IMCC - Abu Dhabi Group Company Profile ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK FABRICATED WEIGHT (Tonnes) CONTRACT VALUE (USD1,000) START DATE COMPLETION DATE A 1 GUSTO / SBM GPC YARD TDS 2000 CONSTRUCTION OF SEMI-SUBMERSIBLE DRILLING RIG NO.1 (LONE STAR) 20,500t 190,000 Aug-06 Oct-10 2 GUSTO / SBM GPC YARD TDS 2000 CONSTRUCTION OF SEMI-SUBMERSIBLE DRILLING RIG NO.2 (NORBE IV) 21,000t 169,000 Oct-06 Nov-10 3 GUSTO / SBM GPC YARD TDS 2500 CONSTRUCTION OF SEMI-SUBMERSIBLE DRILLING RIG NO.3 (DELBA) 23,000t 200,000 Apr-07 May-11 B 1 SBM INC. GPC YARD DEEP PANUKE FIELD DEVELOPMENT FABRICATION OF MOBILE OFFSHORE PRODUCTION UNIT 22,000t 135,000 Feb-08 Apr-11 C 1 CHARVILLE - CONSULTORES E SERVICOS, LDA. ( A JV OF KBR INC. & SNAMPROGETTI) GPC YARD ESCRAVOS GAS TO LIQUID, NIGERIA PROJECT MANAGEMENT, FABRICATION ENGINEERING, PROCUREMENT (EXCEPT FIM), CONSTRUCTION, PRE-COMM., LOADOUT & SEAFASTNING, OF 14 NOS. PIPERACK & UTILITY MODULES 7,170t Nov-05 Oct-09 2 CHARVILLE - CONSULTORES E SERVICOS, LDA. ( A JV OF KBR INC. & SNAMPROGETTI) GPC YARD ESCRAVOS GAS TO LIQUID, NIGERIA PROJECT MANAGEMENT, FABRICATION ENGINEERING, PROCUREMENT (EXCEPT FIM), CONSTRUCTION, PRE-COMM., LOADOUT & SEAFASTNING, OF 9 NOS. PROCESS EQUIPMENT MODULES 8,900t Oct-05 Oct-09 3 ABB LUMMUS GLOBAL B. V. GPC YARD MOLIKPAQ TIE-IN, SAKHALIN ISLAND - RUSSIA FABRICATION & LOAD-OUT OF PLATFORM TOPSIDE MODULES 'A' & 'B' 3,200 16,593 Nov-04 May-06 4 FPSO MYSTRAS PRODUCAO DE PETROLEO (FMPP) GPC YARD CONVERSION OF VESSEL MYSTRAS INTO AN FPSO CONSTRUCTION OF VARIOUS TOPSIDE PROCESS MODULES 1850t 12,000 Aug-02 Jun-03 5 VETCO AIBEL GPC YARD GOLFINHO II FPSO FABRICATION & LOADOUT OF PROCESS MODULES 1460 10,100 Sep-05 Jun-06 ONSHORE / OFFSHORE PREFABRICATED MODULES : DECKS / TOPSIDES SUMMARY OF EXPERIENCE IMCC - Abu Dhabi Group - MAJOR PROJECTS LIST (Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises) 164,000 DRILLING RIGS Mobile Offshore Production Systems SUMARY OF EXPERIENCE Page 1 of 23

Upload: buiminh

Post on 28-Mar-2018

235 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

A

1 GUSTO / SBM GPC YARD TDS 2000 CONSTRUCTION OF SEMI-SUBMERSIBLE DRILLING RIG NO.1 (LONE STAR) 20,500t 190,000 Aug-06 Oct-10

2 GUSTO / SBM GPC YARD TDS 2000 CONSTRUCTION OF SEMI-SUBMERSIBLE DRILLING RIG NO.2 (NORBE IV) 21,000t 169,000 Oct-06 Nov-10

3 GUSTO / SBM GPC YARD TDS 2500 CONSTRUCTION OF SEMI-SUBMERSIBLE DRILLING RIG NO.3 (DELBA) 23,000t 200,000 Apr-07 May-11

B

1 SBM INC. GPC YARD DEEP PANUKE FIELD DEVELOPMENT FABRICATION OF MOBILE OFFSHORE PRODUCTION UNIT 22,000t 135,000 Feb-08 Apr-11

C

1CHARVILLE - CONSULTORES E SERVICOS, LDA. ( A JV OF KBR INC. & SNAMPROGETTI)

GPC YARD ESCRAVOS GAS TO LIQUID, NIGERIA

PROJECT MANAGEMENT, FABRICATION ENGINEERING, PROCUREMENT (EXCEPT FIM), CONSTRUCTION, PRE-COMM., LOADOUT & SEAFASTNING, OF 14 NOS. PIPERACK & UTILITY MODULES

7,170t Nov-05 Oct-09

2CHARVILLE - CONSULTORES E SERVICOS, LDA. ( A JV OF KBR INC. & SNAMPROGETTI)

GPC YARD ESCRAVOS GAS TO LIQUID, NIGERIA

PROJECT MANAGEMENT, FABRICATION ENGINEERING, PROCUREMENT (EXCEPT FIM), CONSTRUCTION, PRE-COMM., LOADOUT & SEAFASTNING, OF 9 NOS. PROCESS EQUIPMENT MODULES

8,900t Oct-05 Oct-09

3 ABB LUMMUS GLOBAL B. V. GPC YARD MOLIKPAQ TIE-IN, SAKHALIN ISLAND - RUSSIA

FABRICATION & LOAD-OUT OF PLATFORM TOPSIDE MODULES 'A' & 'B' 3,200 16,593 Nov-04 May-06

4 FPSO MYSTRAS PRODUCAO DE PETROLEO (FMPP) GPC YARD CONVERSION OF VESSEL MYSTRAS INTO AN

FPSOCONSTRUCTION OF VARIOUS TOPSIDE PROCESS MODULES 1850t 12,000 Aug-02 Jun-03

5 VETCO AIBEL GPC YARD GOLFINHO II FPSO FABRICATION & LOADOUT OF PROCESS MODULES 1460 10,100 Sep-05 Jun-06

ONSHORE / OFFSHORE PREFABRICATED MODULES : DECKS / TOPSIDES

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

164,000

DRILLING RIGS

Mobile Offshore Production Systems

SUMARY OF EXPERIENCE Page 1 of 23

Page 2: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

D

4 IOOC - IRAN GPC YARD KHARG ISLAND GAS GATHERING & NGL RECOVERY PROJECT, IRAN

EPIC OF ABOOZAR & BAHREGANSAR OFFHSORE PLATFORMS, Jacket, Piles (in JV with PIDEC - Iran) 5000t

67,000 (GPC part -

34,000)Jan-04 Jun-11

1 QATAR PETROLEUM DEVELOPMENT CO. LTD. GPC YARD QPD OFFSHORE FACILITIES

ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION, HOOK-UP & COMMISSIONING OF QPD OFFSHORE FACILITIES (KK-1, AN-7, GIP, PDP & LQP PLATFORMS)

2420t 34,900 May-04 Nov-05

2 ARCHIRODON GPC YARD GASCO RUWAIS JETTY FABRICATION OF MODULES & JACKETS 12,500t 26,500 Sep-06 Apr-08

3 ABB / SHELL GPC YARD BELEMA GAS INJECTION PROJECT 3 NOS. GAS COMPRESSION TOPSIDES 3 NOS. PROCESS TOPSIDES 5000t Oct-99 Oct-00

4 ABB / SHELL GPC YARD BELEMA GAS INJECTION PROJECT 6 NOS. JACKET'S PILES Oct-99 Oct-00

5 ABB / SHELL GPC YARD BELEMA GAS INJECTION PROJECT LIVING QUARTER (54 MEN) 1200t Oct-99 Oct-00

6 ABB / SHELL GPC YARD BELEMA GAS INJECTION PROJECT SWITCH GEAR BUILDING CONTROL ROOM 900t Oct-99 Oct-00

7ABU DHABI MARINE OPERATING COMPANY (ADMA-OPCO)

GPC YARD ADDITION OF 10 NEW WELLS ON EXISTING ZAKUM WHT's

EPC WORKS FOR ADDITION OF 10 NEW WELLS ON EXISTING ZAKUM WHT's 550t 22,500 Mar-07 Mar-09

8SBM ( SINGLE BUOY MOORINGS )/BROWN & ROOT - NIGERIA

GPC YARD SHELL EA PROJECT SO 12750 FABRICATION OF TURRET'S DECK - 4 LEVELS 1150t 9,000 Oct-01 Feb-02

9SBM ( SINGLE BUOY MOORINGS )/BROWN & ROOT - NIGERIA

GPC YARD SHELL EA PROJECT SO 12751 FABRICATION OF JACKET - 4 LEGGED 1200t Oct-01 Feb-02

10 ABB LUMMUS GLOBAL B. V. GPC YARD MOLIKPAQ TIE-IN, SAKHALIN ISLAND - RUSSIA

ENGINEERING, SUPPLY & PREFAB. OF ARCHITECTURALS -- 3,503 Feb-05 Sep-05

11 BUNDUQ CO. LTD. GPC YARD BUNDUQ FIELD EB-03 PROJECT FAB/OFFSHORE INSTALLATION OF SEAHORSE JACKET AND TOPSIDE 200t 3,100 Apr-92 Jun-93

IN EXCESS OF 20,000

(ENGINEERING AND ALL

PROCUREMENT OF MAT'LS

FREE ISSUED BY ABB)

OFFSHORE FIXED PLATFORMS : JACKETS / DECKS / TOPSIDES (PROCESS, WELLHEADS ETC.)

SUMARY OF EXPERIENCE Page 2 of 23

Page 3: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

12 LARSEN & TUOBRO LTD. - INDIA GPC YARD BUNDUQ GAS RE-INJECTION

FABRICATION, LOAD-OUT & TRANSPORTATION OF 1 NO. PLATFORM JACKET (4-LEGGED) + PILES & BOATLANDING

752 1,317 Dec-04 May-05

13 SOLUS EMIRATES GPC YARD SUPPLY OF 'UA' JACKETSFABRICATION AND OFFSHORE INSTALLATION OF JACKETS 200 Jan-86 Mar-86

14 BUNDOQ CO. LTD. GPC YARD SUPPLY OF JACKET EB-37 FOR BONDUQ FIELD

DESIGN, SUPPLY FABRICATION AND INSTALLATION OF JACKET EB-37 471 Oct-87 Dec-87

15 ADOC (JAPAN) CO./ NADOC GPC YARD

CONSTRUCTION OF CRUDE OIL PRODUCTION AND GAS INJECTION FACILITES AT UMM AL ANBAR FIELD-WEST MUBARRAZ ISLAND

FAB/INSTALLATION OF CRUDE OIL PRODUCTION AND GAS INJECTION FACILITIES AT UM AL ANBAR FIELD 10,000 Feb-88 Jan-89

16 ZAKUM DEVELOPMENT COMPANY (ZADCO)

GPC YARD/OFFSHORE

ZAKUM FIELD FACILITIES, UZ FULL FIELD DEVELOPMENT EWAD PH-1, PROJECT NO. 8221, CONTRACT NO. CTE FE04 07

SLOT EXTENSION CONSTRUCTION FOR 8 PLATFORMS 350t 12,500 Mar-06 Jul-07

17 TOTAL ABK GPC YARD REVAMPING OF AKE AND WOS PLATFORMS PHASE BR 1

REFURBISHMENT OF AKE AND WOS PLATFORMS - MISC STR'L WORKS 1,000 Jan-88 Jun-88

18 ZADCO GPC YARD WATER INJECTION PIGGING FACILITIES AND CORROSION MONITORING PHASE III 50t 1,963 Jan-93 Nov-93

19 IRANIAN OFFSHORE OIL COMPANY (IOOC) GPC YARD

INSTALLATION AND HOOK-UP OF ELECTRICAL EQUIPMENT ON DRILLING PLATFORMS IN SIRRI FIELD

MISC OFFSHORE WORK - INSTALLATION AND HOOK-UP OF E&I EQUIPMENTS 120t 4,245 Nov-91 May-92

20 ZADCO ( Zakum Development Company )

OFFSHORE/GPC YARD VARIOUS OFFSHORE WORKS OFFSHORE MINOR WORKS BLANKET AGREEMENT 1,500 Dec-00 Dec-03

21 ECC/NIOC, IRAN GPC YARD REFURBISHMENT OF NASR, NOSRAT AND RESHADAT PLATFORM FAB OF MISC STR'L APPURTENANCES 200t 3,050 Nov-97 Sep-98

22 CLOUGH ENGINEERING LTD., AUSTRALIA GPC YARD GS1 & GS15 FIELD DEVELOPMENT, ONGC -

INDIAFABRICATION & LOADOUT OF GS1 MONOPOD PLATFORM & MODIFICATION OF GS15 550 2,320 Jul-05 Mar-06

23 ADOC MUBARRAZ EMERGENCY REPAIR TO ADOC 'BF' WELLHEAD PLATFORM OFFSHORE REPAIR WORK ON WELLHEAD PLATFORM 60t 370 Apr-95 Jun-95

24 ZADCO ARZANAH ARZAANAH FACILITIES-INSTALLATION OF MOSS STRUCTURE AND TIE-IN OF AZ-33

FAB/INSTALLATION OF MISC STRUCTURES AND TIE-IN 515 Mar-94 Apr-94

25 AL FALAH/ADNOC, JAPAN MUBARRAZ DISMANTLING OF SOLAR GENERATOR SITE WORK - MISC MECH'L AND E&I WORKS 124 Mar-94 Jun-94

26 ADOC (JAPAN) MUBARRAZ EXTENSION MODIFICATION OF "BA" PLATFORM MUBARRAZ OFFSHORE OILFIELD

FAB/INSTALLATION OF ADDITIONAL MISC SECONDARY STRUCTURES 415 Mar-93 Jun-93

27 ZADCO GPC YARD ZAKUM FIELD FACILITIESOFFSHORE WORK - FAB/INSTALLATION OF EXTENSION OF OVERBOARDING LINES AND TEST HEADERS

634 Nov-92 May-93

SUMARY OF EXPERIENCE Page 3 of 23

Page 4: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

28 ADCO JEBEL UPGRADING OF INSTRUMENT AIR SYSTEM AT JEBEL DHANNA SITE WORK - UPGRADING OF INSTRUMENT SYSTEM 423 Sep-92 Mar-93

29 KCC PROCESS EQUIPMENTS GPC YARD BAYUN-UNDAN GAS RECYCLE PROJECT FABRICATION OF SKID 423 Jan-01 Mar-02

30 SBM ( SINGLE BUOY MOORINGS ) GPC YARD KUITO PHASE 1C DEVELOPMENT FABRICATION OF INLET MODULE 700 Oct-00 Mar-01

E

1 IMODCO IMAC YARD ESPADARTE FPSO - BOTTOM MOUNTED INTERNAL TURRET

FAB/ASSY OF LOWER TURRET, WINCH DECK, SUPERSTRUCTURE, OVERHEAD STRUCTURE 3020t 15,350 Dec-98 Oct-99

2 FMC/SOFEC GPC YARD TERRA NOVA PROJECT - UPPER TURRET FAB/ASSY/PAINTING AND LOADOUT OF MODULE 1 - MANIFOLD DECK C/W PIPING/E&I SYSTEM 1100t 12,000 Nov-98 Feb-00

3 SOFEC GPC YARD TERRA NOVA PROJECT - TURRET SHAFTFAB/ASSY/PAINTING/LOADOUT OF TURRET SHAFT MODULE 1 TO 4, SPIDER BUOY AND MISC APPURTENANCES

3000t 10,496 Nov-97 Apr-99

4 SBM - IMODCO INC. IMAC YARD WHITE ROSE SUPPLY & FABRICATION OF ONE NO. INTERNAL TURRET SYSTEM 2500t 9,200 May-02 Sep-03

5 SOFEC IMAC YARD BRASOIL ALBACORA TURRETFAB/ASSY OF TURRET CYLINDER C/W RISERS/SPIDER AND UPPER SUPPORT STRUCTURE/TURNTABLE DECK C/W PIPING

2513t 9,000 Sep-96 Mar-97

6 BLUEWATER GPC YARD TURRET MOORING SYSTEM FOR P-38

FAB/ASSY/PAINTING/LOADOUT OF COMPLETE TURRET CYLINDER STRUCTURE C/W UPPER BEARING SUPPORT, SPIDER AND TURRET TURNTABLE C/W PIPING SYSTEM

550t (LT)480t (TT/TAS) 8,079 Dec-98 Sep-99

7 SBM MONACO GPC YARD LAMINARIA FPSO TURRET - BOTTOM MOUNTED INTERNAL TURRET

FAB/PAINTING OF MANIFOLD DECK AND GANTRY STRUCTURE C/W WITH DUPLEX PIPING 1200t 6,256 Jul-97 Aug-98

8 BLUEWATER, HOLLAND IMAC YARD WISHBONE TURRET FAB OF SOFT YOKE TYPE, TURRET STRUCTURE AND TOP DECK ASSY. 2400t 6,000 Jan-97 Sep-97

9 BLUEWATER IMAC YARD TURRET MOORING SYSTEM FOR P-47

FAB/ASSY/LOADOUT OF TURRET CASING/LOWER/UPPER BEARING SUPPORT/SPIDER ASSY, TURNTABLE ACCESS STRUCT., PIPING, MISC STRUCTURAL APPURTENANCES

1224t 5,706 Jun-98 Nov-98

OFFSHORE FPSO's TURRETS

SUMARY OF EXPERIENCE Page 4 of 23

Page 5: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

10 SBM IMAC YARD P33/P35 MARLIM TURRET - BMIT FAB OF LOWER TURRET AND UPPER TURRET PARTS ASSY 1250t 5,100 Jan-97 Sep-97

11 S B M IMAC YARD CURLEW TURRET - BOTTOM MOUNTED INTERNAL TURRET

FAB/ASSY/PAINTING AND LOADOUT OF TURRET CYLINDER/SPIDER AND UPPER SUPPORT STRUCTURE/GANTRY STRUCTURE & TURNTABLE DECK C/W PIPING

742t 5,000 Jun-96 Apr-97

12 SINGLE BUOY MOORINGS INC. GPC YARD EXXON FPSO ATLANTIC (XIKOMBA) FABRICATION, ERECTION, COMMISSIONING & LOAD-OUT OF AN EXTERNAL TURRET HI39220 1500t 4,900 Jun-02 Apr-03

13 IMODCO IMAC YARD TANTAWAN BOW MOUNTED TURRET WITH ANCHOR / PILES

FAB/ASSY RIGID ARM, TURNTABLE, FIXED PART - TURRET FULL ASSEMBLY 778t 3,300 Jul-95 Jun-96

14 S B M VIETNAM IMAC YARD SOFT YOKE MOORING SYSTEM FAB/ASSY OF SOFT YOKE TURRET UPPER PART 800t 3,000 Dec-93 Jul-94

15 BLUEWATER GPC YARD P37 TURRET CASING AND LOWER BEARING BOX FOR TURRET MOORING SYSTEM

FAB/ASSY/PAINTING/LOADOUT OF CASING AND LOWER/UPPER BEARING BOX FOR TURRET P47 600t 2,547 Dec-97 Nov-98

16 SBM IMAC YARD LAMINARIA FPSO - BOTTOM MOUNTED INTERNAL TURRET

FAB/ASSY OF LOWER TURRET CYLINDER AND BOTTOM SECTION 615t 2,500 Aug-97 May-98

17 SBM MONACO GPC YARD JVPC RANG DONG FSO TURRET FAB/FULL ASSY/LOADOUT OF RIGID ARM, TURNTABLE AND TURRET FIXED PART 320t 1,797 Jul-97 Mar-98

18 SOFEC / FMC GPC YARD TERRA NOVA PROJECT - UPPER TURRET MODULES 2, 3 & 4

FAB/ASSY OF STAIR TOWER, TORQUE TUBE AND TORQUE ARM BRIDGE 211t 1,780 May-99 Jan-00

19 SBM / ELF NIGERIA IMAC YARD FSO TURRET - BOW MOUNTED TURRET FAB/ASSY OF RIGID ARM, TURNTABLE, FIXED PART - TURRET FULL ASSEMBLY 650t 1,750 Mar-92 Aug-92

20 SINGLE BUOY MOORINGS INC. GPC YARD SANHA LPG FPSO FABRICATION OF TURRET 195t 1,165 Nov-02 Aug-03

21 SOFEC/FMC GPC YARD ALBACORA FPSO - BOTTOM MOUNTED INTERNAL TURRET

FABRICATION/PAINTING OF SWIVEL PLATFORM C/W PIPING 400t 1,520 Dec-96 Mar-97

22 S B M IMAC YARD N'KOSSA BOW MOUNTED TURRET FAB/ASSY OF RIGID ARM, TURNTABLE, FIXED PART - TURRET FULL ASSEMBLY 750 1,350 Nov-94 Jul-95

SUMARY OF EXPERIENCE Page 5 of 23

Page 6: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

23 SBM IMAC YARD ESPADARTE FPSO - BOTTOM MOUNTED INTERNAL TURRET

FAB OF FPSO COMPONENT - CASING (MOONPOOL) SUB ASSEMBLY 656t 1,213 Jan-99 Aug-99

24 SBM GPC YARD FSO FOR PPML DEVELOPMENT - BOW MOUNTED EXTERNAL TURRET

FAB/FULL ASSY/LOADOUT OF RIGID ARM, TURNTABLE AND TURRET FIXED PART 470t 1,200 Oct-98 May-99

25 BLUWATER GPC YARD BLUEWATER WISHBONE TURRET ASSY/ERECTION/LOADOUT OF WISHBONE TURRET, PILES ETC 1000t 1,181 Dec-96 Oct-97

26 SBM MONACO GPC YARD EXTERNAL BOW MOUNTED TURRET FOR FGSO

FAB/FULL ASSY/LOADOUT OF RIGID ARM, TURNTABLE AND TURRET FIXED PART 250t 1,030 Dec-95 Jun-96

27 SBM GPC YARD ELECTRICAL INSTRUMENT FOR SBM CURLEW PROJECT

SUPPLY AND INSTALLATION OF COMPLETE E&I FACILITIES 650 Nov-96 Jun-97

28 SBM GPC YARD SBM CURLEW TURRET ERECTION/PAINTING/LOADOUT OF COMPLETE TURRET CYLINDER/GANTRY STRUCTURE/TURNTABLE DECK C/W PIPING

(742t) 575 Dec-96 May-97

29 BRASOIL GPC YARD BRASOIL ALBACORA TURRET FAB/ASSY/PAINTING/LOADOUT OF TURRET CASING (MOONPOOL) AND LOWER BEARING STRUCTURE 300t 525 Sep-96 Nov-96

30 ADMA-OPCO GPC YARD SUPPLY AND FABRICATION OF MOORING DEAD WEIGHT ANCHORS 200t 175 Jul-90 Oct-90

31 NOELL IMAC /SBM GPC YARD N'KOSSA FSO - BOW MOUNTED EXTERNAL TURRET

FAB/ASSY/PAINTING OF TURRET RIGID ARM, TURNTABLE AND FIXED PART 63 May-95 Oct-95

F

1 S B M GPC YARD IRAQ CRUDE OIL EXPORT EXPANSION PROJECT FABRICATION OF 4 CALM BUOY ,3 PLEM,18 PILES 2320t 11,242 Aug-10 Aug-11

2 S B M GPC YARD GEOCEAN CALM SYSTEM BUOY FABRICATION OF CALM BUOY AND PLEM 190t 1,600 Jan-10 Nov-10

3 BLUEWATER ENERGY SERVICES GPC YARD CRUDE OIL EXPORT SYSTEMS, AL SHAHEEN

TERMINAL, QATARFABRICATION OF 3 NOS. CALM BUOY FOR MAERSK OIL QATAR 325t 6,553 Feb-08 Aug-09

4 BLUEWATER ENERGY SERVICES GPC YARD ADCOP BUOYS FABRICATION OF 3 NOS. 12 M SQ. BUOY 855t 5,766 Mar-09 Mar-10

5 N P C, IRAN IMAC YARD CHEMICAL PLANT MISC STR'L STEELWORKS 3,720 Feb-89 Dec-89

OFFSHORE CALM BUOYS

SUMARY OF EXPERIENCE Page 6 of 23

Page 7: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

6 SBM ATLANTIA GPC YARD SO 17810 FABRICATION OF 12.0 M SAPREF BUOY 272t 2,873 Sep-08 Apr-09

7 BLUEWATER ENERGY SERVICES GPC YARD RAS LAFFAN, QATAR FABRICATION OF 2 NOS. TURRET BUOY & 2 NOS.

PLEM 525t 2,865 May-06 Feb-07

8 BLUEWATER ENERGY SERVICES GPC YARD KUWAIT OIL COMPANY (KOC) EXPORT

FACILITIES FABRICATION OF 2 NOS. TURNTABLE CALM BUOY & 2 NOS. PLEM 400t 2,800 Mar-06 Dec-06

9 SBM MONACO GPC YARD SALM BUOY FOR SAKHALIN ISLAND COMPLETE FABRICATION/PAINTING 500t 2,500 Nov-97 Jul-98

10 SOFEC GPC YARD 2 NO. CALM BUOYS COMPLETE FABRICATION/PAINTING 560t 2,252 Sep-97 Jan-98

11 SBM-IMODCO INC. GPC YARD RELAINCE JAMNAGAR REFINED PRODUCT PROJECT, INDIA SO 17450 - FABRICATION OF 2 NO. 12.5 M CALM BUOY 460t 2,260 Mar-06 Dec-06

12 SOFEC IMAC YARD 2 K.O.C. BUOYS FAB OF OFFLOADING CALM BUOY 450t 2,192 Apr-95 Nov-96

13 S B M IMAC YARD BTM FOR CHINA FAB/FULL ASSY/LOADOUT OF TUBULAR RIGID ARM, TURNTABLE AND TURRET FIXED PART 615t 2,000 Sep-93 Apr-94

14 SBM ATLANTIA GPC YARD SO 17790 FABRICATION OF SPARE CALM BUOY FOR JAMNAGAR 277t 1,965 May-08 Feb-09

15 SINGLE BUOY MOORINGS INC. IMAC YARD PARADIP, INDIA FABRICATION OF 11.0 M CALM BUOY, PLEM, PILES 567 1,733 Sep-04 Mar-05

16 IMODCO JIZAN IMAC YARD 2 BUOYS AND 2 PLEMS FAB OF 12M DIA OFFLOADING CALM BUOY AND PLEM 425t 1,700 Nov-94 Jul-95

17 SBM ATLANTIA GPC YARD SO 17750 FABRICATION OF 12.5 M CALM BUOY FOR ZADCO (REPEAT ORDER) 250t 1,606 Mar-08 Jan-09

18 BLUEWATER ENERGY SERVICES GPC YARD HPCL BUOY FABRICATION OF 1 NO. 10.2 M SQ. BUOY 225t 1,575 Apr-09 Dec-09

19 SOFEC GPC YARD BUNTINGE CALM BUOY AND PLEM COMPLETE FABRICATION/PAINTING 300t 1,544 Nov-97 May-98

20 SBM INC. GPC YARD SO 17760 FABRICATION OF 10.0 M CEPSA BUOY 133t 1,527 Jun-08 Jun-09

21 SBM MONACO GPC YARD TWO CALM BUOYS FOR SHELL NIGERIA COMPLETE FABRICATION/PAINTING 500t 1,500 Sep-95 May-96

22 BLUEWATER ENERGY SERVICES B. V. GPC YARD VOPAK - ENOC / CEIBA FABRICATION OF 2 Nos.SPM TURRET CALM BUOY 650t 1,400 Dec-01 Jun-02

23 SBM-IMODOC INC. GPC YARD D1 WATER INJECTION PLATFORM - ONGC / EIL - SBM PROJECT 17200

FABRICATION OF 12.5 M CALM BUOY, PLEM, PILES & BUOYANCY TANK 395 1,356 Sep-04 Apr-05

24 SBM-IMODCO INC. GPC YARD AGBAMI FOELD OFFSHORE, NIGERIA SO 17350 - TRUNATABLE FABRICATION 267t 1,340 Mar-06 Nov-06

25 SBM MONACO GPC YARD 2 BUOYS FOR MANAVGAT TURKEY COMPLETE FABRICATION/PAINTING 500t 1,332 Oct-97 Mar-98

SUMARY OF EXPERIENCE Page 7 of 23

Page 8: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

26 BLUEWATER ENERGY SERVICES GPC YARD TURKMENISTAN BUOY FABRICATION OF 1 NO. 10.2 M DIA. CALM BUOY 211t 1,296 Mar-09 Feb-10

27 S B M MONACO IMAC YARD 2 OFFSHORE CALM BUOYS FAB OF 12M DIA OFFLOADING CALM BUOY 350t 1,250 Sep-91 May-92

28 BLUEWATER ENERGY SERVICES GPC YARD MELUT SUDAN BUOY FABRICATION OF CALM BUOY & PLEM FOR ADMA

OPCO 270 1,183 Dec-04 Jun-05

29 SBM-IMODCO INC. GPC YARD RELAINCE JAMNAGAR CRUDE OIL PROJECT, INDIA SO 17440 - FABRICATION OF I NO. 12.5 M CALM BUOY 230t 1,130 Mar-06 Dec-06

30 BLUEWATER GPC YARD SPM TURRET CALM BUOY & PLEM FOR MUGLAD BASIN PROJECT COMPLETE FABRICATION/PAINTING 450t 1,109 Oct-98 Jun-99

31 SBM INC. GPC YARD STOCK BUOY FABRICATION OF 12 M CALM BUOY 236 1,010 Jun-05 Dec-05

32 COWLTZ. USA IMAC YARD STOP LOGS, ETC. FOR COWLITZ, U.S.A. MISC STRUCTURAL WORKS 1,086 Mar-92 Mar-93

33 BLUEWATER GPC YARD SPM TURRET CALM BUOY & PLEM FOR WESTERN ROUTE PROJECT COMPLETE FABRICATION/PAINTING 350t 1,054 Aug-97 Mar-98

34 SOFEC/FMC GPC YARD STOCK BUOY - 12M DIA COMPLETE FABRICATION/PAINTING 280t 1,039 Feb-98 Sep-98

35 SBM-IMODCO INC. GPC YARD STOCK BUOY FABRICATION OF 12.5 M CALM BUOY 235 950 Jun-05 Dec-05

36 SBM INC. GPC YARD SO 17300, MELITTAH PROJECT FABRICATION OF BUOY 199t 940 Apr-05 Sep-05

37 SBM MONACO GPC YARD PETROGAL BUOY & PLEM COMPLETE FABRICATION/PAINTING 330t 936 Jan-97 Jun-97

38 BLUEWATER ENERGY SERVICES GPC YARD BUOY FOR ADMA-OPCO FABRICATION OF CALM BUOY 187 920 Aug-05 Jun-07

39 SBM-IMODCO INC. GPC YARD STOCK FABRICATION OF 1 NO. 12.5 STOCK BUOY 230t 900 Mar-06 Dec-06

40 SINGLE BUOY MOORING INC. (SBM) GPC YARD SO 17410 FABRICATION OF 1 NO. CALM BUOY 200t 900 Mar-06 Sep-06

41 SBM IMAC YARD 1 CALM BUOY FAB OF12M DIA OFF LOADING CALM BUOY 175t 900 May-97 Sep-97

42 BLUEWATER ENERGY SERVICES GPC YARD ADOC BUOY FABRICATION OF CALM BUOY 170 880 May-05 Mar-06

43 S B M IMAC YARD 1 BUOY WITH PLEM / PILES FOR INDIA FAB OF 12M DIA OFF LOADING CALM BUOY 350t 830 Jul-95 Mar-96

44 IMODCO IMAC YARD STOCK BUOY WITH 6 SPARE CHAINHAWSE FAB OF 12M DIA OFF LOADING CALM BUOY 210t 800 Jan-96 Jun-96

45 BLUEWATER ENERGY SERVICES B. V. GPC YARD DJENO BUOY SUPPLY & FABRICATION OF ONE NO. TURNTABLE

BOUY AND PLEM 250t 800 May-02 Sep-02

46 SINGLE BUOY MOORINGS INC. GPC YARD SO 12920 FABRICATION OF A CALM BUOY 226t 797 Feb-02 Aug-02

SUMARY OF EXPERIENCE Page 8 of 23

Page 9: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

47 SBM OFFHSHORE CONTRACTORS GPC YARD FABN. OF CALM BUOY - SO 17150 180t 780 Oct-03 Apr-04

48 SBM INC. (VIETNAM) IMAC YARD OFFSHORE CALM BUOY 12 M DIA. FAB OF12M DIA OFFLOADING CALM BUOY 200t 780 Mar-89 Sep-89

49 BLUEWATER ENERGY SERVICES B. V. GPC YARD FABRICATION OF TURNTABLE CALM BUOY 195t 775 Sep-02 Feb-03

50 SBM MONACO GPC YARD 12M DIA STOCK CALM BUOY COMPLETE FABRICATION/PAINTING 250t 761 Apr-97 Nov-97

51 IMODCO IMAC YARD NEW STOCK BUOY + 6 CHAINHAWSE FAB OF 12M DIA OFFLOADING CALM BUOY/CHAINHAWSE SPARES 210t 753 Nov-92 May-93

52 SBM INC. (YEMEN) IMAC YARD OFFSHORE CALM BUOY 8 M DIA. FAB OF 8M DIA OFFLOADING CALM BUOY 160t 750 Feb-89 Jun-89

53 SBM MONACO GPC YARD STOCK CALM BUOY COMPLETE FABRICATION/PAINTING 250t 745 Dec-95 Nov-96

54 SBM INC. IMAC YARD OFFSHORE CALM BUOY 12 M DIA. FAB OF 12M DIA OFFLOADING CALM BUOY 200t 742 Sep-89 Mar-90

55 IMODCO IMAC YARD STOCK BUOY FAB OF 12M DIA OFF LOADING CALM BUOY 175t 730 Jan-99 Jul-99

56 SOFEC INC. (INDIA) IMAC YARD OFFSHORE CALM BUOY 10 M DIA. FAB OF 10M DIA OFFLOADING CALM BUOY 185t 726 Sep-89 Mar-90

57 SBM ( SINGLE BUOY MOORINGS ) GPC YARD SO 12850 FABRICATION OF ONE STOCK CALM BUOY 250t 715 Jul-01 Dec-01

58 SBM MONACO GPC YARD STOCK BUOY - 12M DIA COMPLETE FABRICATION/PAINTING 250t 713 Jan-98 Jul-98

59 SBM MONACO GPC YARD NEW STOCK CALM BUOY COMPLETE FABRICATION/PAINTING 250t 705 Jul-97 Apr-98

60 SBM ( SINGLE BUOY MOORINGS ) GPC YARD TOTAL - HIDRA FIELD, ARGENTINA FABRICATION OF ONE CALM BUOY 145t 700 Oct-00 Feb-00

61 S B M IMAC YARD OFFSHORE CALM BUOY FAB OF 12M DIA OFFLOADING CALM BUOY 175t 700 Nov-90 May-91

62 SBM / MOBIL AUSTRALIA IMAC YARD OFFSHORE CALM BUOY 10 M DIA. FAB OF 12M DIA OFFLOADING CALM BUOY 175t 700 Apr-90 Sep-90

63 SBM MONACO GPC YARD NEW STOCK CALM BUOY COMPLETE FABRICATION/PAINTING 250t 680 Oct-95 Apr-96

64 S B M IMAC YARD NEW STOCK BUOY FAB OF 12M DIA OFFLOADING CALM BUOY 175t 680 Feb-93 Aug-93

65 S B M IMAC YARD STOCK BUOY FAB OF 12M DIA OFFLOADING CALM BUOY 175t 680 Nov-92 Apr-93

66 IMODCO / CONOCO INDONESIA IMAC YARD OFFSHORE CALM BUOY FAB OF 12M DIA OFFLOADING CALM BUOY 175t 675 Jan-92 Jul-92

SUMARY OF EXPERIENCE Page 9 of 23

Page 10: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

67 S B M YEMEN IMAC YARD STOCK BUOY FAB OF 12M DIA OFFLOADING CALM BUOY 175t 665 Mar-92 Oct-92

68 AL FALAHI GPC YARD SBM OVERHAULING WORKS 200t 665 Jul-91 Oct-91

69 SBM MONACO GPC YARD STOCK CALM BUOY COMPLETE FABRICATION/PAINTING 250t 660 Oct-96 May-97

70 IMODCO IMAC YARD NEW STOCK BUOY FAB OF12M DIA OFFLOADING CALM BUOY 175t 660 Sep-94 Apr-95

71 IMODCO IMAC YARD NEW STOCK BUOY FAB OF12M DIA OFFLOADING CALM BUOY 175t 650 Apr-94 Sep-94

72 SBM / ELF ANGOLA IMAC YARD OFFSHORE CALM BUOY FAB OF 12M DIA OFFLOADING CALM BUOY 175t 650 Nov-91 Feb-92

73 SBM MONACO GPC YARD STOCK CALM BUOY COMPLETE FABRICATION/PAINTING 250t 648 Jul-96 Mar-97

74 SBM MONACO GPC YARD FABRICATION OF VASILIKOS CALM BUOY COMPLETE FABRICATION/PAINTING 250t 630 Mar-98 Nov-98

75 SBM ( SINGLE BUOY MOORINGS ) GPC YARD SO 12870 FABRICATION OF ONE CALM BUOY 290t 600 Dec-01 Apr-02

76 BLUEWATER GPC YARD SPM BUOY FOR TAKORADI PROJECT COMPLETE FABRICATION/PAINTING 260t 600 May-96 Nov-96

77 SBM INC. (IRAN) IMAC YARD OFFSHORE CALM BUOY 8 M DIA. FAB OF 8M DIA OFFLOADING CALM BUOY 130t 520 May-89 Sep-89

78 UDECO GPC YARD SUPPLY OF NAVIGATIONAL BUOYSDESIGN, PROCUREMENT, FABRICATION AND INSTALLATION OF NAVIGATIONAL BUOYS 500 Jan-85 Apr-85

79 DUBAI PETROLEUM CO. GPC YARD REPAIR OF SPM REPAIR OF SPM 210t 325 Apr-05 Jun-05

80 TOTAL ABK GPC YARD OVERHAUL OF EMH CALM BUOY REFURBISHMENT OF CALM BUOY 210t 296 Oct-94 Dec-94

81 ADCO/SOFEC GPC YARD BEARING HOUSING & BEARING SUPPORT FOR ADCO CALM BUOY

FAB/MACHINING OF BUOY COMPONENTS - BEARING HOUSING/SUPPORT STRUCTURE 20t 284 Oct-98 Dec-98

82 A. D. O. C. (Japan ) Ltd. GPC YARD SBM OVERHAULING WORKS SBM OVERHAULING WORKS 250t 250 Sep-01 Oct-01

83 CCC - IOEC JV GPC YARD SOUTH PARS GAS FIELD DEV. PHASE-1 SBM BUOY SYSTEM REFURBISHMENT 290t 240 Aug-00 Sep-01

84 BLUEWATER ENERGY SERVICES B. V. GPC YARD SHUWEIHAT FABRICATION OF 3 CALM BUOYS AND 1 PLEM 50t 215 Sep-02 Apr-03

85 ADCO GPC YARD REFURBISHMENT OF SPM-3 REFURBISHMENT OF SPM-3 164t 209 Jun-03 Jul-03

86 ZADCO GPC YARD SUPPLY OF SPARE BUOYS DESIGN AND FABRICATION OF SPAR BUOYS 200 Dec-81 Jan-82

SUMARY OF EXPERIENCE Page 10 of 23

Page 11: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

87 TOTAL ABK GPC YARD OVERHAUL OF SBM LOADING BUOY OVERHAUL OF SBM LOADING BUOY 210t 173 Nov-92 Jan-93

88 FMC TECHNOLOGIES AG GPC YARD FABRICATION OF TURNTABLE BEARING HOUSING 8t 118 Feb-02 May-02

89 IMODCO IMAC YARD SAFANIYA BUOY FABRICATION OF BUOY MARKER 25t 85 May-92 Jul-92

90 MINA ZAYED SEA PORT GPC YARD SUPPLY OF NAVIGATIONAL BUOYSDESIGN, PROCUREMENT, FABRICATION AND INSTALLATION OF NAVIGATIONAL BUOYS 79 Sep-87 Nov-87

91 ADOC (JAPAN) CO. GPC YARD SBM BUOY OVERHAULING WORKS 74 Sep-86 Oct-86

92 SUBTEC NATIONAL GPC YARD REPAIR OF DAMAGE SPM BUOY 68 Jul-87 Aug-87

G

1 SIX CONSTRUCT IMAC YARD NEW MAQTA BRIDGE, ABU DHABI FAB OF STR'L BRIDGE COMPONENTS (ERECTION AT GPC YARD)

2715.4t(Fab)1163.5t

(T.Struct.)6,472 Jul-97 Mar-99

2 DUTCO BALFOUR BEATTY IMAC YARD AL MAKTOUM BRIDGE GIRDERS FAB/ASSY OF STR'L BRIDGE GIRDERS 2,123 Nov-91 May-92

3 GOVERNMENT OF SRI LANKA IMAC YARD BRIDGES FOR SRI LANKA FAB/ASSY OF STR'L COMPOSITE BRIDGE 1,902 Apr-95 Jul-96

4 EMIARATE OF ABU DHABI GPC YARD NEW MAQTA BRIDGE, ABU DHABI ERECTION/PAINTING AND DELIVERY TO SITE OF COMPOSITE STR'L BRIDGE 1,872 Oct-97

5 HILALCO IMAC YARD BRIDGE AT OFFICERS CITY, ABU DHABI FABRICATION OF THE BRIDGE AND INSTALLATION AT SITE 850t 1,795 Jun-03 Mar-04

6 SIX CONSTRUCT IMAC YARD HABAL BRIDGE FAB/ASSY OF STR'L COMPOSITE BRIDGE 431t 1,100 Nov-97 May-98

7 CENTRAL AFRICAN REPUBLIC IMAC YARD 100 M ROAD BRIDGE FAB/ASSY OF STR'L COMPOSITE BRIDGE 750 Sep-89 Mar-90

8 CENTRAL AFRICAN REPUBLIC IMAC YARD 100 METER BRIDGE FAB/ASSY OF STR'L COMPOSITE BRIDGE COMPONENTS 750 Oct-87 Nov-87

9 BURUNDI GOVERNMENT IMAC YARD BRIDGES FOR BURUNDI FAB/ASSY OF STR'L COMPOSITE BRIDGE 543 Jun-93 Nov-93

10 TOTAL ABK OFFSHORE DAMAGED BRIDGE RECOVERY (WOS/AKE) RECOVERY AND DISMANTLING WORKS 539 Feb-87 Apr-87

11 GOVERNMENT OF SRI LANKA IMAC YARD RAILWAYS BRIDGES FOR SRI LANKA MISC STR'L STEELWORKS 465 Mar-86 Jul-86

STEEL BRIDGES

SUMARY OF EXPERIENCE Page 11 of 23

Page 12: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

12 TOTAL ABK/ADNOC GPC YARDFABRICATION OF BRIDGE BETWEEN AKE AND WOS PLATFORMS

FABRICATION OF BRIDGE BETWEEN AKE AND WOS PLATFORMS 450 Jan-88 Apr-88

13 HUMBURG PORT IMAC YARD RO-RO BRIDGE 45 M SPAN FAB/ASSY OF STR'L COMPOSITE BRIDGE COMPONENTS 258 Jul-89 Nov-89

14 BURUNDI GOVERNMENT IMAC YARD STEEL ROAD BRIDGES FAB/ASSY OF STR'L COMPOSITE BRIDGE COMPONENTS 258 Sep-88 Dec-88

SUMARY OF EXPERIENCE Page 12 of 23

Page 13: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

H

1 NHAVA SHEVA PORT AUTHORITY, INDIA GPC YARD 12 RTG / 2 RMG, NAVA SHEVA MUMBAI PAINTING/ASSY/ERECTION AND SHIPMENT -

COMPLETE SHIP TO SHORE CONTAINER CRANE TBA Feb-98 Feb-99

2 APL LOS ANGELES IMAC YARD 12 CONTAINER CRANES STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD)

10200t(850 x 12) 36,000 Jan-95 Dec-96

3 MAERSK TAIWAN IMAC YARD 6 CONTAINER CRANES STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 7320t 18,964 Sep-94 Apr-96

4 NOELL CRANE SYSTEMS GPC/IMAC MAERSK - LOS ANGELES 8 NOS. STS CRANES 6000t 17,616 Feb-01 Mar-02

5 PORT OF SINGAPORE IMAC YARD 5 CONTAINER CRANES STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD)

4565t(913 x 5) 15,157 Sep-94 Apr-96

6 PUBLIC WORKS DEPT. ABU DHABI IMAC YARD 2 CONTAINER CRANES FOR MINA ZAYED STR'L FAB/ASSY OF CONTAINER CRANE

COMPONENTS - (ERECTION AT GPC YARD) 1180t 10,671 Sep-95 Sep-96

7 PORT ZAYED, ABU DHABI GPC YARD 2 CONTAINER CRANES FOR MINA ZAYED, ABU DHABI, UAE

PAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 10,600 Mar-96 Oct-96

8 APL GPC YARD 12 PORT CONTAINER CRANES FOR APL PAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 9,307 Dec-95 Oct-96

9 NOELL GmbH, GERMANY GPC YARD 11 NOS. PORT CONTAINER CRANES PAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 9,300 Apr-95 Mar-96

10 PORT OF SINGAPORE IMAC YARD 8 RUBBER TYRED GANTRIES STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 800t 9,239 May-93 Jan-94

11 PORT OF SINGAPORE IMAC YARD 3 CONTAINER CRANES STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 2880t 9,114 Apr-95 May-96

12 PORT OF FUJAIRAH IMAC YARD CONTAINER HANDLING CRANE AND RUBBER TYRED GANTRY

STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 8,850 Dec-91 Apr-93

13 NOELL CRANE SYSTEMS, GMBH GPC YARD CRANES FOR CHENNAI , INDIA FABRICATION, PAINTING, ERECTION AND DELIVERY

OF 4 STS CONTAINER CRANES 3200t 8,350 Mar-02 Dec-02

14 PORTNET SOUTH AFRICA IMAC YARD 2 CONTAINER CRANES OR CAPE TOWN STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 1244t 5,638 May-95 Apr-96

15 NHAVA SHEVA PORT AUTHORITY, INDIA IMAC YARD 4 CONTAINER CRANES, NAVA SHEVA

MUMBAISTR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 2540t 5,163 Dec-97 Mar-99

16 DELTA B. V., ROTTERDAM IMAC YARD 5+1 STS MAERSK CONTAINER CRANES FOR DELTA B.V. ROTTERDAM

STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 5000t 5,000 Jun-99 Mar-00

17 QICT - KARACHI IMAC YARD 3 CONTAINER CRANES, KARACHI STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 2280t 4,887 Nov-97 Oct-98

PORT CRANES (STS, RTG)

SUMARY OF EXPERIENCE Page 13 of 23

Page 14: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

18 APL KAOSHIUNG IMAC YARD 2 CONTAINER CRANES, APL KAOSHIUNG STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 1840t 4,448 Jan-97 Mar-98

19 NOELL CRANE SYSTEMS GPC / IMAC MAERSK - LOS ANGELES 2 NOS. STS CRANES 1500t 4,404 Oct-01 May-02

20 MAERSK SPAIN IMAC YARD CONTAINER CRANES STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 1800t 4,076 Jul-93 Apr-94

21 PORTNET SOUTH AFRICA IMAC YARD 2 CONTAINER CRANES FOR DURBAN STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 1290t 3,736 Jun-95 Mar-96

22 NOELL CRANE SYSTEMS IMAC YARD 2 CONTAINER CRANES FOR CHINA STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 1380t 3,396 May-95 Aug-96

23 PORTNET SOUTH AFRICA IMAC YARD 2 CONTAINER CRANES, DURBAN STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 1290t 3,333 Sep-97 Jun-98

24 NHAVA SHEVA PORT AUTHORITY, INDIA IMAC YARD 12 RTG / 2 RMG, NAVA SHEVA MUMBAI STR'L FAB/ASSY OF CONTAINER CRANE

COMPONENTS - (ERECTION AT GPC YARD) 1080t 3,210 Dec-97 Mar-99

25 NHAVA SHEVA PORT AUTHORITY, INDIA GPC YARD 2 STS CRANES FOR NAVA SHEVA, MUMBAI PAINTING/ASSY/ERECTION AND SHIPMENT -

COMPLETE SHIP TO SHORE CONTAINER CRANE 1260t 2,904 Oct-99 Dec-00

26 NHAVA SHEVA PORT AUTHORITY, INDIA IMAC YARD 2 STS CRANES FOR NAVA SHEVA, MUMBAI STR'L FAB/ASSY OF CONTAINER CRANE

COMPONENTS - (ERECTION AT GPC YARD) 1260t 2,904 Jun-99 Nov-00

27 GOTENBORG, SWEDEN IMAC YARD 2 CONTAINER CRANES, GOTHENBURG STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 650t 2,800 Aug-97 May-98

28 MAERSK IMAC YARD 1 CONTAINER CRANE FOR ALGECIRAS STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 1142t 2,717 Jun-95 Jun-96

29 APL - KARACHI GPC YARD 3 NO. STS FOR APL KARACHI PAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 2,631 Oct-97 Sep-98

30 NHAVA SHEVA PORT AUTHORITY, INDIA GPC YARD 4 CONTAINER CRANES, NAVA SHEVA

MUMBAIPAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 2,605 Feb-98 Jan-99

31 PORTNET SOUTH AFRICA IMAC YARD 2 CONTAINER CRANES, DURBAN S.A. STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 620t 2,600 Mar-96 Mar-97

32 HHLA IMAC YARD 2 CONTAINER CRANES STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 1300t 2,241 Jul-94 Feb-95

33 FANTUZZI REGGIANE GPC/IMAC ADEN, YEMEN I STS CRANE 1,958 Mar-01 Dec-01

34 DUBAI PORT AUTHORITY IMAC YARD 8 RUBBER TYRED GANTRIES STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 600t 1,785 Jan-92 Oct-92

SUMARY OF EXPERIENCE Page 14 of 23

Page 15: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

35 PORTNET SOUTH AFRICA GPC YARD 2 CONTAINER CRANES FOR DURBAN PAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 1,715 Mar-96 Sep-96

36 NHAVA SHEVA PORT AUTHORITY, INDIA GPC/IMAC NHAVA SHEVA - IV 6 NOS. RTG CRANES 1,470 Oct-00 Sep-01

37 GOTENBORG, SWEDEN GPC YARD 2 NOS PORT CONTAINER CRANES FOR GOTENBORG, SWEDEN

PAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 1,362 Sep-97 Jan-98

38 NHAVA SHEVA PORT AUTHORITY, INDIA GPC/IMAC NHAVA SHEVA - 8 I NO. STS CRANE 1,303 Dec-00 Sep-01

39 PORTNET SOUTH AFRICA GPC YARD 2 NO. PORT CONTAINER CRANES FOR DURBAN

PAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 1,280 Oct-97 Apr-98

40 AUCKLAND PORT, NZ IMAC YARD CONTAINER HANDLING CRANE STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 715t 1,228 Apr-90 Nov-90

41 APL, KARACHI IMAC YARD 6 RUBBER TYRED GANTRY CRANES (RTG) STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 540t 1,200 Nov-97 Jun-98

42 NST GPC YARD 4 NOS. RTG'S FOR QICT - KARACHI PAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 1,111 Mar-99 Aug-99

43 XIAMEN, CHINA GPC YARD 2 CRANES FOR XIAMEN CHINA PAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 1,090 Dec-95 Jun-96

44 MAERSK IMAC YARD 6 RTG'S FOR MAERSK STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 1,019 Dec-93 Jul-94

45 NST IMAC YARD 7 NOS. DUBAL OVERHEAD CRANE FAB OF O/H CRANE COMPONENTS 500t 998 Sep-98 Oct-99

46 NHK GERMANY IMAC YARD 1 NO. STS NOORDNATIE ANTWERPEN STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 650t 979 Sep-98 Jan-99

47 MAERSK GPC YARD 1 CONTAINER CRANE FOR MAERSK PAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 763 Feb-96 Jul-96

48 KAOSHIUNG, TAIWAN GPC YARD 2 NOS APL CRANES FOR KAOSHIUNG, TAIWAN

PAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 735 Feb-97 Aug-97

49 QICT - KARACHI IMAC YARD 4 NOS. RTG'S FOR QICT - KARACHI STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 480t 702 Feb-99 Jul-99

50 NOELL HAFENTECHNIK IMAC YARD 2 RTG's FOR KHORFAKKAN STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 670 Sep-94 Apr-95

51 AL-MAHDI - IRAN GPC/IMAC YARD AL-MAHDI, IRAN FABN. & DELIVERY OF 3 NOS. PORT ROOM CRANES 128t 615 Mar-03 Oct-03

SUMARY OF EXPERIENCE Page 15 of 23

Page 16: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

52 APL - KARACHI GPC YARD 6 NO. RTG'S FOR APL KARACHI PAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 614 Oct-97 May-98

53 BUSS HAMBURG IMAC YARD FABRICATION OF CONTAINER CRANE STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 591t 512 May-96 Aug-96

54 NST IMAC YARD OFFLOADING STS CRANES IN INDIA STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 200t 500 Jan-99 Apr-99

55 NESPAK, PAKISTAN IMAC YARD 1500T OVERHEAD CRANE FOR TARBELA DAM, PAKISTAN MISC STR'L STEELWORKS 500 Oct-88 Jan-89

56 NOELL CRANE SYSTEMS, GMBH GPC YARD NHAVA SHEVA INTERNATIONAL CONTAINER

TERMINAL, INDIAFABRICATION, PAINTING, ERECTION AND DELIVERY OF 2 RTG CRANES 300t 490 Mar-02 Sep-02

57 NINGBO - CHINA IMAC YARD 2 CONTAINER CRANES COMPONENTS FOR NINGBO

STR'L FAB/ASSY OF CONTAINER CRANE COMPONENTS - (ERECTION AT GPC YARD) 105t 440 May-96 Nov-96

58 NINGBO - CHINA GPC YARD 2 NOS. CRANES FOR NINGBO, CHINA PAINTING/ASSY/ERECTION AND SHIPMENT - COMPLETE SHIP TO SHORE CONTAINER CRANE 317 Apr-96 Nov-96

I

1 I.O.O.C, IRAN OFFSHORE/GPC YARD

REHABILITATION OF LOADING TERMINAL AT SIRRI ISLAND

EPC CONTRACT: ENGG./PROCUREMENT/FABN./ & INSTALLN. INCL. COMMISSIONING OF OIL LOADING FACILITY

6,400 Nov-01 May-03

2 IOOC - IRANGPC

YARD/LAVAN ISLAND

PROJECT AT LAVAN ISLAND

OVERHAUL, REFURBISHMENT, UPGRADING & INSTALLATION OF ONE SBM BUOY AT GPC YARD AND OFFSHORE INSTALLATION OF COMPLETE LOADING TERMINAL IN LAVAN ISLAND

5,698 Dec-01 Aug-04

3 BROWN & ROOT ENERGY SERVICES GPC YARD BARRACUDA & CATARINGA CRUDE OIL

FIELDS PRODUCTION FACILITIES SUPPLY & FABRICATION OF 37 NOS. SUCTION PILES 3200t 4,500 Feb-02 Sep-02

4 FLARE INDUSTRIES INC. IMAC YARD QATAR PETROLEUM MITIGATION PROJECT FABRICATION OF FLARE RISERS 958 2,995 Jul-04 Mar-05

5 TECHNIP MARITIME OVERSEAS LIMITED GPC YARD BP SHAH DENIZ GAS EXPORT FABRICATION OF TPG 500 PLATFORM LEG PLATE

GIRDERS & LEG EQUIPMENT 535 1,660 May-04 Mar-05

6 HALLIBURTON FAR EAST LTD. GPC YARD BELANAK FPSO FIELD DEVELOPMENT FABRICATION OF 14 Nos. SUCTION PILES 1066t 1,577 Dec-02 Aug-03

7 BROWN & ROOT ENERGY SERVICES GPC YARD BARRACUDA & CATARINGA CRUDE OIL

FIELDS PRODUCTION FACILITIESSUPPLY & FABRICATION OF 51 NOS. RISER ANCHOR PILES 620t 1,571 Apr-02 Sep-02

OFFSHORE STRUCUTRES

SUMARY OF EXPERIENCE Page 16 of 23

Page 17: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

8 INTERBETON GPC YARD Q-LNG-WATER FRONT MARINE FACILITIES FABRICATION OF PIPELINES 915t 1,530 Dec-03 Jul-04

9 IMODCO IMAC YARD 12 ANCHOR PILES FAB OF ANCHOR PILES FOR BUOY 480t 1,254 Dec-97 Mar-98

10 GULF MARINE SERVICES GPC YARD NEW LEGS FOR JACK-UP BARGE KIKUYU FABRICATION & INSTALLATION OF 4 NOS. LEGS 880 1,250 May-05 Dec-05

11 SBM GPC YARD 9 NO. SUNCTION ANCHORS FOR SBM CURLEW PROJECT

FABRICATION OF SUCTION ANCHORS FOR FPSO TURRET 480t 1,000 Nov-96 Apr-97

12 SINGLE BUOY MOORINGS INC. GPC YARD EXXON FPSO EAGLE FABRICATION OF 9 NOS. SUCTION PILES 500t 890 Jun-02 Jan-03

13 SINGLE BUOY MOORINGS INC. GPC YARD EXXON FPSO ATLANTIC FABRICATION OF 9 NOS. SUCTION PILES 500t 890 Jun-02 Jan-03

14 ODERCO INC. GPC YARD DALMA ENERGY INC. FABRICATION MAST STEM, SUBSTRUCTURE & INTERMEDIATE TANK 357 855 Jan-05 Apr-05

15 ITOCHO - MARUBENI GSME YARD KHARG ISLAND FABRICATION OF PILES 2763t 850 Jun-03 May-04

16 ARCO QATAR INC./ BP GPC YARD AL RAYAN OIL FIELD DEVELOPMENT FABRICATION OF SPUD CANS 505t 510 Mar-02 Jul-02

17 ADMA-OPCO GPC YARD USAAP BOATLANDING REPLACEMENT FABRICATION OF BOATLANDING STRUCTURE 110t 404 Jun-03 Oct-04

18 IMODCO IMAC YARD 4 NOS. PILES FOR JAMNAGAR FABRICATION OF TUBULAR PILING SYSTEM JAMNAGAR BUOY 240t 454 Jan-99 Feb-99

19 SBM MONACO GPC YARD FABRICATION OF 4 NO. PLEM FOR MANVAGAT, TURKEY COMPLETE FABRICATION/PAINTING 425 Sep-97 Feb-98

20 VALENTINE MARITIME GPC YARD ANCHOR PILES SPM INSTALLATION - MAERSK OIL QATAR PROJECT COMPLETE FAB OF ANCHOR PILES FOR SPM BUOY 240t 421 Mar-97 Aug-97

21 SBM MONACO GPC YARD 12 NO. MAG ANCHORS FOR NANAVGAT, TURKEY COMPLETE FABRICATION/PAINTING 351 Sep-97 Feb-98

22 SBM - IMODCO GPC YARD SO 12800 FABRICATION OF PLEM & PILES FOR TEXACO - KUWAIT 32t 337 Sep-01 Nov-01

SUMARY OF EXPERIENCE Page 17 of 23

Page 18: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

23 ZADCO GPC YARD 23 NOS DEAD WEIGHT ANCHORS COMPLETE FABRICATION/PAINTING 500t 302 Aug-96 Nov-96

24 SUBSEA INT'L INC. GPC YARD 3 NO. GRILLAGE GRAVITY ANCHORS (3 X 40TONNES) COMPLETE FABRICATION/PAINTING 120t 288 Jun-97 Jul-97

25 S B M IMAC YARD 8 x 18T ANCHORS FAB OF MAG ANCHORS FOR CALM BUOY 144t 268 Sep-93 May-94

26 SOFEC GPC YARD TWO PLEM FOR SOFEC COMPLETE FABRICATION/PAINTING 160t 259 Jul-95 Oct-95

27 S B M NIGERIA IMAC YARD ANCHORS FAB OF MAG ANCHORS FOR CALM BUOY 150t 220 Apr-92 Sep-92

28 S B M IMAC YARD SUBSEA ANCHORS FAB OF MAG ANCHORS FOR CALM BUOY 112t 210 Jan-91 Jun-91

29 S B M IMAC YARD 8 x 14 T ANCHORS FAB OF MAG ANCHORS FOR CALM BUOY 112t 207 Apr-93 Jul-93

30 FLARE INDUSTRIES INC. GPC YARD ENSCO INTERNATIONAL FABRICATION OF FLARE BOOM 20 156 Apr-05 Jun-05

31 S B M IMAC YARD 6 x 12T MAG ANCHORS FAB OF MAG ANCHORS FOR CALM BUOY 72t 120 May-93 Jul-93

32 I.O.O.C. IMAC YARD ROLLING AND FABRICATION OF OFFSHORE PILING MISC STR'L STEELWORKS 78 Feb-84 May-84

33 BLUEWATER GPC YARD PLEM FOR SHELL SR LANKA CBM PROJECT FAB/ASSY OF PLEM STRUCTURE C/W PIPING 40t 72 Nov-98 Jan-99

34 CCC-IOEC, IRAN GPC YARD SOUTH PAR GAS FIELD DEVELOPMENT PLEM REFURBISHMENT 45 Aug-01 Sep-01

J

1 ADWEA/TOTAL TRACEBELGPC YARD/ TAWEELAH

SITETAWEELAH A1

- PREFABN. OF STORAGE TANKS - FABN. OF PIPE BRIDGE STEEL STRUCTURE - PIPE WORKS ERECTION

6,880 Apr-01 Jun-02

2 ADNOC-FOD GPC YARD 10 NOS STORAGE TANKS FOR ADNOC FOD FABRICATION/SITE ERECTION/PAINTING OF TANKS 4,872 Jan-96 Sep-97

3 WATER AND ELECTRICITY DEPARTMENT BEDA WATER TANK AND PIPELINE TA DEDA

MUTAWAFAB/SITE ERECTION OF TANK AND ASSOCIATED PIPELINES 3,500 Jul-95 Dec-96

4 APPLEDORE U. K. IMAC YARD 4 LPG VESSEL, APPLEDORE U.K. FABRICATION - PRESSURE VESSEL 2,717 Apr-96 Feb-96

TANKS & PRESSURE VESSELS

SUMARY OF EXPERIENCE Page 18 of 23

Page 19: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

5 ZADCO ( Zakum Development Company )

ZIRKU FACILITIES ZIRKU PRODUCTION FACILITIES

DESIGN, SUPPLY & ERECTION OF EFFLUENT DEGASSING AND DE-OILING TANKS AND INTERNALS FOR ZIRKU PRODUCTION FACILITIES

2,400 Aug-00 May-01

6 LGA REMAGEN IMAC YARD NGL LOW TEMPERATURE PRESSURE VESSEL FABRICATION - PRESSURE VESSELS 2,357 Jul-91 Apr-92

7 APPLEDORE U. K. IMAC YARD 2 TANKS FOR APPLEDORE FABRICATION - PRESSURE VESSEL 628.86t 2,142 Apr-95 Sep-95

8 SIEMENS / DUBAI ELECTRICITY IMAC YARD 8 FUEL OIL TANKS FABRICATION - STORAGE TANKS 2,142 Dec-91 Sep-92

9 ADOC (JAPAN) MUBARRAZ OVERHAULING AND REPAIR WORK TO TANK T450 AT MUBARRAZ IS. SITE WORK - TANK REPAIR/OVERHAULING 210t 1,730 Aug-96 Apr-97

10 NOELL LGA IMAC YARD 2 LPG TANKS FOR YSSEL YARD FABRICATION - PRESSURE VESSEL 300t 1,358 May-95 Sep-95

11 LGA REMAGEN ITALY IMAC YARD 3 BILOBE TANKS FOR LA SPEZIA FABRICATION - PRESSURE VESSEL 1300t 958 Dec-94 May-95

12 NOELL LGA IMAC YARD 2 LPG TANKS FABRICATION - PRESSURE VESSEL 951 Dec-95 Jul-96

13 LGA REMAGEN IMAC YARD 2 LPG TANKS FOR DENMARK FABRICATION - PRESSURE VESSEL 828 Dec-94 Jun-95

14 ADCO / ASAB IMAC YARD FIRE WATER TANKS FABRICATION - STORAGE TANKS 547 Aug-90 Oct-91

15 MUSTANG ENG'G/BAKER MO IMAC YARD FABRICATION AND ERECTION OF TANKS - ADCO FAB/ERECTION - STORAGE TANKS 534 Jul-93 Dec-93

16 ADOC (JAPAN) GPC YARD OVERHAULING OF FLOATING ROOF TANK T440, MUBARRAZ ISLAND CLEAN-UP/OVERHAUL OF STORAGE TANK 200t 509 Nov-95 Mar-95

17 PREUSSAG / NOELL / LGA IMAC YARD 2 LPG TANKS, ROMANIA FABRICATION - PRESSURE VESSEL 175t 490 Dec-97 Sep-98

18 ADCO, ABU DHABI, UAE IMAC YARD 350 CUBIC METER SURGE TANK FAB/ERECTION - STORAGE TANK 350 Dec-84 Feb-85

19 ADNOC / FOD IMAC YARD 1 FIREWATER TANK FABRICATION - STORAGE TANK 85t 330 Mar-97 Sep-97

20 ADOC (JAPAN) GPC YARD TANKS OVERHAULING WORKS T170, T190 & T290 270 Feb-91 Aug-91

21 S B M IMAC YARD 2 RISER BUOYANCY TANKS MISC STR'L STEELWORKS 260 Jan-94 Apr-94

22 ADNOC - FOD IMAC YARD HIGH OCTANE FUEL TANK FABRICATION - STORAGE TANKS 205 Jun-91 Dec-91

23 ADNOC-FOD / ZAKUM, ABU DHABI UAE IMAC YARD FLOATING ROOF GASOLINE TANKS FAB/ERECTION - STORAGE TANKS 197 Jun-87 Aug-87

SUMARY OF EXPERIENCE Page 19 of 23

Page 20: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

24 AL HABAISHI CONT. CO. GPC YARD DESIGN, SUPPLY AND FABRICATION OF 2 CHEMICAL PREPARATION TANKS 142 Apr-90 Oct-90

25 NATIONAL DRILLING COMPANY GPC YARD 4 NOS MUD TANKS - ND8 FABRICATION/PAINTING OF MUD TANK 141 Sep-91 Jan-92

26 GASCO GPC YARD REPLACEMENT OF IP VESSELS 2C-102 AND 2C-209 BUHASA 100t 140 Jul-94 Dec-94

27 ADNOC - FOD IMAC YARD TANKS FOR GASOLINE DEPOT FAB/ERECTION - STORAGE TANKS 125 Jun-88 Aug-88

28 SIDEM GPC YARD FABRICATION OF FRAME EVAPORATOR 50t 94 Oct-90 Aug-91

29 ADCO, ABU DHABI, UAE IMAC YARD 8 WATER STORAGE TANKS FOR ASAB AND BUHASA FAB/ERECTION - STORAGE TANKS 55 Nov-85 Jan-86

30 PALATEX ENGINEERING GPC YARD FABRICATION AND PAINTING OF STORAGE AND SEPARATOR TANKS 45 Apr-89 May-89

31 SINGLE BUOY MOORINGS INC. GPC YARD EXXON FPSO ATLANTIC (XIKOMBA) FABRICATION OF 2 NOS. PIG RECEIEVERS 7t 42 Jul-02 Dec-02

32 ADMA-OPCO IMAC YARD SOUR SERVICE DEGASSING VESSEL FABRICATION - PRESSURE VESSELS 27 Sep-87 Feb-88

K

1 N.I.O.C. (IRAN) OFFSHORE REPAIR OF DARUD SUBMARINE PIPELINE OFFSHORE WORK - REPAIR AND REFURBISHMENT OF SUBMARINE PIPELINE 930t 9,500 Aug-95 Feb-96

2 VOEST ALPINE GmBH GPC YARD SAUDI HADEED FABRICATION OF 2 NOS. SHIP UNLOADER 2,160t 9,300 Jan-06 Jan-07

3 ADNOC-FOD GPC YARD ADNOC-FOD DISTRIBUTION FACILITIES FAB/ERECTION OF MISC STR'L WORK 4,869 Jan-97 Aug-97

4 ADCO GPC YARD TIE-IN CONSTRUCTION PACKAGE FOR BUHASA FST

FAB/SITE INSTALL OF MISC STR'L AND TIE-IN PIPE SPOOLS 600t 3,592 Aug-94 Apr-95

5 AUSTRIAN ENERGY GPC/IMAC TAWEELAH A1 FABRICATION OF 5 UNITS HRSG STEEL STRUCTURES & PREFABRICATION OF STACK FOR BOILERS 2,499 Apr-01 Mar-02

6 ABB / SADELMI IMAC YARD TAWEELAH B C/W PIPELINE MISC PIPING WORK 2,445 Jan-93 Oct-93

7 ADWEA/TOTAL TRACEBEL GPC YARD TAWEELAH A1 ADDITIONAL STRUCTURE 2,394 Aug-01 Dec-01

8 G+H MONTAGE IMAC YARD 3 UNITS AIR INTAKE & EXHAUST SYSTEM FOR TAWEELAH A2

FAB OF STEELWORK FOR INTAKE AND EXHAUST DUCTS 750t 2,350 Jun-99 Mar-00

9 G+H MONTAGE GPC YARD 3 UNITS AIR INTAKE & EXHAUST SYSTEM AND DIVERTERS FOR TAWELLAH A2

SUB ASSEMBLY AND ERECTION OF EXHAUST AND INTAKE DUCTS 750t 2,350 Jun-99 Mar-00

10 ZADCO ZIRKU MAINTENANCE WORK FOR ZIRKU CRUDE HEAT EXCHANGERS FOR ZADCO MAINTENANCE AND CLEAN-UP WORK ---- 2,310 Jul-97 Jan-99

11 DUBAI DRY DOCK GPC YARD DUPLEX PIPING SPOOLS FABRICATION AND INSTALLATION OF PIPING SPOOLS 2,243 Nov-98 Jul-99

OTHER WORKS

SUMARY OF EXPERIENCE Page 20 of 23

Page 21: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

12 KAEFER - RACO ENGINEERING IMAC YARD JEBEL ALI "K" FABRICATION OF 3 UNITS OF EXHAUST SYSTEM INLCUDING DIVERTER. 515t 1,910 Feb-01 Oct-01

13 SIEMENS/GUDDU PAKISTAN IMAC YARD POWER STATION STRUCTURES MISC MECH'L/STR'L WORKS 1,805 Nov-90 Aug-91

14 THYSSENKRUPP IMAC YARD QATAR GAS COMMON SULPHUR PROJ. FABRICATION OF 2 NOS. STACKER/RECLAIMER 330t 1,600 Dec-05 May-06

15 ADGAS GPC YARD ADGAS JETTY LONGEVITY PROJECT REPAIR/UPGRADING OF BERTHING DOLPHINS 80t 1,645 Dec-92 May-93

16 W.E.D., ABU DHABI, UAE SHAHAMA EXTENSION OF WATER DISTRIBUTION NETWORK AT SHAHAMA

FAB/INSTALLATION OF UTILITY LINE - WATER DISTRIBUTION SYSTEM 1,492 May-92 May-93

17 SBM MONACO GPC YARD 9 NO. SUCTION ANCHORS FOR LAMINARIA FPSO SYSTEM FABRICATION OF SUCTION ANCHORS 440t 1,303 Sep-97 May-98

18 DSD DILLINGER GMBH GPC/IMAC KUKULA GANGA HYDRO PROJECT, SRI LANKA

FABRICATION OF HYDROPOWER GATE & PENSTOCK TUBE 1,122 May-00 Apr-02

19 ADCO/FOSTER WHEELER GPC YARD BAB OIL DEVELOPMENT PROJECT FABRICATION OF PRE-ASSEMBLED UNITS C/W PIPING 1,027 Dec-92 Jul-93

20 WATER AND ELECTRICITY DEPARTMENT ZIBARA WATER DISTRIBUTION SYSTEM FOR

PALACES IN ZIBARA AREAFAB/INSTALLATION OF UTILITY LINES - WATER DISTRIBUTION SYSTEM 1,000 Jan-95 Sep-95

21 ADNOC RUWAIS GENERAL MAINTENANCE WORK DURING 1985 REFINERY SHUTDOWN

REFINERY SHUTDOWN GENERAL MAINTENANCE WORK DURING 1,000 Dec-84 Feb-85

22 NPCC GPC YARD SUPPLY OF MISC APPURTENANCES FOR OFFSHORE PLATFORM

FABRICATION OF VARIOUS OFFSHORE STR'L APPURTENANCES 1,000 Jan-84 May-84

23 GTME RUWAIS 2 DESALINATION PLANTS FOR ADNOCFAB/ERECTION OF 2 DESALINATION PLANTS FOR ADNOC 1,000 Jan-83 May-83

24 BACHMANN IMAC YARD 4 NOS. GAS TURBINE EXHAUST SYSTEM FABRICATION OF EXHAUST DUCTS AND MISC STR'L SUPPORTS 250t 990 Feb-99 Oct-99

25 BROWN & ROOT INT'L., ABU DHABI, UAE IMAC YARD OFFSHORE FLARE BRIDGES MISC STR'L STEELWORKS 923 Sep-82 Nov-82

26 COMMONWEALTH GPC YARD 2 STACKS FOR ADNOC OGD II FABRICATION/DELIVERY OF STACKS AND MISC ACCESS STRUCTURE 450t 900 Mar-99 Oct-99

27 G+H SCHALLSCHUTZ IMAC YARD KIRKUK, IRAQ FABRICATION OF EXHAUST SYSTEMS 350t 810 Nov-03 Apr-04

28 DUTCO BALFOUR BEATTY IMAC YARD DUBAI DRYDOCKS FLOATING DOCK INSTALLATION MISC STRUCTURAL WORKS 782 Oct-93 Apr-94

29 ADOC (JAPAN) GPC YARD CONSTRUCTION OF GAS HOLDER (SPHERE) FOR MUBARRAZ ISLAND COMPLETE FAB OF SPHERICAL PRESSURE TANK 526 Mar-93 Apr-94

30 KAEFER RACO ENGINEERING IMAC YARD SHUWEIHAT S1 PROJECT FABRICATION OF 2 GAS-FLOW DIVERTER SYSTEMS (TYPE V94.3) 170t 520 Feb-02 Sep-02

31 SBM-IMODCO INC. GPC YARD YOHO VIP - FLOWLINE BYPASS FABRICATION OF SUBSEA SPOOLS 58 355 Mar-05 May-05

SUMARY OF EXPERIENCE Page 21 of 23

Page 22: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

32 SBM INC. GPC YARD YOHO VIP FABRICATION OF PIPING SPOOLS 51 500 Feb-05 May-05

33 G+H SCHALLSCHUTZ IMAC YARD KIRKUK, IRAQ FABRICATION OF AIR INTAKE SYSTEMS 3t 478 Dec-03 Mar-04

34 TAIWAN POWER MINGTAN IMAC YARDHYDRO-MECHANICAL WORKS INTAKE GATES, TRASHRACK SLUICEWAY GATES, GANTRY CRANE

MISC MECH'L/STR'L WORKS 450 Mar-90 Sep-91

35 WESCON INTERNATIONAL GPC YARD SUPPLY OF CARBON STEEL PIPE SPOOLS FOR ADCO WATER INJECTION PROJECT PRE FABRICATION OF PIPE SPOOLS 416 May-93 Sep-93

36 HITACHI ZOSEN GPC YARD ADNOC/RUWAIS GUP EXPANSION PROJECT - SUPPLY OF PIPING SPOOLS FABRICATION OF PIPING SPOOLS 50t 282 Oct-94 Apr-95

37 SKIMOVEX (UK) LTD. GPC YARD BABOIL DEVELOPMENT PROJECT

SUPPLY/FABRICATION/TESTING/PAINTING OF WATER SEPARATION PLANT, AIR FLOATING UNITS, PLATE SEPARATORS, PIPE SPOOLS AND MISC SECONDARY STRUCTURES.

278 Nov-92 May-93

38 ADNOC-PD GPC YARD SULPHUR HANDLING PROJECT NO. 943SUPPLY/INSTALLATION OF STEEL STRUCTURES AND SHELTERS 120t 258 Nov-90 Aug-91

39 NST IMAC YARD 12 NOS. FLUID TRACKS MISC STRUCTURAL WORKS 55t 190 Jan-99 Mar-99

40 ADOC (JAPAN) GPC YARD AR-10 FLOWLINE MECHANICAL WORKS 186 Jul-91 Aug-91

41 BROWN & ROOT, BAHRAIN IMAC YARD PLATE GIRDERS FOR OFFSHORE STRUCTURE MISC STR'L STEELWORKS 181 Jul-85 Aug-85

42 TOTAL ABK GPC YARD FABRICATION OF AHS 12" KHUFF MANIFOLD FABRICATION OF PIPE SPOOLS - MANIFOLD SYSTEM 149 Nov-91 Feb-92

43 NOELL IMAC YARD 6 ISOLATING GATES FOR SENNA DAM SUDAN MISC STRUCTURAL WORKS 139 May-93 Sep-93

44 BRUCE ANCHORS LTD. GPC YARD SUPPLY & FABRICATION OF 6 NOS. 10T ANCHORS 60t 110 Feb-02 May-02

45 ADNOC-STONE & WEBSTER ZAKUM FIELD

SUPPLY AO ACCESS PLATFORM AND STACK EXTENSIONS FOR ADMA OPCO

FABRICATION OF PLATFORM AND STACK EXTENSIONS 100 Mar-82 Apr-82

46 ZADCO GPC YARD FABRICATION AND INSTALLATION OF OVERBOARDING FACILITIES, SATELLITES

FAB/OFFSHORE INSTALLATION OF BOATLANDINGS AND OVERBOARDING FACILITIES 88 Dec-91 May-92

47 S B M IMAC YARD 2 x 2T MAG ANCHORS FAB OF ANCHORS FOR CALM BUOY 4t 51 Nov-94 Jan-95

SUMARY OF EXPERIENCE Page 22 of 23

Page 23: Mobile Offshore Production Systems ONSHORE / · PDF fileconstruction of semi-submersible ... 5 vetco aibel gpc yard golfinho ii fpso fabrication & loadout of process modules 1460 10,100

IMCC - Abu Dhabi Group Company Profile

ITEM No. CLIENT FAB LOC. PROJECT DESCRIPTION SCOPE OF WORK

FABRICATED WEIGHT (Tonnes)

CONTRACT VALUE

(USD1,000)

START DATE

COMPLETION DATE

SUMMARY OF EXPERIENCEIMCC - Abu Dhabi Group - MAJOR PROJECTS LIST

(Gulf Piping Company/International Metal & Constn. Co. /Abu Dhabi Coating Enterprises)

48 CONSTAIN ABU DHABI COMPANY W.L.L. GPC YARD MARGHAM PLANT SHUTDOWN PIPING PREFABRICATION (SS DUPLEX) 12t 42 Jan-01 Feb-02

49 ADGC ( ATHEER ) ( CALLOUT BASIS PROJECT) GPC/IMAC AT HABSHAN GRP/RTR PIPING REPAIR SERVICES AT HABSHAN 27 May-00 May-02

SUMARY OF EXPERIENCE Page 23 of 23