety above all else