Mid-Run Assessment - ISD

S. Kaye, D. Gates

10 May 2006

Page 2: Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006

ISD Priorities: Co-Injection

Menard: Long pulse development at low density using EF correction coil

2   1 1 2

Maingi: Extension of enhanced H-mode through current profile and shape control

1   1 0.5 1

Gates: Long pulse double null development with rtEFIT 2 1 1 1 3

Kaye: Dependence of ELM severity and confinement on boundary shape

1   1 1 1

Kessel: Systematic Variation of the Front-End of Long Pulse Discharges

1   1 1 1

Kessel: Non-Solenoidal Ip Rampup 5   1.5 1 2

Soukhanovskii:

Divertor detachment in highly shaped long pulse LSN plasmas

0.5   2   0.5

Soukhanovskii:

Gas fueling efficiency and H-mode access with various gas jet injectors

0.5   2   0.5

Leuer: NSTX MIMO control collaboration 1   2 0.5 1

9 Total: 14 6 11R

eque

sted

Con

tinge

ncy

Prio

rity

Ass

igne

d

Nee

ded

Page 3: Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006

Progress on XP603 (2 x 0.5 run days) - Gates

• Attempted to achieve early H-mode by:– Divert earlier - failed PF1A problem– Larger Ip flat-spot, les dIp/dt - failed– Adjust early gas - failed– Requires higher early with PF3U/L (a few

more shots)

• Raised elongation to = 2.45 (maintained 119991) – Led to record 1MA pulse length (at the

time)

• After remaining adjustments made push wall conditions to improve confinement– He discharges, Li, B, - no bakeout

• Need field and current scan broaden operating space (see Fig.)

Plot showing improvement in pulse averaged and

pulse length with shaping over narrow range

(for 2006)

Page 4: Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006

XP526: Scans – Effect on Confinement & ELMs (Kaye)

• Initial attempt (1 day) unsuccessful– Facility, plasma issues

• Spent several hours on 5/2 to develop target– Successful

• Will attempt low--scan first, then high- -scan, then mid- -scan

Shot 120423

Page 5: Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006

XP602 run plan status (Menard)

Day 1 – 30 shots need to finish phase scan• Re-obtain long-pulse discharge at 4-4.5kG and IP = 0.8MA done

– Implemented rt-EFIT control of LSN long-pulse shots – took ½ day• Scan ramp-up density to determine MHD locking threshold started• Scan EFC amp & phase during locking scanned amp, not phase

Day 2 – 30 shots only have 2 shots at lower ne• If EFC enables lower ne operation, reduce ne again (12 shots)

– From May 5 data, lower ne delayed early H-mode, shot dev. required• Increase IP to 0.9, 1.0, 1.2MA (18 shots)

– Developed a 700kA target via XP614 – obtained info about optimal PNBI

Day 3 (1/2 day) – 15 shots Unlikely to get here this year• Obtain density flat-top in longest-pulse obtained with EFC at 0.8MA

• Scan Li deposition to achieve desired pumping for ne control (10 shots)• Increase fueling for constant line-average density = 3e19 m-3 (5

shots)

Page 6: Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006

XP602: Long-pulse development at reduced ne using EFC- Developed shot with 30% lower density early- q-min higher initially even w/ lower heating- EFC used during early phase of shot

Page 7: Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006

XP602: Long-pulse development at reduced ne using EFC

- Applying early EFC can increase early plasma rotation- Other shots (120336) show smaller increase

Predictive OHxTF EFC on by t=150ms EFC off

Page 8: Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006

Run plan wish-list

• Start and finish EFC phase scan– 8 shots

• Run @ lower ne multiple He-cond shots needed?– H-mode threshold strongly affected at lowest ne values– 8-15 shots

• Increase IP to 1, 1.2MA– Tested at 700 and 800kA so far– 5-10 shots

Page 9: Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006

XP627 Non-Solenoidal Ip Rampup (Kessel)

• Part A: HHFW (1/2 day)– Use k|| = 14 m-1 heating, run at Ip = 250 kA, utilize trip avoidance (power

reduction before voltage reaches trip limit)– Use k|| = 10 m-1 heating, co-CD, and cntr-CD, run Ip = 250 kA– Using best phasing result attempt OH clamp– For additional run time attempt lower Ip values (200, 150 kA) for both 14

and 10 m-1

• Part B: NBI (1/2 day)– At Ip = 600 kA, inject A @ 70 keV, inject B @ 70 keV, and inject A+B @ 70

keV– Repeat at Ip = 500 kA– Repeat at Ip = 400 kA– Repeat at Ip = 300 kA

– For additional run time try source C @ 70 keV, and sources A and B @ higher energy

Examine the replacement of inductive current by non-inductive current in the form of CD and bootstrap current from HHFW and NBI, to determine the efficiency of

these sources to rampup the plasma current

Page 10: Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006

Summary of XP627 Part A: HHFW

Part A of this XP were run for 1/2 day to examine the effectiveness of HHFW to replace inductive current and provide non-solenoidal plasma current rampup. The experiments used low plasma currents 250-350 kA, isoflux/rtEFIT control of the outer gap for antenna coupling, HHFW powers ranging from 1.2-1.7 MW, and HHFW heating phasing at 14 m-1. Initially there were difficulties getting the plasma control system to function at low Ip, but these were corrected, and reliable discharges were produced, but resulted in the loss of 1/4 day.

The HHFW system was choppy at first due to gap control oscillations and non-optimal matching, however, this improved significantly as the matching was tuned. The plasma did enter H-mode in several discharges, however, it did not stay in H-mode, which appears to be correlated to the HHFW power dropping out. The HHFW power required to enter the H-mode is lower than previously observed at these Ip values by about 1.5-2 times, and more work is required to understand the HHFW power and H-mode sustainment.

Page 11: Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006

More Run Time for XP627 Part A: HHFW

Lost 1/4 day did not allow the time necessary to get good matching with the antenna, this must be improved to provide longer steady HHFW power input

Expand power scan and power trajectory (step up in power) of HHFW to identify reliable entry into H-mode and sustainment of H-mode, including gap adjustments after plasma is in H-mode

Extend pulse lengths (to 700 ms) to get HHFW conditioning over long periods (HHFW on at 100 ms and off at 650 ms)

Keep plasma current LOW to (250 kA) to make HHFW heating effects strong, unless control issues force Ip to higher values

Try intermediate phasing at <k||> = 10 m-1 to see CD and heating effects

Have good starting discharge for this work, 120297, with reasonable HHFW antenna matching

Page 12: Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006

Summary of XP627 Part B: NBIPart B of this XP was run for ½ day, examining NBI into low Ip plasmas to establish database for non-solenoidal plasma current rampup. The plasma stored energies under a single NB source reached 120 kJ at 600 kA, 70-90 kJ at 500 kA, and 60 kJ at 400 kA. With 2 NB sources the plasma stored energy reaches 120 kJ at 600 kA, 120 kJ at 500 kA, and 80-90 kJ at 400 kA. With 3 NB sources at 500 kA, the stored energy was 120 kJ, indicating that source C is not well confined at these low Ip values.

The li values were 0.75-0.9 at 600 kA, 0.7-0.85 at 500 kA, and 0.85 at 400 kA. The lowest surface voltage was 0.1 V, although more typically across these discharges about 0.2 V. The density regularly exceeded the Greenwald density by about 50% due to the low plasma currents and strong NB fueling. Analysis of the NB characteristics with TRANSP will help to understand the trade-offs of NB confinement vs Ip, bootstrap and NBCD, and single and double source effects. The diminishing returns of NBI for non-solenoidal current rampup are becoming evident at 400 kA, although the easy transitions to H-mode are encouraging.

Page 13: Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006

More Run Time for XP627 Part B: NBI

Add source C @ 70 keV to the 2 NB source cases at all currents

Examine Ip = 300 kA to find the “cliff” for NB confinement, where it is no longer effective. So far the trend is smooth.

Begin NB injection into plasmas at low Ip with HHFW heating (Ip = 500-250 kA) to examine the parasitic absorption effects when Ip is low and the NB is poorly confined. This serves as the transition from the HHFW-only rampup phase to the HHFW+NBI phase

Page 14: Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006

Counter-Injection Campaign Priorities

Kaye:Overview and issues, Thermal confinement

trends 1   1 1 1.5

Akers: Ideas from across the ocean 0        

Bush: H-mode power threshold     1 0.5 1

Menard: J-profile modifications during ctr with early H-

mode startup 2   1 1 2

Lee: Assessment of the magnitude and direction of

ELMs with FIRETIP 1        

Darrow: Ctr-inj beam blips 0.5     0.5 1

West: Search for the QH-mode with ctr-inj and low

target density 1   1 1 1

Bernabei: HHFW operation with reversed fields 2   1   2

Soukhanovskii Edge and boundary characterization in

reversed Bt Bp plasmas 0.5   2   0.5

Stutman: Development of ctr-inj L-modes 1   2   1

Petty:Displacement of neutral beam ions by MHD

instabilities 2   2    