MINISTRY OF MUNICIPALITY & URBAN PLANNING PUBLIC PARKS DEPARTMENT BUILDING PERMIT REQUEST AUTOMATION PHASE II AUTOVUE INTEGRATION USER GUIDE Document Reference EGQ-MMUP-PII-AutoVue-Guide-EN Document Title MMUP BPRA PII – AutoVue Integration - User Guide (English) Author EVER Gulf Co Version 1.0 Issue Date Status Final

Upload: others

Post on 24-Feb-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MINISTRY OF MUNICIPALITY & URBAN PLANNING

PUBLIC PARKS DEPARTMENT

BUILDING PERMIT REQUEST AUTOMATION PHASE II

AUTOVUE INTEGRATION

USER GUIDE

Document Reference EGQ-MMUP-PII-AutoVue-Guide-EN

Document Title MMUP BPRA PII – AutoVue Integration - User Guide (English)

Author EVER Gulf Co

Version 1.0

Issue Date

Status Final

Page 2: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 2 of 15

TABLES OF CONTENTS

Document History

Author Version Date Change Reference

Hussein SHOKOR 1.0

Document Reviewers

Name Role Version Date

Document Approvals

Name Role Version Date

Legends

Key Definition

Information

Note

Warning

Critical Information

Action

Page 3: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 3 of 15

1. SUMMARY This document describes the user guide for the Integration with AutoVue Advanced viewer as

part of the modules implementation for the project Building Permit Request Automation

Phase II.

Page 4: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 4 of 15

2. INTRODUCTION AutoVue is an advanced imaging viewer which supports DWG and DWF files, with the ability of adding markups to these files.

Page 5: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 5 of 15

3. AUTOVUE INTEGRATION AutoVue integration will be used by two types of users: Municipality Engineers and Consultants

3.1. MUNICIPALITY ENGINEERS

3.1.1 OPEN AND ADD MARKUPS

Municipality engineers can open building maps (DWG/DWF) using AutoVue along with adding the markups (notes) for the consultant to amend if necessary.

In order to open/add markups, the engineer should follow the below steps:

Go to attachments tree

Navigate to the required file(map)

Right click on the file go to AutoVue Actions click “Open With Markups” Button

Page 6: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 6 of 15

Figure 1: Open file with AutoVue

Upon clicking the open button, a new window will open the file in AutoVue with markups (if added) (figure 2 below)

Page 7: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 7 of 15

Figure 2: File with markups in AutoVue

In order to add markups user can either go to Markup Add Entity (under toolbar), then choose the markup he want to add (figure 3)

Page 8: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 8 of 15

Figure 3 : Add Markups from toolbar

Or he/she can add markups from the left panel in AutoVue (figure 4)

Figure 4 : left panel markups

Page 9: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 9 of 15

3.1.1.1. MARKUP TYPES

The user can add a set of predefined markups described below:

Distance: To add a distance markup the user clicks on distance button , a new window will pop-up (figure 5) where he/she can change the measurement unit, then the user need to select two locations on the map in order to have the distance from the 1st location to the 2nd one (figure 6). Once the locations are selected, the user can close the pop-upped window

Figure 5 : Measurement window

Figure 6 : Distance Markup

Page 10: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 10 of 15

Text: In order to add a text markup, user clicks on text markup button , selects the region where he want to add the text then write inside it (figure 7)

Figure 7 : Text Markup

Highlight: To highlight anything on the map, the user clicks on Highlight button and selects a region where he/she needs to highlight as shown in figure 8 below (red rectangle)

Figure 8 : Highlight Markup

Leader: to add a leader, the user clicks on Leader button and click on the pointed position then right click in order to add the text (figure 9)

Figure 9 : Leader Markup

And he/she can add other shapes like lines, circles and polygons.

When the engineer is done from adding markups, he/she must save them by:

1. clicking “Markup” in the top toolbar Save

Page 11: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 11 of 15

Figure 10 : Saving Markups

Once he/she click save, a new window will pop up (figure 11) where the user needs to enter an id for these markups

Figure 11 : Saving Markups

3.1.2 COMPARE DOCUMENTS

Sometimes municipality engineers needs to compare a current building map with its previous version to check for any changes done, so for that they will have in the attachments tab, in addition to opening a file in AutoVue, the option to compare with the previous version (if any).

From the tree the user must right click on the file AutoVue Actions Compare Documents button. A new pop up will opens showing the document for the current request (figure 12), the user checks 2 files and click compare button (figure 13), a new browser window will open showing the current version map in a panel, the previous version of the map in another panel and another panel showing the similarities, difference between both versions (figures 14-15)

Legends:

1. Blue: Same map details in both versions

2. Red: Deleted things

3. Green: Added things

Page 12: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 12 of 15

Figure 12 : Compare Documents pop up

Figure 13 : Compare Documents

Page 13: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 13 of 15

Figure 14 : AutoVue Compare

Figure 15 : AutoVue Compare-Zoom in

Page 14: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 14 of 15

3.2. CONSULTANT

Consultants will not have access to AutoVue, all what they need is to see the list of markups added by municipality engineer, and download the file (as PDF) with the markups.

The consultant will achieve this by: right click on the file list markups (figure 16); a new window will pop showing the list of markups added by the engineer along with a download button (figure 17)

Figure 16 : Consultant - List Markups

Figure 17 : File Markups

The consultant will press on download button to get the file with the markups on it (figures 18-19-20)

Figure 18 : Download Document with markups

Page 15: MMUP Technical Proposalbps.baladiya.gov.qa/ArticleDocuments/EGQ_MMUP_BPRA_Phase...MMUP E-Services – Building Permit Request Automation – Phase II EVER TEAM - Information Owner

MMUP E-Services – Building Permit Request Automation – Phase II

EVER TEAM - Information Owner Page 15 of 15

Figure 19 : Download document

Figure 20 : PDF with Markups