Enpetrol Key Facts • Founded in 2005 in İstanbul / TURKEY

• Offices and branches in Turkey, Kazakhstan, Iraq, Qatar

• International certifications including ISO 9001, ISO 14001, OHSAS 18001.

• ENPETROL is an international engineering, manufacturing and construction company specialized in oil & gas, petroleum & petrochemicals, power generation and industrial facility construction projects

• 500+ Employees

• Experienced Engineering Team for Oil&Gas, Power and Industrial Projects

• Rapid Mobilization Capability

• Fast and Solution Oriented Management

• Fast and Sustainable Growing Curve

• A Large Number of Good References from International Group Companies

• Signed EPC Contract directly with the Ministry of Electricity of Iraq

• Has capability to mobilize and work in difficult territories

Teknokon Group Companies

TKN DESIGNTEKNOKON INTERNATIONAL

TEKNOMONT

TEKNOKON MAINTENANCE

Design and Engineering service for industrial plants

International lump sum turnkey / EPC Industrial

construction projects

EPC services for energy, environmental and water

projects

Large spectrum maintenance services for industrial plants

TEKNOKON MACHINERY

Design and fabrication of industrial process

equipment

TEKNOKON INDUSTRY

Undertaking of lump sum turnkey Industrial construction

projects

TEKNOPUR

Turnkey insulation, scaffolding and painting

services

GROUP STRUCTURE

Teknokon Group affiliates execute & manage construction of plants by providing:

DETAIL ENGINEERING PROCUREMENT AND MATERIAL MANAGEMENT

PIPING PRE-FABRICATION & ERECTION

ELECTRICAL & INSTRUMENTATION WORKS

FABRICATION OF PROCESS EQUIPMENT

INSULATION SCAFFOLDINGAND PAINTING

COMMISSIONING & START UP

MAINTENANCE AND TURN-AROUNDS

INFRASTRUCTURAL & CIVILWORKS

MECHANICAL ERECTION

SERVICES

EPC / LSTK CONSTRUCTION SERVICES

MANUFACTURING SERVICES

CIVIL CONSTRUCTION SERVICES

INSULATION & SCAFFOLDING PAINTING SERVICES

MAINTENANCE & INDUSTRIAL SERVICES

OUR LOCATIONS

MAJOR CLIENTS

WORLDWIDE SUPPLY

QUALITY & CERTIFICATION

Our Quality Target is to achieve 100% customer satisfaction by continuous providing a high qualitystandard that meets the client expectations.Quality certificates: ISO 9001, ISO 14001, OHSAS 18001 , ASME-U, ASME-S, AD 2000–Merkblatt HP0, PED 97/23/EC, DIN-EN ISO 3834-2 (EN 729-2)

SAFETY • OHSAS 18001 Certification

• Continuous in-house safety training program

• External safety training programs

• Personnel protective equipment

• Periodical safety audits

• Management safety commitment declaration

• In-house developed safety manuals and safe working procedures

• Zero LTI target

• Environmental controls in areas of dust, noise and hazardous materials

SAFETY

Location:

Client:

EPC:

Scope:

Status:

Samsun / Turkey

OMV

Metka

Complete mechanical works including erection

of 2 HRSG and stacks, erection of 2 Power Islands,

installation of BOP equipment, installation of BOP

piping.

Completed

Location:

Client:

EPC:

Scope:

Status:

Denizli / Turkey

RWE

Metka

Erection of 2 HRSG and stacks.

Completed

OMW 880 MW NG - CCPP RWE 775 MW NG - CCPP

REFERENCE PROJECTS - POWER

Location:

Client:

EPC:

Scope:

Status:

Shatura / Russia

OGK / E-On

Gama / GE

Erection of power island, HRSG, stack, compressor

station.

Completed

Location:

Client:

EPC:

Scope:

Status:

Surgut / Russia

OGK / E-On

Gama / GE

Erection of two unit HRSG’s, two stacks, one

unit power island, two unit BOP equipment,

compressor station, gas lines.

Completed

OGK / E-ON 400 MW NG - CCPP OGK / E-ON 800 MW NG - CCPP

REFERENCE PROJECTS - POWER

Location:

Client:

Scope:

Status:

Izmit / Turkey

Sondel Energy

Mechanical erection of power island, BOP

equipment, piping, electrical and instrumentation,

tanks.

Completed

Location:

Client:

Scope:

Status:

Moscow / Russia

Zorlu Energy

Erection of power island, BOP equipment, main

cooler, auxiliary cooler, piping, insulation.

Completed

Sondel Energy 33 MW NG - CCPP Zorlu 230 MW NG – CCPP

REFERENCE PROJECTS - POWER

Location:

Client:

Scope:

Status:

Bandırma / Turkey

Siemens

Complete mechanical erection of HRSG and

stacks

Completed

Location:

Client:

Scope:

Status:

Kırıkkale / Turkey

SAMSUNG

HRSG Erection Works

On - Going

Siemens Bandırma II, 600 MW NG-CCPP ACWA 950 MW CCGT

REFERENCE PROJECTS - POWER

Location:

Client:

Scope:

Status:

Kırıkkale / Turkey

GAMA

Complete mechanical erection works of 2 HRSGs

and stacks. 900 tons of piping prefabrication and

supply for BOP

Completed

GAMA İç Anadolu 840 MW CCPP

REFERENCE PROJECTS - POWER

Location:

Client:

Scope:

Status:

Iraq

Ministry of Electricity

Design, supply and construction of civil,

mechanical and electrical works

On - Going

Rehabilitation of Unit 1 and Unit 2 of Baiji Thermal Power Plant

Location:

Client:

Scope:

Status:

Kırıkkale Refinery / Kırıkkale/ Turkey

Tüpraş

Tecnicas Reunidas / Alarko

Mechanical works, prefabrication and erection of

1.100 tons process & utility piping.

Completed

Location:

Client:

Scope:

Status:

Aliağa Refinery / İzmir/ Turkey

Tüpraş

Foster Wheeler / Gama Prefabrication and site

erection of 1.800 tons process & utility piping, 720

tie-ins during shut-downs.

Completed

Tüpraş DHP / HDS / SRU Process & Utility SystemsTüpraş CCR Izometrization Unit, Hydrotreater

and CCR Unit

REFERENCE PROJECTS - OIL & GAS

Location:

Client:

Scope:

Status:

İzmir/ Turkey

Tüpraş

Complete civil, structural and mechanical

erection and piping works.

Completed

Location:

Client:

Scope:

Status:

Ataş Refinery / Mersin / Turkey

BP / Ataş Foster Wheeler

Civil & mechanical works including prefabrication

and erection of 1.200 tons of piping.

Completed

Tüpraş Aliağa GSIP Project BP / Ataş Refinery / Terminal Conversion Project

REFERENCE PROJECTS - OIL & GAS

Location:

Client:

Scope:

Statu:

Batumi / Georgia

Batumi Oil Terminal Ltd. / PCE Denmark LSTK

Design, supply and erection of 4 bays of railcar

unloading platform within the existing terminal.

The terminal is capable to handle HFO/LFO and

crude oil with 70 cum/hr and total 10 million ton

per year unloading capacity.

Complete

Location:

Client:

Scope:

Statu:

Trabzon / Turkey

Petrol Ofisi (OMV)

LSTK design, supply and erection of road truck

loading gantries, terminal automation system.

Complete

Batumi Oil Terminal Ltd. Railcars, Unloading and

Storage Terminal OMV POAS Trabzon Distribution and Storage Terminal

Location:

Client:

Scope:

Statu:

Location:

Client:

Scope:

Statu:

Trabzon / Turkey

Petrol Ofisi (OMV)

LSTK design, supply and erection of road truck

loading gantries, terminal automation system.

Complete

Batumi Oil Terminal Ltd. Railcars, Unloading and

Storage Terminal OMV POAS Trabzon Distribution and Storage Terminal

Location:

Client:

Scope:

Status:

Location:

Client:

Scope:

Status:

Trabzon / Turkey

Petrol Ofisi (OMV)

LSTK design, supply and erection of road truck

loading gantries, terminal automation system.

Completed

Batumi Oil Terminal Ltd. Railcars, Unloading and

Storage Terminal OMV POAS Trabzon Distribution and Storage Terminal

REFERENCE PROJECTS - OIL & GAS

Location:

Client:

Scope:

Status:

İzmit Refinery / İzmit/ Turkey

Tüpraş

Design, supply and construction of: railcar

and road trucks loading/ unloading gantry,

construction of storage tanks, interconnecting

piping, transformers, insulation, E&I works.

Completed

Location:

Client:

Scope:

Status:

M. Ereglisi / Turkey

Opet Petrol

Jetty – Terminal piping system; installation and

erection of structural steel, piping, loading arms

and pigging system.

Completed

Tüpraş Rail & Road Trucks, Unloading and Storage

System Opet Petrol Jetty Transfer Lines and Unloading Arms

REFERENCE PROJECTS - OIL & GAS

Location:

Client:

Scope:

Status:

Uralsk / Kazakhstan

Zhaikmunaigas - KazStroyService KSS

234.000 WDI Fabrication and installation of

various diameters of pipes on the piperack,

interconnection piping, tank farm area piping,

painting and logistic works.

On - Going

Location:

Client:

Scope:

Status:

Atyrau / Kazakshtan

KazStroyService KSS

Fabrication and installation of various diameters

of pipes on the piperack, interconnection piping,

tank farm area piping.

Completed

Gas Treatment Plant – Phase 3 Atyrau Refinery ANPZ Phase 3 FCC

REFERENCE PROJECTS - OIL & GAS

Location:

Client:

Scope:

Status:

Atyrau / Kazakhstan

Kazmunaigaz, Atyrau Oil Refinery LLC, Kazakhstan

All Mechanical manufacturing, installation and

construction works. Manufacturing of tubes,

manufacturing of steel structure etc.

Completed

Location:

Client:

Scope:

Status:

Atyrau / Kazakshtan

Sinopec Engineering - KazStroyService KSS

Fabrication and installation of various diameters

of pipes on the piperack, interconnection piping,

tank farm area piping.

Completed

1 million ton/year Four in one Furnace for ReformingExtraction Unit Field Installation and Construction Piping Works on the piperack

REFERENCE PROJECTS - OIL & GAS

Location:

Client:

Scope:

Status:

Northern Iraq

DNO / Norway

Engineering, Procurement and Construction of

Storage Tanks (total capacity 160,000 BPOD)

Completed

Location:

Client:

Scope:

Status:

Northern Iraq

DNO / Norway

Engineering, Procurement and Construction of

Temporary Oil Loading Stations

Completed

DNO / Fishkhabour Crude Oil Storage & Loading Facility Project

DNO / Fishkhabour Crude Oil Storage & Loading Facility Project

REFERENCE PROJECTS - OIL & GAS

Location:

Client:

Scope:

Status:

Northern Iraq

DNO / Norway

Construction of total 50 km flowlines, Mechanical

and E&I Completion of 100,000 BPOD CPF Unit,

4 Storage Tanks total of 35,000 BPOD capacity.

Completed

Location:

Client:

Scope:

Status:

Northern Iraq

DNO / Norway

Lump-Sum Turn-Key Contract inc. Engineering,

Construction, Installation. 45 Km Above Ground

Pipeline

Completed

DNO / Tawke Oil Field Development DNO / 45 Km Above Ground Pipeline Project

REFERENCE PROJECTS - OIL & GAS

Location:

Client:

Scope:

Status:

Northern Iraq

DNO / Norway

Lump-Sum Turn-Key Contract inc. Engineering,

Construction, Installation.

Completed

Location:

Client:

Scope:

Status:

Northern Iraq

DNO / Norway

Lump-Sum Turn-Key Contract inc. Refurbishment,

Mechanical Erection and E&I Completion and

Construction of Process Units.

Completed

DNO / Warehouse and Workshop Project DNO / Tawke Topping Plant Construction Project

REFERENCE PROJECTS - OIL & GAS

Location:

Client:

Scope:

Status:

Tawke Oil Field – Zakho/ Northern Iraq

DNO / Norway

LSTK 25 km Flowline – 25 km Right of Way and

Flowline construction Mechanical Works 25 km

Flowline Installation 2900 dia inch flowline pipe

welding Civil Work in mountainous area, Sleeper

manufacturing of 2550 Pieces Road and valley

crossings

Completed

DNO – Row & Flowline Project

REFERENCE PROJECTS - OIL & GAS

Location:

Client:

Scope:

Status:

Polatlı / Turkey

Air Liquide

Complete Turn-Key mechanical piping, electrical

works and insulation of the green field air

separation plant

Completed

Location:

Client:

Scope:

Status:

Nizhni Novgrod / Russia

Air Liquide

Supply, prefabrication and erection of piping

works, cryogenic liquid storage tanks, steel

structures and equipment installation.

Completed

Air Liquide Cryogenic Air Separation Plant Air Liquide Air Separation Plant

REFERENCE PROJECTS - AIR SEPARATION

Location:

Client:

Scope:

Status:

İzmir / Turkey

AIR LIQUIDE

LSTK

On - Going

Location:

Client:

Scope:

Status:

İskenderun / Turkey

Erenco / İsdemir

Complete Turn-Key installation of the 7th Air

Separation Unit including civil, structural steel,

piping, mechanical, E&I and insulation works.

Completed

Air Liquide Petkim Air Separation Unit Erenko / İsdemir Air Separation No 7

REFERENCE PROJECTS - AIR SEPARATION

Location:

Client:

Scope:

Status:

İskenderun / Turkey

Linde

LSTK

On - Going

Linde Air Separation Plant Unit 8

REFERENCE PROJECTS - AIR SEPARATION

Location:

Client:

Scope:

Status:

Moa / Cuba

Intecsa SA

Mechanical erection, piping, refractory lining,

electrical, instrumentation, insulation and painting

works for a 2.000 tpd sulphuric acid plant.

Completed

Location:

Client:

Scope:

Status:

Gördes / Turkey

Meta Nikel – Zorlu Group

Design, supply shop fabrication and field erection

of 24 ea Tanks, supply and installation of 1.000 tons

piping, 4.000 tons structural works.

Completed

Intecsa Moa Nickel / Sulphuric Acid PlantMeta Nikel - Zorlu Group Cobalt /

Nickel Refining Facility

REFERENCE PROJECTS - MINING

Location:

Client:

Scope:

Status:

Mardin / Turkey

ETI BAKIR

Process Equipment Fabrication and Erection works

On - Going

Location:

Client:

Scope:

Status:

Samsun / Turkey

ETI BAKIR

Process Equipment Fabrication and Erection works

Completed

Eti Bakır Mazıdağı Leach Plant Eti Bakır Acid and Smelting Plant Equipment

REFERENCE PROJECTS - MINING

Location:

Client:

Scope:

Status:

Aliağa Refinery / İzmir / Turkey

Tüpraş

LSTK design, supply and construction of total

60.000 m3 capacity petroleum storage tanks.

Completed

Location:

Client:

Scope:

Status:

Kırıkkale Refinery / Kırıkkale / Turkey

Tüpraş

LSTK design, supply and construction of MTBE

storage tanks.

Completed

Tüpraş 30.000 m3 Oil Storage Tank Farm Tüpraş 2 x 10.000 m3 MTBE Storage Tanks

REFERENCE PROJECTS - FIELD STORAGE TANKS

Location:

Client:

Scope:

Status:

Orhangazi / Turkey

Cargill

LSTK including, engineering, civil, structural steel,

equipment fabrication and erection, piping

electrical, instrumentation & insulation works.

Completed

Location:

Client:

Scope:

Status:

Adana / Turkey

Amylum / Tate&Lyle

Fabrication, mechanical erection , piping and

insulation works of over 200 tanks

Completed

Cargill Tuna Project / Glucose Plant Amylum / Tate & Lyle Corn Wet Mill Plant

REFERENCE PROJECTS - FOOD & BEVERAGE

Location:

Client:

Scope:

Status:

Orhangazi / Bursa / Turkey

Cargill

LSTK including, engineering, civil, structural steel,

equipment fabrication and erection, piping,

electrical, instrumentation & insulation works

Completed

Cargill Arda Starch Drier Project

REFERENCE PROJECTS - FOOD & BEVERAGE

Location:

Client:

Scope:

Status:

Adana / Turkey

SASA / Advansa

Complete mechanical erection and piping of a

green-field dimethyl terephtalic acid plant

Completed

Location:

Client:

Scope:

Status:

Bursa / Turkey

Korteks – Zorlu Group

Complete equipment fabrication, mechanical

erection and piping works of a continous

polymerization plant

Completed

SASA / Advansa DMT PlantKorteks - Zorlu Continuous Polymerization /

Spinning / Chips Plant

REFERENCE PROJECTS - OTHER INDUSTRIES

REFERENCE PROJECTS - OTHER INDUSTRIES

Location:

Client:

Scope:

Status:

Tekirdağ / Turkey

Modern Karton

Full installation of 300 meters length paper making

machine and interconnection piping.

Completed

Location:

Client:

Scope:

Status:

İskenderun / Turkey

İsdemir

Civil, mechanical and electrical installation

of 65.000 m3 gas holder tank, 3.000 meter gas

collecting duct system and interconnecting

piping.

Completed

Modern Karton Paper Machine 5 İsdemir Gas Holder Tank and Gas Collecting System

REFERENCE PROJECTS - OTHER INDUSTRIES

Location:

Client:

Scope:

Status:

Astana - Kazakhstan

CCC - ArabTech JV

Engineering, Procurement, Constrıction of Fuel Oil

and LPG systems.

On - Going

Kazakhstan Abu Dhabi Plaza